+ All Categories
Home > Documents > TheHub Floorplan - Master

TheHub Floorplan - Master

Date post: 03-Jun-2018
Category:
Upload: oliver-giam
View: 230 times
Download: 0 times
Share this document with a friend

of 40

Transcript
  • 8/12/2019 TheHub Floorplan - Master

    1/40

    Plan

    floor plans

    Three spaces thatcome together to createa well balanced work-lifeenvironment

  • 8/12/2019 TheHub Floorplan - Master

    2/40

    A freehold development of 2.51 acres.

  • 8/12/2019 TheHub Floorplan - Master

    3/40

    A thoughtfully integrated environment

    thinkingspaces

    These are facilities for quiet contemplation, and private

    conducive environments to refine your business ideas,

    strategies and plans. You may find that your mind mightwork better at the gym, perhaps the pool deck, or in the

    calmness of the lush landscape. Take your pick.

    workingspaces

    Choose a low-rise Retail Office space, or a high-rise

    tower of Signature Suites available in several versatile

    configurations micro-unit, loft, 1-room and 2-room

    suites, all equipped with fibre-optic cables. Work

    comfortably at any time of the day or night.

    connectingspaces

    Here, weve allocated open areas, sheltered spaces

    overlooking beautiful landscapes, sculptures, and

    wide corridors, all specifically designed to inspire and

    connect you with people and nature, in an environment

    buzzing with good energy.

    You no longer need to separate work from your personallife as though they were jealous lovers competing for yourattention. You want both, and you deserve both. At The Hub,they are best of friends.

    The Hub is a next generation versatile Signature Suites andRetail Offices designed for people who pride themselves onbeing different from the rest. This freehold development of

    2.51 acres contains two components Signature Suites withunits ranging from 517 sq ft to 1,313 sq ft, and 13 units of4-storey Retail Offices, set in well-balanced landscaping allto inspire perfect work-life balance.

    Realising that inspiration is as essential to your work as wateris to plants, we have designed the landscape around yourthinking, working and connecting spaces to put you in a greatstate of body and mind in order to work better. To furtherensure that your life runs as smoothly as possible, The Hub isalso designed to be earthquake resistant using internationalstandards.

    At The Hub,

    work isinspired by

    life, and lifeis inspiredby work.

  • 8/12/2019 TheHub Floorplan - Master

    4/40

    Signature Suites

    Double volume Signature Loft.

  • 8/12/2019 TheHub Floorplan - Master

    5/40

    site planSignature Suites

    01 drop-off point

    02 reflective pool

    03 bridge to Five Stones

    & Ameera

    04 open lawn

    05 ramp

    stairs from/to carpark

    JalanHarapan

    Signature SuitesTower

    Sungai Penchala

    RO08

    0210

    11

    03A

    05

    01

    0309

    08

    07

    06

    RO09

    RO11

    RO13

    RO10

    RO12 RO07 RO03ARO05 RO02 RO01RO06 RO03

    03

    02

    01

    04

    05

    4-storey Retail Offices

    4-storey Retail Offices

    Jalan

    17/47

  • 8/12/2019 TheHub Floorplan - Master

    6/40

    Signature Suites.

