TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP, Revision 4, "Software Requirements Specification for the Post Accident Monitoring System" Dated February, 2011
Transcript
Page 1: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

TVA Letter Dated February 25, 2011

Attachment 16

Westinghouse Electric Company WNA-SD-00239-WBT-NP, Revision 4, "SoftwareRequirements Specification for the Post Accident Monitoring System"

Dated February, 2011

Page 2: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

* Westinghouse

Westinghouse Non-Proprietary Class 3

Nuclear AutomationWatts Bar Unit 2 NSSS Completion Program

I&C Projects

Software Requirements Specification for thePost Accident Monitoring System

WNA-SD-00239-WBT-NP,

Rev. 4

February 2011

APPROVALS

Function Name and Signature

Author Shawn M. Downey*Principal Engineer, CE Fleet Safety System Support & Upgrades

Reviewer Dennis Buyan*Senior Engineer, Safety System Software Applications II

Stephanie L. Smith*Project Manager, Common Q PAMS

Approver Mesut B. Uzman*I Manager, New Plant Safety Support Systems

*Electronically approved records are authenticated in the electronic document management system.

WESTINGHOUSE NON-PROPRIETARY CLASS 3

© 2011 Westinghouse Electric Company LLCAll Rights Reserved

Page 3: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS Completion Program I&C Projects

Software Requirements Specification for thePost Accident Monitoring System

LIST OF CONTRIBUTORS

Revision Name and Title

1 Jenna L. TygerEditorial Specialist, Technical Communications

2 Jenna L. TygerEditorial Specialist, Technical Communications

3 Jenna L. TygerEditorial Specialist, Technical Communications

4 Jenna L. TygerEditorial Specialist, Technical Communications

Template Version 2.0

WNA-SD-00239-WBT-NP, Rev. 4 i Westinghouse Non-Proprietary Class 3

Page 4: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear Automation Software Requirements Specification for theWatts Bar Unit 2 NSSS Completion Program I&C Projects Post Accident Monitoring System

REVISION HISTORY

RECORD OF CHANGES

Revision Author Description Completed

1 Shawn M. Downey * Initial Issue 06/10

2 Shawn M. Downey * Addressed open items. 11/10* Addressed customer and internal comments.* Updated list of references and revision numbers* Corrected lists of RSEDs.* Added Rationales in support of requirements

traceability.* Updated two RVLIS block diagrams.* Corrected units in Plant Computer datalink (Tables

7.2-1 and 7.2-2).* Added index to the Plant Computer datalink (Tables

7.2-1 and 7.2-2).* Corrected entries in the Plant Computer datalink

(Tables 7.2-1 and 7.2-2).* Corrected the FE Keyswitch description in Section

2.1.* Revised the description of the RVLIS level alarm

setpoint graphical depiction in R7.2.7 5.* Changed the CET margin alarm to be part of the

SMM annunciator in R7.1.5.2-2 and R7.1.5.2-4.* Modified Figure 5.3-1 to eliminate the C1 error bits

17-32.* Changed R5.2.1-1 and Figure 5.2-1 to have three

CONTRMs." Corrected display descriptions." Corrected AC 160 DB Element configuration settings

in Section 4.2.* Revised the display resolution requirements in

subsection 7.2.44." Corrected the usage of "shall" throughout to indicate

requirements exclusively.* Removed Communication Module (C1631) Error

from Controller Ready logic.* Modified the analog output point scaling in

R7.2.32-4." Modified the System Health page description in

subsection 7.2.17.

WNA-SD-00239-WBT-NP, Rev. 4 ii Westinghouse Non-Proprietary Class 3. v _ _

Page 5: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS Comvietion Pro2ram I&C Projects

Software Requirements Specification for thePost Accident Monitorine System

REVISION HISTORY (Cont'd)

RECORD OF CHANGES (Cont'd)

Revision Author Description Completed

" Added R7.2.2-16 to require the status indications inWNA-DS-01617-WBT, Table 2.6-5.

" Eliminated requirements referring to processdocuments (these apply regardless).

