Date post: | 27-Apr-2018 |
Category: |
Documents |
Upload: | hoanghuong |
View: | 247 times |
Download: | 7 times |
PT. MULTI PT. MULTI ADVERINDOADVERINDO
Servicing the World of Construction Servicing the World of Construction
Contents
1. Words From The Board
2. Company Details
3. Professional Team
4. List of Equipments
5. Reference List of Major Projects
6. Company Policy in Quality Assurance
7. Company Policy in Health, Safety and Environmental
8. Certificates
9. Documentation
Words from the Board
In servicing the world of construction, PT Multi Adverindo
was established in 2003. In our very early stage, we even
started with only old and used machines. We believe our
solid team work determines our own and the future of the
company.
In the period of only five years since the establishment, PT Multi Adverindo has
expanded the range of activities and performed numerous of projects in the wide scope
of civil construction for and on the satisfaction of States Own and Private Clients.
Such performed has been accompanied by corresponding accumulation of :
Professional staffs in engineering, surveyors, mechanics, logistic and HSE staff
Equipments and fleet development and innovation.
Since the beginning, we maintain an extensive inventory of equipment and is
constantly being increased and upgraded. Our extensive inventory of well-maintained and work ready equipment which allows us to perform to client's expectations and
beyond on both small and large projects. We realizes that equipment requires continual reinvestment for maximum efficiency with minimal downtime on our
projects.
We focus on state-of-the-art technology, safety and productivity, and we offer a degree of professionalism and quality unmatched by our competition. Looking toward the
future, we will continue our commitment to provide the best in construction, safety
and environmental contracting services.
In PT Multi Adverindo, we are ready in servicing the world of construction and expects
continuous growth in the years to come. We invite you to experience the satisfaction of
working with PT Multi Adverindo and in assisting you to realize your goals.
Ir. Askaris Chioe
President Director
Company Profile
Servicing the World of Construction
Company Name PT MULTI ADVERINDO Head Office Jl. Mawar No. 5 Perumahan Cemara Asri
Medan 20371
Phone : +62 61 6631666, 6638666
Facsimile : +62 61 6630666, 6631590
Email : [email protected]
Workshop Bengkel GM
Jl. Sisingamangaraja KM.12 No. 88 Medan
Deed of Establishment No. 15 dated 11 August 2003 ( Akte Pendirian ) Other Certificate No. 110 dated 20 November 2007 ( Akte Perubahan ) No. 13 dated 5 November 2008 Registration of Company’s C-21394 HT.01.01.TH.2003 dated 9 September 2003 Certifcates C-07712 HT.01.04.TH.2007 dated 27 December
2007 ( Pengesahan Akte ) AHU-90128.AH.01.02.Tahun2008 dated 26 Nov 2008 Tax Register Identification 01.516.976.6-123.000 ( NPWP ) Trading Business Permit 503.530.08.570/0091/KP2TPM-DS/II/2015 ( SIUP ) dated 09 February 2015 License of Business Palace No. 470/035/2012 ( Surat Domisili ) dated 09 February 2012 License of Construction Permit No.1.127349.1212.2.00454/2012 ( SIUJK ) dated 11 May 2012 Company Registration No. 021314601238 ( TDP ) dated 12 February 2014 Construction Firm Certificate No. 0152/GAPEKSINDO/02/03/10 ( SBU ) dated 05 March 2010 License of Mining Permit No.658.K/30/DJB/2012 ( SIUJP ) dated 12 June 2012 Classification Grade 7 ISO 14001 : 2004 08 104 0678
Servicing the World of Construction
Board Management
President Director : Ir. Askaris Chioe Technical Director : Ir. Rudy Bokslag
Operational Director : Henry, SE.
Marketing Director : Sarung, ST., MT.
Commercial Director : Besdy, SE.
