50
Social Monitoring Report # Semiannual Report July-December 2019 December 2019 INO: West Kalimantan Power Grid Strengthening Project Part 2 Prepared by Pusat Manajemen Proyek (Pusmanpro) for the PT PLN and the Asian Development Bank.
Transcript
Page 1: INO: West Kalimantan Power Grid Strengthening Part 2...STRUKTUR ORGANISASI TIM MANAJEMEN KONSTRUKSI STRENGTHENING WEST KALIMANTAN PROJECT ADB LOAN 3015 DAN AFD 1024-01 B PT PLN (Persero…

Social Monitoring Report

# Semiannual Report July-December 2019 December 2019

INO: West Kalimantan Power Grid Strengthening

Project – Part 2

Prepared by Pusat Manajemen Proyek (Pusmanpro) for the PT PLN and the Asian Development

Bank.

Page 2: INO: West Kalimantan Power Grid Strengthening Part 2...STRUKTUR ORGANISASI TIM MANAJEMEN KONSTRUKSI STRENGTHENING WEST KALIMANTAN PROJECT ADB LOAN 3015 DAN AFD 1024-01 B PT PLN (Persero…

CURRENCY EQUIVALENTS (as of 31 December 2019)

Currency unit – Indonesian rupiah (Rp) Rp1.00 = $0.000071849

$1.00 = Rp13,918

NOTE

(i) In this report, "$" refers to US dollars. This social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

Page 3: INO: West Kalimantan Power Grid Strengthening Part 2...STRUKTUR ORGANISASI TIM MANAJEMEN KONSTRUKSI STRENGTHENING WEST KALIMANTAN PROJECT ADB LOAN 3015 DAN AFD 1024-01 B PT PLN (Persero…

Social Semi Annual Report July - December 2019

APPENDICES

Page 4: INO: West Kalimantan Power Grid Strengthening Part 2...STRUKTUR ORGANISASI TIM MANAJEMEN KONSTRUKSI STRENGTHENING WEST KALIMANTAN PROJECT ADB LOAN 3015 DAN AFD 1024-01 B PT PLN (Persero…

Social Semi Annual Report July - December 2019

Appendix 1 Project Organization Charts

Page 5: INO: West Kalimantan Power Grid Strengthening Part 2...STRUKTUR ORGANISASI TIM MANAJEMEN KONSTRUKSI STRENGTHENING WEST KALIMANTAN PROJECT ADB LOAN 3015 DAN AFD 1024-01 B PT PLN (Persero…

PROJECT ORGANIZATION CHART

Page 6: INO: West Kalimantan Power Grid Strengthening Part 2...STRUKTUR ORGANISASI TIM MANAJEMEN KONSTRUKSI STRENGTHENING WEST KALIMANTAN PROJECT ADB LOAN 3015 DAN AFD 1024-01 B PT PLN (Persero…

ORGANIZATION CHART OF PT PLN (PERSERO) UIP KALBAGBAR

PLT. General Manager

Rachmat Lubis

Planning Senior Manager

Agus Risfian Noor

Operation Construction

Senior Manager

I Wayan Semudiarsa

PLT Finance and HRD

Senior Manager

Dadang Hardiana

PLT Land Affairs &

Communication

Senior Manager

Effrizon

MANAGERUPP KBB 2

R. Djoko Pribadi

MANAGERUPP KBB 3

Benaya Sutami

Page 7: INO: West Kalimantan Power Grid Strengthening Part 2...STRUKTUR ORGANISASI TIM MANAJEMEN KONSTRUKSI STRENGTHENING WEST KALIMANTAN PROJECT ADB LOAN 3015 DAN AFD 1024-01 B PT PLN (Persero…

ORGANIZATION CHART OF PT PLN (Persero) UPP KALBAGBAR 2

`

MANAGER

R. Djoko Pribadi

ADMINISTRATION & FINANCE

SUPERVISOR

Hendy Guntur S.

MANAGER ENGINEERING

Ivan Dharma Sihite

PLT. MANAGER LAND

AFFAIRS

Kumara Bagus RW.