  • 8/12/2019 TheHub Floorplan - Master

    7/40

    block planSignature Suites

    level SS2/SS19 view Bangsar view Bukit Kiara/SS17 view

    43 m&e roof

    42 swimming pool

    41 gymnasiumSV41-03A

    B2 SV40-05A2

    SV40-06A1

    SV40-07A1

    SV40-08A1

    SV40-09A1

    SV40-10A1

    SV40-11A4

    40 gymnasiumSV40-03A

    B2

    39SV38-01

    A3SV38-02

    A3SV38-03

    A3

    SV39-03AB2 SV38-05

    A2SV38-06

    A1SV38-07

    A1SV38-08

    A1SV38-09

    A1SV38-10

    A1SV38-11

    A438

    SV38-03AB2

    37SV36-01

    A3SV36-02

    A3SV36-03

    A3

    SV37-03A

    B2 SV36-05A2

    SV36-06A1

    SV36-07A1

    SV36-08A1

    SV36-09A1

    SV36-10A1

    SV36-11A4

    36SV36-03A

    B2

    35 SV33A-01A3

    SV33A-02A3

    SV33A-03A3

    SV35-03A

    B2 SV33A-05A2

    SV33A-06A1

    SV33A-07A1

    SV33A-08A1

    SV33A-09A1

    SV33A-10A1

    SV33A-11A4

    33ASV33A-03A

    B2

    33SV33-01

    C1 SV32-02A3

    SV33-03C1

    SV33-03AB2 SV32-05

    A2SV32-06

    A1

    SV33-07C3 SV32-08

    A1SV32-09

    A1

    SV33-10C3 SV32-11

    A432

    SV31-01

    A3SV31-03

    A3

    SV32-03AB2 SV31-07

    A1SV31-10

    A131

    SV30-02A3

    SV31-03AB2 SV30-05

    A2SV30-06

    A1SV30-08

    A1SV30-09

    A1

    SV31-11C4

    30 void voidSV30-03A

    B2 SV29-07A1

    SV29-10A1

    SV29-11A4

    29 break tankSV29-03A

    B2 SV28-05A2

    SV29-06C3

    SV29-08B1

    28SV27-01

    A3

    SV28-02C1 SV27-03

    A3

    SV28-03AB2

    SV28-06B1 SV27-08

    A1SV27-09

    A1SV27-10

    A1

    SV28-11C4

    27SV26-02

    A3

    SV27-03AB2 SV26-05

    A2SV26-06

    A1SV26-07

    A1SV26-11

    A426

    SV25-01A3

    SV26-03

    C1SV26-03A

    B2 SV25-08A1

    SV26-09

    B1

    25SV25-02

    C1 SV23A-03A3

    SV25-03AB2 SV23A-05

    A2

    SV25-06B1 SV23A-09

    A1SV23A-10

    A1

    SV25-11C4

    23ASV23-01

    A3SV23-02

    A3

    SV23A-03AB2 SV23-06

    A1SV23-07

    A1SV23-08

    A1SV23-11

    A423

    SV23-03

    C1SV23-03A

    B2SV23-05

    C2SV23-09

    C3SV23-10

    C3

    22 SV21-01A3

    SV21-02A3

    SV21-03A3

    SV22-03A

    B2 SV21-05A2

    SV22-06

    C3 SV21-07A1

    SV22-08

    B1 SV21-10A1

    SV21-11A4

    21SV21-03A

    B2 SV20-06A1

    SV20-08

    A1

    SV21-09C3

    20SV20-01

    C1 SV19-02A3

    SV19-03A3

    SV20-03AB2

    SV20-05C2

    SV20-07C3 SV19-09

    A1SV19-10

    A1

    SV20-11C4

    19SV18-01

    A3

    SV19-03A

    B2 SV18-05A2

    SV18-06A1

    SV18-07A1

    SV19-08

    C3 SV18-11A4

    18SV18-02

    C1SV18-03

    C1SV18-03A

    B2 SV17-08A1

    SV18-09C3 SV17-10

    A117

    SV17-01C1

    SV17-02C1

    SV17-03C1

    SV17-03AB2

    SV17-05C2

    SV17-06C3 SV16-07

    A1SV16-09

    A1SV16-11

    A416

    SV16-01C1

    SV16-02C1 SV15-03

    A3

    SV16-03AB2 SV15-05

    A2SV15-06

    A1SV15-08

    A1

    SV16-10C3

    15 break tankSV15-03A

    B2 SV13A-07A1

    SV13A-09A1

    SV13A-10A1

    SV13A-11A4

    13A break tankSV13A-03A

    B2 SV13-05A2

    SV13A-06C3 SV13-08

    A113 break tank

    SV13-03AB2 SV12-06

    A1

    SV13-07C3

    SV13-09B1

    SV13-11C4

    12SV11-01

    A3

    SV12-02C1 SV11-03

    A3

    SV12-03AB2

    SV12-05C2 SV11-07

    A1SV11-08

    A1SV11-09

    A1

    SV12-10C3 SV11-11

    A411

    SV010-02A3

    SV11-03A

    B2 SV10-05A2

    SV11-06

    C3 SV10-10A1

    10SV10-01

    C1SV10-03

    C1SV10-03A

    B2SV10-06