Engineering Manager : Litto Thamsir, ST., M.Eng. Finance Manager : Drs. Koko Wijaya
Servicing the World of Construction
Professional Staff
Department Number of personnels
Finance 5 persons
Procurement 4 persons
Logistic 10 persons
Tax & Accounting 7 persons
Engineer & Site Engineer 13 persons
Human Resources 10 persons
Technical Administration 10 persons
QC/QA & HSE 20 persons
Surveyor 10 persons
Electric & Mechanic 45 persons
No
1
2
3
4
5
6
7
8
9
10
Servicing the World of Construction
List of Equipment
No Type Total
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
Excavator
Bulldozer
Dump Truck
Heavy Duty Dumper
Motor Grader
Compactor
Crawler Crane
Self Loader
Wheel Loader
Rough Terrain Crane
Vibro Hammer
Fuel Truck
Crawler Rock Drill
Compressor
Rock Breaker
Trado
Tug Boat 450HP
Anchor Boat 340 HP
54 units
38 units
148 units
18 units
8 units
14 units
8 units
2 units
4 units
4 units
6 units
4 units
4 units
2 units
4 units
4 units
2 units
2 units
Servicing the World of Construction
List of Equipment
No Type Total Capacity
1
2
3
Excavator
Komatsu PC 400
Komatsu PC 200
Komatsu PC 300
Hitachi ZX 330
Hitachi Zaxis 210
Kobelco SK 200
Kobelco SK 480
Bulldozer
Komatsu D31P
Komatsu D 85SS
Komatsu D 68 ESS
John Deere 760 J
Dump Truck
Hino FM 260 JD
FAW CA 3256
FAW HD 360 DT
Mitsubishi PS 125
Mitsubishi PS 120
Nissan CWB 45 ALDN
7 unit
40 unit
10 unit
16 unit
12 unit
19 unit
3 unit
2 unit
25 unit
5 unit
3 unit
7 unit
20 unit
2 unit
11 unit
2 unit
34 unit
330 HP
143 HP
260 HP
247 HP
147 HP
152,9 HP
315 HP
71 HP
200 HP
175 HP
157 HP
26 ton
20 ton
30 ton
10 ton
10 ton
20 ton
Servicing the World of Construction
List of Equipment
No Type Total
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
Excavator
Bulldozer
Dump Truck
Heavy Duty Dumper
Motor Grader
Compactor
Crawler Crane
Self Loader
Wheel Loader
Rough Terrain Crane
Vibro Hammer
Fuel Truck
Crawler Rock Drill
Compressor
Rock Breaker
Trado
Tug Boat 450HP
Anchor Boat 340 HP
54 units
38 units
148 units
18 units
8 units
14 units
8 units
2 units
4 units
4 units
6 units
4 units
4 units
2 units
4 units
4 units
2 units
2 units
Servicing the World of Construction
List of Equipment
No Type Total Capacity
4
5
6
7
8
9
Compactor
Hamm 3410
Sakai SV 515
Sakai SV 512
Bomag BW 211D-40
Crane
XCMG QUY55
Zoomlion QUY50
Fuel Tank
Hino FM 260 JD
Water Tank
Nissan CW 520 H
Wheel Loader
Furukawa 230-1
Vibro Hammer
Vibro Hammer FAV 600
Tomen VM2-40000E
Nisha SVS 80
5 unit
7 unit
2 unit
3 unit
1 unit
2 unit
1 unit
1 unit
1 unit
1 unit
1 unit
1 unit
134 HP
114 HP
114 HP
132 HP
55 ton
50 ton
26 ton
7 ton
2,5 m3
Servicing the World of Construction
List of Equipment
No Type Total
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
Excavator
Bulldozer
Dump Truck
Heavy Duty Dumper
Motor Grader
Compactor
Crawler Crane
Self Loader
Wheel Loader
Rough Terrain Crane
Vibro Hammer
Fuel Truck
Crawler Rock Drill
Compressor
Rock Breaker
Trado
Tug Boat 450HP
Anchor Boat 340 HP
54 units
38 units
148 units
18 units
8 units
14 units
8 units
2 units
4 units
4 units