PMIS Management

Supervisor

Wega Dwi Putra

K3L EXECUTIVE OFFICER

Afditia Azhari

Page 8: INO: West Kalimantan Power Grid Strengthening Part 2...STRUKTUR ORGANISASI TIM MANAJEMEN KONSTRUKSI STRENGTHENING WEST KALIMANTAN PROJECT ADB LOAN 3015 DAN AFD 1024-01 B PT PLN (Persero…

ORGANIZATION CHART OF PT PLN (Persero) UPP KALBAGBAR 3

PLT. MANAGER

Benaya Sutami

ADMINISTRATION & FINANCE

SUPERVISOR

Rosda Agung A

MANAGER ENGINEERING

Yulius Wiji HS.

PLT.MANAGER LAND

AFFAIRS

Hariadi Putiray

PMIS Management

Supervisor

Sanjaya Nasution PLT. PROJECT MANAGER

(PLTU 3 KALBAR)

Faizal Hidayatur RH.

PLT. PROJECT MANAGER

(PLTU 2 KALBAR)

Harry Gusti N

K3L EXECUTIVE OFFICER

M. Sayyid Romdhoni.

Page 9: INO: West Kalimantan Power Grid Strengthening Part 2...STRUKTUR ORGANISASI TIM MANAJEMEN KONSTRUKSI STRENGTHENING WEST KALIMANTAN PROJECT ADB LOAN 3015 DAN AFD 1024-01 B PT PLN (Persero…

STRUKTUR ORGANISASI TIM MANAJEMEN KONSTRUKSI STRENGTHENING WEST KALIMANTAN PROJECT

ADB LOAN 3015 DAN AFD 1024-01 B

PT PLN (Persero) PUSAT MANAJEMEN PROYEK

PROJECT COORDINATING AND REPORTING

PROJECT SUPERVISION

PROJECT TEAM LEADER

PROJECT ADMINISTRATOR

Bilingual Secrctary : Nungky Mesayu

Project Administrator: Aqil Zulfikar

TENAGA AHLI ENGINEER

Ahli Keuangan :

Ahli Konstruksi E/M :

Ahli Konstruksi Sipil :

Ahli Sosial dan LARP :

Eng, Lingkungan :

Eng, K3 :

Eng, Schedule : Kristina Wulan

MANAGER UMK II

P/C

KTSK ( 1 orang )

Dedi Hartanto

P/C ADMINISTRATOR (2 orang)

Adm Proyek: Brendhadea

Adm Umum : Diera Rahmia Arif

Pengawas Lingkungan (1

orang)

Naffa

Pengawas Sosial (1 orang )

Aqil

Koor Proyek Gardu Induk

Muchlis

Pengawas K3 (4 orang)

Risdyanti

Pengawas Sipil (6 orang)

Dicky, Hermawan

Pengawas E/M (6 orang)

Samsul Arbi

Koor Proyek Transmisi (1 orang)

Dedy Galih

Pengawas K3 (8 orang)

Naffa, Angga Alvin, Tari,

Huda

Pengawas Sipil (2orang)

Ikas

Lisen

Deny

Pengawas E/M (14 orang)

Sugeng, Samsul Arbi, Pengawas Scadatel (4 orang)

Deka, Angga

Page 10: INO: West Kalimantan Power Grid Strengthening Part 2...STRUKTUR ORGANISASI TIM MANAJEMEN KONSTRUKSI STRENGTHENING WEST KALIMANTAN PROJECT ADB LOAN 3015 DAN AFD 1024-01 B PT PLN (Persero…

Social Semi Annual Report July - December 2019

Appendix 2 Submission Letter of Revised IMA

Page 11: INO: West Kalimantan Power Grid Strengthening Part 2...STRUKTUR ORGANISASI TIM MANAJEMEN KONSTRUKSI STRENGTHENING WEST KALIMANTAN PROJECT ADB LOAN 3015 DAN AFD 1024-01 B PT PLN (Persero…
Page 12: INO: West Kalimantan Power Grid Strengthening Part 2...STRUKTUR ORGANISASI TIM MANAJEMEN KONSTRUKSI STRENGTHENING WEST KALIMANTAN PROJECT ADB LOAN 3015 DAN AFD 1024-01 B PT PLN (Persero…
Page 13: INO: West Kalimantan Power Grid Strengthening Part 2...STRUKTUR ORGANISASI TIM MANAJEMEN KONSTRUKSI STRENGTHENING WEST KALIMANTAN PROJECT ADB LOAN 3015 DAN AFD 1024-01 B PT PLN (Persero…
Page 14: INO: West Kalimantan Power Grid Strengthening Part 2...STRUKTUR ORGANISASI TIM MANAJEMEN KONSTRUKSI STRENGTHENING WEST KALIMANTAN PROJECT ADB LOAN 3015 DAN AFD 1024-01 B PT PLN (Persero…

