Module IV Incorporation of Construction Site BMPs into the Design Process Modul e Topic 0 Overview I Introduction II Soil Stabilization (SS) and Sediment Control (SC) BMPs III Tracking, Wind Erosion, and Construction Site Management BMPs IV Incorporation of Construction Site BMPs into the Design Process V Final Wrap-Up
Transcript
Page 1: Module IV Incorporation of Construction Site BMPs into the Design Process ModuleTopic 0Overview IIntroduction II Soil Stabilization (SS) and Sediment Control.

Module IVIncorporation of

Construction Site BMPs into the Design Process

Module IVIncorporation of

Construction Site BMPs into the Design Process

Module

Topic

0 Overview

I Introduction

IISoil Stabilization (SS) and Sediment Control (SC) BMPs

IIITracking, Wind Erosion, and Construction Site Management BMPs

IVIncorporation of Construction Site BMPs into the Design Process

V Final Wrap-Up

Page 2: Module IV Incorporation of Construction Site BMPs into the Design Process ModuleTopic 0Overview IIntroduction II Soil Stabilization (SS) and Sediment Control.

Module IV ObjectivesModule IV Objectives

Upon completion, the student will be able to

incorporate Construction Site BMPs into PID, PA/ED,

and PS&E phases of the design process. This

includes

– Completing Section 6 of the SWDR

– Developing a phase appropriate BMP strategy

– Estimating costs for BMPs

– Preparing Final PS&E package

2

Page 3: Module IV Incorporation of Construction Site BMPs into the Design Process ModuleTopic 0Overview IIntroduction II Soil Stabilization (SS) and Sediment Control.

Refine BMP Strategy

Preliminary BMP Cost

Estimate

ID Potential WQ Impacts

& BMP Strategy

BMP Cost Allocation

Select BMPs

ID SSPs for Line Items

Prepare Line items & Lump Sum

Cost estimates

PID PS&EPA/ED

Project Study/Project Scope

Summary Report

Project Report

Working Drawings

Construction Site BMPs and the Design Process

Page 4: Module IV Incorporation of Construction Site BMPs into the Design Process ModuleTopic 0Overview IIntroduction II Soil Stabilization (SS) and Sediment Control.

Construction Site BMPs Are Detailed inSection 6 of the Storm Water Data Report

Construction Site BMPs Are Detailed inSection 6 of the Storm Water Data Report

Section 6 of the Storm Water Data Report is separated into three distinct parts, as follows:

• The Construction Site BMP

strategy

• Quantity and cost information

• Documentation of Construction

Division’s concurrence4

Estimating quantities & cost of BMPs

Incorporating revised & new SSPs

Completing SWDR - section 6

Completing SWDR - Section 6

BMP Strategy Development

Estimating Construction Site BMPs in PS&E Phase

Page 5: Module IV Incorporation of Construction Site BMPs into the Design Process ModuleTopic 0Overview IIntroduction II Soil Stabilization (SS) and Sediment Control.

What is a Construction Site BMP Strategy?

What is a Construction Site BMP Strategy?

• It is a discussion of the selected Construction Site BMPs in a short narrative

• The level of detail will be different during the following phases:

− Project Initiation Document (PID)− Project Approval/Environmental Document

(PA/ED)− Plans, Specifications & Estimates (PS&E)

5

Completing SWDR - Section 6

BMP Strategy Development

Estimating Construction Site BMPs in PS&E Phase

Page 6: Module IV Incorporation of Construction Site BMPs into the Design Process ModuleTopic 0Overview IIntroduction II Soil Stabilization (SS) and Sediment Control.

Example ProjectExample Project

Roadway Widening

Central Expressway

• $50 Million project

• Widen from two to four lanes

• Elevate roadway

• Construct wall and bridge structures

• Grade embankments

6

PID Phase

Completing SWDR - Section 6

BMP Strategy Development

Estimating Construction Site BMPs in PS&E Phase

Page 7: Module IV Incorporation of Construction Site BMPs into the Design Process ModuleTopic 0Overview IIntroduction II Soil Stabilization (SS) and Sediment Control.

Construction Activities

• Clearing and grubbing

• Structure excavation

• Roadway excavation

• Roadway grading

• Cuts and fills

7

Project Information

Project Information

Example Project

PID Phase

Completing SWDR - Section 6

BMP Strategy Development

Estimating Construction Site BMPs in PS&E Phase

Completing SWDR - Section 6

BMP Strategy Development

Estimating Construction Site BMPs in PS&E Phase

Page 8: Module IV Incorporation of Construction Site BMPs into the Design Process ModuleTopic 0Overview IIntroduction II Soil Stabilization (SS) and Sediment Control.