" Added new subsections for AC 160 MemoryConstraints, AC 160 Operations, AC 160 SiteAdaptations, AC 160 User Characteristics, AC 160

Assumptions and Dependencies, AC 160Apportioning of Requirements, AC 160 Availability,FPDS Memory Constraints, FPDS Operations, FPDS

Site Adaptations, FPDS User Characteristics, FPDSAssumptions and Dependencies, FPDS Apportioning

of Requirements, and FPDS Availability.0 Revised Section 1.4 (Background).

3 Shawn M. Downey S

S

S

Corrected typos.Corrected rationales.Corrected requirement number R7.2.8-6 to be R7.2.7-8.

11/10

* Changed the FPDS configuration control requirementin R2.3.2 17.

* Corrected table reference in R3.4-1.* Added exception to R3.4-2.* Corrected reference in R7.2.42-1.* Added clarification and corrections to R5.3.24-2

requirement, guidance, and rationale.* Corrected the RCS Pressure Low Range input to

SMMON.* Added subsection 7.2.57 (Print Screen) with

requirements for controlling print screen using the FEkeyswitch and button lock out between print jobs.

* Deleted Requirement R5.1-2 which would allow theCPU load to be as high as 75%.

* Added an exception for test signals to R5.4.3-8.* Clarified guidance in R7.1.4.3 49 regarding out-of-

range signals." Deleted Requirement R5.1.1-3 since it referred to

"protective actions" and no such actions exist in the

PAMS system.* Required OPCIDET for thermocouple inputs in

R4.2-8

WNA-SD-00239-WBT-NP, Rev. 4 iii Westinghouse Non-Proprietary Class 3

Page 6: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS Completion Program I&C Projects

Software Requirements Specification for thePost Accident Monitoring System

REVISION HISTORY (Cont'd)

RECORD OF CHANGES (Cont'd)

Revision Author Description Completed

* Updated revisions in the References section.* Corrected name of the "CET Summary" page to be

"Core Exit Thermocouples."0 Corrected the three Corrected DP cell values sent to

the plant computer to be in psfd rather than psid inTables 7.2-1 and 7.2-2.

* Clarified that the bypass or failure status is sent to theplant computer.

0 Add requirement R5.2.2-4 to require the exclusiveuse of "process data transfers."

* Deleted requirement for matching times for DSP pairsin R4.3.1-3.

0 Deleted Requirement to fail all internally calculatedand output signals when addressable constants aremarked bad in R5.1.1-4.

* Added exceptions to compliance with WNA-DS-01070-WBT in R2.3-3 and R3.1-2.

0 Changed wording of RCP statuses.

4 Shawn M. Downey , Updated references. See* Per TVA letter WBT-TVA-1603, "Comments on the EDMS

Revision 3 Documentation," the following changeswere made:o Changed "FE switch" to "FE keyswitch" in

Tables 7.2-1 and 7.2-2, items 101 and 102.o Changed "Enable" to "ENABLE" in Section

2.1.o Changed "active" to "ENABLE" in R7.2.14-6

and R7.2.16-7.o Changed "enabled" to "ENABLE" in R7.2.23-2,

R7.2.25-2, R7.2.26-2, R7.2.31-4, subsection7.2.56, and R7.2.57-4.

0 Per TVA letter WBT-TVA-1624, "Comments on theDRAFT System Design Specifications rev 4 andSoftware Requirements Specifications rev 4," thefollowing changes were made:o 7-36 / subsection 7.2.1: changed "SLE switch"

to "SLE keyswitch"o 5-28/R5.5-1 and 6-3/R6.2-1: Removed wording

stating "hardwired FE keyswitch" since theproject is not permanently installing the OM's

WNA-SD-00239-WBT-NP, Rev. 4 iv Westinghouse Non-Proprietary Class 3

Page 7: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear Automation Software Requirements Specification for theWatts Bar Unit 2 NSSS Completion Program I&C Proiects Post Accident Monitoring System

Revision Author Description Completed

FE keyswitch. Changed wording to "OM or

MTP displays shall require the FE keyswitch tobe enabled."

o 7-65/R7.2.29-2: changed "in the enabled

position" to "in the "ENABLE" position".o 7-64, subsection 7.2.29: changed wording from

"SLE keyswitch to the deactivated position toreboot back to QNX" to "SLE keyswitch to the

