Module IVIncorporation of
Construction Site BMPs into the Design Process
Module IVIncorporation of
Construction Site BMPs into the Design Process
Module
Topic
0 Overview
I Introduction
IISoil Stabilization (SS) and Sediment Control (SC) BMPs
IIITracking, Wind Erosion, and Construction Site Management BMPs
IVIncorporation of Construction Site BMPs into the Design Process
V Final Wrap-Up
Module IV ObjectivesModule IV Objectives
Upon completion, the student will be able to
incorporate Construction Site BMPs into PID, PA/ED,
and PS&E phases of the design process. This
includes
– Completing Section 6 of the SWDR
– Developing a phase appropriate BMP strategy
– Estimating costs for BMPs
– Preparing Final PS&E package
2
Refine BMP Strategy
Preliminary BMP Cost
Estimate
ID Potential WQ Impacts
& BMP Strategy
BMP Cost Allocation
Select BMPs
ID SSPs for Line Items
Prepare Line items & Lump Sum
Cost estimates
PID PS&EPA/ED
Project Study/Project Scope
Summary Report
Project Report
Working Drawings
Construction Site BMPs and the Design Process
Construction Site BMPs Are Detailed inSection 6 of the Storm Water Data Report
Construction Site BMPs Are Detailed inSection 6 of the Storm Water Data Report
Section 6 of the Storm Water Data Report is separated into three distinct parts, as follows:
• The Construction Site BMP
strategy
• Quantity and cost information
• Documentation of Construction
Division’s concurrence4
Estimating quantities & cost of BMPs
Incorporating revised & new SSPs
Completing SWDR - section 6
Completing SWDR - Section 6
BMP Strategy Development
Estimating Construction Site BMPs in PS&E Phase
What is a Construction Site BMP Strategy?
What is a Construction Site BMP Strategy?
• It is a discussion of the selected Construction Site BMPs in a short narrative
• The level of detail will be different during the following phases:
− Project Initiation Document (PID)− Project Approval/Environmental Document
(PA/ED)− Plans, Specifications & Estimates (PS&E)
5
Completing SWDR - Section 6
BMP Strategy Development
Estimating Construction Site BMPs in PS&E Phase
Example ProjectExample Project
Roadway Widening
Central Expressway
• $50 Million project
• Widen from two to four lanes
• Elevate roadway
• Construct wall and bridge structures
• Grade embankments
6
PID Phase
Completing SWDR - Section 6
BMP Strategy Development
Estimating Construction Site BMPs in PS&E Phase
Construction Activities
• Clearing and grubbing
• Structure excavation
• Roadway excavation
• Roadway grading
• Cuts and fills
7
Project Information
Project Information
Example Project
PID Phase
Completing SWDR - Section 6
BMP Strategy Development
Estimating Construction Site BMPs in PS&E Phase
Completing SWDR - Section 6
BMP Strategy Development
Estimating Construction Site BMPs in PS&E Phase
Embankment SlopeAccess Road
Additional Right of Way
Retaining WallDrainage System
8
Access Point
Adobe CreekBridge Structure
Stockpile AreaNew Roadway
9
How Do You Develop the Construction Site BMP Strategy at the PID Phase?
How Do You Develop the Construction Site BMP Strategy at the PID Phase?
• Use Section 2 (“Selecting/Implementing Construction Site BMPs”) of the Construction Site BMPs Manual to identify BMPs for the project.
• The level of detail should include BMP categories to be implemented.
• What is an acceptable strategy at the PID phase?
At the PID phase, the strategy should be very general. Give a list of BMP categories to be implemented.
10
Completing SWDR - Section 6
BMP Strategy Development
Estimating Construction Site BMPs in PS&E Phase
Example Strategy at the PID Phase . . .
Example Strategy at the PID Phase . . .
Detail the required construction site BMP categories.
11
Completing SWDR - Section 6
BMP Strategy Development
Estimating Construction Site BMPs in PS&E Phase
On July 21, 2005 a memo was received from the designated Construction representative (I.M. Concurring), concurring on the Construction Site BMPs strategy for this project.