    B1 SV09-08A1

    SV10-09C3 SV09-11

    A4

    09

    SV09-01

    C1 SV08-02A3

    SV09-03

    C1

    SV09-03A

    B2 SV08-05A2

    SV08-06A1

    SV09-07

    C3 SV08-09A1

    SV09-10

    C3

    08SV07-01

    A3SV07-03

    A3

    SV08-03AB2 SV07-07

    A1

    SV08-08C3 SV07-10

    A1

    SV08-11C4

    07SV07-02

    C1SV07-03A

    B2SV07-05

    C2 SV06-06A1

    SV07-08

    B1 SV06-11A4

    06SV06-01

    C1SV06-02

    C1SV06-03

    C1SV06-03A

    B2SV06-05

    C2SV06-07

    C3 SV05-08A1

    SV06-09B1

    05SV05-01

    C1 SV03A-02A3

    SV05-03C1

    SV05-03AB2 SV03A-05

    A2

    SV05-06C3 SV03A-07

    A1

    SV05-09B1

    SV05-11C4

    03ASV03A-01

    C1 SV03-03A3

    SV03A-03AB2

    SV03A-06C3

    SV03A-08B1 SV03-10

    A1

    SV03A-11C4

    03SV02-01

    A3

    SV03-02

    C1SV03-03A

    B2SV03-05

    C2 SV02-06A1

    SV03-07

    C3 SV02-08A1

    SV03-09

    C3 SV02-11A4

    02SV02-02

    C1SV02-03

    C1SV02-03A

    B2 SV01-05A2

    SV02-07C3

    SV02-09B1

    01SV01-01

    C1SV01-02

    C1SV01-03

    C1SV01-03A

    B2SV01-06

    C3SV01-07

    C3SV01-08

    C3SV01-09

    C3SV01-10

    C3SV01-11

    C4

    upper mezzanine

    lower mezzanine

    lobby @ ground floor

    single floor

    loft

    unit descriptions

    type A1 : 2-room loft

    type A2 : 2-room loft

    type A3 : 2-room loft

    type A4 : 1-room loft

    type B1 : 2-room unit

    type B2 : 2-room unit

    type C1 : 1-room unit

    type C2 : 1-room unit

    type C3 : 1-room unit

    type C4 : micro unit

    Unit11 Unit10 Unit09 Unit08 U

    nit07 Unit06

    Unit03

    Unit05

    Unit03A

    Unit02

    Unit01

  • 8/12/2019 TheHub Floorplan - Master

    8/40

    01 office 1

    02 office 2

    03 pantry

    04 washroom 1

    05 office 3

    06 washroom 2

    07 a/c ledge

    approx built-up

    969 sq ft / 90 sq m

    typeA1

    lower plan upper plan

    72007200

    03

    04

    01

    07

    06

    02

    05

    8985

    8985

    built-up & layout plan are subject to change

  • 8/12/2019 TheHub Floorplan - Master

    9/40

    01 office 1

    02 office 2

    03 pantry

    04 washroom 1

    05 office 3

    06 washroom 2

    07 a/c ledge

    approx built-up

    1,012 sq ft / 94 sq m

    typeA2

    8468 8468

    02

    04

    01 06

    03 07

    05

    7200

    7200

    lower plan upper plan

  • 8/12/2019 TheHub Floorplan - Master

    10/40

    TOILET 2

    OFFICE 3VOID

    wet

    dry

    VOID

    DN

    OFFICE 2 OFFICE 1

    TOILET 2

    A/C LEDGE

    wet

    dry

    PANTRY

    UP

    built-up & layout plan are subject to change

    01 office 1

    02 office 2

    03 pantry

    04 washroom 1

    05 office 3

    06 washroom 2

    07 a/c ledge

    approx built-up

    1001 sq ft / 93 sq m

    typeA3

    7200

    lower plan upper plan

    7200

    03

    04

    0102

    07

    05

    06

    8715

    8715

  • 8/12/2019 TheHub Floorplan - Master

    11/40

    01 office 1

    02 pantry

    03 washroom 1

    04 store room

    05 office 2

    06 washroom 1

    07 a/c ledge

    approx built-up

    786 sq ft / 73 sq m

    typeA4

    lower plan upper plan

    72007200

    02

    01

    07

    05

    03 0406

    7005

    7005

  • 8/12/2019 TheHub Floorplan - Master

    12/40

    01 office 1

    02 office 2

    03 office 3

    04 pantry

    05 washroom 1

    06 washroom 2

    07 a/c ledge

    approx built-up