Embankment SlopeAccess Road

Additional Right of Way

Retaining WallDrainage System

8

Page 9: Module IV Incorporation of Construction Site BMPs into the Design Process ModuleTopic 0Overview IIntroduction II Soil Stabilization (SS) and Sediment Control.

Access Point

Adobe CreekBridge Structure

Stockpile AreaNew Roadway

9

Page 10: Module IV Incorporation of Construction Site BMPs into the Design Process ModuleTopic 0Overview IIntroduction II Soil Stabilization (SS) and Sediment Control.

How Do You Develop the Construction Site BMP Strategy at the PID Phase?

How Do You Develop the Construction Site BMP Strategy at the PID Phase?

• Use Section 2 (“Selecting/Implementing Construction Site BMPs”) of the Construction Site BMPs Manual to identify BMPs for the project.

• The level of detail should include BMP categories to be implemented.

• What is an acceptable strategy at the PID phase?

At the PID phase, the strategy should be very general. Give a list of BMP categories to be implemented.

10

Completing SWDR - Section 6

BMP Strategy Development

Estimating Construction Site BMPs in PS&E Phase

Page 11: Module IV Incorporation of Construction Site BMPs into the Design Process ModuleTopic 0Overview IIntroduction II Soil Stabilization (SS) and Sediment Control.

Example Strategy at the PID Phase . . .

Example Strategy at the PID Phase . . .

Detail the required construction site BMP categories.

11

Completing SWDR - Section 6

BMP Strategy Development

Estimating Construction Site BMPs in PS&E Phase

Page 12: Module IV Incorporation of Construction Site BMPs into the Design Process ModuleTopic 0Overview IIntroduction II Soil Stabilization (SS) and Sediment Control.

On July 21, 2005 a memo was received from the designated Construction representative (I.M. Concurring), concurring on the Construction Site BMPs strategy for this project.

Document Construction

Division’s Concurrence

Document Construction

Division’s Concurrence

Acquire the Construction representative’s concurrencewith Section 6, and document it in the narrative.

July 31, 2005,(I.M. Concurring)

PID PhasePID Phase

12

memo

Completing SWDR - Section 6

BMP Strategy Development

Estimating Construction Site BMPs in PS&E Phase

Page 13: Module IV Incorporation of Construction Site BMPs into the Design Process ModuleTopic 0Overview IIntroduction II Soil Stabilization (SS) and Sediment Control.

Include an Estimate of

Quantities and Costs

Indicate the method of BMP quantity and cost estimates used in the narrative, and reference the

storm water BMP cost summary. Include it as a supplemental attachment.

PID PhasePID PhaseAs outlined in appendix F of the Project Planning and Design Guide, the percent of total cost method was used for estimating the cost of Construction Site BMPs.At this time no Construction Site BMPs have been designated as separate bid line items.This project will require a storm water pollution prevention plan (SWPPP). Construction Site BMPs will be incorporated into the project.

The costs to prepare the SWPPP and implement the Construction Site BMP work are estimated at 2% of the entire construction cost. See the storm water BMP cost summary (supplemental attachments) for specifics concerning costs.

13

Completing SWDR - Section 6

BMP Strategy Development

Estimating Construction Site BMPs in PS&E Phase

Page 14: Module IV Incorporation of Construction Site BMPs into the Design Process ModuleTopic 0Overview IIntroduction II Soil Stabilization (SS) and Sediment Control.

Construction Site BMPs

Cost SummaryConstruction Site BMPs

Cost Summary

14

PID PhasePID Phase

Completing SWDR - Section 6

BMP Strategy Development

Estimating Construction Site BMPs in PS&E Phase

Page 15: Module IV Incorporation of Construction Site BMPs into the Design Process ModuleTopic 0Overview IIntroduction II Soil Stabilization (SS) and Sediment Control.

Example ProjectExample Project

Roadway Widening

Central Expressway

• Widen from two to four lanes

• Elevate roadway

• Construct wall and bridge structures

• Grade embankments

15

PA/ED Phase

Completing SWDR - Section 6

BMP Strategy Development

Estimating Construction Site BMPs in PS&E Phase

Page 16: Module IV Incorporation of Construction Site BMPs into the Design Process ModuleTopic 0Overview IIntroduction II Soil Stabilization (SS) and Sediment Control.

