REFERENCE LIST KEAS Control Systems India Private Limited www.keascontrols.com SL NO CUSTOMER PROJECT DELIVERY REMARKS 204 External Electrification Dec - 2012 Supply , Erection, Testing and Commissioning of External Electrification for Substation at West Bengal 203 Electrical Package for Rawan wagon tippler, UltraTech Mar - 2012 Electrical Package for Rawan wagon tippler, UltraTech 202 Design, Engineering, supply of Electrical Package Mar - 2012 Design, Engineering, manufacturing, testing, inspection, painting of manufacturing works, packing, forwarding, supply , loading of plant electrical package and Mandatory Spares 201 Supply, Erection & Commissioning Mar - 2012 Supply, Unloading, Storage, watch & ward, Erection & Commissioning of Instrumentation Package 200 Supply for Cochin ShipYard Feb 2012 Supply of HMWPE Cables and TKD Cables 199 Rewiring of Residential Buildings Feb - 2012 Rewiring of Residential Buildings at DAE Township 198 DRDO Jan - 2012 Supply of PLC Based Beam on interlocking system for LINACS
Transcript

 REFERENCE LIST 

 

KEAS Control Systems India Private Limited www.keascontrols.com 

SL NO

CUSTOMER PROJECT DELIVERY REMARKS

204

External Electrification Dec - 2012 Supply , Erection, Testing and Commissioning of External Electrification for Substation at West Bengal

203

Electrical Package for Rawan wagon tippler, UltraTech

Mar - 2012 Electrical Package for Rawan wagon tippler, UltraTech

202

Design, Engineering, supply of Electrical Package

Mar - 2012 Design, Engineering, manufacturing, testing, inspection, painting of manufacturing works, packing, forwarding, supply , loading of plant electrical package and Mandatory Spares

201

Supply, Erection & Commissioning

Mar - 2012 Supply, Unloading, Storage, watch & ward, Erection & Commissioning of Instrumentation Package

200

Supply for Cochin ShipYard

Feb  ‐ 2012  Supply of HMWPE Cables and TKD Cables

199

Rewiring of Residential Buildings

Feb - 2012 Rewiring of Residential Buildings at DAE Township

198

DRDO Jan - 2012 Supply of PLC Based Beam on interlocking system for LINACS

 REFERENCE LIST 

 

KEAS Control Systems India Private Limited www.keascontrols.com 

 

SL NO

CUSTOMER PROJECT DELIVERY REMARKS

197

Supply for Titan Industries limited

Enduring  

Supply of Westec / Wago Products

196

Supply for Tamilnadu Newsprint and Papers Limited

Enduring  

Supply of EKD Drag Chain, Helaform Cable Trolley System and TKD Cables

195

Supply for Dynaspede Integrated Systems (P) Limited

Enduring  

Supply of Cables and Connectors

194

Earth Pits for GMR 20MW

Dec - 2011 Supply and Installation of Earth Pits for Solar Power Plant GMR 20 MW at Gujarat

193

Earth Pits for TATA 8MW

Dec - 2011 Supply and Installation of Earth Pits for Solar Power Plant TATA 8MW at Gujarat

192

Earth Pits for GMR 5MW

Dec - 2011 Supply and Installation of Earth Pits For Solar Power Plant GMR 5MW at Gujarat

191

Supply and Installation of cables & GI flats for solar plant TATA , Gujarat

Dec - 2011 Supply and Installation of 8MW Solar Plant I,E Cables (UV Resistant ) & G.I Strips Hot Dip Galvanized for Solar Power Plant TATA at Gujarat

 REFERENCE LIST 

 

KEAS Control Systems India Private Limited www.keascontrols.com 

SL NO

CUSTOMER PROJECT DELIVERY REMARKS

190

Electrical Erection & Commissioning for Solar Plant TATA

Dec - 2011 Erection and commissioning

189

Bharat Petroleum Corporation Limited – ongole

Dec - 2011 Drain Valve Close Position Indication at ongole

188

Bharat Petroleum Corporation Limited – Irugur

Dec - 2011 Drain Valve Close Position Indication at Irugur

187

Bharat Petroleum Corporation Limited - Irimpanam

Dec - 2011 Drain Valve Close Position Indication at Irimpanam

186

Supply of BMS Dec - 2011 Erection, Testing & Commisioning of BMS Software, DDC Controllers, Sensors & Field Devices, Cables & Conduits As Per Bill of Materials

185

Supply for Cordite Factory

Nov - 2011 Supply of VFD Panels with motors

184

Supply & Installation of BMS

Nov - 2011 Supply & Installation of BMS

 REFERENCE LIST 

 

