+ All Categories
Home > Business > The Enterprise 2.0 Continuum

The Enterprise 2.0 Continuum

Date post: 02-Dec-2014
Category:
Upload: michael-hafner
View: 551 times
Download: 1 times
Share this document with a friend
Description:
This is a rough sketch of a model to explain the few dimensions you have to care about in an (emerging) Enterprise 2.0
12
The Enterprise 2.0 Continuum Michael Hafner, phomek Medienbüro Donnerstag, 13. Oktober 11
Transcript
Page 1: The Enterprise 2.0 Continuum

The Enterprise 2.0 Continuum

Michael Hafner, phomek Medienbüro

Donnerstag, 13. Oktober 11

Page 2: The Enterprise 2.0 Continuum

2.0:Who is in charge?

• we‘re not working on just one thing.

• it‘s neither an IT, a communications or an HR-thing alone.

• we handle a fourdimensional space

Donnerstag, 13. Oktober 11

Page 3: The Enterprise 2.0 Continuum

Content

Infrastructure

Networks

Doing Things

Donnerstag, 13. Oktober 11

Page 4: The Enterprise 2.0 Continuum

This is a model

• its not a theory

• it‘s not wisdom (yet)

• it visualizes some guidance: what do you have to care about as a 2.0 agent

Donnerstag, 13. Oktober 11

Page 5: The Enterprise 2.0 Continuum

Content

Infrastructure

Networks

Doing Things

0 Comments0 Ratings0Single Sign On

0 Blogs0Wiki, Collab

Donnerstag, 13. Oktober 11

Page 6: The Enterprise 2.0 Continuum

Content

Infrastructure

Networks

Doing Things

0specific Blogs0Pilots 0Videomessages

Donnerstag, 13. Oktober 11

Page 7: The Enterprise 2.0 Continuum

Move to the upper right corner.

• doing things and creating infrastructure is a lot of work - but that‘s the easy part.

• managing content in a content strategy and activating (engaging, enchanting, - whatever) networks) is the far more difficult part.

• That‘s where things start to live. This is the fun zone, that some consider as dangerous...

Donnerstag, 13. Oktober 11

Page 8: The Enterprise 2.0 Continuum

Content

Infrastructure

Networks

Doing Things

0 Comments0 Ratings0Single Sign On

0 Blogs0Wiki, Collab

supportBusinessprocesses

Donnerstag, 13. Oktober 11

Page 9: The Enterprise 2.0 Continuum

Content

Infrastructure

Networks

Doing Things

0 Comments0 Ratings0Single Sign On

0 Blogs0Wiki, Collab

supportBusinessprocesses

0specific Blogs0Pilots 0Videomessages

cultural change, efficiency, creativity

Donnerstag, 13. Oktober 11

Page 10: The Enterprise 2.0 Continuum

Content

Infrastructure

Networks

Doing Things

0 Comments0 Ratings0Single Sign On

0 Blogs0Wiki, Collab

supportBusinessprocesses

0specific Blogs0Pilots 0Videomessages

cultural change, efficiency, creativity0 Virals

0

0Workflows

0 the way of work

Donnerstag, 13. Oktober 11

Page 11: The Enterprise 2.0 Continuum

You will never be there.

• there is no good or bad

• we need all four dimensions to get things going...

• it‘s a moving target (thank god...)

Donnerstag, 13. Oktober 11

Page 12: The Enterprise 2.0 Continuum

A word on the donkey: Everybody has an idea about donkeys. You think of it, and you think something. But have you ever met one? Doesn‘t matter. The donkey always works.

Donnerstag, 13. Oktober 11


Recommended