Social Semi Annual Report July - December 2019

Appendix 3 Vulnerable Affected People List in the Corridor of the 275 kV

Bengkayang - Jagoibabang TL

Page 15: INO: West Kalimantan Power Grid Strengthening Part 2...STRUKTUR ORGANISASI TIM MANAJEMEN KONSTRUKSI STRENGTHENING WEST KALIMANTAN PROJECT ADB LOAN 3015 DAN AFD 1024-01 B PT PLN (Persero…

Status of Age Sex

Affected AP in In In Other Total

People (th) M/F Project Location Area

(AP) Household Area

Lumar Lamolda

1 Amoi widow 56 F 0 Yes No Yes Yes 20000 144 10000 30000 9

Cannot work any more, livelihood supported

by her children. Prefer to get cash as income

restoration.

Sudah tidak bekerja, Biaya sehari hari di berikan dari

anak anaknya, Jika di berikan bantuan program income

restoration lebih menyukai mendapatkan uang kas

Vulnerable

Sanggau Ledo Bange

2 Surai widow 75 F Farmer 550,000 Yes Yes Yes Yes 10000 2600 2500 12500 1

Cannot work any more, livelihood supported

by her children. Prefer to get fertilizer and

seed as income restoration.

Sudah tidak bekerja, Biaya sehari hari di berikan dari

anak anaknya, Jika di berikan bantuan program income

restoration lebih menyukai mendapatkan pupuk dan

bibit

Vulnerable

Seluas Mayak

3 Batu householder 70 M farmer 150,000 Yes Yes No Yes 40000 40000 6

He is 80 years old, he work as rock breaker

and sell the rock. His income is less than Rp.

250,000/month, Eventhough he has 1 Ha of

land but he cannot work on his farm as he's

very old. He involved in every process of land

acquisition but unfortunatly compensation

was taken away by his son.

Pak Batu sudah berumur 80 tahun dan tidak lagi

berladang, saat ini pekerjaannya adalah memecah batu

dan menjualnya. Penghasilannya adalah Rp. 250,000/

bulan. Pada saat proses pemebebasan ROW ikut aktif

menghadiri sosialisasi. Pak Batu tidak bisa

memanfaatkan uang kompensasinya karena telah di

ambil oleh anaknya

Vulnerable

Jagoi Babang Jagoi Babang

4 Akon household 80 M farmer 693,333 Yes Yes No Yes 40000 40000 10

work as farmer, his house is far away from

village, so PIC only can meet his son. His

income is less than Rp. 1,000,000/ month.

Mr. akon also join in farmer group which

each group receive corn seeds from

Agriculture agency

Bekerja sebagai petani, karena rumahnya jauh dari

desa maka PIC hanya bisa menemui anaknya. Mr.

akon termasuk dalam kelompok tani yang menerima

bantuan bibit jagung dari dinas pertanian bengkayang.

Pendapatannnya kurang dari Rp. 1,000,000/bulan

Vulnerable

5Nyawop /

Anyenhousehold 78 M farmer 100,000 Yes Yes No Yes 113

Land belongs to his son Mr, Anyen. Work as

motor bike taxi and his income is Rp.

500,000,- as additional income he plant

pepper and get Rp. 5,600,000 /year. He

expect to get fertilizer for pepper tree as

income restoration

Lahan yang terkena adalah milik anaknya : Bp. Anyen

yang bekerja sebagai ojek dengan penghasilan Rp.

500,000/bulan. Sebagai tambahan pendapatannya Bp.