KEAS Control Systems India Private Limited www.keascontrols.com 

SL NO

CUSTOMER PROJECT DELIVERY REMARKS

183

Electric Supply for Solar Plant TATA , Gujarat

Nov - 2011 Supply of Equipments / Materials For 8MW Solar Plant I.E Electrical Balance Of Plant (EBOP) & Auxiliary Power System for Solar Power Plant TATA at Gujarat

182

Supply & Installation of BMS

Nov - 2011 Supply & Installation of BMS

181

Design, supply, installation, testing & commissioning

Nov - 2011 Design, Engineering, supply, Erection, Testing and Commissioning of complete Electrical, Instrumentation & PLC – Automation System for INI stacker

180 Design, supply, installation, testing & commissioning

Nov - 2011 Design, Supply, Installation Testing and Commissioning of Structure Mounted Flameproof Type, OSO

179

Supply for Apollo Tyres Limited , Chennai

Oct - 2011 Supply of TKD make Cables

178

Eversandai ,trichy

Erection and Commissioning

Sep - 2011 Erection and Commissioning

177

Eversandai ,trichy

Supply cables and Main Distribution panels

Sep - 2011 Supply of cables, Supply of Main Distribution panels

 REFERENCE LIST 

 

KEAS Control Systems India Private Limited www.keascontrols.com 

SL NO

CUSTOMER PROJECT DELIVERY REMARKS

176

Supply for Kudankulam Nuclear Power Project

Aug - 2011 Supply and Installation of Copper Bus Bar

175 Design, supply, installation, testing & commissioning

Aug - 2011 Design, supply, installation, testing & commissioning of push button station outside dyke wall enclosure for tank movs and position indicators for drain valves located outside tank dyke wall at hyderabad terminal under apso

174 Design, supply, installation, testing & commissioning

Aug - 2011 Design, supply, installation, testing & commissioning of push button station outside dyke wall enclosure for tank movs and position indicators for drain valves located outside tank dyke wall at vijayawada terminal under apso

173 Design, supply, installation, testing & commissioning

Aug - 2011 Design, supply, installation, testing & commissioning of push button station outside dyke wall enclosure for tank movs and position indicators for drain valves located outside tank dyke wall at rajahmundry terminal under apso

172 Design, supply, installation, testing & commissioning

Aug - 2011 Design, supply, installation, testing & commissioning of push button station outside dyke wall enclosure for tank movs and position indicators for drain valves located outside tank dyke wall at vizag terminal under apso

 REFERENCE LIST 

 

KEAS Control Systems India Private Limited www.keascontrols.com 

SL NO

CUSTOMER PROJECT DELIVERY REMARKS

171 Design, supply, installation, testing & commissioning

Aug - 2011 Design, supply, installation, testing & commissioning of push button station outside dyke wall enclosure for tank movs and position indicators for drain valves located outside tank dyke wall at kakinada terminal under

170 Design, supply, installation, testing & commissioning

Aug - 2011 Design, supply, installation, testing & commissioning of push button station outside dyke wall enclosure for tank movs and position indicators for drain valves located outside tank dyke wall at ramagundam depot under apso

169 Design, supply, installation, testing & commissioning

Aug - 2011 Design, supply, installation, testing & commissioning of position indicator for drain valves located outside tank dyke wall at kadapa depot

168 Design, supply, installation, testing & commissioning

Aug - 2011 Design, supply, installation, testing & commissioning of position indicator for drain valves located outside tank dyke wall at guntakal depot

167 Design, supply, installation, testing & commissioning

Aug - 2011 Design, supply, installation, testing & commissioning of position indicator for drain valves located outside tank dyke wall at ongole depot

 REFERENCE LIST 

 

KEAS Control Systems India Private Limited www.keascontrols.com 

SL NO

CUSTOMER PROJECT DELIVERY REMARKS

166 Design, supply, installation, testing & commissioning

Aug - 2011 Design, supply, installation, testing & commissioning of position indicator for drain valves located outside tank dyke wall at vizag fhi

165 Design, supply, installation, testing & commissioning

Aug - 2011 Supply, Installation, Testing & Commissioning Of Standalone Pc Based Hmi Software For Remote Controlling / Monitoring Of Exisiting Movs Through Rotork Mov Master Station At Vijayawada Terminal

164 Design, supply, installation, testing & commissioning

Aug - 2011 Provision of Dyke drain valve position indicator at terminals/depots of OSO, Paradeep terminal, Bhubaneswar (jatini) depot Balasore depot Sambalpur depot Rourkela depot

163 Design, supply, installation, testing & commissioning

Aug - 2011 Provision of push buttons outside dyke walls for tank MOVs - Paradeep terminal