Document Construction
Division’s Concurrence
Document Construction
Division’s Concurrence
Acquire the Construction representative’s concurrencewith Section 6, and document it in the narrative.
July 31, 2005,(I.M. Concurring)
PID PhasePID Phase
12
memo
Completing SWDR - Section 6
BMP Strategy Development
Estimating Construction Site BMPs in PS&E Phase
Include an Estimate of
Quantities and Costs
Indicate the method of BMP quantity and cost estimates used in the narrative, and reference the
storm water BMP cost summary. Include it as a supplemental attachment.
PID PhasePID PhaseAs outlined in appendix F of the Project Planning and Design Guide, the percent of total cost method was used for estimating the cost of Construction Site BMPs.At this time no Construction Site BMPs have been designated as separate bid line items.This project will require a storm water pollution prevention plan (SWPPP). Construction Site BMPs will be incorporated into the project.
The costs to prepare the SWPPP and implement the Construction Site BMP work are estimated at 2% of the entire construction cost. See the storm water BMP cost summary (supplemental attachments) for specifics concerning costs.
13
Completing SWDR - Section 6
BMP Strategy Development
Estimating Construction Site BMPs in PS&E Phase
Construction Site BMPs
Cost SummaryConstruction Site BMPs
Cost Summary
14
PID PhasePID Phase
Completing SWDR - Section 6
BMP Strategy Development
Estimating Construction Site BMPs in PS&E Phase
Example ProjectExample Project
Roadway Widening
Central Expressway
• Widen from two to four lanes
• Elevate roadway
• Construct wall and bridge structures
• Grade embankments
15
PA/ED Phase
Completing SWDR - Section 6
BMP Strategy Development
Estimating Construction Site BMPs in PS&E Phase
Construction Activities
• $60 M Project Costs
• 27 acres (11 ha ) of
DSA
• Four construction stages
• Slopes from flat to 1:1.5
• Slope lengths to 125 ft (20 m)
• Discharges to an urban channel - Adobe Creek an ESA (not on 303[d] list)
16
More Project Information
More Project Information
Example Project
PA/ED Phase
Completing SWDR - Section 6
BMP Strategy Development
Estimating Construction Site BMPs in PS&E Phase
Construction Activities• Dewatering• Stream crossing• Vehicle and
equipment• Material storage• Stockpiles• Demolition• Concrete placement
17
Example Project
More Project Information
More Project Information
PA/ED Phase
Completing SWDR - Section 6
BMP Strategy Development
Estimating Construction Site BMPs in PS&E Phase
How Do You Develop the
Construction Site BMP Strategy
at the PA/ED Phase?
How Do You Develop the Construction Site BMP
Strategy at the PA/ED Phase?
• Use Section 2 (“Selecting/Implementing Construction Site BMPs”) of the Construction Site BMPs Manual to identify BMPs for the project.
• The level of detail should include BMP types to be implemented.
• What is an acceptable strategy at PA/ED?
At the PA/ED phase the strategy should become better detailed than in the PID phase, describing types of BMPs typically used on projects with a similar scope and range of construction activities.
18
Completing SWDR - Section 6
BMP Strategy Development
Estimating Construction Site BMPs in PS&E Phase
How Do You Deal with Complex Projects at the
PA/ED Phase?
How Do You Deal with Complex Projects at the
PA/ED Phase?• While not technically required, use the
Construction Site BMP Consideration Form to aid in the selection of BMPs.
• Use the appropriate parts of Checklist CS-1, as instructed by the form.
• Develop a BMP strategy (types) from Checklist CS-1, Parts 1 – 6.
19
Completing SWDR - Section 6
BMP Strategy Development
Estimating Construction Site BMPs in PS&E Phase
Typical Strategy at
the PA/ED Phase
Typical Strategy at
the PA/ED Phase
Detail the required types of temporary BMPs.
Run-off ControlSlope Interruption
20
Completing SWDR - Section 6
BMP Strategy Development
Estimating Construction Site BMPs in PS&E Phase
Include an Estimate of
Quantities and CostsInclude an Estimate of
Quantities and Costs
Indicate the method of BMP quantity and cost estimates used in the narrative, and
refer to the stormwater BMP cost summary. Include it as a supplemental
attachment.