    1,313 sq ft / 122 sq m

    typeB1

    04

    03

    02

    07

    07

    01

    06

    05

    14400

    built-up & layout plan are subject to change

    10865

  • 8/12/2019 TheHub Floorplan - Master

    13/40

    01 office 1

    02 office 2

    03 office 3

    04 pantry

    05 washroom 1

    06 washroom 2

    07 a/c ledge

    08 open veranda

    approx built-up

    1,292 sq ft / 120 sq m

    typeB2

    0302

    04

    08

    05 06

    01

    07

    7871

    15545

  • 8/12/2019 TheHub Floorplan - Master

    14/40

    OFFICE 2

    OFFICE 1

    TOILET

    A/C LEDGE

    dry

    wet

    PANTRY

    01 office 1

    02 office 2

    03 pantry

    04 washroom

    05 a/c ledgeapprox built-up

    667 sq ft / 62 sq m

    built-up & layout plan are subject to change

    typeC1

    8715

    7200

    02

    03

    04

    05

    01

  • 8/12/2019 TheHub Floorplan - Master

    15/40

    01 office 1

    02 office 2

    03 pantry

    04 washroom

    05 a/c ledgeapprox built-up

    667 sq ft / 62 sq m

    typeC2

    8468

    04

    03

    05

    02

    01

    7200

  • 8/12/2019 TheHub Floorplan - Master

    16/40

    01 office 1

    02 office 2

    03 pantry

    04 washroom

    05 a/c ledgeapprox built-up

    667 sq ft / 62 sq m

    typeC3

    7200

    03

    01

    05

    04

    02

    8985

    built-up & layout plan are subject to change

  • 8/12/2019 TheHub Floorplan - Master

    17/40

    approx built-up

    517 sq ft / 48 sq m

    typeC401 office 1

    02 office 2

    03 pantry

    04 washroom

    05 a/c ledge

    7200

    03

    02

    05

    04

    01

    7005

  • 8/12/2019 TheHub Floorplan - Master

    18/40

  • 8/12/2019 TheHub Floorplan - Master

    19/40

    Retail Offices

    Street view of 4-storey Retail Offices.

  • 8/12/2019 TheHub Floorplan - Master

    20/40

    4-storey Retail Offices and open lawn.

  • 8/12/2019 TheHub Floorplan - Master

    21/40

    site planRetail Offices

    01 drop-off point

    02 reflective pool

    03 bridge to Five Stones

    & Ameera

    04 open lawn

    05 ramp

    stairs from/to carpark

    Jalan

    17/47

    JalanHarapan

    4-storey Retail Offices

    4-storey Retail Offices

    Sungai Penchala

    0210

    11

    03A

    05

    01

    0309

    08

    07

    06

    RO08

    RO09

    RO11

    RO13

    RO10

    RO12 RO07 RO03ARO05 RO02 R O01RO06 RO03

    03

    02

    01

    04

    05

    Signature SuitesTower

  • 8/12/2019 TheHub Floorplan - Master

    22/40

    approx built-up

    7,115 sq ft / 661 sq m

    RO0101 shop

    02 office

    03 garden

    04 veranda

    05 toilet

    06 lift

    07 store

    7400 7400 7400 7400

    20745

    22880

    22880

    22880 0301

    04

    02 02

    02

    ground floor plan first floor plan third floor plantransfer staircase plan second floor plan

    built-up & layout plan are subject to change

    05

    05

    05 0505 05

    05

    07 07 07

    06 06 06 06

  • 8/12/2019 TheHub Floorplan - Master

    23/40

    approx built-up

    6,965 sq ft / 647 sq m

    RO0201 shop

    02 office

    03 garden

    04 veranda

    05 toilet

    06 lift

    07 store

    7400 7400 7400 7400

    20940

    22880

    22880

    22880

    0301

    04

    06 06 06

    0707 07

    05

    05

    05

    0505 0505

    06

    02 02

    02

    ground floor plan first floor plan third floor plantransfer staircase plan second floor plan