162 Coke and fluoride handling system for Aditya and Mahan Aluminum plants

Aug- 2011

Design, supply, installation and commissioning of instrumentation, electrical and control systems

 

SL NO

161

160

159

158

157

156

155

CUST

KEAS

OMER

REFE

S Control Systwww.ke

Internal work

TATA PBOKAR

Electricathe ServVarious Chennai

ESL & E

Electrifi

AutomatDehydra

Erection

 ERENCE LIS

tems India Preascontrols.c

PROJECT

Electrification

PROJECT-RO STEEL PLA

al Arrangemenice Buildings aLocation in

i

ECC Buildings

cation work

tion for Gas ation package

n work

ST 

rivate Limitedcom 

DEL

n July -

ANT July -

nts to at

July -

s July -

June -

April

Mar -

LIVERY

2011 EleSIS

2011 DeEnEleInsAuforPr

2011 SuElean

2011 ReElein Bu

- 2011 EleIWSuSpElewaPla

- 2011 DeSutescompro

2011 Su132con

REMARKS

ectrification ofSCO Bay – Tri

esign and ngineering of ectrical, strumentation utomation packr HMDS Bokaroject

upply and Erecectrical Producd Wiring

efurbishment oectrical InstalESL & ECC

uildings

ectrification ofWMUST plantsupply of Electripares and AMCectrical Systemaste managemeants esign, Engineerupply, Manufacsting and mmissioning oocess control s

upply and erect2kV switchyarntrol station

S

f ichy

and kage ro

ction cts

of lation

f s, ical

C for m to ent

ring, cture,

f system

tion of rd and

 REFERENCE LIST 

 

KEAS Control Systems India Private Limited www.keascontrols.com 

SL NO

CUSTOMER PROJECT DELIVERY REMARKS

154 Services and testing of high pressure valves.

Jan- 2011 Servicing & Testing Of Valves for ONGC Karaikal

153

Revamping of Electrical and Instrumentation / FPSO BROTOJOYO

Jan - 2011 Supply and Erection of Electrical, Instrumentation and Control System

152

Electrification of DAE – UGC – CSR Building

Jan - 2011 Design Manufacturing, Supply, Installation, Testing, and Commissioning of Electrical systems.

151

Revamping of Electrical and Instrumentation / FPSO BROTOJOYO

Dec - 2010 Design, Engineering, Manufacture, Supply, Erection, Install and Commissioning of Heat Tracing

150

Revamping of Electrical and Instrumentation / FPSO BROTOJOYO

Dec - 2010 Design, Engineering, Manufacture, Supply, Erection, Install and Commissioning of Fire Alarm Panel

149

Revamping of Electrical and Instrumentation / FPSO BROTOJOYO

Dec - 2010 Design, Engineering, Manufacture, Supply, Erection, Install and Commissioning of Electric Control System and DCS System

148

Revamping of Electrical and Instrumentation / FPSO BROTOJOYO

Dec - 2010 Design, Engineering, Manufacture, Supply, Erection, Install and Commissioning of E-House and Instrumentation

 REFERENCE LIST 

 

KEAS Control Systems India Private Limited www.keascontrols.com 

SL NO

CUSTOMER PROJECT DELIVERY REMARKS

147

Electrical and Automation Panel

Nov - 2010 Design, Engineering, Manufacture, Supply and Commissioning of MMC cum VFD Panels, UPS, JUNCTION Boxes and PLC Panels

146

Building Management Systems

Nov - 2010 Supply and Installation of BMS

145

Automation System for Air Conditioning Equipments

Nov - 2010 Design, Manufacture, Supply, Installation, Testing , Commissioning and Training of Automation System.

144

Electrical System for RECLAIMER

Nov - 2010

Design, Engineering, Supply, Erection and Commissioning of Electrical System.

143

Control System Upgradation for EAF – III Project

Nov - 2010 Design, Supply, Erection, Testing, Commissioning of PLC based Control System

142

Electrical and Control systems for Wagon Tippler and Side Arm Charger ( Vedanta Aluminum Limited, Orissa )

Oct - 2010 Design, Engineering, Supply, Erection and Commissioning of Electrical and Control systems.

141

Electrical and Control systems for Wagon Tippler and Side Arm Charger ( Bellary Thermal Power Station, Karnataka Power Corporation )

Oct - 2010 Design, Engineering, Supply, Erection and Commissioning of Electrical and Control systems.

 REFERENCE LIST 

 

KEAS Control Systems India Private Limited www.keascontrols.com 

SL NO

CUSTOMER PROJECT DELIVERY REMARKS

140

Electrical and Control systems for Stacker & Reclaimer ( Bellary Thermal Power Station, Karnataka Power Corporation )

Oct 2010 Design, Engineering, Supply, Erection and Commissioning of Electrical and Control systems.