Although no water pollution control plan sheets were developed, initial quantities are estimated based on the type and length of the project.
PA/ED PhasePA/ED Phase
21
Completing SWDR - Section 6
BMP Strategy Development
Estimating Construction Site BMPs in PS&E Phase
Construction Site
BMPs Cost Summary
Construction Site BMPs
Cost SummaryC
on
stru
ctio
n S
ite
BM
Ps
Cost S
um
mary
Con
stru
ctio
n S
ite
BM
Ps
Cost S
um
mary
22
On October 31, 2005 an e-mail was received from the designated Construction representative (Mina Changes) concurring on the Construction Site BMPs strategy for this project.
Document Construction Representative Concurrence
Document Construction Representative Concurrence
Acquire the Construction representative’s concurrencewith Section 6, and document it in the narrative.
October 31, 2005,(Mina Changes)
PA/ED PhasePA/ED Phase
23
Completing SWDR - Section 6
BMP Strategy Development
Estimating Construction Site BMPs in PS&E Phase
See Reference Material TabPage 22
Example Project
Example ProjectRoadway Widening
Central Expressway
• $64 million widening project• Widen from two to four
lanes• Elevate roadway• Construct wall and bridge
structures• Grade embankments
24PS&E Phase
PurposeSelect and deploy BMPsIdentify SSPs for separate bid line items• Estimate Line item and Lump Sum costs
Completing SWDR - Section 6
BMP Strategy Development
Estimating Construction Site BMPs in PS&E Phase
25
Example Project Proposed Construction Site
BMPs Deployment Plans (D-Plans)
Proposed Construction Site BMPs Deployment Plans
(D-Plans)
Completing SWDR - Section 6
BMP Strategy Development
Estimating Construction Site BMPs in PS&E Phase
How Do You Develop the
Strategy at the PS&E Phase?
How Do You Develop the Strategy at the PS&E
Phase?
• Use the Construction Site BMP Consideration Form
• Use the appropriate parts of Checklist CS-1 as instructed by the form
• Level of detail should include specific BMP items and how the BMPs will be implemented
26
Completing SWDR - Section 6
BMP Strategy Development
Estimating Construction Site BMPs in PS&E Phase
See Reference Material Tab Page 1
Construction Site BMP Strategy PS&E Phase
The Construction Site BMP strategy for this project shall consist of the following for soil stabilization and sediment control. Perimeter Controls shall consist of silt fence placed at the toe of all embankment slopes and gravel bag berms shall be placed along the construction pad above Smith Creek. Contour grading of slopes shall include surface roughening by walking the slopes with tracked equipment. Immediately thereafter, slope interruption devices such as fiber rolls shall be installed and soil stabilizer shall be hydraulically applied. Whenever possible, early implementation of permanent erosion control seeding or landscape planting shall be performed
Example StrategyExample Strategy
Detail the specific BMPs to be incorporated into the project as prescribed by CS-1, Parts 1 – 6.
Perimeter controls silt fencegravel bag berms
27
surfaceroughening
fiber rolls
Completing SWDR - Section 6
BMP Strategy Development
Estimating Construction Site BMPs in PS&E Phase
Include an
Estimate of Quantities and
Costs
Include an Estimate of
Quantities and Costs
28
increasing the quantity by 25%Quantities include
take-offs
PS&E PhasePS&E Phase
Completing SWDR - Section 6
BMP Strategy Development
Estimating Construction Site BMPs in PS&E Phase
Indicate the method of BMP quantity determination and the method of cost estimates in the narrative, and refer to BMP quantity and cost estimates. Provide
separate spreadsheets as attachments.
