1. ABO WIND
2. Why Investing in Argentina?
3. Current Opportunities
4. Renewable Energy in Argentina
5. ABO WIND in Argentina
6. Our Projects in Argentina
7. Contact Details
3%
1. ABO WIND
ABO WIND is one of Europe's most successful developers of wind power projects.
350 employees developing projects in Germany, Spain, France, Argentina, Uruguay, Mexico, Belgium, Ireland, the UK, Bulgaria and Finland .
Annual turnover of 300 Million Euros.
Over 450 wind energy turbines with a nominal capacity of over 1000 Megawatt have already been installed.
2. Why Investing in Argentina?
A diversified and dynamic industry, open economy and high growth potential makes Argentina one of the growing economies in Latin America.
Access to a large local market and to important trade organizations such as MERCOSUR and WTO.
Well trained personnel, natural recourses, a lively culture and modern infrastructure makes Argentina a very creative and competitive field for business.
Governmental support: tax exemptions, incentives for export encouragement and loans.
Argentinean Environmental Policy
2. Why Investing in Argentina? (cont.)
The percentage of produced renewable energy must reach 8% by 2016.
Laws that make the development of wind energy projects easier:o Accelerated amortization.o Sales tax refunds.o Tax exemptions on minimum
presumed income o Subsidy: 15 AR$/MWh (1,8 USD/MWh)o Financial Stability.
Legislative initiative to create the following benefits:
o 8% of the energy of large consumers has to be through renewable energy.
o Subsidies for domestic production increase.
o Credit lines. o Tax benefits.
3. Current Opportunites
The local currency reduces investment and business costs.
Great amount of infrastructural work to do.
High availability of local currency for investments.
Custom-free import of wind energy turbines.
Intended Changes to the Energy Matrix
3%
Source: CAMMESA. Informe anual 2013.
4. Renewable Energy in Argentina
Goal: 8% renewable until 2016
Wind Energy
3%
Argentina belongs to the top 5 countries with the highest potential for wind energy.
Strong and constant wind of the highest quality in many regions, especially in southern Patagonia (9 - 12 m/s; CF > 35%)
Regions with capacity factor CF > 35%
Average wind speed
4. Renewable Energy in Argentina
Source: Argentina Wind Energy Report CADER 2009.
ABO WIND began 2006 with activities in Buenos Aires, Argentina.
Highly qualified employees working in Buenos Aires.
ABO WIND has recently signed a cooperation agreement for the “Añelo I” project, in
Neuquén.
5. ABO WIND in Argentina
in Argentina, of which 200 MW are ready to build. ABO WIND also has projects in Uruguay and Mexico.
ABO WIND has developed 850 MW
investment opportunity
Project financing: provision of the needed equity.
Trust Fund
Project Acquisition
Joint Venture
PartnershipFor local businesses
Large range of investments opportunities and especially new
tenders.
5. ABO WIND in Argentina
Our portfolio in Argentina and Uruguay contains 13 Projects with a total volume of 850 MW. Furthermore we have many projects in preliminary stages of development.
5. ABO WIND in Argentina
PE Pampeanos 50 MWPE Argentinos 50 MW
PE Alto Valle 100 MW
PE Vientos del sur 50 MW
PE Llanuras del Viento 100 MW
PE Vulturno 100 MW
PE Vientos del Oriente 50 MW
PE Del Fin del Mundo 50 MW
PE Australes 50 MW
PE Del Bicentenario 100 MW
PE Brisas Serranas 50 MW
PE Vientos del Cambio 50 MW
PE Corredores del Viento 50 MW
Hochspannungsleitung 132 kV
The wind farm “Vientos del Secano” is in Mayor Buratovich, close to Bahía Blanca.
Cost effective connection to the electricity grid, right off the federal street 3 and only 80 km from the airport and port of Bahía Blanca.
Wind Farm “VIENTOS DEL SECANO” – 50 MW
6. Our Projects in Argentina
980 Hectares
14 m above MSL
Wind mast since April 2008
8.4 m/s average wind speed
Land for shepherding
6. Our Projects in Argentina
Wind Farm “VIENTOS DEL SECANO” – 50 MW
The project is ready to build. Only Finances, are needed to start the construction.
Studies made by ABO WIND :o Environmentalo Soil studieso Topographical analysiso Studies to grid connection
Permits from public authorities:o New electricity producer MEMo ENRE permito Environmental licenseo Clean development mechanism
Wind Farm “VIENTOS DEL SECANO” – 50 MW
6. Our Projects in Argentina
3%
7. Contact Details
Vanesa M. RevelliLatin America Director
[email protected] [email protected]
www.ABOWIND.com
In Germany:
Unter den Eichen 7, 65195 Wiesbaden Phone: +49 (0) 611-267655-63; Fax: -99 Mobil: +49 (0) 152 5671 1563
In Argentina:
Alicia Moreau de Justo 1050 P. 4 Of. 196C1107AAP - Dock 7Ciudad Autónoma de Buenos AiresPhone: +54 11 5917 1235 Mobil: +54 911 3045 6312