6 units
4 units
4 units
2 units
4 units
4 units
2 units
2 units
Servicing the World of Construction
List of Equipment
No Type Total Capacity
10
11
12
Mixer
Mitsubishi F415 J
FAW FW 86 R
HD Truck
Komatsu DT HD 605-5
Motor Grader
Komatsu GD 511 A
Mitsubishi MG 330
1 unit
1 unit
4 unit
4 unit
2 unit
5 m3
5 m3
739 HP
135,4 HP
130 HP
Servicing the World of Construction
Reference List of Major Project
No Description of Works Location Commissioned Contract Value
1 2 3 4 5 6 7 8 9
10
11
LAND MATURATION AND SOIL INVESTIGATION AT PT. MUSIM MAS FUJI PROJECT No. : 004/III/MMF-MA/GA/11 Date : March 10, 2011 OMATI LANDFALL OPERATION FOR PNG LNG EPC2 OFFSHORE PIPELINE PROJECT No. : 602357 Date : June 24, 2011 LOAD AND HAUL OF BLASTED ROCKS IN P. KARIMUN BESAR , RIAU Date : June 30, 2011 CUT & FILL DIGESTER POND WORKS AT PT. SUKAJADI SAWIT MEKAR PROJECT No. : 001/PKS SSM1-BIO/VII/2011 Date : July 7, 2011 SAIPEM KARIMUN YARD CONSTRUCTION PROJECT Karimun Camp Extension No. : 626437 Date : July 25, 2011 EARTHWORKS (CUT & FILL) MILL AREA IN PMKS PT. KEMILAU INDAH NUSANTARA No : 051/THB-SPB/SUB/XII/11 Date : December 19, 2011 HAULING ROAD & INFRASTRUCTURE PT. GUNUNG BARA UTAMA No. : GBU-C004/HR-0112 Date : January 26, 2012 CUT & FILL DIGESTER POND WORKS AT PT. SUKAJADI SAWIT MEKAR PROJECT No. : 001/PKS SSM2-BIO/III/2012 Date : March 20, 2012 EARTHWORKS (CUT & FILL) EFFLUENT POND IN PMKS PT. KALIMAN RIA SEJAHTERA No : 010A/THB-SPB/SUB/III/12 Date : March 05, 2012 EARTHWORKS (CUT & FILL) EFFLUENT POND IN PMKS PT. KEMILAU INDAH NUSANTARA No : 012/THB-SPB/SUB/III/12 Date : March 20, 2012 EARTHWORKS (POND EMBANKMENT) IN PMKS KALIMAN RIA SEJAHTERA No : 028B/THB-SPB/SUB/V/12 Date : May 2012
Bekasi,
West Java
Omati, Papua New
Guinea
Karimun, Kepulauan Riau
Sebabi, Central
Kalimantan
Karimun, Kepulauan Riau
Bengalon, Kutim, East Kalimantan
Melak, East Kalimantan
Sebabi, Central
Kalimantan
Kuala Kurun, Central
Kalimantan
Bengalon, Kutim, East Kalimantan
Kuala Kurun, Central
Kalimantan
PT. MUSIM MAS FUJI
Saipem Asia PNG Branch
PT. Pacific Granitama
PT. SUKAJADI SAWIT MEKAR
PT. Saipem Indonesia
PT. Tunas Harapan Baru
PT. Gunung Bara Utama
PT. SUKAJADI SAWIT MEKAR
PT. Tunas Harapan Baru
PT. Tunas Harapan Baru
PT. Tunas Harapan Baru
Rp. 623,900,000 USD 2,545,650 USD 934,742.57 Rp. 2,879,231,360 USD 1,850,000 Rp. 2.039.000.000 Rp. 164.345.274.951 Rp. 2.201.697.750 Rp. 1.421.152.000 Rp. 3.565.685.000 Rp. 33.959.000
Servicing the World of Construction
Reference List of Major Project
No Description of Works Location Commissioned Contract Value
12
13
14
15
16
17
18
19
20
21
22