• SSP 07-485 – Move in/Move out (Temp. Erosion Control)
• SSP 20-020 - Move in/Move out (Erosion Control)
• SSP 07-466 – Temporary Fence (Type ESA)
• SSP 07-350 – Temporary Erosion Control
• SSP 07-420 – Temporary Fiber Roll
• SSP 07-470 – Temporary Gravel Bag Berm
• SSP 07-395 - Temporary Cover
• SSP 07-460 – Temporary Silt Fence
• SSP 07-490 - Temporary Drainage Inlet Protection
• SSP 07-480 – Temporary Construction Entrance
• SSP 07-360 – Street Sweeping
• SSP 07-395 - Temporary Cover
• SSP 07-405 – Temporary Concrete Washout Facility
• SSP 07-346 – Construction Site Management
29
Completing SWDR - Section 6
BMP Strategy Development
Estimating Construction Site BMPs in PS&E Phase
Ratify the Construction Site BMP Consideration
Form
Ratify the Construction Site BMP Consideration
Form
Acquire the Construction representative’s concurrencewith Section 6, and initial and date the bottom of the form.Include the form as a required attachment to the SWDR.
Project Engineer to Sign & Date
30
PS&E PhasePS&E Phase
Completing SWDR - Section 6
BMP Strategy Development
Estimating Construction Site BMPs in PS&E Phase
Document Construction
Representative Concurrence
Document Construction Representative
Concurrence
Document concurrence with Section 6 in the narrative.
31
At a separate meeting for Construction Site BMP implementation conducted on December 31, 2005 the designated Construction representative (Mark S. Alott) concurred on the Construction Site BMPs strategy for this project. See the meeting minutes.
(Mark S. Alott),
December 31, 2005,
PS&E PhasePS&E Phase
meeting minutes
Completing SWDR - Section 6
BMP Strategy Development
Estimating Construction Site BMPs in PS&E Phase
BEEs and
Construction Site BMPs Quantities
BEEs and Construction Site BMPs QuantitiesB
EES
an
d
Con
stru
ctio
n S
ite
BM
Ps Q
uan
tities
BEES
an
d
Con
stru
ctio
n S
ite
BM
Ps Q
uan
tities
32
C
on
stru
ctio
n S
ite B
MP
s
Cost S
um
mary
Con
stru
ctio
n S
ite B
MP
s
Cost S
um
mary
Construction Site BMPs Cost SummaryConstruction Site BMPs Cost Summary
33
Summary of Cost Information by Phase
PID PA/ED PS&E
Construction Costs
$50, 000, 000 $60,000,000 $64,000,000
SW BMP Estimated Costs
$1, 010,000 $900,000 $800,000
34
• $64 million widening project
• Three-year construction project
• Total length of 3 miles
• To be constructed in four stages
• Four bridges to be widened
• Four freeway-to–local street interchanges to be modified
Class Exercise TimeAppropriate Strategies for the Design
Phases
Class Exercise TimeAppropriate Strategies for the Design
Phases
Is the strategy appropriate?Which design phase (PS&E, PA/ED, PID)?
35Exercise Tab Page 6
Completing SWDR - Section 6
BMP Strategy Development
Estimating Construction Site BMPs in PS&E Phase
Use D-Plans to• Develop deployment quantity• Justify temporary BMP quantities in
RE file• Develop WPC plans for PS&E (per
District policy)• Obtain concurrence from
Construction Division
36
Proposed Construction Site BMPs Deployment
Plans
Proposed Construction Site BMPs Deployment
Plans
Example Project
Completing SWDR - Section 6
BMP Strategy Development
Estimating Construction Site BMPs in PS&E Phase
See Reference Material TabPage 22
Estimating Construction Site Costsin the PS&E Phase
Select and deploy BMPs Identify SSPs for separate bid line items• Conduct BMP takeoff for separate bid
items• Estimate Line item costs• Estimate Construction Site
Management Costs (Lump Sum)
37
Conduct BMP takeoff• Count and measure BMP quantities• Apply increase factor for
complicated projects – Multiple stages– Multiple rainy seasons– Multiple construction activities– Proximity to 303(d) bodies or
other sensitive environmental areas
38
Example Project Construction Site
BMP EstimatingConstruction Site
BMP Estimating
Completing SWDR - Section 6
BMP Strategy Development
Estimating Construction Site BMPs in PS&E Phase
Specify Soil Stabilization Type
Protect DSAs from rainfall by applying soil stabilization BMPs
39
Example Quantity
Takeoff SpreadsheetExample Quantity
Takeoff Spreadsheet
Separate Contract Items:• List in Estimate (BEES)• Include takeoff quantities in the Quantity Table
Separate Contract Items:• List in Estimate (BEES)• Include takeoff quantities in the Quantity Table 40
Example Project
Completing SWDR - Section 6
BMP Strategy Development
Estimating Construction Site BMPs in PS&E Phase
(b) Increase the quantities by 25% for each additional rainy season. (The designated Construction representative may suggest an alternate increase.)