Anyen menanam sahang dengan tambahan

penghasilan Rp. 5,600,000/bulan. Mengharapkan

mendapatkan bantuan berupa pupuk untuk sahang

Vulnerable

Jumlah Vulnerable 0

Survey Result by PIC/ Hasil Survey PIC

KECAMATAN DESA

KECAMATAN DESA

KECAMATAN DESA

KECAMATAN DESA

Photos

AP Affected by the ROW of 275 kV

No Occupation

Status / Vulnerability Field Surveky result by PIC / Survey Lapangan oleh PIC

VulnerabilityIncome/

MonthStatus

IncomeUsage

Status

Aged

Status

Gender

Vulnerabl

e Propose

Affected

Trees

Tower Name Of

Affected People

Number (AP)

KECAMA: Seluas DESA : Seluas

T.160 Kartini Melayu F 25,000 625 2.5Private,

farmer600,000 Yes Yes No Yes

Cannot work as she's

already old and her right

leg was fracture, daily

cost is supproted by her

brother and sister.

Sudah tidak mampu lagi bekerja

karena sudah tua dan kakinya

patah. Biaya sehari hari di

tanggung oleh saudaranya.

Vulnerabl

e Propose%

Occupatio

n

Income

/month

Income

Status

Gender

Status

Ethnic

Status

AP Affected by the Tower Foundation of 275 kV

Ethnic

GroupGender

Landho

lding

(m2)

Affected LandSTATUS

m

Field Surveky result by PIC / Survey Lapangan oleh PIC

Survey Result by PIC/ Hasil Survey PIC Photos

Page 16: INO: West Kalimantan Power Grid Strengthening Part 2...STRUKTUR ORGANISASI TIM MANAJEMEN KONSTRUKSI STRENGTHENING WEST KALIMANTAN PROJECT ADB LOAN 3015 DAN AFD 1024-01 B PT PLN (Persero…