EARTHWORKS (CUT & FILL) EFFLUENT POND IN PMKS PT. KEMILAU INDAH NUSANTARA No : 030/THB-SPB/SUB/V/12 Date : June 01, 2012 RESERVOIR WORKS IN PMKS PT. KEMILAU INDAH NUSANTARA No : 049/THB-SPB/SUB/VIII/12 Date : August 08, 2012 EARTHWORKS ACCESS ROAD & WOODEN PILE IN PKMS PT KEMILAU INDAH NUSANTARA No.060D/THB-SPB/THB/IX/2012 Date : September 15,2012 LAND CLEARING AND FILLING WORKS AT SIDE B AREA AT PT SUKAJADI SAWIT MEKAR No.001/SSM-SMPT-ST.B/PRJ/2013 Date : January 21, 2013 PAVING BLOCK AND KERB INSTALLATION PROJECT AT PT SUKAJADI SAWIT MEKAR No.003/SSM-SMPT/PRJ/I/2013 Date : January 21, 2013 LAND CLEARING, FILLING, GEOTEXTILE AND BASE COURSE AT SIDE B AREA PROJECT AT PT SUKAJADI SAWIT MEKAR No.003/SSM-SMPT-ST.B/PRJ/I/2013 Date : January 21, 2013 SLOPING ACCESS ROAD AND AREA WATER TREATMENT PLANT WORKS AT PKMS PT KEMILAU INDAH NUSANTARA No.010/THB-SPB/SUB/II/2013 Date : February 07, 2013 DRAINAGE, FENCING, GEOTEXTILE, WOODEN PILE AND BASE COURSE AT AREA SIDE B PROJECT AT PKMS PT SUKAJADI SAWIT MEKAR No.005/SSM-SMPT-ST.B/PRJ/IV/2013 Date : April 02, 2013 ROAD PREPARATION WORK AT BIOGAS PLANT AREA AND PREPARATION OF HDPE PIPELINE ON DIGESTER POND AT PKMS PT SUKAJADI SAWIT MEKAR No. : 006/PKS-SSM1 BIO/V/2013/ Dated : May 01, 2013 CONCRETE BEAM DEVELOPMENT WORK AT PKMS PT SUKAJADI SAWIT MEKAR No. : 009/SSM-SMPT/PRJ/V/2013 Dated : May 20, 2013 CUT & FILL ON EMBANKMENT POND AT DIGESTER POND AREA ON PKMS PT . SUKAJADI SAWIT MEKAR No. : 008/PKS SSM2-BIO/VI.2013 Dated : June 18, 2013
Bengalon, Kutim, East Kalimantan
Bengalon, Kutim, East Kalimantan
Bengalon, Kutim, East Kalimantan
Bagendang, Sampit Central
Kalimantan
Bagendang , Sampit, Central
Kalimantan
Bagendang , Sampit, Central
Kalimantan
Bengalon, Kutim, East Kalimantan
Bagendang , Sampit, Central
Kalimantan
Sampit Central
Kalimantan
Sampit, Central
Kalimantan
Sampit, Central
Kalimantan
PT. Tunas Harapan Baru
PT. Tunas Harapan Baru
PT. Tunas Harapan Baru
PT Sukajadi Sawit Mekar
PT Sukajadi Sawit Mekar
PT Sukajadi Sawit Mekar
PT. Tunas Harapan Baru
PT Sukajadi Sawit Mekar
PT Sukajadi Sawit Mekar
PT Sukajadi Sawit Mekar
PT Sukajadi Sawit Mekar
Rp. 720.900.000 Rp. 3.406.913.000 Rp 114.722.000 Rp 3.025.000.000 Rp. 295.900.000 Rp. 3.729.000.000 Rp. 135.034.000 Rp. 1.791.900.000 Rp. 40,000,000 Rp. 62,700,000 Rp. 21,420,000
Servicing the World of Construction
Reference List of Major Project
No Description of Works Location Commissioned Contract Value
23
24
25
26
27
28
29
30
31
32
33
34
35
36
CUT & FILL DIGESTER POND BIOGAS PLANT ON PKMS PT. GUNTUNG IDAMANUSA No. : 001/PKS GIN1-BIO/IV/2014 Dated : April 08, 2014 EARTHWORKS AT PKMS PT ADITYA AGRINDO No : 048/THB-SPB/VI/2014 Dated : June 17, 2014 PILING INSTALLATION WORK (DRIVEN PILES) No : 949498 Dated : July 01, 2014 CONCRETE WORKS FOR YARD DEVELOPMENT PROJECT No : 956103 Dated : July 17, 2014 CUT & FILL DIGESTER POND BIOGAS PLANT No : 001/PKS ISB-BIO/IX/2014 Dated : September 15, 2014 SITE PREPARATION FOR LUMUT BALAI GEOTHERMAL FCRS & POWER PLANT PROJECT No : - Dated : April 30, 2015 INDONESIA SARULLA GEOTHERMAL POWER PLANT PROJECT FOR NIL AREA CIVIL PKG No : IPON-SC-C-006 Dated : March 04, 2015 INDONESIA SARULLA GEOTHERMAL POWER PLANT PROJECT FOR SIL AREA CIVIL PKG No : IPON-SC-C-005 Dated : March 19, 2015 ADDITIONAL EARTHWORKS AT PKMS PT ADITYA AGRINDO No : 160/THB-SPB/SUB/X/14 Dated : October 18, 2014 CUT & FILL AT PKS TANJUNG HARAPAN MILL FOR PT Multi Jayantara Abadi No : 01/PB/HO/PBR-MA/EW/XI/2014 Dated : November 28, 2014 ADDITIONAL EARTHWORKS OF EFFLUENT POND AT PKMS PT Aditya Agrindo No : 081/THB-SPB/SUB/III/2015 Dated : March 01, 2015 PILEWORK (NIL POWER PLAN) No : IPON-SC-C-009 Dated : June 30, 2015 LAND PREPARATION WORKS No : - Dated : July 13,2015 CONSTRUCTION OF BRIDGE FOR PT GLOBALINDO ALAM PERKASA No : 006A-HO/PT.GAP/IX/2015 Dated : September 15, 2015