"OFF" position to reboot back into QNX."o 7-86, subsection 7.2.56: changed wording from

"If the FE keyswitch is in the off (disabled)position" to "If the FE keyswitch is in the"OFF" (disabled) position"

o 7-86/R7.2.57-2: changed "If the FE keyswitch isin the disabled position" to "If the FE keyswitch

is in the "OFF" position"o Added quotations to the word ENABLE in the

following places:* 2-4, Section 2.1* 7-53 / R7.2.14-6* 7-54 / R7.2.16-7* 7-59 / R7.2.23-2

* 7-61 /R7.2.25-2* 7-62 / R7.2.26-2* 7-67 / R7.2.31-4* 7-86 / subsection 7.2.56* 7-87 / R7.2.57-4

o 7-62 / R7.2.27-3: changed "when the SLEkeyswitch is active" to "when the SLEkeyswitch is in the "ENABLE" position".

o 7-36 / subsection 7.2.1 revised description of FE

keyswitch.Corrected Memory Constraints section 7.1.18 and7.2.50.

* Deleted R5.1.1-2 and R5.4.3-5.* Deleted R8.2.1-1.* Revised password requirement in R8.2.1-12.

WNA-SD-00239-WBT-NP, Rev. 4 Westinghouse Non-Proprietary Class 3WNA-SD-00239-WBT-NP, Rev. 4 Westinghouse Non-Proprietary Class 3

Page 8: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS Completion Program I&C Projects

Software Requirements Specification for thePost Accident Monitoring System

DOCUMENT TRACEABILITY & COMPLIANCE

Created to Support the Following Document(s) Document Number Revision

Watts Bar 2 NSSS Completion Program I&C Projects WNA-DS-01617-WBT-P 4Post Accident Monitoring System - System RequirementsSpecification

Watts Bar 2 NSSS Completion Program I&C Projects WNA-DS-01667-WBT-P 4Post Accident Monitoring System - System DesignSpecification

OPEN ITEMS

Item Description Status

None

WNA-SD-00239-WBT-NP, Rev. 4 vi Westinghouse Non-Proprietary Class 3WNA-SD-00239-WBT-NP, Rev. 4 vA Westinghouse Non-Proprietary Class 3

Page 9: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear Automation Software Requirements Specification for theWatts Bar Unit 2 NSSS Completion Program I&C Projects Post Accident Monitoring System

TABLE OF CONTENTS

Section Title Page

LIST OF CONTRIBUTORS ....................................................................................... iRE V ISIO N H IST O R Y ................................................................................................ iiTA B LE O F CO N TENT S ............................................................................................. viiL IST O F T A B L E S ....................................................................................................... xiiLIST O F FIG U R E S ............................................................................................... xiiACRONYMS AND TRADEMARKS ......................................................................... xiiiGLOSSARY OF TERMS ............................................................................................ xviR E FER E N C E S ............................................................................................................ xviiiRE Q U IR EM EN T S ....................................................................................................... xxii

SEC TIO N 1 IN TR O D U C TIO N ....................................................................................................... 1-1

1.1 O V E R V IE W ................................................................................................................ 1-11.2 S C O P E ......................................................................................................................... 1-21.3 O B JE C T IV E ................................................................................................................ 1-21.4 B A C K G R O U N D ......................................................................................................... 1-2

SECTION 2 GENERAL DESCRIPTION ........................................................................................ 2-1

2.1 FUNCTIONAL DESCRIPTION ................................................................................. 2-12.2 SYSTEM ARCHITECTURE DESCRIPTION ........................................................... 2-22.3 GENERAL CONSTRAINTS ...................................................................................... 2-22.3.1 N am ing C onventions ................................................................................................... 2-32.3.1.1 N ode N am es ................................................................................................................. 2-32.3.1.2 AC 160 PC Terminal Names ........................................................................................ 2-42.3.1.3 AC 160 Communication Database (DB) Element Names ............................................ 2-42.3.1.4 A C 160 I/O N am es ....................................................................................................... 2-52.3.2 C onfiguration C ontrol .................................................................................................. 2-5