Social Semi Annual Report July - December 2019

Appendix 4 Coordination Meeting related to CSR Package 1: 275 kV

Bengkayang - Jagoibabang TL

Page 17: INO: West Kalimantan Power Grid Strengthening Part 2...STRUKTUR ORGANISASI TIM MANAJEMEN KONSTRUKSI STRENGTHENING WEST KALIMANTAN PROJECT ADB LOAN 3015 DAN AFD 1024-01 B PT PLN (Persero…
Page 18: INO: West Kalimantan Power Grid Strengthening Part 2...STRUKTUR ORGANISASI TIM MANAJEMEN KONSTRUKSI STRENGTHENING WEST KALIMANTAN PROJECT ADB LOAN 3015 DAN AFD 1024-01 B PT PLN (Persero…
Page 19: INO: West Kalimantan Power Grid Strengthening Part 2...STRUKTUR ORGANISASI TIM MANAJEMEN KONSTRUKSI STRENGTHENING WEST KALIMANTAN PROJECT ADB LOAN 3015 DAN AFD 1024-01 B PT PLN (Persero…
Page 20: INO: West Kalimantan Power Grid Strengthening Part 2...STRUKTUR ORGANISASI TIM MANAJEMEN KONSTRUKSI STRENGTHENING WEST KALIMANTAN PROJECT ADB LOAN 3015 DAN AFD 1024-01 B PT PLN (Persero…
Page 21: INO: West Kalimantan Power Grid Strengthening Part 2...STRUKTUR ORGANISASI TIM MANAJEMEN KONSTRUKSI STRENGTHENING WEST KALIMANTAN PROJECT ADB LOAN 3015 DAN AFD 1024-01 B PT PLN (Persero…
Page 22: INO: West Kalimantan Power Grid Strengthening Part 2...STRUKTUR ORGANISASI TIM MANAJEMEN KONSTRUKSI STRENGTHENING WEST KALIMANTAN PROJECT ADB LOAN 3015 DAN AFD 1024-01 B PT PLN (Persero…
Page 23: INO: West Kalimantan Power Grid Strengthening Part 2...STRUKTUR ORGANISASI TIM MANAJEMEN KONSTRUKSI STRENGTHENING WEST KALIMANTAN PROJECT ADB LOAN 3015 DAN AFD 1024-01 B PT PLN (Persero…
Page 24: INO: West Kalimantan Power Grid Strengthening Part 2...STRUKTUR ORGANISASI TIM MANAJEMEN KONSTRUKSI STRENGTHENING WEST KALIMANTAN PROJECT ADB LOAN 3015 DAN AFD 1024-01 B PT PLN (Persero…
Page 25: INO: West Kalimantan Power Grid Strengthening Part 2...STRUKTUR ORGANISASI TIM MANAJEMEN KONSTRUKSI STRENGTHENING WEST KALIMANTAN PROJECT ADB LOAN 3015 DAN AFD 1024-01 B PT PLN (Persero…
Page 26: INO: West Kalimantan Power Grid Strengthening Part 2...STRUKTUR ORGANISASI TIM MANAJEMEN KONSTRUKSI STRENGTHENING WEST KALIMANTAN PROJECT ADB LOAN 3015 DAN AFD 1024-01 B PT PLN (Persero…
Page 27: INO: West Kalimantan Power Grid Strengthening Part 2...STRUKTUR ORGANISASI TIM MANAJEMEN KONSTRUKSI STRENGTHENING WEST KALIMANTAN PROJECT ADB LOAN 3015 DAN AFD 1024-01 B PT PLN (Persero…
Page 28: INO: West Kalimantan Power Grid Strengthening Part 2...STRUKTUR ORGANISASI TIM MANAJEMEN KONSTRUKSI STRENGTHENING WEST KALIMANTAN PROJECT ADB LOAN 3015 DAN AFD 1024-01 B PT PLN (Persero…
Page 29: INO: West Kalimantan Power Grid Strengthening Part 2...STRUKTUR ORGANISASI TIM MANAJEMEN KONSTRUKSI STRENGTHENING WEST KALIMANTAN PROJECT ADB LOAN 3015 DAN AFD 1024-01 B PT PLN (Persero…
Page 30: INO: West Kalimantan Power Grid Strengthening Part 2...STRUKTUR ORGANISASI TIM MANAJEMEN KONSTRUKSI STRENGTHENING WEST KALIMANTAN PROJECT ADB LOAN 3015 DAN AFD 1024-01 B PT PLN (Persero…
Page 31: INO: West Kalimantan Power Grid Strengthening Part 2...STRUKTUR ORGANISASI TIM MANAJEMEN KONSTRUKSI STRENGTHENING WEST KALIMANTAN PROJECT ADB LOAN 3015 DAN AFD 1024-01 B PT PLN (Persero…
Page 32: INO: West Kalimantan Power Grid Strengthening Part 2...STRUKTUR ORGANISASI TIM MANAJEMEN KONSTRUKSI STRENGTHENING WEST KALIMANTAN PROJECT ADB LOAN 3015 DAN AFD 1024-01 B PT PLN (Persero…