Indragiri Hilir
Riau
Ketapang West Kalimantan
Karimun, Kepulauan Riau
Karimun, Kepulauan Riau
Desa Rambah, Kec. Rambah Hilir, Kab Rokan Hulu
Lumut Balai,
South Sumatra
North Tapanuli, North Sumatra
North Tapanuli, North Sumatra
Ketapang, West Kalimantan
Tanjung Harapan, East Kalimantan
Ketapang, West Kalimantan
North Tapanuli, North Sumatra
Kariangau, West Kalimantan
Sampit, Central Kaliman-
tan
PT Guntung Idamanusa
PT Tunas Harapan Baru
PT Saipem Indonesia
PT Saipem Indonesia
PT Indomakmur Sawit Berjaya
Hawkins Infrastruc-ture / BCK Joint
Operations
Hyundai Engineering & Construction—
Seoul Korea
Hyundai Engineering & Construction—
Seoul Korea
PT Tunas Harapan Baru
PT Pancakarsa Bangun Reksa
PT Tunas Harapan Baru
Hyundai Engineering & Construction—
Seoul Korea
PT Bintang Garuda Mas Raya
PT Globalindo Alam Perkasa
Rp. 2,083,236,295 Rp. 9,228,728,000 USD 140,000 USD 1,485,000 Rp 1,300,000,000 Rp 12,221,000,000 USD 11,952,069.77 USD 5,073,608.66 Rp 2,953,000,000 Rp 6,300,000,000 Rp 4,375,000,000 USD 3,101,940.26 Rp 10,281,000,000 Rp 5,490,000,000
Servicing the World of Construction
Reference List of Major Project
No Description of Works Location Commissioned Contract Value
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
Sea Shore Slope Protection No : 005/BGMR/Project/XI/2015 Dated : November 16, 2015 Construction of Road and Drainage No : 014/BGMR/Project/I/2016 Dated : January 01, 2016 Pre-work #2 No : LB-0007-P1 Dated : April 01, 2016 Construction of new infrastructure road from LMB-6 to LMB-9 and the entrance along with pipeline at LMB-9 No : 4600002814 Dated : May 30, 2016 Lumut Balai Geothermal FCRS & Power Plant 1 x 55 MW No : Aw—3101- 01 Dated : June 20, 2016 Temporary Surface Water Treatment System No : LB-0008-P1 Dated : July 28, 2016 Cut & Fill Jetty Kartiasa No : 002/SEC-JETTY/XI/2016 Dated : November 01, 2016 Hill Top Cutting #2 No : LB-0011-P1 Dated : November 10, 2016 Civil Works for FCRS Area No : LMB-SC-LOI-009 Dated : November 14, 2016 Construction of Weight Bridge and Weight Bridge Office No : 105/KRN/LGL-Bpn/XII/2016 Dated : December 15, 2016 Construction of Retaining Wall No : 106/KRN/LGL-Bpn/XII/2016 Dated : December 15, 2016 Construction of Road and Drainage Elv.21 No : 107/KRN/LGL-Bpn/XII/2016 Dated : December 15, 2016 Construction of Perimeter Fencing No : 108/KRN/LGL-Bpn/XII/2016 Dated : December 15, 2016 Construction of Slope Protection No : 109/KRN/LGL-Bpn/I/2016 Dated : December 15, 2016 Rental Heavy Equipment for Touch Up All Project Area No : P4702-ON-PC1300 Dated : December 16, 2016 Construction of Box Culvert No : 003/SEC-JETTY/XII/2016 Dated : December 27, 2016
Kariangau.
