+ All Categories
Home > Education > {LIKE} 3rd PM PPT

{LIKE} 3rd PM PPT

Date post: 12-Jan-2015
Category:
Upload: like
View: 52 times
Download: 0 times
Share this document with a friend
Description:
 
Popular Tags:
40
517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP Learning through Innovative management concepts to ensure transfer of Knowledge of Elderly people” – LIKE 3rd Project Meeting Santander, 26 th -27 th November 2012 Dimitris Raftopoulos - Project Coordinator
Transcript
Page 1: {LIKE} 3rd PM PPT

517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP

“Learning through Innovative management concepts to ensure transfer of Knowledge of Elderly people” – LIKE

3rd Project MeetingSantander, 26th-27th November 2012

Dimitris Raftopoulos - Project Coordinator

Page 2: {LIKE} 3rd PM PPT

517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP

Meeting Agenda• Overall Status Update

• WP.1: Project Management

• WP.3: Developing Business Concepts for Age Management & Investment in the HR Sector

• WP.5: Quality Assurance

• WP.6: Awareness raising activities

• WP.7: Dissemination of results

• Next Steps

Page 3: {LIKE} 3rd PM PPT

517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP

Page 4: {LIKE} 3rd PM PPT

517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP

Projects’ Action Plan• Implementation Methodology – PMI Project Life Cycle

• WP1 - Project Management | Lead: 3LRI• WP2 - Defining Ageing and Employment Trends in EU | Lead: University

of Social Sciences• WP3 - Developing Business Concepts for Age Management & Investment

in the HR sector | Lead: UoS• WP4 - Pilot Projects | Lead: FU-Uppsala• WP5 - Quality Assurance | Lead: 3LRI • WP6 - Awareness raising activities | Lead: Documenta• WP7 - Dissemination of Results | Lead: 3LRI• WP8 - Mainstreaming and results exploitation | Lead: 3LRI

Page 5: {LIKE} 3rd PM PPT

517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP

WP.1 Project Management1.2 Web-based system

1.4 Progress reports & List of Indicators

Page 6: {LIKE} 3rd PM PPT

517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP

WP.3: Developing Business Concepts for Age Management & Investment in the HR SectorUniversity of Strathclyde

Page 7: {LIKE} 3rd PM PPT

517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP

WP.3: Developing Business Concepts for Age Management & Investment in the HR Sector• 3.1 Designing model for

enterprises on age management: Uni. of Strathclyde

• 3.2 Guide for management optimisation performance: Uni. Of Social Sciences

• 3.3 Development of measurable performance indicators: FU-Uppsala

• 3.4 Analysis of older workforce work traits: Documenta

Page 8: {LIKE} 3rd PM PPT

517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP

WP.3-Act.3.1-3.2Activity 3.1: Designing model for enterprises on age management

• Focus on the development of innovative business concepts related to age management processes. To this end, a studywill be conducted to design a model for enterprises on introducing age management concepts, flexible workingarrangements and succession management, using the finding of the report already elaborated in WP2.

• Duration: M15, 1 month

• Budget: 13.627,00€

• The 40 pages report will be firstly available in English and in electronic version and then translated in Greek, Spanish, Polish and Swedish

Activity 3.2: Guide for management optimisation performance• The above guide will cross examine the management systems currently deployed in the companies of the EU with

those suggested in the first action of WP3 and will lead to the development of a methodological guide which willpoint what actions need to be taken in order to optimize the performance of management systems used in the EUmarket.

• Duration: M17, 1 month

• Budget: 2.674,00€

• The 40 pages report will be available in English

Page 9: {LIKE} 3rd PM PPT

517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP

WP.3-Act.3.3-3.4Activity 3.3: Development of measurable performance indicators

• In order to examine the effectiveness of the proposed systems, a guide will be elaborated stating the measurableperformance indicators that are needed in order to estimate the effectiveness of the management concepts. This willoffer the opportunity for perfective maintenance actions as well as identification of further needed actions that needto be taken.