Page 33: INO: West Kalimantan Power Grid Strengthening Part 2...STRUKTUR ORGANISASI TIM MANAJEMEN KONSTRUKSI STRENGTHENING WEST KALIMANTAN PROJECT ADB LOAN 3015 DAN AFD 1024-01 B PT PLN (Persero…
Page 34: INO: West Kalimantan Power Grid Strengthening Part 2...STRUKTUR ORGANISASI TIM MANAJEMEN KONSTRUKSI STRENGTHENING WEST KALIMANTAN PROJECT ADB LOAN 3015 DAN AFD 1024-01 B PT PLN (Persero…
Page 35: INO: West Kalimantan Power Grid Strengthening Part 2...STRUKTUR ORGANISASI TIM MANAJEMEN KONSTRUKSI STRENGTHENING WEST KALIMANTAN PROJECT ADB LOAN 3015 DAN AFD 1024-01 B PT PLN (Persero…
Page 36: INO: West Kalimantan Power Grid Strengthening Part 2...STRUKTUR ORGANISASI TIM MANAJEMEN KONSTRUKSI STRENGTHENING WEST KALIMANTAN PROJECT ADB LOAN 3015 DAN AFD 1024-01 B PT PLN (Persero…
Page 37: INO: West Kalimantan Power Grid Strengthening Part 2...STRUKTUR ORGANISASI TIM MANAJEMEN KONSTRUKSI STRENGTHENING WEST KALIMANTAN PROJECT ADB LOAN 3015 DAN AFD 1024-01 B PT PLN (Persero…
Page 38: INO: West Kalimantan Power Grid Strengthening Part 2...STRUKTUR ORGANISASI TIM MANAJEMEN KONSTRUKSI STRENGTHENING WEST KALIMANTAN PROJECT ADB LOAN 3015 DAN AFD 1024-01 B PT PLN (Persero…
Page 39: INO: West Kalimantan Power Grid Strengthening Part 2...STRUKTUR ORGANISASI TIM MANAJEMEN KONSTRUKSI STRENGTHENING WEST KALIMANTAN PROJECT ADB LOAN 3015 DAN AFD 1024-01 B PT PLN (Persero…
Page 40: INO: West Kalimantan Power Grid Strengthening Part 2...STRUKTUR ORGANISASI TIM MANAJEMEN KONSTRUKSI STRENGTHENING WEST KALIMANTAN PROJECT ADB LOAN 3015 DAN AFD 1024-01 B PT PLN (Persero…
Page 41: INO: West Kalimantan Power Grid Strengthening Part 2...STRUKTUR ORGANISASI TIM MANAJEMEN KONSTRUKSI STRENGTHENING WEST KALIMANTAN PROJECT ADB LOAN 3015 DAN AFD 1024-01 B PT PLN (Persero…
Page 42: INO: West Kalimantan Power Grid Strengthening Part 2...STRUKTUR ORGANISASI TIM MANAJEMEN KONSTRUKSI STRENGTHENING WEST KALIMANTAN PROJECT ADB LOAN 3015 DAN AFD 1024-01 B PT PLN (Persero…
Page 43: INO: West Kalimantan Power Grid Strengthening Part 2...STRUKTUR ORGANISASI TIM MANAJEMEN KONSTRUKSI STRENGTHENING WEST KALIMANTAN PROJECT ADB LOAN 3015 DAN AFD 1024-01 B PT PLN (Persero…
Page 44: INO: West Kalimantan Power Grid Strengthening Part 2...STRUKTUR ORGANISASI TIM MANAJEMEN KONSTRUKSI STRENGTHENING WEST KALIMANTAN PROJECT ADB LOAN 3015 DAN AFD 1024-01 B PT PLN (Persero…
Page 45: INO: West Kalimantan Power Grid Strengthening Part 2...STRUKTUR ORGANISASI TIM MANAJEMEN KONSTRUKSI STRENGTHENING WEST KALIMANTAN PROJECT ADB LOAN 3015 DAN AFD 1024-01 B PT PLN (Persero…
Page 46: INO: West Kalimantan Power Grid Strengthening Part 2...STRUKTUR ORGANISASI TIM MANAJEMEN KONSTRUKSI STRENGTHENING WEST KALIMANTAN PROJECT ADB LOAN 3015 DAN AFD 1024-01 B PT PLN (Persero…
Page 47: INO: West Kalimantan Power Grid Strengthening Part 2...STRUKTUR ORGANISASI TIM MANAJEMEN KONSTRUKSI STRENGTHENING WEST KALIMANTAN PROJECT ADB LOAN 3015 DAN AFD 1024-01 B PT PLN (Persero…
Page 48: INO: West Kalimantan Power Grid Strengthening Part 2...STRUKTUR ORGANISASI TIM MANAJEMEN KONSTRUKSI STRENGTHENING WEST KALIMANTAN PROJECT ADB LOAN 3015 DAN AFD 1024-01 B PT PLN (Persero…
Page 49: INO: West Kalimantan Power Grid Strengthening Part 2...STRUKTUR ORGANISASI TIM MANAJEMEN KONSTRUKSI STRENGTHENING WEST KALIMANTAN PROJECT ADB LOAN 3015 DAN AFD 1024-01 B PT PLN (Persero…