139

Sub-Station 8 at DAE Township

Sep - 2010 Supply, Installation, Testing & Commissioning of LT Switch board & Bus duct for Sub‐Station 8  at  DAE Township

138

6th Oxidizer Line at Cristal Pigment Plant

Sep - 2010 Detail Design Engineering, PDMS Modeling of Mechanical and Piping.

137

Control System for Nitrogen Package

Sep - 2010 Design, Engineering and Commissioning of PLC and Power Distributed Panels

136

Electrical Works at LOBS Project Site

Aug 2010 Supply, Installation, Testing & Commissioning of LT Switchgears ( Excluding Supply ), Cabling, Lighting etc at LOBS Project Site

135

PLC Based Control System for Fuel Recovery System

Jul - 2010 Design, Engineering and Commissioning for PLC, MCC and VFD Systems

134

ROC Plant

Jun - 2010

Design and Detail Engineering of Electrical, Instrumentation and control system

 REFERENCE LIST 

 

KEAS Control Systems India Private Limited www.keascontrols.com 

SL NO

CUSTOMER PROJECT DELIVERY REMARKS

133

Electrical and Automation Panel

Apr - 2010 Design, Engineering, Manufacture, Supply and Commissioning of MMC cum VFD Panels, UPS, JUNCTION Boxes and PLC Panels.

132

OGIP IK WELLHEAD PLATFORM

Apr - 2010 Site survey, design and detail engineering for modification of Existing E-House with deck extension

131

OGIP SD WELLHEAD PLATFORM

Mar - 2010 Design, detail engineering, commissioning supervision and Factory Acceptance Testing of new E-House

130

GOHDS REVAMP PROJECT AT MRPL

Mar - 2010

Supply and Installation of Electrical & Instrumentation work

129

B193 – Detailed Engineering

Feb - 2010 Pre-Bid Engineering support

128

D1 Development Project

Feb - 2010 Pre-Bid Engineering support

127

Tank Level and Temperature Measurement System

Jan - 2010 Design, Engineering, Commissioning and Supply of Instrumentation and PLC Panel

 REFERENCE LIST 

 

KEAS Control Systems India Private Limited www.keascontrols.com 

SL NO

CUSTOMER PROJECT DELIVERY REMARKS

126

B193 Process Platform

Jan - 2010 Pre-Bid Engineering support

125

PLC System

Jan - 2010

Supply, Installation, Commissioning and Testing of PLC system

124

Electrification of Modified Hall

Jan - 2010

Electrical Works

123

Drive Panels for Printing Machines - 47 Nos.

Dec - 2009

Manufacturing and Supply

122

Compression Test Bed Facility at SIEMENS, Vadodara

Dec - 2009

SITC of Electrical and Instrumentation Package

121

HRDC Building

Dec - 2009

Electrical Works

120

, KKNPP

Starter Panel

Nov - 2009

Manufacture, and Supply of Stater Panel

 REFERENCE LIST 

 

KEAS Control Systems India Private Limited www.keascontrols.com 

SL NO

CUSTOMER PROJECT DELIVERY REMARKS

119

,KKNPP

Copper Bus Bar

Nov- 2009

Supply,Fabrication & Installation of Copper Bus Bar

118

Electrical System for Wagon Tippler

Nov - 2009

Design, Engineering, Supply, Erection and Commissioning of Electrical Systems.

117

, DAE , KALPAKKAM

Power Control Center

Nov - 2009

Manufacture,Supply,Erection, Commissioning and Testing of Control panel

116

Electrical and Control systems for Stacker & Reclaimer (Paradeep project of ESSAR STEEL)

Nov - 2009

Design, Engineering, Supply, Erection and Commissioning of Electrical and Control systems.

115

6WPP Well Head Platform

Oct - 2009 Pre-Bid Engineering support

114

Orient Cement Plant

Oct - 2009

Manufacture and supply of MCC Panel

113

Orient Cement Plant

Oct - 2009

Manufacture and supply of Control desk

 REFERENCE LIST 

 

KEAS Control Systems India Private Limited www.keascontrols.com 

SL NO

CUSTOMER PROJECT DELIVERY REMARKS

112

Automatic Cotton Feeding System

Oct - 2009

Design, Engineering and Supply of PLC System

111 INS KATTABOMMAN

Modification of compressor control system

Sep - 2009

Manufacture and supply of compressor control system

110 EXCEL TEXTRONICS

VFD Panel

Aug - 2009

Manufacture and Supply of VFD Panel.

109

Drive Panel

Aug - 2009

Manufacture and Supply of Drive Panel.