Construction Activities

• $60 M Project Costs

• 27 acres (11 ha ) of

DSA

• Four construction stages

• Slopes from flat to 1:1.5

• Slope lengths to 125 ft (20 m)

• Discharges to an urban channel - Adobe Creek an ESA (not on 303[d] list)

16

More Project Information

More Project Information

Example Project

PA/ED Phase

Completing SWDR - Section 6

BMP Strategy Development

Estimating Construction Site BMPs in PS&E Phase

Page 17: Module IV Incorporation of Construction Site BMPs into the Design Process ModuleTopic 0Overview IIntroduction II Soil Stabilization (SS) and Sediment Control.

Construction Activities• Dewatering• Stream crossing• Vehicle and

equipment• Material storage• Stockpiles• Demolition• Concrete placement

17

Example Project

More Project Information

More Project Information

PA/ED Phase

Completing SWDR - Section 6

BMP Strategy Development

Estimating Construction Site BMPs in PS&E Phase

Page 18: Module IV Incorporation of Construction Site BMPs into the Design Process ModuleTopic 0Overview IIntroduction II Soil Stabilization (SS) and Sediment Control.

How Do You Develop the

Construction Site BMP Strategy

at the PA/ED Phase?

How Do You Develop the Construction Site BMP

Strategy at the PA/ED Phase?

• Use Section 2 (“Selecting/Implementing Construction Site BMPs”) of the Construction Site BMPs Manual to identify BMPs for the project.

• The level of detail should include BMP types to be implemented.

• What is an acceptable strategy at PA/ED?

At the PA/ED phase the strategy should become better detailed than in the PID phase, describing types of BMPs typically used on projects with a similar scope and range of construction activities.

18

Completing SWDR - Section 6

BMP Strategy Development

Estimating Construction Site BMPs in PS&E Phase

Page 19: Module IV Incorporation of Construction Site BMPs into the Design Process ModuleTopic 0Overview IIntroduction II Soil Stabilization (SS) and Sediment Control.

How Do You Deal with Complex Projects at the

PA/ED Phase?

How Do You Deal with Complex Projects at the

PA/ED Phase?• While not technically required, use the

Construction Site BMP Consideration Form to aid in the selection of BMPs.

• Use the appropriate parts of Checklist CS-1, as instructed by the form.

• Develop a BMP strategy (types) from Checklist CS-1, Parts 1 – 6.

19

Completing SWDR - Section 6

BMP Strategy Development

Estimating Construction Site BMPs in PS&E Phase

Page 20: Module IV Incorporation of Construction Site BMPs into the Design Process ModuleTopic 0Overview IIntroduction II Soil Stabilization (SS) and Sediment Control.

Typical Strategy at

the PA/ED Phase

Typical Strategy at

the PA/ED Phase

Detail the required types of temporary BMPs.

Run-off ControlSlope Interruption

20

Completing SWDR - Section 6

BMP Strategy Development

Estimating Construction Site BMPs in PS&E Phase

Page 21: Module IV Incorporation of Construction Site BMPs into the Design Process ModuleTopic 0Overview IIntroduction II Soil Stabilization (SS) and Sediment Control.

Include an Estimate of

Quantities and CostsInclude an Estimate of

Quantities and Costs

Indicate the method of BMP quantity and cost estimates used in the narrative, and

refer to the stormwater BMP cost summary. Include it as a supplemental

attachment.

Although no water pollution control plan sheets were developed, initial quantities are estimated based on the type and length of the project.

PA/ED PhasePA/ED Phase

21

Completing SWDR - Section 6

BMP Strategy Development

Estimating Construction Site BMPs in PS&E Phase

Page 22: Module IV Incorporation of Construction Site BMPs into the Design Process ModuleTopic 0Overview IIntroduction II Soil Stabilization (SS) and Sediment Control.

Construction Site

BMPs Cost Summary

Construction Site BMPs

Cost SummaryC

on

stru

ctio

n S

ite

BM

Ps

Cost S

um

mary

Con

stru

ctio

n S

ite

BM

Ps

Cost S

um

mary

22

Page 23: Module IV Incorporation of Construction Site BMPs into the Design Process ModuleTopic 0Overview IIntroduction II Soil Stabilization (SS) and Sediment Control.