Oate 28 Februari 2019

Time 09.00 WlB - selesai

Place

Note Taker

RR. Lt.l3 PLN Pusat

Teuku M. Reza FahmyAttendess : (daftar hadir terlampir)

endaAg

MinutesPembahasan Usulan Program CSR terkaitSocial Safeguard SUTET 275 kV Bengkayang -Jagoibabang

Presenter 1. DIV KR KAL

2. CS & CSR.

3, UIP KALBAGBAR4, UIP KALBAGTIIM

5, ADB

Rapat dibuka oleh VP Konstruksi Jaringan Regional Kalimantan.

Menindaklanjuti rapat sebelumnya pada tanggal 28 November 2018

PLN UIP Kalbaqtim :

Menindaklanjuti kewajiban PLN untuk memenuhi IRRP Paket '1, UIP Kalbagtim telah melakukansurvey ke 13 lokasi di sepanjang jalur SUTET 275 Bengkayang - Jagoibabang. dimana program

CSR ini lebih kepada program pemberdayaan ekonomi masyarakat terkena dampak ROW

disepanjang Jalur SUTET 275 kV Bengkayang - Jagoibabang.

ADB :

Menyampaikan terkait program-program yang akan dilakukan agar memastikan partisipasi

warga yang terkena dampak ROW, memperhatikan partisipasi kelompok Perempuan, dan ada

unsur pendampingan . ADB mengharapkan agar monitoring kegiatan IRRP dibuatkan laporan

tersendiri agar nantinya dapat dilampirkan ke dalam Laporan semi annual social monitoring

report dengan dilengkapi evidence (foto/video). Pada prinsipnya ADB menyetujui program-program usulan CSR UIP Kalbagtim. Agar detail workplan program dapat disampaikan ke pihak

ADB.

CSR :

Proposal Usulan program CSR UIP Kalbagtim sudah disampaikan dan diterima oleh Corporate

Communication & CSR pada tanggal 20 Februari 2019. Terkait usulan program dan anggaranprogram CSR UIP Kalbagtim ini masih akan dibahas terlebih dahulu, dan surat persetujuan akan

disampaikan paling lambat tanggal 04 maret 2019.

KESIMPULAN:- Pada prinsipnya ADB menyetujui program-program usulan CSR UIP Kalbagtim.- Pelaksanaan program - program CSR UIP Kalbagtim ini dilaksanakan Oleh UIP

KALBAGTIM. UIP Kalbagbar akan mensupport transportasi dan akomodasi pelaksanaan

program dilapangan.- Tentative ladwal dan detail lmplementasi program akan dilaksanakan April - November

2019.

Notulis,

Teuku M. Reza Fahmy

Minutes of Meeting

Page 50: INO: West Kalimantan Power Grid Strengthening Part 2...STRUKTUR ORGANISASI TIM MANAJEMEN KONSTRUKSI STRENGTHENING WEST KALIMANTAN PROJECT ADB LOAN 3015 DAN AFD 1024-01 B PT PLN (Persero…

PT PrN (PERSERO)

KANTOR PUSAT

Hari/ Tgl

Tempat

Waktu

Agenda

DAFTAR HADIR

: Kamis / 28 Februari 2019

: PT PLN (Persero) Kantor Pusat, RR Lt. 13

: 09.00 WIB - Selesai

: Usulan Program CSR terkait Social Safeguard SUTET 275 kV

Bengkayang - Jagoibabang

NAMA INSTANSIEMAIL/

NO. TELPTTD

L lStv/A).P-utlltGll11,"" o?rz6ol{39a \

2 1ilr,r Ul.'tze terny DUhc\6$Ltown^,. o.z^{*U-e-aflf

3. NI6nrno Manh-rv at ., Aogttynd rrlt ruah e culbo o u1

4 Medhn^ +{sr\dii^fr da}rr AMmM n el-nidef i . consuttanfg ,dboD

,\t"d4Aruugoa96.

5 ,rlnr[r]tL U? KAlw'

A^rt-bl QI4h.o.,o P

6. fbcr.rnavtlnp nvl+l<ALffin +u so LD

7 i-larrv UJ CSRO8}8tr3 .t & fLP 4Ftar,g,nwrJr @ yln.co,u)

8 1ggyA? LrgrANF \.rt? kg0tirrran€rr\e'd"ri @ Ita .c<+t

o8l2 8Bo9 q0t'7.

9

10.

i

'.,ol

0

I


Recommended