108

B-193 Well head

Aug - 2009

Pre-Bid Engineering support

107

Automation for 10 MW Bio Mass Power plant

Jun - 2009

Design , Engineering, Supply, Erection and Commissioning of DCS system

106

Fertilizer &Chemical Plant

May -2009

Design and Detail Engineering & supply of PLC control system

 REFERENCE LIST 

 

KEAS Control Systems India Private Limited www.keascontrols.com 

SL NO

CUSTOMER PROJECT DELIVERY REMARKS

105

OGIP IB WELLHEAD PLATFORM

Apr - 2009 Site survey, design and detail engineering for modification of Existing E-House with deck extension

104

OGIP SR WELLHEAD PLATFORM

Apr - 2009 Design, detail engineering, commissioning supervision and Factory Acceptance Testing of new E-House

103

OGIP NH WELLHEAD PLATFORM

Apr - 2009 Design, detail engineering, commissioning supervision and Factory Acceptance Testing of new E-House

102

Electrical and Control systems for Paddle Feeder. (Santaldih Thermal Power plant)

Apr- 2009

Design, Engineering, Supply, Erection and Commissioning of Electrical and Control systems.

101

Automation for Amine Sweetening Plant

Apr - 2009

Design , Engineering, Supply, Manufacture, testing and Commissioning of Process control system and process shutdown system

100

OGIP RS2 WELLHEAD PLATFORM

Mar - 2009 Site survey, design and detail engineering for modification of Existing E-House with deck extension

99

OGIP SE WELLHEAD PLATFORM

Mar - 2009 Design, detail engineering, commissioning supervision and Factory Acceptance Testing of new E-House

 REFERENCE LIST 

 

KEAS Control Systems India Private Limited www.keascontrols.com 

SL NO

CUSTOMER PROJECT DELIVERY REMARKS

98

OGIP N4 WELLHEAD PLATFORM

Mar - 2009 Design, detail engineering, commissioning supervision and Factory Acceptance Testing of new E-House

97

OGIP NJ WELLHEAD PLATFORM

Mar - 2009 Design, detail engineering, commissioning supervision and Factory Acceptance Testing of new E-House

96

OGIP NV WELLHEAD PLATFORM

Mar - 2009 Design, detail engineering, commissioning supervision and Factory Acceptance Testing of new E-House

95

OGIP SP WELLHEAD PLATFORM

Mar - 2009 Design, detail engineering, commissioning supervision and Factory Acceptance Testing of new E-House

94

OGIP NM WELLHEAD PLATFORM

Mar - 2009 Design, detail engineering, commissioning supervision and Factory Acceptance Testing of new E-House

93

OGIP SB WELLHEAD PLATFORM

Mar - 2009 Design, detail engineering, commissioning supervision and Factory Acceptance Testing of new E-House

92

OGIP IF WELLHEAD PLATFORM

Mar - 2009 Site survey, design and detail engineering for modification of Existing E-House with deck extension

 REFERENCE LIST 

 

KEAS Control Systems India Private Limited www.keascontrols.com 

SL NO

CUSTOMER PROJECT DELIVERY REMARKS

91

Electrical Distribution system with DG sets

Mar- 2009

Design, Engineering, Supply, Erection and Commissioning of Electrical distribution systems and DG sets.

90

Unit - 400

Mar- 2009

Design and Detail Engineering of Electrical, Instrumentation and control system

89

OGIP RS11 WELLHEAD PLATFORM

Feb - 2009 Site survey, design and detail engineering for modification of Existing E-House with deck extension

88

OGIP NO WELLHEAD PLATFORM

Feb - 2009 Design, detail engineering, commissioning supervision and Factory Acceptance Testing of new E-House

87

OGIP NW WELLHEAD PLATFORM

Feb - 2009 Design, detail engineering, commissioning supervision and Factory Acceptance Testing of new E-House

86

OGIP SS WELLHEAD PLATFORM

Feb - 2009 Design, detail engineering, commissioning supervision and Factory Acceptance Testing of new E-House

85

OGIP SJ WELLHEAD PLATFORM

Feb - 2009 Design, detail engineering, commissioning supervision and Factory Acceptance Testing of new E-House

 REFERENCE LIST 

 

KEAS Control Systems India Private Limited www.keascontrols.com 

SL NO

CUSTOMER PROJECT DELIVERY REMARKS

84

OGIP SN WELLHEAD PLATFORM

Feb - 2009 Design, detail engineering, commissioning supervision and Factory Acceptance Testing of new E-House

83

OGIP IG WELLHEAD PLATFORM

Feb - 2009 Site survey, design and detail engineering for modification of Existing E-House with deck extension

82

OGIP IA WELLHEAD PLATFORM

Feb - 2009 Site survey, design and detail engineering for modification of Existing E-House with deck extension

81 JEYA VISHNU TEX PROCESSORS PVT LTD

PLC based water level control panel

Feb - 2009

Manufacture and Supply of PLC Control Panel.