41
Example Project
Checklist CS-1, Part 1
Checklist CS-1, Part 1
Completing SWDR - Section 6
BMP Strategy Development
Estimating Construction Site BMPs in PS&E Phase
Review plans to determine quantity• Each direction• Each stage• Each major construction
activity (structures, etc.)• Breaks in K-rail• Acceleration lanes
Temporary Construction
Entrance Estimating
Temporary Construction
Entrance Estimating
42
Example Project
Completing SWDR - Section 6
BMP Strategy Development
Estimating Construction Site BMPs in PS&E Phase
43
Example Project Proposed Construction Site
BMPs Deployment Plans (D-Plans)
Proposed Construction Site BMPs Deployment Plans
(D-Plans)
Completing SWDR - Section 6
BMP Strategy Development
Estimating Construction Site BMPs in PS&E Phase
Step 1: Determine total volume of concrete to be placed
Step 2: Determine total volume of waste to be generated
Step 3: Select the most likely types of washout to be used
Step 4: Determine the number of washout facilities of the type selected
Temporary Concrete Washout EstimatingTemporary Concrete Washout Estimating
44
Example Project
Completing SWDR - Section 6
BMP Strategy Development
Estimating Construction Site BMPs in PS&E Phase
Exercise Tab Page 9
Project Information
1. $64 million freeway widening project
2. Total length of 3 miles
3. Four bridges to be widened
4. Four freeway-to–local street interchanges to be modified
5. Includes retaining walls and sound walls
6. Requires local street work
7. 60,160 yd3 (46,000 m3 ) of concrete to be placed
Class Exercise TimeEstimating Quantity of
Concrete Washouts
Class Exercise TimeEstimating Quantity of
Concrete Washouts
Determine the estimated quantity of temporary concrete washouts for the project
45
Example Project
Exercise Tab Page 9
Completing SWDR - Section 6
BMP Strategy Development
Estimating Construction Site BMPs in PS&E Phase
Step 1: Review standards (SC-7 and SSP 07-360)
Step 2: Determine the duration sweeping may be required
Step 3: Determine the number of sweepers required
Street Sweeping
Estimating
Street Sweeping
Estimating
46
Example Project
Exercise Tab Page 10
Completing SWDR - Section 6
BMP Strategy Development
Estimating Construction Site BMPs in PS&E Phase
Step 1: Review standards (SC-7 and SSP 07-360)
Street Sweeping
Estimating
Street Sweeping
Estimating
47
Example Project
Completing SWDR - Section 6
BMP Strategy Development
Estimating Construction Site BMPs in PS&E Phase
Class Exercise Time
Estimating Street Sweeping CostClass Exercise Time
Estimating Street Sweeping Cost
48
Example Project
Determine the estimated cost of street sweeping for the project
Project Information
1. $64 million freeway widening project
2. Three-year construction project
3. Total length of 3 miles
4. To be constructed in four distinct stages
5. Four bridges to be widened
6. Four freeway-to–local street interchanges to be modified
7. Includes local street work
8. Entails 392,385 yd3 (300,000 m3) of roadway
excavation
9. Requires 130,795 yd3 (100,000 m3) of imported
borrow
Completing SWDR - Section 6
BMP Strategy Development
Estimating Construction Site BMPs in PS&E Phase
Exercise Tab Page 10
BEEs and
Construction Site BMPs Quantities
BEEs and Construction Site BMPs QuantitiesB
EES
an
d
Con
stru
ctio
n S
ite
BM
Ps Q
uan
tities
BEES
an
d
Con
stru
ctio
n S
ite
BM
Ps Q
uan
tities
49
The quantity is one Lump Sum, but how do we estimate the cost?