  • 8/12/2019 TheHub Floorplan - Master

    24/40

    built-up & layout plan are subject to change

    RO03

    approx built-up

    7,115 sq ft / 661 sq m

    01 shop

    02 office

    03 garden

    04 veranda

    05 toilet

    06 lift

    07 store

    74007400 7400 7400

    20745

    22880

    22880

    22880

    0301

    04

    02

    06 06 06

    070707

    05

    05

    0505

    05

    0505

    06

    02

    02

    ground floor plan first floor plan third floor plantransfer staircase plan second floor plan

  • 8/12/2019 TheHub Floorplan - Master

    25/40

    RO03A

    approx built-up

    6,965 sq ft / 647 sq m

    01 shop

    02 office

    03 garden

    04 veranda

    05 toilet

    06 lift

    07 store

    7400 7400 7400 7400

    20940

    22880

    22880

    22880 0301 05

    05

    05 0505 05

    05

    07 07 07

    06 06 0606

    04

    02 02

    02

    ground floor plan first floor plan third floor plantransfer staircase plan second floor plan

  • 8/12/2019 TheHub Floorplan - Master

    26/40

    approx built-up

    7,115 sq ft / 661 sq m

    RO0501 shop

    02 office

    03 garden

    04 veranda

    05 toilet

    06 lift

    07 store

    7400 7400 7400 7400

    20745

    22880

    22880

    22880

    0301

    04

    02 02

    02

    06060606

    ground floor plan first floor plan third floor plantransfer staircase plan second floor plan

    built-up & layout plan are subject to change

    0707 07

    0505

    05

    0505

    05

    05

  • 8/12/2019 TheHub Floorplan - Master

    27/40

    approx built-up

    6,965 sq ft / 647 sq m

    RO0601 shop

    02 office

    03 garden

    04 veranda

    05 toilet

    06 lift

    07 store

    7400 7400 7400 7400

    20940

    22880

    22880

    22880

    0301

    04

    06 06 06

    0707 07

    05

    05

    05

    0505 0505

    06

    02 02

    02

    ground floor plan first floor plan third floor plantransfer staircase plan second floor plan

  • 8/12/2019 TheHub Floorplan - Master

    28/40

    built-up & layout plan are subject to change

    RO07

    approx built-up

    7,771 sq ft / 722 sq m

    01 shop

    02 office

    03 garden

    04 veranda

    05 toilet

    06 lift

    07 store

    6720 866086608660

    21230

    23173

    23173

    23173

    0301

    04

    06 0606 06

    05

    05 05 0505 05

    07 07 07

    02 02

    02

    ground floor plan first floor plan third floor plansecond floor plan

    05

  • 8/12/2019 TheHub Floorplan - Master

    29/40

    approx built-up

    7,115 sq ft / 661 sq m

    RO0801 shop

    02 office

    03 garden

    04 veranda

    05 toilet

    06 lift

    07 store

    7400 7400 7400 7400

    20745

    22880

    22880

    22880 0301

    04

    02 02

    02

    ground floor plan first floor plan third floor plantransfer staircase plan second floor plan

    0606 0606

    05

    07 07 07

    05

    05 05

    05

    05 05

  • 8/12/2019 TheHub Floorplan - Master

    30/40

    approx built-up

    6,965 sq ft / 647 sq m

    RO09

    built-up & layout plan are subject to change

    01 shop

    02 office

    03 garden

    04 veranda

    05 toilet

    06 lift

    07 store

    7400 7400 7400 7400

    20940

    22880

    22880

    22880

    0301

    04

    02

    0505 05

    05

    05

    05

    05

    06 06 06 06

    07 07 07

    02

    02

    ground floor plan first floor plan third floor plantransfer staircase plan second floor plan