80

Automation for Sinter Plant

Feb - 2009

Design , Engineering , Erection and Commissioning of PLC system

79

OGIP SY WELLHEAD PLATFORM

Jan - 2009 Design, detail engineering, commissioning supervision and Factory Acceptance Testing of new E-House

78

OGIP SM WELLHEAD PLATFORM

Jan - 2009 Design, detail engineering, commissioning supervision and Factory Acceptance Testing of new E-House

 REFERENCE LIST 

 

KEAS Control Systems India Private Limited www.keascontrols.com 

SL NO

CUSTOMER PROJECT DELIVERY REMARKS

77

OGIP N8 WELLHEAD PLATFORM

Jan - 2009 Design, detail engineering, commissioning supervision and Factory Acceptance Testing of new E-House

76

OGIP N9 WELLHEAD PLATFORM

Jan - 2009 Design, detail engineering, commissioning supervision and Factory Acceptance Testing of new E-House

75

Drive Panels for Printing Machines – 21 Nos.

Jan - 2009

Manufacturing and Supply

74

Drive Panels for process Pumps

Jan - 2009

Design ,Engineering , Installation, Erection and Commissioning

73

MHN Process Platform

Dec- 2008

Pre-Bid Engineering support

72

6th Chlorinator

Dec - 2008

Design and Detail Engineering of Electrical, Instrumentation and control system

71

Automatic cotton feeding system

May - 2008

Design, Engineering , Installation, Erection and Commissioning

 REFERENCE LIST 

 

KEAS Control Systems India Private Limited www.keascontrols.com 

SL NO

CUSTOMER PROJECT DELIVERY REMARKS

70

Digital Counting system for Castings

May-2008

Design, Engineering , Installation, Erection and Commissioning

69

Automation of Cup Cake Machine

Mar-2008

Design, Engineering , Installation, Erection and Commissioning

68 GLOBAL CONVEYOR

Automation of Material Handling System

Feb-2008

Design, Engineering , Installation, Erection and Commissioning

67

Automatic cotton feeding system

Feb-2008

Design, Engineering , Installation, Erection and Commissioning of PLC System

66

Design and Detail Engineering of ONGC - OGIP Power to ESP

Jan-2008/ Mar-09

Design and Detail Engineering for Offshore Grid interconnectivity Project comprising of Electrical Instrumentation, Structural modification Telecommunication, Catholic Production, JTube Design, SCADA System etc.,

65

Control Panel for Ready-mix Concrete preparation plant

Nov-2007

Design, Engineering , Installation, Erection and Commissioning of PLC System

64

Automatic cotton feeding system

Aug-2007

Design, Engineering , Installation, Erection and Commissioning of PLC System

 REFERENCE LIST 

 

KEAS Control Systems India Private Limited www.keascontrols.com 

SL NO

CUSTOMER PROJECT DELIVERY REMARKS

63

Automatic cotton feeding system

July-2007

Design ,Engineering , Installation, Erection and Commissioning of PLC System

62

G.KUPPUSWAMYNAIDU MEMORIALHOSPITAL

Automation control panel for chillers p/c and plant room equipments

July-2007

Design ,Engineering , Installation, Erection and Commissioning of PLC System

61

2.5MW Captive Power Plant

July-2007

Design , Engineering , Erection and Commissioning of DCS

60

10MW Bio-Mass Power Plant

July-2007

Design , Engineering , Erection and Commissioning of DCS

59

3 MW Captive Power Plant

May-2007

Design , Engineering , Erection and Commissioning of DCS

58

SAXI – TEG regeneration package

June-2007

Design and Engineering of Gas Dehydration and TEG Regeneration System (160 MMscfd, 22 USgpm (99.8% wt TEG conc.)

57

PURE GROUP -Modec TEG Package

June-2007

13.28 MMscfd, Fuel Gas conditioning for Gas Turbine Generator

 REFERENCE LIST 

 

KEAS Control Systems India Private Limited www.keascontrols.com 

SL NO

CUSTOMER PROJECT DELIVERY REMARKS

56

FRADE FPSO – TEG regeneration package

June-2007

Design and Engineering of Gas Dehydration and TEG Regeneration System

55

SBM / CHEVRON -FRADE FPSO Desander and Sand Jetting water feed pump package

June-2007

Design & Enginnering of sand removal system

54

PETROBRAS-GENERIC FPSO GAS

Aug-2007

Detailed engineering of Flare and Drain Module,Water Injection Module and Gas dehydration/Fuel gas module.