East Kallimantan
Kariangau, East Kalimantan
Lumut Balai, Palembang
Lumut Balai, Palembang
Lumut Balai, Palembang
Lumut Balai, Palembang
PKS Sambas, West Kalimantan
Lumut Balai, Palembang
Palembang, South Sumatra
West Kalimantan
West Kalimantan
West Kalimantan
West Kalimantan
West Kalimantan
West Kalimantan
West Kalimantan
PT Bintang Garuda Mas
Raya
PT Bintang Garuda Mas Raya
PT Toshiba Asia Pasific Indonesia
PT Pertamina Geothermal Energy
PT Inti Karya Persada Tehnik
PT Toshiba Asia Pasific Indonesia
PT Sarana Esa Cita
PT Toshiba Asia Pasific Indonesia
PT. Inti Karya Persada Tehnik
PT Kutai Refinery Nusantara
PT Kutai Refinery Nusantara
PT Kutai Refinery Nusantara
PT Kutai Refinery Nusantara
PT Kutai Refinery Nusantara
PT Kutai Refinery Nusantara
PT Sarana Esa Cita
Rp 4,000,000,000 Rp 1,030,000,000 Rp 2,848,886,510 Rp 12,500,000,000 Rp 3,707,907,810 Rp 532,469,340 Rp 6,387,000,000 Rp 16,840,793,034 Rp 104,886,000,000 Rp 561,106,157 Rp 714,003,000 Rp 217,358,000 Rp 592,375,000 Rp 378,227,000 Rp 183,957,500 Rp 120,000,000
Servicing the World of Construction
Reference List of Major Project
No Description of Works Location Commissioned Contract Value
53
54
Retaining Wall Works No : 129/PKS-GIN2/III/2017 Dated : March 24, 2017 Construction of Infrastructure Final Cut HTC-3 and Switch Yard Area Include Slope Protection GPP Lumut Balai No : 141/PGE000/2017-S0 Dated : April 25, 2017
Indragiri Hilir,
Riau
Lumut Balai, Palembang
PT Guntung Idamannusa
PT Pertamina Geothermal Energy
Rp 4,450,000,000 Rp 143,000,000,000
Quality Policy The quality policy of PT Multi Adverindo is to deliver to clients design and construction services which meet the contract and statutory requirements. EMPLOYEES All employees of PT Multi Adverindo are guided by our Quality Policy in all decisions and actions on a daily basis. To realize the Quality Policy, all employees shall set up detail execution plan in their working fields and control as the personal objectives for client’s satisfaction. THE POLICY GOALS Our goals are to provide the following: A product, service, or solution which meets or exceeds our client’s expectations Conscientious, responsive, and professional efforts A highly trustworthy and ethical work environment that provides long-term
employment, development, and growth for all employees. Continuous improvement in all that we do
THE POLICY GOALS To accomplish this policy, PT Multi Adverindo establishes the following objectives: 1. PT Multi Adverindo requires all employees to work to the client’s require-
ments, which is in terms of attendance, workmanship quality and completion timing.
2. Prepares and uses a Project Quality Management Plan to plan, do, check, act both works and materials, for every ground engineering contract and statutory requirements which PT Multi Adverindo undertakes.
3. Maintains core employee, selects and maintains qualified suppliers and sub-contractors, and give effective instructions and feedback so that client requirements are met effectively and efficiently.
To ensure a complete and responsible approach to the Project Management Team, our system also includes separate policies for Health and Safety and Environmental management. PT Multi Adverindo will not compromise the integrity of our services in an attempt to satisfy short-term goals. We are committed to long-term growth, profitability and employment of our personnel and which encompasses an attitude of “Quality First.”