SECTION 3 STANDARD SOFTWARE DESCRIPTION .............................................................. 3-1

3.1 AC 160 BASE SYSTEM SOFTWARE ....................................................................... 3-13.2 AC160 APPLICATION SOFTWARE DEVELOPMENT .......................................... 3-23.3 FPDS APPLICATION SOFTWARE DEVELOPMENT ENVIRONMENT .............. 3-33.4 FPDS APPLICATION SOFTWARE DEPLOYMENT .............................................. 3-4

SECTION 4 AC 160 DATABASE CONFIGURATION .................................................................. 4-1

4.1 O V E R V IE W ................................................................................................................ 4-14.2 HARDWARE DB ELEMENT CONFIGURATION .................................................. 4-14.3 COMMUNICATION DB ELEMENT CONFIGURATION ....................................... 4-34.3.1 DSP/DAT Configuration Requirements ...................................................................... 4-3

WNA-SD-00239-WBT-NP, Rev. 4 vii Westinghouse Non-Proprietary Class 3

Page 10: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear Automation Software Requirements Specification for theWatts Bar Unit 2 NSSS Completion Program I&C Projects Post Accident Monitoring System

TABLE OF CONTENTS (Cont'd)

4.3.2 M D A T Configuration Requirem ents ........................................................................... 4-54.3.3 H igh Speed Link (H SL) Configuration Requirem ents ................................................ 4-5

SECTION 5 PROCESS CONTROL PROGRAMMING .............................................................. 5-1

5.1 G EN ERA L ................................................................................................................... 5-15.1.1 Initialization ................................................................................................................. 5-15.2 STRUCTURE ELEMENT CONFIGURATION ......................................................... 5-25.2.1 G eneral ......................................................................................................................... 5-45.2.2 PCPG M Structure Elem ent .......................................................................................... 5-45.2.3 CON TRM Structure Elem ent ...................................................................................... 5-55.2.4 FUN CM Structure Elem ent ......................................................................................... 5-65.3 SU PERV ISO RY LO G IC ............................................................................................. 5-65.3.1 CPU Load Error ........................................................................................................... 5-85.3.2 CRC Invalid Error ........................................................................................................ 5-95.3.3 A pplication Program CRC Error ................................................................................. 5-95.3.4 System Softw are CRC Error ........................................................................................ 5-105.3.5 D SP Error ..................................................................................................................... 5-115.3.6 Processor M odule (PM 646A ) Error ............................................................................. 5-115.3.7 Com m unication M odule (C1631) Error ....................................................................... 5-125.3.8 PRO M Checksum Error ............................................................................................... 5-125.3.9 PM StatusI W ord Error ............................................................................................... 5-125.3.10 CON TR M Run Error ................................................................................................... 5-135.3.11 1/O M odule Errors ........................................................................................................ 5-145.3.12 M D A T Error ......................................................................................................... .5-145.3.13 H SL Receive Channel 1 and 2 Errors .......................................................................... 5-145.3.14 A ddressable Constants CRC Error ............................................................................... 5-145.3.15 A ddressable Constants CRC W arning ......................................................................... 5-155.3.16 A pplication Trouble Error ............................................................................................ 5-155.3.17. Controller Ready Error ................................................................................................ 5-165.3.18 Processor In-Test A larm .............................................................................................. 5-165.3.19 A pplication Specific Errors .......................................................................................... 5-165.3.20 Cabinet Status A larm s ................................................................................................. 5-175.3.21 1/O Channel Errors ....................................................................................................... 5-175.3.22 H eartbeat ...................................................................................................................... 5-185.3.23 W atchdog Tim er Supervision ...................................................................................... 5-195.3.24 Failure N otification, Indication, and D isplay .............................................................. 5-195.3.25 Error Recovery ............................................................................................................. 5-205.4 SIG N A L Q U A LITY PRO CESSIN G ........................................................................... 5-225.4.1 G eneral ......................................................................................................................... 5-225.4.2 Controller Ready .......................................................................................................... 5-235.4.3 Input Signal Q uality Processing ................................................................................... 5-245.4.4 H SL R eceive Error Processing ........................................ ........................................... 5-255.4.5 M D A T Receive Error Processing ................................................................................ 5-25