On October 31, 2005 an e-mail was received from the designated Construction representative (Mina Changes) concurring on the Construction Site BMPs strategy for this project.

Document Construction Representative Concurrence

Document Construction Representative Concurrence

Acquire the Construction representative’s concurrencewith Section 6, and document it in the narrative.

October 31, 2005,(Mina Changes)

PA/ED PhasePA/ED Phase

23

e-mail

Completing SWDR - Section 6

BMP Strategy Development

Estimating Construction Site BMPs in PS&E Phase

See Reference Material TabPage 22

Page 24: Module IV Incorporation of Construction Site BMPs into the Design Process ModuleTopic 0Overview IIntroduction II Soil Stabilization (SS) and Sediment Control.

Example Project

Example ProjectRoadway Widening

Central Expressway

• $64 million widening project• Widen from two to four

lanes• Elevate roadway• Construct wall and bridge

structures• Grade embankments

24PS&E Phase

PurposeSelect and deploy BMPsIdentify SSPs for separate bid line items• Estimate Line item and Lump Sum costs

Completing SWDR - Section 6

BMP Strategy Development

Estimating Construction Site BMPs in PS&E Phase

Page 25: Module IV Incorporation of Construction Site BMPs into the Design Process ModuleTopic 0Overview IIntroduction II Soil Stabilization (SS) and Sediment Control.

25

Example Project Proposed Construction Site

BMPs Deployment Plans (D-Plans)

Proposed Construction Site BMPs Deployment Plans

(D-Plans)

Completing SWDR - Section 6

BMP Strategy Development

Estimating Construction Site BMPs in PS&E Phase

Page 26: Module IV Incorporation of Construction Site BMPs into the Design Process ModuleTopic 0Overview IIntroduction II Soil Stabilization (SS) and Sediment Control.

How Do You Develop the

Strategy at the PS&E Phase?

How Do You Develop the Strategy at the PS&E

Phase?

• Use the Construction Site BMP Consideration Form

• Use the appropriate parts of Checklist CS-1 as instructed by the form

• Level of detail should include specific BMP items and how the BMPs will be implemented

26

Completing SWDR - Section 6

BMP Strategy Development

Estimating Construction Site BMPs in PS&E Phase

See Reference Material Tab Page 1

Page 27: Module IV Incorporation of Construction Site BMPs into the Design Process ModuleTopic 0Overview IIntroduction II Soil Stabilization (SS) and Sediment Control.

Construction Site BMP Strategy PS&E Phase

The Construction Site BMP strategy for this project shall consist of the following for soil stabilization and sediment control. Perimeter Controls shall consist of silt fence placed at the toe of all embankment slopes and gravel bag berms shall be placed along the construction pad above Smith Creek. Contour grading of slopes shall include surface roughening by walking the slopes with tracked equipment. Immediately thereafter, slope interruption devices such as fiber rolls shall be installed and soil stabilizer shall be hydraulically applied. Whenever possible, early implementation of permanent erosion control seeding or landscape planting shall be performed

Example StrategyExample Strategy

Detail the specific BMPs to be incorporated into the project as prescribed by CS-1, Parts 1 – 6.

Perimeter controls silt fencegravel bag berms

27

surfaceroughening

fiber rolls

Completing SWDR - Section 6

BMP Strategy Development

Estimating Construction Site BMPs in PS&E Phase

Page 28: Module IV Incorporation of Construction Site BMPs into the Design Process ModuleTopic 0Overview IIntroduction II Soil Stabilization (SS) and Sediment Control.

Include an

Estimate of Quantities and

Costs

Include an Estimate of

Quantities and Costs

28

increasing the quantity by 25%Quantities include

take-offs

PS&E PhasePS&E Phase

Completing SWDR - Section 6

BMP Strategy Development

Estimating Construction Site BMPs in PS&E Phase

Page 29: Module IV Incorporation of Construction Site BMPs into the Design Process ModuleTopic 0Overview IIntroduction II Soil Stabilization (SS) and Sediment Control.

Indicate the method of BMP quantity determination and the method of cost estimates in the narrative, and refer to BMP quantity and cost estimates. Provide

separate spreadsheets as attachments.