Construction Site Management
Estimating
Construction Site Management
Estimating
50
Example Project
?
Completing SWDR - Section 6
BMP Strategy Development
Estimating Construction Site BMPs in PS&E Phase
Remember We’ve Included the Following Construction Site BMPs
as Bid Line Items
Remember We’ve Included the Following Construction Site BMPs
as Bid Line Items SSP 07-350 – Temporary Erosion Control
SSP 07-360 – Street Sweeping
SSP 07-395 - Temporary Cover
SSP 07-405 – Temporary Concrete Washout Facility
SSP 07-420 – Temporary Fiber Roll
SSP 07-460 – Temporary Silt Fence
SSP 07-466 – Temporary Fence (Type ESA)
SSP 07-470 – Temporary Gravel Bag Berm
SSP 07-480 – Temporary Construction Entrance
SSP 07-490 - Temporary Drainage Inlet Protection
51
Example Project
Completing SWDR - Section 6
BMP Strategy Development
Estimating Construction Site BMPs in PS&E Phase
Construction Site
Management Estimating
Construction Site Management
Estimating
52
Example Project
Step 1: Determine total cost of Construction Site Water Pollution Control from developed guidance
Step 2: Determine total cost of Construction Site BMPs identified as bid line items
Step 3: Construction Site Management is the difference between the costs computed in Steps 1 and 2
Completing SWDR - Section 6
BMP Strategy Development
Estimating Construction Site BMPs in PS&E Phase
Project Information
1. $64 million freeway widening project
2. Project is in Los Angeles RWQCB (Region 4)
3. Estimated cost of all line item BMPs equals $661,000
Class Example TimeEstimating Cost of
Construction Site Management
Class Example TimeEstimating Cost of
Construction Site Management
Determine the estimated cost of Construction Site Management for the project
53
Example Project
Completing SWDR - Section 6
BMP Strategy Development
Estimating Construction Site BMPs in PS&E Phase
Reference TabPage 22
Quantity Sheet for Construction Site
BMPs
Quantity Sheet for Construction Site
BMPs
54
16,400
656
5906
LF
AC
AC
LF
LF
6.7
2.5
C
on
stru
ctio
n S
ite B
MP
s
Cost S
um
mary
Con
stru
ctio
n S
ite B
MP
s
Cost S
um
mary
Construction Site BMPs Cost SummaryConstruction Site BMPs Cost Summary
55
Don’t Forget to Include Standard Plans of Selected Construction
Site BMPs
Don’t Forget to Include Standard Plans of Selected Construction
Site BMPs • T56 – Temporary Fiber Roll
• T51 – Temporary Silt Fence
• T58 – Temporary Construction Entrance
• T53 - Temporary Cover
• T59 – Temporary Concrete Washout Facility
56
Example Project
Completing SWDR - Section 6
BMP Strategy Development
Estimating Construction Site BMPs in PS&E Phase
• Include Water Pollution Control quantity sheets
• Include special provisions of selected bid line items
• Include details of selected bid line items
• Provide estimated quantities for selected bid line items
• Provide estimated costs for selected bid line items
Finalize PS&E Package for
Construction Site BMPs
Finalize PS&E Package for
Construction Site BMPs
57
Module IV SummaryModule IV Summary
58
In this module we have covered the
incorporation of Construction Site BMPs into the
PID, PA/ED, and PS&E phases of the design
process. This includes
Completing Section 6 of the SWDR
Developing a phase appropriate BMP
strategy
Estimating quantities and costs for
BMPs
San Mateo 1, Culvert Replacement Project
QuestionsQuestions
59
Well, I have a few more
questions . . .Well, I have a few more
questions . . .
Can a practice identified in 07-346, Construction Site Management, also be identified as a separate bid line item?
60
At a minimum, how must Construction Site BMPs be identified in the contract documents?Is the Water Pollution Control Cost Break-Down still a part of the contract documents?