  • 8/12/2019 TheHub Floorplan - Master

    31/40

    approx built-up

    7,115 sq ft / 661 sq m

    RO1001 shop

    02 office

    03 garden

    04 veranda

    05 toilet

    06 lift

    07 store

    7400 7400 7400 7400

    20745

    22880

    22880

    22880 0301

    04

    02 02

    02

    ground floor plan first floor plan third floor plantransfer staircase plan second floor plan

    0606 0606

    05

    07 07 07

    05

    05 05

    05

    05 05

  • 8/12/2019 TheHub Floorplan - Master

    32/40

    approx built-up

    6,965 sq ft / 647 sq m

    RO1101 shop

    02 office

    03 garden

    04 veranda

    05 toilet

    06 lift

    07 store

    7400 7400 7400 7400

    20940

    22880

    22880

    22880

    030105

    06 06 06 06

    05 07 07 07

    05 05 05

    05

    05

    04

    02 02

    02

    ground floor plan first floor plan third floor plantransfer staircase plan second floor plan

    built-up & layout plan are subject to change

  • 8/12/2019 TheHub Floorplan - Master

    33/40

    approx built-up

    7,115 sq ft / 661 sq m

    RO1201 shop

    02 office

    03 garden

    04 veranda

    05 toilet

    06 lift

    07 store

    7400 7400 7400 7400

    20745

    22880

    22880

    22880

    0301

    04

    02 02

    02

    ground floor plan first floor plan third floor plantransfer staircase plan second floor plan

    06 0606

    070707

    05

    05

    0505

    0505

    0505

  • 8/12/2019 TheHub Floorplan - Master

    34/40

    approx built-up

    6,965 sq ft / 647 sq m

    RO13

    built-up & layout plan are subject to change

    01 shop

    02 office

    03 garden

    04 veranda

    05 toilet

    06 lift

    07 store

    7400 7400 7400 7400

    20940

    22880

    22880

    22880

    0301

    04

    02

    0505 05

    05

    05

    05

    05

    06 06 06 06

    07 07 07

    02

    02

    ground floor plan first floor plan third floor plantransfer staircase plan second floor plan

  • 8/12/2019 TheHub Floorplan - Master

    35/40

  • 8/12/2019 TheHub Floorplan - Master

    36/40

    specifications

    Signature Suites

    Structure

    Wall

    Roof Covering

    Roof Framing

    Ceiling

    Windows

    Doors

    Ironmongery

    : Reinforced concrete structure

    : Common brick / RC wall / Dry wall partition Dry wall partition pantry (pocket wall)

    : Reinforced concrete flat roof

    : Reinforced concrete structure

    : Toilets & pantry Others

    : Aluminium framed windows

    : Main entrance Pantry Toilets Others

    : Quality lockset

    : Plaster ceiling & paint: Skim coat / plaster & paint

    : Timber fire rated door: Timber sliding door: Timber flush door: Timber door

    Wall Finishes

    Floor Finishes

    : External Internal

    : Staircase / others Air con ledge Toile ts & pantry

    : Pantry: Toilets

    : Others

    : Plaster & weather shield paint: Tiles and / or plaster & paint: Dry : Plaster & paint Wet : Tiles: Plaster & paint

    : Laminated timber flooring: Cement render: Tiles

    Sanitary and

    Plumbing Fittings

    Electrical Installations

    Internal Telephone

    Trunking andCabling

    Type

    : Wash basin Sink with tap Handheld shower Water closet Bip tap Water tap Toilet roll holder

    : Lighting point Fan point 13A power point 15A power point AC point & piping Hot water point SMATV point Fibre wall socket Audio intercom Doorbell with push button

    : Fibre cabling to fibre wall socket

    A1

    : 2: 1: 2: 2: 2: 1: 2

    : 19: 3: 16: 2: 3: 2: 2: 1: 2: 1

    A2

    2122212

    193

    162322121

    A3

    2122212

    193

    162322121

    A4

    2112212

    173

    132312121

    B1

    2122212

    193

    172322111

    B2

    2122212

    173

    152322111

    C1

    1111111

    102

    132211111

    C2

    1111111

    102

    132211111

    C3

    1111111

    102

    132211111

    C4

    1111111

    92

    112211111

    Retail Offices

    Structure

    Wall

    Roof Covering

    Roof Framing

    Ceiling

    Windows

    Doors

    Ironmongery

    : Reinforced concrete structure

    : Brick wall / RC wall

    : Reinforced concrete flat roof /Metal mesh canopy 3rd floor (garden)