• SSP 07-485 – Move in/Move out (Temp. Erosion Control)

• SSP 20-020 - Move in/Move out (Erosion Control)

• SSP 07-466 – Temporary Fence (Type ESA)

• SSP 07-350 – Temporary Erosion Control

• SSP 07-420 – Temporary Fiber Roll

• SSP 07-470 – Temporary Gravel Bag Berm

• SSP 07-395 - Temporary Cover

• SSP 07-460 – Temporary Silt Fence

• SSP 07-490 - Temporary Drainage Inlet Protection

• SSP 07-480 – Temporary Construction Entrance

• SSP 07-360 – Street Sweeping

• SSP 07-395 - Temporary Cover

• SSP 07-405 – Temporary Concrete Washout Facility

• SSP 07-346 – Construction Site Management

29

Completing SWDR - Section 6

BMP Strategy Development

Estimating Construction Site BMPs in PS&E Phase

Page 30: Module IV Incorporation of Construction Site BMPs into the Design Process ModuleTopic 0Overview IIntroduction II Soil Stabilization (SS) and Sediment Control.

Ratify the Construction Site BMP Consideration

Form

Ratify the Construction Site BMP Consideration

Form

Acquire the Construction representative’s concurrencewith Section 6, and initial and date the bottom of the form.Include the form as a required attachment to the SWDR.

Project Engineer to Sign & Date

30

PS&E PhasePS&E Phase

Completing SWDR - Section 6

BMP Strategy Development

Estimating Construction Site BMPs in PS&E Phase

Page 31: Module IV Incorporation of Construction Site BMPs into the Design Process ModuleTopic 0Overview IIntroduction II Soil Stabilization (SS) and Sediment Control.

Document Construction

Representative Concurrence

Document Construction Representative

Concurrence

Document concurrence with Section 6 in the narrative.

31

At a separate meeting for Construction Site BMP implementation conducted on December 31, 2005 the designated Construction representative (Mark S. Alott) concurred on the Construction Site BMPs strategy for this project. See the meeting minutes.

(Mark S. Alott),

December 31, 2005,

PS&E PhasePS&E Phase

meeting minutes

Completing SWDR - Section 6

BMP Strategy Development

Estimating Construction Site BMPs in PS&E Phase

Page 32: Module IV Incorporation of Construction Site BMPs into the Design Process ModuleTopic 0Overview IIntroduction II Soil Stabilization (SS) and Sediment Control.

BEEs and

Construction Site BMPs Quantities

BEEs and Construction Site BMPs QuantitiesB

EES

an

d

Con

stru

ctio

n S

ite

BM

Ps Q

uan

tities

BEES

an

d

Con

stru

ctio

n S

ite

BM

Ps Q

uan

tities

32

Page 33: Module IV Incorporation of Construction Site BMPs into the Design Process ModuleTopic 0Overview IIntroduction II Soil Stabilization (SS) and Sediment Control.

C

on

stru

ctio

n S

ite B

MP

s

Cost S

um

mary

Con

stru

ctio

n S

ite B

MP

s

Cost S

um

mary

Construction Site BMPs Cost SummaryConstruction Site BMPs Cost Summary

33

Page 34: Module IV Incorporation of Construction Site BMPs into the Design Process ModuleTopic 0Overview IIntroduction II Soil Stabilization (SS) and Sediment Control.

Summary of Cost Information by Phase

PID PA/ED PS&E

Construction Costs

$50, 000, 000 $60,000,000 $64,000,000

SW BMP Estimated Costs

$1, 010,000 $900,000 $800,000

34

Page 35: Module IV Incorporation of Construction Site BMPs into the Design Process ModuleTopic 0Overview IIntroduction II Soil Stabilization (SS) and Sediment Control.

• $64 million widening project

• Three-year construction project

• Total length of 3 miles

• To be constructed in four stages

• Four bridges to be widened

• Four freeway-to–local street interchanges to be modified

Class Exercise TimeAppropriate Strategies for the Design

Phases

Class Exercise TimeAppropriate Strategies for the Design

Phases

Is the strategy appropriate?Which design phase (PS&E, PA/ED, PID)?

35Exercise Tab Page 6

Completing SWDR - Section 6

BMP Strategy Development

Estimating Construction Site BMPs in PS&E Phase

Page 36: Module IV Incorporation of Construction Site BMPs into the Design Process ModuleTopic 0Overview IIntroduction II Soil Stabilization (SS) and Sediment Control.