• Duration: M19, 1 month

• Budget: 7.797,00€

• The 40 pages report will be available in English

Activity 3.4: Analysis of older workforce work traits• An analysis of the work traits of the aged workforce (strengths and weaknesses) will be conducted in order to

identify the EU labour market employment opportunities for the aged workforce. The SWOT analysis will beconducted under the perspective of the “new skills for new jobs report”, thus the findings of it will point the set ofquestions needed to be asked so to start transforming older workers to become more productive again for theircompanies/ organizations.

• Duration: Μ20, 1 month

• Budget: 7.785,00€

• The 40 pages report will be available in English and then translated in Greek, Spanish, Polish and Swedish

Page 10: {LIKE} 3rd PM PPT

517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP

WP.3-Act.3.5Activity 3.5: Employment opportunities for older workers

• Employment opportunities will be the results of the previous report and will beexamined in relation to the EQF system along with the national qualifications systems.The aim of the report is to examine how to adapt the approach of potentialemployment opportunities for aged personnel to the local labour market. The reportwill examine how the different levels of the professional framework systems can becomethe starting point for changing the perception towards aged personnel and their skills.It will also demonstrate the required actions in terms of training issues for olderworkers.

• Duration: Μ22, 1 month

• Budget: 6.944,00€

• The 40 pages report will be available in English

Page 11: {LIKE} 3rd PM PPT

517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP

Page 12: {LIKE} 3rd PM PPT

517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP

WP.5: Quality Assurance3L Research Institute

Page 13: {LIKE} 3rd PM PPT

517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP

5.2: Methodological Guide for WP “Developing Business Concepts for Age Management & Investment in the HR sector”: Univ. of Strathclyde

5.5: Evaluation of the results of the project: Uni. Of Social Sciences & 3L Research Institute

Page 14: {LIKE} 3rd PM PPT

517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP

WP.5-Act.5.2• 5.2: Methodological Guide for WP “Developing Business Concepts for Age

Management & Investment in the HR sector”• Status Update by University of Strathclyde

• Responsible PP: UoS

• 5.5: Evaluation of the results of the project• Status Update by 3L Research Institute

• Responsible PP: 3L Research Institute

Page 15: {LIKE} 3rd PM PPT

517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP

Act. 5.5: External Evaluation of the results of the projectUniversity of Social Sciences

Page 16: {LIKE} 3rd PM PPT

517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP

• Role of the evaluator

• Stages of the project evaluation

• Types of evaluation

• Project evaluation + quality next steps

• Available tools for evaluation for the project

Contents

Page 17: {LIKE} 3rd PM PPT

517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP

The evaluator must:

• Set the context for open discussion on project performance

• Identify strengths & weaknesses, obstacles to progress

• Make recommendations to continue, modify, and/or delete

• Assures and improves the quality of the project and project outcomes and of other actors

• pursues a culture of quality assurance

• Helps quantifying results

• Predicts how the project activities will develop

• Reduces the work of the Final Report

Role of the evaluator

Page 18: {LIKE} 3rd PM PPT

517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP

• Start after the project approval

• Make a logical schedule

• Choose evaluation tools carefully structured and make indicators clear

Stages of the project evaluation

Page 19: {LIKE} 3rd PM PPT

517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP

• Use the evidence to implement changes

• Analyse results -if possible at a project meeting1. What does this mean for the project? 2. What should we do next? 3. How will we manage changes to the project’s workplan?

• Draw attention to the positives as well as challenges

• Adapt: workplan, activities, communication platforms, management, budgets

• Inform everyone involved -try not to impose!

• Record all reasons for the changes

Stages of the project evaluation

Page 20: {LIKE} 3rd PM PPT

517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP

• Internal Evaluation: performed by staff of partnership members, preferably directly involved in the project work

• External Evaluation: performed by an expert not attached to any of the partnership members, who has no other task in the project

Types of the evaluation 1/2

Page 21: {LIKE} 3rd PM PPT

517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP

Planning Evaluation

Inception Report &

a Quality A2 Plan

Formative Evaluation

Progress Reports &

Quality Assurance Recommendations

Summative Evaluation

Impact Reports &

Quality Assessment

Types of Evaluation 2/2

Page 22: {LIKE} 3rd PM PPT

517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP

Pla

nnin

g ev

alua

tion • Send a questionnaire to

all the participants before the event to assess their expectations

Form

ativ

e ev

alua

tion • Enable the participants

to reflect on the progress of the event (e.g. training, meeting, seminar) while it is taking place (e.g. through reflective diaries, individual interviews, post-it notes stuck on a wall, etc.) Su

mm

ativ

e ev

alua

tion • Gather final evaluative

information at the end of the event, discuss it, use to improve the next event

Examples types of evaluation

Page 23: {LIKE} 3rd PM PPT

517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP

• What can we say about the object in our hands?