    : Reinforced concrete structure

    : Toilets & pantry Others

    : Aluminium framed windows

    : Main and rear entrance Roof garden Fire staircaseToilets

    : Quality lockset

    : Plaster ceiling & paint: Skim coat / plaster & paint

    : Aluminium frame glass door: Aluminium frame glass door: Fire rated door: Timber flush door

    Wall Finishes

    Floor Finishes

    : External Internal

    : Others PantryMeeting roomToiletsStore / master room

    : Pantry: Toilets: Others

    : Plaster & weather shield paint: Tiles and / or plaster & paint: Tiles up to ceiling height: Plaster & paint

    : Power float concrete: Cement render: Laminated timber flooring: Homogeneous tiles: Cement render

    Sanitary and

    Plumbing Fittings

    Electrical Installations

    Internal Telephone

    Trunking andCabling

    : Wash basin Sink with tap Water closetBip tap Toilet roll holder

    : Lighting point External lighting point

    Water proof power socket 13A power point Fibre wall socket

    : Fibre cabling to fibre wall socket

    : 7: 2: 7: 7: 7

    : 60: 3

    : 1: 40: 4

  • 8/12/2019 TheHub Floorplan - Master

    37/40

    Commercial spaces overlooking greenery.

  • 8/12/2019 TheHub Floorplan - Master

    38/40

    Located in the trendy and youthful part of SS2, The Hub lets you experience a

    stylish lifestyle and youthful energy on one side, and the best of Petaling Jayas

    charms, classic rustic food and good old fashioned values on the other. As to

    accessibility to the rest of the Klang-Valley, The Hub is close to 3 major highways

    SPRINT, LDP and the Kerinchi Link.

    GPS

    N 3 07.374, E 101 37.710

    location of The Hub

    Proposed Seksyen 16 MRT Station

    2.6km away

    Proposed TTDI MRT Station

    3.6km away

    DAMANSARAUTAMA

    KDU

    JalanSemangat

    Lebuhraya Damansara Puchong (LDP)

    Federal Highway KL/BANGSAR>>

    >

    SprintHighway

    DAMANSARAINTAN

    TTDI

    MONTKIARA

    Mont KiaraInt. School

    Sin ChewJit Poh

    UniversityHospital

    UniversitiMalaya

    SS2CommercialCentre

    Jalan SS2/72

    Jalan

    19/8

    Jalan

    Univer

    siti

    Jalan Harap an

    Jalan 17/21

    FIVESTONES

    KLGCC

    Proposed Seksyen 16

    MRT Station

    (Park N Ride)

    AMEERA

    KWSP

    Bomba

    Jalan

    17/47

    SsTwoMall

    Tropicana

    City Mall

    PhileoDamansara

    Proposed TTDI

    MRT Station

    Five Stones

    A collection of 377 unitsof low and high-risecondominiums withextensive facilities

    located in Petaling Jaya

    Park Seven

    A 105-unit luxurycondominium at PersiaranKLCC, 700m from theiconic Petronas Twin Towers

    Windows on the Park,

    Cheras

    8.9 acres of parklandsurrounding 540 units ofcondominiums ranging from916 sq ft 4,311 sq ft,all with beautiful views.

    Upcoming Projects:

    Jia, Melawati

    Take in the view of theTwin Towers on one sideor the worlds longestquartz ridge on the other.