Use D-Plans to• Develop deployment quantity• Justify temporary BMP quantities in

RE file• Develop WPC plans for PS&E (per

District policy)• Obtain concurrence from

Construction Division

36

Proposed Construction Site BMPs Deployment

Plans

Proposed Construction Site BMPs Deployment

Plans

Example Project

Completing SWDR - Section 6

BMP Strategy Development

Estimating Construction Site BMPs in PS&E Phase

See Reference Material TabPage 22

Page 37: Module IV Incorporation of Construction Site BMPs into the Design Process ModuleTopic 0Overview IIntroduction II Soil Stabilization (SS) and Sediment Control.

Estimating Construction Site Costsin the PS&E Phase

Select and deploy BMPs Identify SSPs for separate bid line items• Conduct BMP takeoff for separate bid

items• Estimate Line item costs• Estimate Construction Site

Management Costs (Lump Sum)

37

Page 38: Module IV Incorporation of Construction Site BMPs into the Design Process ModuleTopic 0Overview IIntroduction II Soil Stabilization (SS) and Sediment Control.

Conduct BMP takeoff• Count and measure BMP quantities• Apply increase factor for

complicated projects – Multiple stages– Multiple rainy seasons– Multiple construction activities– Proximity to 303(d) bodies or

other sensitive environmental areas

38

Example Project Construction Site

BMP EstimatingConstruction Site

BMP Estimating

Completing SWDR - Section 6

BMP Strategy Development

Estimating Construction Site BMPs in PS&E Phase

Page 39: Module IV Incorporation of Construction Site BMPs into the Design Process ModuleTopic 0Overview IIntroduction II Soil Stabilization (SS) and Sediment Control.

Specify Soil Stabilization Type

Protect DSAs from rainfall by applying soil stabilization BMPs

39

Page 40: Module IV Incorporation of Construction Site BMPs into the Design Process ModuleTopic 0Overview IIntroduction II Soil Stabilization (SS) and Sediment Control.

Example Quantity

Takeoff SpreadsheetExample Quantity

Takeoff Spreadsheet

Separate Contract Items:• List in Estimate (BEES)• Include takeoff quantities in the Quantity Table

Separate Contract Items:• List in Estimate (BEES)• Include takeoff quantities in the Quantity Table 40

Example Project

Completing SWDR - Section 6

BMP Strategy Development

Estimating Construction Site BMPs in PS&E Phase

Page 41: Module IV Incorporation of Construction Site BMPs into the Design Process ModuleTopic 0Overview IIntroduction II Soil Stabilization (SS) and Sediment Control.

(b) Increase the quantities by 25% for each additional rainy season. (The designated Construction representative may suggest an alternate increase.)

41

Example Project

Checklist CS-1, Part 1

Checklist CS-1, Part 1

Completing SWDR - Section 6

BMP Strategy Development

Estimating Construction Site BMPs in PS&E Phase

Page 42: Module IV Incorporation of Construction Site BMPs into the Design Process ModuleTopic 0Overview IIntroduction II Soil Stabilization (SS) and Sediment Control.

Review plans to determine quantity• Each direction• Each stage• Each major construction

activity (structures, etc.)• Breaks in K-rail• Acceleration lanes

Temporary Construction

Entrance Estimating

Temporary Construction

Entrance Estimating

42

Example Project

Completing SWDR - Section 6

BMP Strategy Development

Estimating Construction Site BMPs in PS&E Phase

Page 43: Module IV Incorporation of Construction Site BMPs into the Design Process ModuleTopic 0Overview IIntroduction II Soil Stabilization (SS) and Sediment Control.

43

Example Project Proposed Construction Site

BMPs Deployment Plans (D-Plans)

Proposed Construction Site BMPs Deployment Plans

(D-Plans)

Completing SWDR - Section 6

BMP Strategy Development

Estimating Construction Site BMPs in PS&E Phase

Page 44: Module IV Incorporation of Construction Site BMPs into the Design Process ModuleTopic 0Overview IIntroduction II Soil Stabilization (SS) and Sediment Control.

Step 1: Determine total volume of concrete to be placed

Step 2: Determine total volume of waste to be generated

Step 3: Select the most likely types of washout to be used

Step 4: Determine the number of washout facilities of the type selected

Temporary Concrete Washout EstimatingTemporary Concrete Washout Estimating

44

Example Project

Completing SWDR - Section 6

BMP Strategy Development

Estimating Construction Site BMPs in PS&E Phase

Exercise Tab Page 9

Page 45: Module IV Incorporation of Construction Site BMPs into the Design Process ModuleTopic 0Overview IIntroduction II Soil Stabilization (SS) and Sediment Control.