Ir. Askaris Chioe President Director
HEALTH, SAFETY, AND ENVIRONMENTAL POLICY
PT Multi Adverindo is fully committed to provide and maintain a safe and healthy
working environment as the first consideration in all work and for employees.
The goal is to conduct all activities in the project in order to achieve: 1. Zero Lost Time Accident
2. Zero Occupational Illness
3. Zero effect to the Environment
PT Multi Adverindo committed to do continuous improvements in the HSE
practices and performances. All activities shall be fully compliant with all
applicable laws, statutory, and standards to be insured all the time.
PT Multi Adverindo Management shall take all reasonable steps in order to ensure employees understand HSE policy through instruction, training, and information.
All staff is required to respect and implement the entire HSE requirement set by employer and encouraged to report and consult with management on HSE issues.
PT Multi Adverindo is fully committed for implementing the project contract requirement set by Client. No alcohol and drugs must be taken into any worksites.
PT Multi Adverindo recognizes this can be put at risk by those who misuse alcohol or drugs to such an extent that it may affect their health, performance, conduct,
and safety, or the safety of others whilst in the worksites.
The application of this policy is direct responsibility of Project Management Team
(PMT), line management, all employees, and sub-contractors involved in its day-to-
day application.
The top management of Multi Adverindo fully supports this policy and
encourages employees to take pro-active approach with respect to HSE matters in executing their duties.
Ir. Askaris Chioe President Director
Servicing the World of Construction
Certificates
LEADERSHIP IN SAFETY
ENVIROMENT FRIENDLY OPERATION
QUALITY FIRST
Servicing the World of Construction
Certificates
ISO 9001 : 2008
Servicing the World of Construction
Certificates
ISO 14001 : 2004
Servicing the World of Construction
Certificates
OHSAS 18001 : 2007
Servicing the World of Construction
Documentation
HSE DRILL & MEETING
Tool Box Talk everyday before
starting to work
Emergency and medical re-
sponse drill twice a month
Mass meeting every week
Servicing the World of Construction
Documentation
WORKSHOP & TRAINING
Training at home office
On site workshop
Servicing the World of Construction
Documentation
IRRIGATION AND DRAINAGE CONSTRUCTION Flood Control Project in Badera River
Dredging by floating excavator or cutter suction
Gabion mass and armour rock protection
Servicing the World of Construction
Documentation
OFFSHORE PILING AND MARINE CONSTRUCTION Construction of Loading Harbour
in Sabang - Nanggroe Aceh Darrusalam
Special handling equipment Special handling and method in marine environment
1400 mm diameter steel spun pipe with 38 m length without joint
Servicing the World of Construction
Documentation
INDUSTRIAL BUILDING AND ITS FACILITIES Erection Works at Bleaching Earth Factory
Steel structure fabrication and erection
Servicing the World of Construction
FORESTRY AND PLANTATION SECTOR PROJECT PT Riau Andalan Pulp and Paper Project
in Pangkalan Kerinci - Riau
Documentation
Harvesting of chip wood for pulp and paper industry
Servicing the World of Construction
Documentation
MINING AND HAULING OF BENTONITE Bentonite Mining and Transporting from Sipirok to Dumai Port - Riau
Planning and Construction of mining road, mine operation and transport
Servicing the World of Construction
Documentation
EARTHWORKS FOR PALM OIL INDUSTRY Cut and Fill Works for Palm Oil Factory of PT Siak Prima
Excavation to design elevation
Back filling according to specification
Servicing the World of Construction
Documentation
EARTHWORKS & SOIL IMPROVEMENT FOR POWER PLANT Site Levelling and Grading Work
for 2 x 135 MW IPP Coal Fired Power Plant in Kuala Tanjung - North Sumatera
Vertical well to collect consolidated air and water
Vertical drain Installation
and preloading
Preloading with backfilling for
consolidation