53

SRKP Field Development – TSIOC/Modec

Aug-2007

FPSO Topsides Basic design and Engineering - production and treatment of 25,000 BOPD

52

SHELL BC-10 FPSO-TEG Package

June-2007

Design and Engineering of Gas Dehydration and TEG Regeneration System(45 MMscfd,11USgpm (99.78% wt TEG conc.)

51

RAS GAS OFFSHORE EXPANSION PROJECT PH-2

Apr-2007

Design engineering of condensate and water strainers (Basket strainers)

50

ARMADA PEKASHA FPSO

Feb-2007

Existing system review and design

 REFERENCE LIST 

 

KEAS Control Systems India Private Limited www.keascontrols.com 

SL NO

CUSTOMER PROJECT DELIVERY REMARKS

49

PETROBRAS- FPSO OPPORTUNITY OIL

Jan-2007

Gas comp capacity of 3,500k m3/day and De-sulphated water inj capacity of 22k m3/day.

48

SBM Saxi Bataque TEG Package

Dec-2006

Design and Engage of Gas Dehydration and TEG Regen Sys (160 MMscfd, 22 USgpm (99.8% wt TEG conc.)

47

SBM/Chevron- FRADE FPSO – Gas Dehydration and TEG Regeneration package

Dec-2006

Design and Engineering of Gas Dehydration and TEG Regen Sys (116.6 MMscfd, 18 USgpm (99.5% wt TEG conc.)

46

PETROBRAS- FPSO OPPORTUNITY OIL

Sep-2006

FPSO Topsides design Engg & (Bidsupport)prodandtreatment of 16k m3/day, Gas comp capacity of 3,500k m3/day & De-sulphated water inj capacity of 22km3/day

45

KIZOMBA- C FPSO MONDO

Sep-2006

Design and Engineering of Gas Dehydration and TEG Regeneration System

44

Premier Oil MERU Project

July-2006

Design, Review and Optimization of Marine Energy Resource Unit (MERU)

43

POLVO-FPSO – COTP 500BPD

May-2006

Design, Review and Optimization of Crude Oil Topping Plant (COTP)

 REFERENCE LIST 

 

KEAS Control Systems India Private Limited www.keascontrols.com 

SL NO

CUSTOMER PROJECT DELIVERY REMARKS

42 Global Techno Systems Engineering

EPCC for MOGA and Transit Line

Mar-2006

Produced water treatment system

41

MODEC INTERNATIONAL LLC / PETROBRAS PRA-1 FSO Project- Fuel Gas Skid Package

Feb -2006

13.28 MMscfd, Fuel Gas conditioning for Gas Turbine Generator

40

SHELL(SSB)- F13 Glycol Dehydration package

Mar-2006

720 MMSCFD gas flow/ 132 USgpm (98.8% wt Glycol concentration)

39

Ujung Pangkah Development Project Gas Dehydration and TEG Regeneration Package

July-2006

148.8 MMSCFD gas flow/ 30USgpm (98.98% wt Glycol concentration)

38 TESMA/Singapore

PETROCHINA-TBA/TBC- Field Development

April-2006

FPSO Topside Process and Utilities

37 JORD International

PTTEP Arthit Field Development Central Facilities

Nov-2005

HP Production Separator Sand Jet Design case

36

COOEC

HZ21-1 Development Project

Aug-2005

Commissioning services

 REFERENCE LIST 

 

KEAS Control Systems India Private Limited www.keascontrols.com 

SL NO

CUSTOMER PROJECT DELIVERY REMARKS

35

Capixaba FPSO of IHCGUSTO/SBM For Petrobras/Brazil

July-2005

Separators Design Assistance

34

SUMANDAK Processing Platform –B of Petronas Cargali Sdn. Bhd./Malaysia

Dec-2005

FEED for gas Processing Facility

33

FPSO Kikeh-Murphy Sabah Oil.Ltd. - Chemical Injection Package

Nov-2005

Chemical Injection System

32

FPSO Kikeh-Murphy Sabah Oil.Ltd.- Nitrogen Generator Package and Nitrogen Intensifier

Nov-2005

Membrane Technology, N2 purity 95%, 100 Nm3/hr

31

FPSO Kikeh-Murphy Sabah Oil.Ltd.- Gas Dehydration And TEG Regeneration Package

Nov-2005

141 MMscfd / 19 USgpm( 99.8% Wt Glycol Concentration)

30 CACT OG, China.

Feasibility Study for Marginal Field Development

Dec-2005

Feasibility Study

29

Panyu 4-2/5-1 Well head Platform Modifications.