Project Information

1. $64 million freeway widening project

2. Total length of 3 miles

3. Four bridges to be widened

4. Four freeway-to–local street interchanges to be modified

5. Includes retaining walls and sound walls

6. Requires local street work

7. 60,160 yd3 (46,000 m3 ) of concrete to be placed

Class Exercise TimeEstimating Quantity of

Concrete Washouts

Class Exercise TimeEstimating Quantity of

Concrete Washouts

Determine the estimated quantity of temporary concrete washouts for the project

45

Example Project

Exercise Tab Page 9

Completing SWDR - Section 6

BMP Strategy Development

Estimating Construction Site BMPs in PS&E Phase

Page 46: Module IV Incorporation of Construction Site BMPs into the Design Process ModuleTopic 0Overview IIntroduction II Soil Stabilization (SS) and Sediment Control.

Step 1: Review standards (SC-7 and SSP 07-360)

Step 2: Determine the duration sweeping may be required

Step 3: Determine the number of sweepers required

Street Sweeping

Estimating

Street Sweeping

Estimating

46

Example Project

Exercise Tab Page 10

Completing SWDR - Section 6

BMP Strategy Development

Estimating Construction Site BMPs in PS&E Phase

Page 47: Module IV Incorporation of Construction Site BMPs into the Design Process ModuleTopic 0Overview IIntroduction II Soil Stabilization (SS) and Sediment Control.

Step 1: Review standards (SC-7 and SSP 07-360)

Street Sweeping

Estimating

Street Sweeping

Estimating

47

Example Project

Completing SWDR - Section 6

BMP Strategy Development

Estimating Construction Site BMPs in PS&E Phase

Page 48: Module IV Incorporation of Construction Site BMPs into the Design Process ModuleTopic 0Overview IIntroduction II Soil Stabilization (SS) and Sediment Control.

Class Exercise Time

Estimating Street Sweeping CostClass Exercise Time

Estimating Street Sweeping Cost

48

Example Project

Determine the estimated cost of street sweeping for the project

Project Information

1. $64 million freeway widening project

2. Three-year construction project

3. Total length of 3 miles

4. To be constructed in four distinct stages

5. Four bridges to be widened

6. Four freeway-to–local street interchanges to be modified

7. Includes local street work

8. Entails 392,385 yd3 (300,000 m3) of roadway

excavation

9. Requires 130,795 yd3 (100,000 m3) of imported

borrow

Completing SWDR - Section 6

BMP Strategy Development

Estimating Construction Site BMPs in PS&E Phase

Exercise Tab Page 10

Page 49: Module IV Incorporation of Construction Site BMPs into the Design Process ModuleTopic 0Overview IIntroduction II Soil Stabilization (SS) and Sediment Control.

BEEs and

Construction Site BMPs Quantities

BEEs and Construction Site BMPs QuantitiesB

EES

an

d

Con

stru

ctio

n S

ite

BM

Ps Q

uan

tities

BEES

an

d

Con

stru

ctio

n S

ite

BM

Ps Q

uan

tities

49

Page 50: Module IV Incorporation of Construction Site BMPs into the Design Process ModuleTopic 0Overview IIntroduction II Soil Stabilization (SS) and Sediment Control.

The quantity is one Lump Sum, but how do we estimate the cost?

Construction Site Management

Estimating

Construction Site Management

Estimating

50

Example Project

?

Completing SWDR - Section 6

BMP Strategy Development

Estimating Construction Site BMPs in PS&E Phase

Page 51: Module IV Incorporation of Construction Site BMPs into the Design Process ModuleTopic 0Overview IIntroduction II Soil Stabilization (SS) and Sediment Control.

Remember We’ve Included the Following Construction Site BMPs

as Bid Line Items

Remember We’ve Included the Following Construction Site BMPs

as Bid Line Items SSP 07-350 – Temporary Erosion Control

SSP 07-360 – Street Sweeping

SSP 07-395 - Temporary Cover

SSP 07-405 – Temporary Concrete Washout Facility

SSP 07-420 – Temporary Fiber Roll

SSP 07-460 – Temporary Silt Fence

SSP 07-466 – Temporary Fence (Type ESA)

SSP 07-470 – Temporary Gravel Bag Berm

SSP 07-480 – Temporary Construction Entrance

SSP 07-490 - Temporary Drainage Inlet Protection

51

Example Project

Completing SWDR - Section 6

BMP Strategy Development

Estimating Construction Site BMPs in PS&E Phase

Page 52: Module IV Incorporation of Construction Site BMPs into the Design Process ModuleTopic 0Overview IIntroduction II Soil Stabilization (SS) and Sediment Control.