WNA-SD-00239-WBT-NP, Rev. 4 viii Westinghouse Non-Proprietary Class 3

Page 11: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear Automation Software Requirements Specification for theWatts Bar Unit 2 NSSS Completion Program I&C Projects Post Accident Monitoring System

TABLE OF CONTENTS (Cont'd)

5.4.6 DAT (AF 100) Receive Error Processing ..................................................................... 5-265.4.7 Plant Com puter Datalink ............................................................................................. 5-265.5 ADDRESSABLE CONSTANTS DATA PROCESSING ........................................... 5-28

SECTION 6 SURVEILLAN CE TESTIN G FEATURES ................................................................. 6-1

6.1 CONTIN UO US ON LINE DIAGNO STICS ........................................................... 6-16.1.1 A C 160 Online Diagnostics .......................................................................................... 6-16.1.2 Flat Panel D isplay Online D iagnostics .................................................................... 6-16.2 M ANUALLY IN ITIATED TESTIN G ........................................................................ 6-3

SECTION 7 WATTS BAR 2 PAMS DESCRIPTIONS/REQUIREMENTS ................................... 7-1

7.1 WATTS BAR 2 PAMS AC 160 SOFTWARE ....................................................... 7-17.1.1 General ......................................................................................................................... 7-17.1.2 Type Circuits and Custom PC Elem ents ................... .................................................. 7-17.1.3 Inputs ........................................................................................................................... 7-37.1.3.1 Analog/D igital Inputs .................................................................................................. 7-37.1.3.2 H SL Inputs ................................................................................................................... 7-37.1.3.3 A F 100 Inputs ..................................................................................................... 7-37.1.3.4 M DAT Inputs ............................................................................................................... 7-47.1.4 Processing .................................................................................................................... 7-47.1.4.1 Input Processing ........................................................................................................... 7-47.1.4.2 CET M onitoring ........................................................................................................... 7-67.1.4.3 RVLIS M onitoring ....................................................................................................... 7-77.1.4.4 Saturation M argin M onitoring ..................................................................................... 7-197.1.4.5 Tim estam p Processing ................................................................................................. 7-217.1.4.6 System Status ............................................................................................................... 7-227.1.4.7 Analog Output Testing ................................................................................................. 7-267.1.5 Outputs ......................................................................................................................... 7-267.1.5.1 Analog Outputs ............................................................................................................ 7-267.1.5.2 Digital O utputs ............................................................................................................. 7-277.1.5.3 H SL Outputs ................................................................................................................ 7-287.1.5.4 A F 100 Outputs ............................................................................................................. 7-287.1.5.5 M DAT Outputs ............................................................................................................ 7-317.1.6 Tim ing .......................................................................................................................... 7-317.1.7 Response to Abnorm al Conditions .............................................................................. 7-327.1.8 Application-Specific Errors ......................................................................................... 7-327.1.9 Error Recovery ............................................................................................................. 7-327.1.10 Initialization ................................................................................................................. 7-337.1.11 Com m unication DB Elem ent M odels .......................................................................... 7-337.1.12 N am ing Conventions ................................................................................................... 7-337.1.13 A C 160 Constraints ....................................................................................................... 7-337.1.14 AC 160 Perform ance .................................................................................................... 7-34

WNA-SD-00239-WBT-NP, Rev. 4 ix Westinghouse Non-Proprietary Class 3

Page 12: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear Automation Software Requirements Specification for theWatts Bar Unit 2 NSSS Completion Program I&C Projects Post Accident Monitoring System

TABLE OF CONTENTS (Cont'd)