Sep-2005

Pre-Commissioning and Commissioning Procedure & IOM

 REFERENCE LIST 

 

KEAS Control Systems India Private Limited www.keascontrols.com 

SL NO

CUSTOMER PROJECT DELIVERY REMARKS

28

OKUME TLP – Modec International

May-2005

Methanol Injection System

27

OKUME TLP – Modec International

May-2005

Methanol Injection System

26

OKUME TLP – Modec International

May-2005

Chemical Injection System

25

OKUME TLP – Modec International

May-2005

Chemical Injection System

24

SUMANDAK Processing Platform –B of Petronas Cargali Sdn. Bhd./Malaysia

May-2005

Sea Water Treatment And Deaeration- Conceptual Design

23

Rong Doi Field Development/Vietnam For Korean National Oil Corporation

June-2005

201 MMscfd / 18 USgpm( 99.0% Wt Glycol Concentration)

22

Capixaba FPSO of IHCGUSTO/SBM For Petrobras/Brazil

May-2005

121 MMscfd / 7.5 USgpm( 99.5% Wt Glycol Concentration)

 REFERENCE LIST 

 

KEAS Control Systems India Private Limited www.keascontrols.com 

SL NO

CUSTOMER PROJECT DELIVERY REMARKS

21

PC Myanmar (Hong Kong) Ltd

FEED

Mar-2005

Pipeline Heaters

20

Back Processing Facility Block 51

Nov-2004

On Shore Processing Facility, Tank Form, Utilities Etc.

19

D1 WWIP

Sep-2004

Fine Filters Package

18

Sumatec Corporation Sdn.Bhd

Rehmat Gas Processing Facilities/Bid Support

June-2003

2 x 62 MMscfd / 10 gpm

17

/NanHaiwest

FPSO (Hai Yang She You 111) Debottlenecking Project

June-2004

FPSO Capacity Upgrade Studies

16

PCSB –Fuel Gas Package- Bid Support

May-2004

Fuel Gas Package

15

BR-E CO2 Topsides Talisman Malaysia Limited

Dec-2004

Condensate Stabilization And Flash Gas Recovery

 REFERENCE LIST 

 

KEAS Control Systems India Private Limited www.keascontrols.com 

SL NO

CUSTOMER PROJECT DELIVERY REMARKS

14

Basis and Detailed Engineering of BAOBAB FPSO Gas Processing Module

May-2004

Gas Dehydration, Gas Hydrocarbon Dew point Control, Gas Metering

13

Basis and Detailed Engineering of BAOBAB FPSO Separation Packages – 4 Skids

May-2004

RVP, BS&W, OIL IN WATER

12

Gas Dehydration And TEG Regeneration Facility -Venezuela

July-2003

2 x 17 MMscfd / 3.4 gpm

11 CPOC/Thailand

CO2 Removal Facility/Bid Support

June-2003

468 MMscfd, CO2 Mole frac.0.4335

10

Training for IBA / EXXON Mobil - Gas Dehydration And TEG Regeneration System/Bid Support

April/May 2003

Training – Operators and Engineers

9 Prai Power Sdn.Bhd.

TENAGA NAZAR - Trouble Shooting/ (350MW Combine cycle gas turbine project Prani, Pulau Pinang .Malaysia)

Feb-2003

Trouble shooting of Diesel Handling System

8

Salman Oil & Gas Field, Gas Dehydration And TEG Regeneration System

July-2003

2 x 300 MMscfd / 55 GPM

 REFERENCE LIST 

 

KEAS Control Systems India Private Limited www.keascontrols.com 

SL NO

CUSTOMER PROJECT DELIVERY REMARKS

7

KINARUT Development - ERB West Tie - in

May-2003

150 MMscfd / 6 GPM

6

MISC - FPSO Project- Gas Dehydration System

May-2003

60 MMscfd / 14 GPM

5

BOABAB Field Development-FPSO Topsides / CNR International (Côte d' Ivoire) S.A.R.L.- Bid Support

Nov-2003

90,000 BPD with 78% Water Cut/ 64 MMscfd/ 9 GPM

4

Espadarte FPSO Brazil - Trouble Shooting of Gas Dehydration Facility

Dec-2003

100 MMscfd

3 General Electric/

Turbine Encloser Structural General Arrangement

Dec-2003

Engineering Support

2

OKUME & OVENG Field's - FPSO Topsides Triton Eqaterial Quinea Inc./Bid Support

Oct-2003

230,000 BPD with 60% Water cut. Gas Flow Rate 70 MMscfd

1 Santa Fe Energy Resources Of China,Ltd. / China Offshore Oil Nanhai West Corporation

Process Design Engineering of PANYU FPSO Topsides

May-2002

220,000 BPD with 0-90% Water Cut, Highly Waxy, High Dew point


Recommended