Construction Site

Management Estimating

Construction Site Management

Estimating

52

Example Project

Step 1: Determine total cost of Construction Site Water Pollution Control from developed guidance

Step 2: Determine total cost of Construction Site BMPs identified as bid line items

Step 3: Construction Site Management is the difference between the costs computed in Steps 1 and 2

Completing SWDR - Section 6

BMP Strategy Development

Estimating Construction Site BMPs in PS&E Phase

Page 53: Module IV Incorporation of Construction Site BMPs into the Design Process ModuleTopic 0Overview IIntroduction II Soil Stabilization (SS) and Sediment Control.

Project Information

1. $64 million freeway widening project

2. Project is in Los Angeles RWQCB (Region 4)

3. Estimated cost of all line item BMPs equals $661,000

Class Example TimeEstimating Cost of

Construction Site Management

Class Example TimeEstimating Cost of

Construction Site Management

Determine the estimated cost of Construction Site Management for the project

53

Example Project

Completing SWDR - Section 6

BMP Strategy Development

Estimating Construction Site BMPs in PS&E Phase

Reference TabPage 22

Page 54: Module IV Incorporation of Construction Site BMPs into the Design Process ModuleTopic 0Overview IIntroduction II Soil Stabilization (SS) and Sediment Control.

Quantity Sheet for Construction Site

BMPs

Quantity Sheet for Construction Site

BMPs

54

16,400

656

5906

LF

AC

AC

LF

LF

6.7

2.5

Page 55: Module IV Incorporation of Construction Site BMPs into the Design Process ModuleTopic 0Overview IIntroduction II Soil Stabilization (SS) and Sediment Control.

C

on

stru

ctio

n S

ite B

MP

s

Cost S

um

mary

Con

stru

ctio

n S

ite B

MP

s

Cost S

um

mary

Construction Site BMPs Cost SummaryConstruction Site BMPs Cost Summary

55

Page 56: Module IV Incorporation of Construction Site BMPs into the Design Process ModuleTopic 0Overview IIntroduction II Soil Stabilization (SS) and Sediment Control.

Don’t Forget to Include Standard Plans of Selected Construction

Site BMPs

Don’t Forget to Include Standard Plans of Selected Construction

Site BMPs • T56 – Temporary Fiber Roll

• T51 – Temporary Silt Fence

• T58 – Temporary Construction Entrance

• T53 - Temporary Cover

• T59 – Temporary Concrete Washout Facility

56

Example Project

Completing SWDR - Section 6

BMP Strategy Development

Estimating Construction Site BMPs in PS&E Phase

Page 57: Module IV Incorporation of Construction Site BMPs into the Design Process ModuleTopic 0Overview IIntroduction II Soil Stabilization (SS) and Sediment Control.

• Include Water Pollution Control quantity sheets

• Include special provisions of selected bid line items

• Include details of selected bid line items

• Provide estimated quantities for selected bid line items

• Provide estimated costs for selected bid line items

Finalize PS&E Package for

Construction Site BMPs

Finalize PS&E Package for

Construction Site BMPs

57

Page 58: Module IV Incorporation of Construction Site BMPs into the Design Process ModuleTopic 0Overview IIntroduction II Soil Stabilization (SS) and Sediment Control.

Module IV SummaryModule IV Summary

58

In this module we have covered the

incorporation of Construction Site BMPs into the

PID, PA/ED, and PS&E phases of the design

process. This includes

Completing Section 6 of the SWDR

Developing a phase appropriate BMP

strategy

Estimating quantities and costs for

BMPs

Page 59: Module IV Incorporation of Construction Site BMPs into the Design Process ModuleTopic 0Overview IIntroduction II Soil Stabilization (SS) and Sediment Control.

San Mateo 1, Culvert Replacement Project

QuestionsQuestions

59

Page 60: Module IV Incorporation of Construction Site BMPs into the Design Process ModuleTopic 0Overview IIntroduction II Soil Stabilization (SS) and Sediment Control.

Well, I have a few more

questions . . .Well, I have a few more

questions . . .

Can a practice identified in 07-346, Construction Site Management, also be identified as a separate bid line item?

60

At a minimum, how must Construction Site BMPs be identified in the contract documents?Is the Water Pollution Control Cost Break-Down still a part of the contract documents?