1. who will be responsible for evaluation across the partnership

2. agree on the priorities for evaluation1. What are we going to evaluate? 2. The processes of the project? 3. The outputs of the project? 4. The outcomes of the project?

3. What tools we are going to use for all 3 types of evaluation

Evaluation Quality next steps

Page 24: {LIKE} 3rd PM PPT

517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP

Evaluation Plan & Quality Indicators

Page 25: {LIKE} 3rd PM PPT

517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP

Evaluation Plan & Quality Indicators

Page 26: {LIKE} 3rd PM PPT

517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP

WP.6: Awareness Raising ActivitiesDocumenta

Page 27: {LIKE} 3rd PM PPT

517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP

WP.6: Awareness Raising Activities

• 6.1 Workshops for the age management concept benefits

• 6.2 Sensitizing entrepreneurs

• 6.3 Seminars addressing HR managers

• 6.4 Sensitizing the aged workforce

Employers Employees

Entrepreneurs Managers

Local Society Stakeholders

Page 28: {LIKE} 3rd PM PPT

517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP

WP.6-Act.6.1Activity 6.1: Awareness raising activities

• The five workshops (one per country) will involve local public and private actors, enterprisesemployees, customers, suppliers, employers and the community and will discuss as well asexamine the benefits enterprises could have from the proposed strategies. It will reveal thestrengths of aged work force and at the same time will demonstrate how enterprises can beprepared to face the “demographic bomb issue”. Invited speakers, expert on their fields, willelaborate on Age management concepts.

• The target groups will be targeted by the partners through the general promotion of theproject and directly by communicating with national and local stakeholders, throughmeetings, emails and phone calls in order to catch a minimum of 20 participants perworkshop.

• These workshops will last half a day and will be organised by each partner in eachparticipating country, adapting the content to their language, their specific workingconditions, labour market needs and specificities of the attendants.

• Duration: M10-M12, 3 months

• Budget: 29.706,00€

Page 29: {LIKE} 3rd PM PPT

517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP

Lunch

Page 30: {LIKE} 3rd PM PPT

517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP

WP.6-Act.6.2-6.3Activity 6.2: Sensitising entrepreneurs

• Project partners will visit each other’s area and will visit businesses that operate with aged work force and have successfulresults, for exchanging experience. PPs will discuss with the personnel and owners, gaining valuable experience and know–howthat they could bring back to their organizations as well as countries. Local business people will be part as well of the studytours.

• These study tours (5 in total, one per country), will last one day and will take place together with the project meetings, inorder to save time and money from travelling.

• Duration: M2, M9, M15, M21, M27, 5 months

• Budget: 2.500,00€ (included in 6.1)

Activity 6.3: Seminars addressing HR managers• There will be organized 5 seminars, one in each different participating country, addressing to Human Resources Managers for

implementing decisions on staff recruitment, retention and redundancy in view of the formulated Age Management Concepts.The proposed issues will be deriving from the reports already elaborated in the context of the project.

• Catch a minimum of 20 participants per seminar.

• These seminars will last half a day and will be organised by each partner in each participating country, adapting the content totheir language, their specific labour market needs and conditions and specificities of the attendants.

• Duration: M18-M22, 5 months

• Budget: 1.700,00€ (included in 6.1)

Page 31: {LIKE} 3rd PM PPT

517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP

WP.6-Act.6.4Activity 6.4: Sensitising the aged workforce

• In parallel with the seminars organized focusing in HR managers, another 5 will be organized, addressing to aged workforce and Unemployed aged 50+, with special focus on sensitive social groups. It will explain the strengths they have as well as the skills that they need to gain, in order to remain competitive in the labour market they operate and even in the EU market.