7.1.15 A C 160 R eliability ........................................................................................................ 7-347.1.16 A C 160 M aintainability ................................................................................................ 7-347.1.17 A C 160 Portability .................................................................................................. 7-347.1.18 A C 160 M em ory Constraints ........................................................................................ 7-347.1.19 A C 160 O perations ....................................................................................................... 7-347.1.20 AC 160 Site Adaptation Requirements ......................................................................... 7-357.1.21 A C 160 U ser Characteristics ......................................................................................... 7-357.1.22 AC160 Assumptions and Dependencies ...................................................................... 7-357.1.23 AC 160 Apportioning of Requirements ........................................................................ 7-357.1.24 A C 160 A vailability ...................................................................................................... 7-357.2 WATTS BAR 2 PAMS FPDS SOFTWARE ............................................................... 7-367 .2 .1 G eneral ......................................................................................................................... 7-367.2.2 D isplay Pages ............................................................................................................... 7-367.2.3 D irectory ...................................................................................................................... 7-407.2.4 IC C Sum m ary .............................................................................................................. 7-407.2.5 C ore Sum m ary D isplay ................................................................................................ 7-427.2.6 Saturation M argin D isplay ........................................................................................... 7-427.2.7 R eactor V essel Level D isplay ...................................................................................... 7-427.2.8 Level Bar G raphs D isplay ............................................................................................ 7-447.2.9 Reactor Vessel Level Sensors Display ........................................................................ 7-457.2.10 Core Exit Thermocouples Display ............................................................................... 7-457.2.11 C ore M ap D isplay ........................................................................................................ 7-467.2.12 R C S D isplay ................................................................................................................ 7-477.2 .13 T rends .......................................................................................................................... 7-4 87.2.14 System E vents .............................................................................................................. 7-527.2.15 FPD Status L ist ............................................................................................................ 7-537.2.16 A larm s .......................................................................................................................... 7-537.2.17 System H ealth D isplay ................................................................................................. 7-547.2.18 CRC and System Info ............................................... ...... 7-567.2.19 Setpoint Display ............................................................... ........ 7-577.2.20 Bypass Display ........................................................................ 7-577.2.21 Modify Setpoint/Bypass ........................................... ... 7-587.2.22 Functional Tests Display ................................................. ....... 7-597.2.23 A nnunciator Test D isplay ............................................................................................ 7-597.2.24 Display Pixel Test .................................................... ............ ....... 7-607.2.25 Saturation Margin Test Display ...................................... 7-607.2.26 Analog Output Test Display ................................................. 7-617.2.27 Maintenance Display ....................................................... 7-627.2.28 RVLIS Constants ...................................................... ...... ... 7-637.2.29 Loading AC 160 Software ...................................................... 7-647.2.30 Input M onitoring ........................................................................ ......... 7-657.2.31 Load and Save Addressable Constants ..................................... 7-667.2.32 Analog Output Selection ............................................. ....... ... 7-677.2.33 Modify Timeout/Modify Default ................................................................................. 7-67

WNA-SD-00239-WBT-NP, Rev. 4 X Westinghouse Non-Proprietary Class 3

Page 13: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear Automation Software Requirements Specification for theWatts Bar Unit 2 NSSS Completion Program I&C Projects Post Accident Monitoring System

TABLE OF CONTENTS (Cont'd)

7.2.34 Plant Com puter D atalink Processing ........................................................................... 7-687.2.35 Legend Bar ................................................................................................................... 7-787.2.36 FPD S H eartbeat ........................................................................................................... 7-787.2.37 A C 160 H eartbeat ......................................................................................................... 7-797.2.38 FPD S Shared M em ory D atabase ................................................................................. 7-797.2.39 FE K eysw itch Interlock ............................................................................................... 7-807.2.40 FPD S System File Checker .......................................................................................... 7-807.2.41 FPD S Screen Savers .................................................................................................... 7-817.2.42 FPDS Software Development and Program Generation .............................................. 7-817.2.43 FPD S RS232 Serial Com m unications Port .................................................................. 7-827.2.44 D isplay Resolution Requirem ents ................................................................................ 7-827.2.45 FPD S Constraints ......................................................................................................... 7-847.2.46 FPD S Perform ance ...................................................................................................... 7-847.2.47 FPD S Reliability .......................................................................................................... 7-847.2.48 FPD S M aintainability .................................................................................................. 7-847.2.49 FPD S Portability .......................................................................................................... 7-857.2.50 FPD S M em ory Constraints .......................................................................................... 7-857.2.51 FPD S O perations ......................................................................................................... 7-857.2.52 FPD S Site A daptation R equirem ents ........................................................................... 7-857.2.53 FPD S U ser Characteristics ........................................................................................... 7-857.2.54 FPD S A ssum ptions and D ependencies ........................................................................ 7-867.2.55 FPD S A pportioning of Requirem ents .......................................................................... 7-867.2.56 FPD S A vailability ........................................................................................................ 7-867.2.57 Print Screen .................................................................................................................. 7-86

