Status PS injection septa 2
Outline• Injection septum SMH42 • Injection bumper• Resources• Conclusion
LIU-ABT review 20/11/2015
Status PS injection septa 3
PS injection septum• Conventional eddy current device
LIU-ABT review 20/11/2015
LIU PresentNominal beam energy [GeV] 2.0 1.4Magnetic length [mm] 913 567Septum thickness at the downstream extremity (including magnetic screen) [mm] 5.8 5
Septum thickness at the upstream extremity (including magnetic screen and bumper septum thickness) [mm] 11 n.a.
Magnet gap height [mm] 70 60.4Magnet gap width between conductors [mm] 95 102Nominal deflection angle [mrad] 55 54.7Bgap [T] 0.56 0.689Integrated field strength [T.m] 0.510 0.390Peak current for nominal deflection [kA] 31.2 33.5Field homogeneity in gap (ʃBy.dl on straight line wr.t. centre) [%] ± 1.2 unknown
Pulse length [ms] 2 (full wave) 3.2 (half sine)Max. induced voltage on magnet terminals when injection bumper is pulsed [mV] 30 n.a.
Average duty cycle [s] 1.2 1.2ppm possible yes no
Status PS injection septa 4
Conventional eddy current septum
LIU-ABT review 20/11/2015
Status PS injection septa 5
Injection septum features
LIU-ABT review 20/11/2015
SMH42 ∫Bydl homogeneity
Uses flattened full sine excitation current→ less sensitive to timing jitter.
Uses soft steel end plates to reduce leak field and improve field homogeneity.
Will use copper coated mu-metal beam screen to reduce leak field.
Status PS injection septa 6
Defined SMH42
• Position in lattice• Magnet aperture• Range of displacement system• Current precision and stability• Field homogeneity• Beam emittance blow up, losses at injection• Beam impedance measures: copper coated
mu-metal beam screen adjacent to septum• Space Reservation Request
LIU-ABT review 20/11/2015
Status PS injection septa 7
Outstanding SMH42
LIU-ABT review 20/11/2015
• Engineering specification• ECR• Prototype would be useful to benchmark
simulations with high precision.
Status PS injection septa 8
Outline• Injection septum SMH42 • Injection bumper• Resources• Conclusion
LIU-ABT review 20/11/2015
Status PS injection septa 9
Injection bumper septum BSW42
2 GeV system Present 1.4 GeV
Physical length [mm] 350 220Magnetic length [mm] 322 192Septum thickness [mm] 5 >6Magnet gap height between poles [mm] 70 90Magnet gap width between conductors [mm] 145 218Nominal deflection angle [mrad] 13 Bgap [T] 0.375 Integrated nominal field strength [T.m] 0.121 0.127Field homogeneity in gap w.r.t angular deflection in H [%] ± 0.8 Peak current for nominal deflection [kA] 20.9 4.5Pulse width, half sine [ms] 1.0 1.6Max. induced voltage on magnet terminals when injection septum is pulsed [mV] 230 n.a.
Average duty cycle [s] 1.2 1.2ppm possible yes
LIU-ABT review 20/11/2015
‘Direct drive like’ eddy current device proposed, using soft steel endplates to improve field homogeneity significantly
Status PS injection septa 10
Field Quality Injection bumper septum• Magnet very short w.r.t. aperture: poor field
homogeneity due to end fields.• Field homogeneity improved by introducing
‘direct drive like’ geometry and additional soft steel field clamps.
LIU-ABT review 20/11/2015
Status PS injection septa 11
‘Direct drive like’ eddy current septum
LIU-ABT review 20/11/2015
Status PS injection septa 12
Magnetic undershoot of fieldWith half sine pulse, magnetic field shows in simulations post pulse ripple (undershoot).
Presently not confirmed as yet by measurements on prototype.
Mitigation to be found.
LIU-ABT review 20/11/2015
0 0.5 1 1.5 2 2.5 3 3.5 4 4.5
-20
0
20
40
60
80
100
120
140
t [ms]∫B
.dl [
mT.
m]
Status PS injection septa 13
Defined Injection bumper BSW42
• Current tracking precision and stability.• Based on MD measurements with timing variations
between -+20 us. • Based on jitter measurements on existing
equipment.• Field homogeneity.
• Effect of higher harmonics of bumper simulated, but negligible contribution to emittance blow up.
• No beam screen insert in magnet gap.
LIU-ABT review 20/11/2015
Status PS injection septa 14
Outstanding BSW42
• Cross talk between magnets.• First values appear counter intuitive: 30 mV
induced on septum, 230 mV on bumper.• Magnetic post pulse ripple mitigation.• Power convertor characteristics to be
finalised.• Engineering specification (combined with
injection septum).
LIU-ABT review 20/11/2015
Status PS injection septa 15
Mechanical concept design
LIU-ABT review 20/11/2015
Coil fixation and copper box insulation defined.
Remote displacement system planned to be recovered from existing system.
EN/MME ‘bureau d’etude’ started. Space Reservation Request submitted. Vacuum equipment still tbd.
Status PS injection septa 16
Outline• Injection septum SMH42 • Injection bumper• Resources• Conclusion
LIU-ABT review 20/11/2015
Status PS injection septa 17
Planning Injection septa
• Functional spec frozen by Christmas 2015• ECR Q2 2016• Mechanical concept finalised 2015 • Mechanical design finished Q1 2016• Bumper prototype to be built Q1 2016• Part procurement as from Q3 2016• Assembly and testing 2017
LIU-ABT review 20/11/2015
Year 2015 2016 2017 2018 2019
PV 188 485 183 0 30EV 0 0 0 0 0AC 19 0 0 0 0
Metrics per year in kCHF
Cumulative metrics per year in kCHF
PI.SMH42 & PI.BSW42 magnets
Year 2015 2016 2017 2018 2019
PV 188 673 856 856 886EV 0 AC 19
Status PS injection septa 19
Human resources• Zsolt leaving 31/1/2015, will depend on Miro
and Bruno for calculations.• Mike and Jan available to follow up start of
project in 2016.• No technicians available in 2016 once part
procurement is to start. • EN/MME started in November on mechanical
design based on Mike’s conceptual design• APT data obsolete.
LIU-ABT review 20/11/2015
Status PS injection septa 20
Outline• Injection septum SMH42 • Injection bumper• Resources• Conclusion
LIU-ABT review 20/11/2015
Status PS injection septa 21
Conclusion• Requirements quasi defined. • Concept design well under way.• Need for prototype bumper magnet
demonstrated by Bruno measuring existing eddy current device.
• Human resources to be clarified.
LIU-ABT review 20/11/2015
Status injection equipment 22
DocumentationPS Injection Septa and Bumper Functional spec: (edms 1477011), In work SRR: sent for approval ((edms 1551627) Engineering spec: to be done ECR: to be done
PS Ring MU41 and MU42 Vacuum Chambers Functional specification: (edms 1504265), released ECR (TE/VSC): (edms 1525018) engineering check
LIU-PS meeting 20/10/2015