• Catch a minimum of 20 participants per seminar

• These seminars will last half a day and will be organised by each partner in each participatingcountry, adapting the content to their language, their specific labour market needs andconditions and specificities of the attendants.

• Duration: M18-M22, 5 months

• Budget: 1.700,00 € (included in 6.1)

Page 32: {LIKE} 3rd PM PPT

517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP

WP.7: Dissemination of results3L Research Institute

Page 33: {LIKE} 3rd PM PPT

517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP

Page 34: {LIKE} 3rd PM PPT

517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP

WP.7: Dissemination of results

Publicity campaign • Dissemination of events

• Press campaign

• Logo

• Posters

Publicity campaign• Information and

Sensitisation brochures

• Electronic Newsletters

Page 35: {LIKE} 3rd PM PPT

517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP

WP.7-Act.7.2Activity 7.2: Publicity campaign – Information and Sensitisation

brochures

Four brochures of 4pages will be produced, in the following languages: EN, ES, EL, SE, PL • one presenting the project • one sensitising the aged workforce • one sensitizing enterprises and • one presenting the project results

• The Lead Partner of the Work Package will create a common layout (with the approbation of all partners),including a project logo, to be used in all brochures and overall material, and a common text, but eachpartner will adapt the text to local conditions, needs and specificities

• Each brochure (A5) will be printed in 1000 items per country

• Duration: M3, M7, M33, 3 months

• Budget: 11.300,00€

Page 36: {LIKE} 3rd PM PPT

517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP

WP.7-Act.7.3Activity 7.3: Publicity campaign – Dissemination of events

• For each event organised (workshops, seminars, conference), each partner will produce anddiffuse flyers and posters to disseminate the event in order to ensure the largest possibleparticipation.

• This means that 6 different flyers and 6 different posters will be produced in each language.Each flyer (A5) will be printed in 200 items, each poster (A3) in 20 items.

• The Lead Partner of the Work Package will create a common layout (with the approbation ofall partners), to be used in for flyers and posters, and a common text, but each partner willadapt the text to local conditions, needs and specificities.

• This dissemination will be done in an electronic way as well.

• Duration: M9, M17, M26, M28-29, 5 months

• Budget: 1.900,00€ (included in 7.1)

Page 37: {LIKE} 3rd PM PPT

517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP

WP.7-Act.7.4Activity 7.4: Publicity campaign – Electronic Newsletters

• 6 newsletters on the employability of the aged workforce and presenting the projectevolution and outputs during the project lifetime will be sent electronically, which willbe used to promote the main Project initiatives, to inform the operators of interestedsectors on the project implementation, the activity phases still in progress, thepossibilities and modalities of participation, to sensitize the population towards thethematic at the focus of the debate, to spread the results obtained by the Project.

• The Lead Partner will have the overall coordination of the activity, but all partners willparticipate in the drafting of the newsletter and in its dissemination to all relevant EU,national, regional and local actors, not only within the 5 participating countries butalso in other European countries, to ensure the largest possible dissemination.

• Duration: M3, M9, M15, M21, M27, M33, 6 months

• Budget: (included in 7.1)

Page 38: {LIKE} 3rd PM PPT

517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP

WP.7-Act.7.5Activity 7.5: Press campaign

• The project will be presented to local actors and local press by each partner during a press-conferencepresenting the project and addressing specific issues relevant to the project theme and the local conditions.Each partner will decide on when organising the press-conference, in order to choose the most appropriatemoment for a more effective and positive event (e.g. before an important event).

• During the press-conferences, folders will be distributed to the journalists with information about theproject, the programme, the transnational actions and the local actions and added value of the project.

• Regional press-releases will inform target groups about the project and the organised events and will beissued after the press-conference and more often if possible.

• Project partners will launch a press and radio campaign trying to sensitise as many actors and target groupsas possible.

• Duration: M1-M36, 36 months

• Budget: 250,00 € (included in 7.1)

Page 39: {LIKE} 3rd PM PPT

517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP

Next Steps

• 4th meeting - Poland: MayXX-XX/05/2013

• 5th meeting - UK: DecemberXX-XX/12/2013

• Closing meeting - Brussels: September XX-XX/09/2014

Study Tour

Page 40: {LIKE} 3rd PM PPT

517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP

Time Table


Recommended