Servicing the World of Construction
Documentation
MARINE STRUCTURE CONSTRUCTION Dumai Portland Reclamation Project
for PT Adei Plantation and Industry
Servicing the World of Construction
Documentation
OFFSHORE STRUCTURE CONSTRUCTION Construction of Trestle, Secondary Jetty, Tangker Barge Jetty and Pipe Rack
in Kuala Tanjung - North Sumatera
2.5 KM of bridge way and jetty
Supply of construction material at marine environment
Servicing the World of Construction
Documentation
OFFSHORE STRUCTURE CONSTRUCTION Construction of Trestle, Secondary Jetty, Tangker Barge Jetty and Pipe Rack
in Kuala Tanjung - North Sumatera
Managing handling of 2.5 KM harbor construction material
Fabrication and erection of 2.5 KM steel girder
Logistic supply and handling in offshore operation
Servicing the World of Construction
Documentation
OFFSHORE & UNDERWATER CONSTRUCTION Laying Underwater Pipes Works
in Pangkalan Susu - North Sumatera
Fabrication and erection of small rig for oil and gas industry
Servicing the World of Construction
Documentation
MARINE STRUCTURE CONSTRUCTION Revetment Project
in Uleule - Nanggroe Aceh Darrusalam
Armour rock protection for tsunami relieve
Servicing the World of Construction
Documentation
MASS HOUSING CONSTRUCTION AND FACILITIES Construction of houses in Leupung - Aceh Besar,
Nanggroe Aceh Darrusalam
Site preparation and mass construction of housing for tsunami victims
Servicing the World of Construction
Documentation
COAST LINE EARTHWORKS SAIPEM Karimun Yard Construction
in Karimun, Kepulauan Riau
Rock breaking
Long range excavation
Excavation of swampy area
Servicing the World of Construction
Documentation
EMBANKMENT WITH SOIL STABILIZATION SAIPEM Karimun Yard Construction
in Karimun - Kepulauan Riau
Backfill and compaction
Installation of geotextile
Servicing the World of Construction
Documentation
PRELOADING AND RECLAIMED MARINE SAND SAIPEM Karimun Yard Construction
in Karimun - Kepulauan Riau
Large volume of earthwork operation
Servicing the World of Construction
Documentation
ROCK DRILLING AND BLASTING WORKS SAIPEM Karimun Yard Construction
in Karimun - Kepulauan Riau
Drilling and installation
engineed
..and blasting
Servicing the World of Construction
Documentation
EARTHWORKS FOR COAL MINING INDUSTRY Melak , East Kalimantan
Servicing the World of Construction
Documentation
EARTHWORKS FOR COAL MINING INDUSTRY Melak , East Kalimantan
Over burden removal
Cut and fill earthwork
Land preparation for crushing plan
Hauling of material
Servicing the World of Construction
Documentation
ENGINEERING DESIGN, PROCUREMENT AND
CONSTRUCTION OF BRIDGE Construction of Perak Bridge
West Kutai - East Kalimantan
70 m prestressed concrete girder bridge
Engineered and designed formwork
Launching by special equipment
Borepile construction and testing
Servicing the World of Construction
Documentation
REMOTE AREA OPERATION PNG LNG EPC2 OFFSHORE PIPELINE PROJECT
Port Moresby-Papua New Guinea
400 KM away to nearest town without road / land access
Pipe tie in preparation at landfall area
Servicing the World of Construction
Documentation
Load and Haul of Blasted Rocks PT. Pacific Granitama
Pulau Karimun Besar, Riau
Servicing the World of Construction
Documentation
Hauling Granite PT. Kawasan Dinamika Harmonika
Pulau Karimun Besar, Riau
Servicing the World of Construction
Documentation
Land Preparation Works PT. Bintang Garuda Mas Raya Kariangau—West Kalimantan
Servicing the World of Construction
Documentation
Concrete Works for Yard Development PT. Saipem Indonesia
Karimun, Kepulauan Riau
Servicing the World of Construction
Documentation
Indonesia Sarulla Geothermal Power Plant Hyundai Engineering & Construction
North Tapanuli , North Sumatra
Servicing the World of Construction
Documentation
Indonesia Sarulla Geothermal Power Plant (SIL) Hyundai Engineering & Construction
North Tapanuli, North Sumatra
Servicing the World of Construction
Documentation
Indonesia Sarulla Geothermal Power Plant Hyundai Engineering & Construction
North Tapanuli , North Sumatra