    Otherwise, a series ofvertical gardens is justoutside the door of thesesuper-link homes

    SDBs projects inSingapore include:

    Hijauan On Cavenagh

    41 handcrafted low-riseluxury apartments ina coveted green lung,located off Orchard Road

    OKIO

    An 18-storey stylishcontemporary residentialand commercialdevelopment locatedon Balestier Road

    Gilstead Two

    A 34-storey luxurydevelopment in theprime Newton locale

    Jia@65 Wilkie

    An exclusive 7-storeydevelopment with only

    22 units, located just offOrchard Road

    Village at Pasir Panjang,

    Singapore

    Most of the 148-unitapartments openup to ,000 sq ftthree-dimensional lawn

    Laman & Bayu, Puchong

    A guarded communitycomprising 72 units of2-storey and 2-storeysemi-D with excellent

    connectivity located inPuchong South

    By The Sea

    138 beachfront luxurysuites with panoramic viewslocated on Batu Ferringhi,Penang, designed for theglobal executives

    Dedaun

    A 38-unit luxury apartmentnestled in a secluded cornerof Kuala Lumpur City Centre

    20trees

    A 201-unit mixeddevelopment overlooking theworlds longest quartz ridge,just 15km fromKuala Lumpur City Centre

    20trees West

    An exclusive collectionof 48 bungalows withprivate pools sited adjacentto 20trees

    our projects

    SDBs projects in Malaysia include:

    more than 7

  • 8/12/2019 TheHub Floorplan - Master

    39/40

    anotherextraordinaryliving

    experiencefrom SDB

    dedaunjalan ampang, kuala lumpur

    by the seabatu ferringhi, penang

    village at pasir panjangdistrict 5, singapore

    windows on the parkbandar tun hussein onn, cheras

    Incorporated in 1962, Selangor Dredging Berhad (SDB) was, until the 1980s principallyinvolved in tin mining. Today, SDB is positioned as a quality lifestyle company focusedon property-related activities. Listed on Bursa Malaysia, SDB owns Wisma SelangorDredging a prestigious business address, and Hotel Maya Kuala Lumpur an award-winning boutique urban resort. Both are within a short walking distance to the iconicKuala Lumpur City Centre (KLCC). Today, SDB is a brand name that is recognisedfor its niche luxury developments and innovative designs. SDB has consistently beenrecognised for its innovation and its excellence by numerous professional bodiessuch as Singapore Institute of Architects (SIA), Pertubuhan Arkitek Malaysia (PAM),and International Real Estate Federation (FIABCI) for setting new benchmarks inthe industry. SDB is committed to its brand promise of Driving Excellence, BuildingLifelong Relationships.

    2012 FIABCI MALAYSIA PROPERTYAWARD - 20 TREES, TAMANMELAWATI, KUALA LUMPUR -WINNER FOR BEST RESIDENTIALDEVELOPMENT (LOW-RISE)

    THE INTERNATIONAL STAR

    FOR LEADERSHIP IN QUALITYAWARD 2012

    THE ASIA RESPONSIBLEENTREPENEURSHIP AWARD(AREA), SOUTH-EAST ASIA 2012

    THE ASIA PACIFICINTERNATIONAL PROPERTYAWARD 2012, 2011 & 2010

    THE ASIA PACIFIC

    ENTREPRENEURSHIP AWARD(APEA), MALAYSIA 2012

    THE BRAND LAUREATE AWARD2011-2012 FOR CORPORATEBRANDING BEST BRANDSIN REAL ESTATE & PROPERTY

    THE INTERNATIONAL STANDARDQUALITY (ISQ) AWARD 2012

  • 8/12/2019 TheHub Floorplan - Master

    40/40

    All inform ation c ontai ned here in includ ing visu als, ill ustra tions , speci ficat ions, fu rnitu re and fit tings la yout an d the pre senta tion of s how unit s are sub ject to c hange a s may be req uired by t he Devel opers c onsult ants a nd/or rele vant a uthor ities a nd cann ot form p art of a n offeror contract for the sale and purchase of a ny unit. While every reasonable care has been ta ken in providing this information, the developer or its agent cannot be held responsible for any inaccuracies. Illustr ations and pictures in the printed materials are computer-generate dartists impressions only and are meant to give an approximate idea of the development All items or plans are subject to va riation modifications amendments and substitution as may be recommended by the Developers consultants a nd/or releva nt authorities

    SDB SS2 Development Sdn Bhd (723454-V)ground floor, south blockwisma selangor dredging

    142a, jalan ampang, 50450 kuala lumpur

    The Hub sales gallery

    603 7968 7788/603 7958 8888

    t 603 2711 2288f 603 2711 2219w www.sdb.com.my

    /selangordredgingberhad


Recommended