SECTION 8 SAFETY AND SECURITY REQUIREMENTS ........................................................ 8-1

8.1 SA FETY ...................................................................................................................... 8-18.2 SECU RITY .................................................................................................................. 8-18.2.1 Cyber Security ............................................................................................................ 8-1

SECTION 9 PROGRAM WIDE DATABASE (PWD) USAGE ..................................................... 9-1

WNA-SD-00239-WBT-NP, Rev. 4 xi Westinghouse Non-Proprietary Class 3WNA-SD-00239-WBT-NP, Rev. 4 xi Westinghouse Non-Proprietary Class 3

Page 14: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS Comuletion Program I&C Proiects

Software Requirements Specification for thePost Accident Monitoring System

TABLE OF CONTENTS (Cont'd)

LIST OF TABLES

Table Title Page

Table 2.3-1. Train A AM PL Naming Conventions ............................................................................... 2-4Table 2.3-2. Train B AM PL N am ing Conventions ............................................................................... 2-4Table 5.3-1. [ ax ...................................................... 5-13Table 5.4-1. []a,c ................................................................ 5-24Table 7.1-1. []a, ................... 7-1Table 7.1-2. [ ]a ....................................................... 7-22Table 7.1-3. [ ] ................................................................................................ 7-23

Table 7.1-4. [a ....................................................................... 7-24Table 7.1-5. [ .................................................................. 7-25Table 7.1-6. []a' ................................................................. 7-31Table 7.2-1. []a, ......................................... 7-69Table 7.2-2. [ ]ac ......................................... 7-73

LIST OF FIGURES

TitleFigure Page

Figure 5.2-1. [Figure 5.3-1. [Figure 5.4-1. [Figure 5.5-1. [Figure 7.1-1. [Figure 7.1-2. [

]a-' .................................................................... 5 -4]a,c ............................................................................................. 5 -2 1

]a,c ................................................................................................... 5 -2 7]a,c ........................................................................ 5 -3 2

]a.c ...................................................................................... 7 -9] c ............................................................................................ 7 -10

WNA-SD-00239-WBT-NP, Rev. 4 xii Westinghouse Non-Proprietary Class 3

Page 15: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS Completion Program I&C Projects

Software Requirements Specification for thePost Accident Monitoring System

ACRONYMS AND TRADEMARKS

Acronyms used in the document are defined in WNA-PS-00016-GEN, "Standard Acronyms andDefinitions" (Reference 2) and NABU-DS-001 15-GEN, "Safety System Standard Definitions"(Reference 3), or included below to ensure unambiguous understanding of their use within this document.

Acronyms Definition

ABBAC160ACCACTAF100AlAMPLAOCDCETCETMSCommon QCRACRCDATDBDB ElementsDIDODSPEUDHFCBFEFPDFPDS

FPROMHJTCHMIHSLHWEVOICCIEEEIPMTPNDHOMPAMS

Asea Brown BoveriAdvant® Controller 160AMPL Control ConfigurationActive Application ProgramAdvant® Fieldbus 100 NetworkAnalog InputABB Advant Master Programming LanguageAnalog OutputCompact DiskCore Exit ThermocoupleCore Exit Thermocouple Monitoring SystemCommon Qualified PlatformCable Redundancy AvailableCyclic Redundancy CheckDatabase element associated with AF 100 communicationDatabaseAC160 Database ElementsDigital InputDigital OutputData Set PeripheralExpected Uncompensated Dynamic HeadFunction Chart BuilderFunction EnableFlat Panel DisplayFlat Panel Display SystemFlash Programmable Read-Only MemoryHeated Junction ThermocoupleHuman-Machine InterfaceHigh Speed LinkHardware ErrorInput/OutputInadequate Core CoolingInstitute of Electrical and Electronics EngineersInternet ProtocolMaintenance and Test PanelNormalized Dynamic HeadOperator's ModulePost Accident Monitoring System

WNA-SD-00239-WBT-NP, Rev. 4 xiii Westinghouse Non-Proprietary Class 3

Page 16: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear Automation Software Requirements Specification for theWatts Bar Unit 2 NSSS Completion Program I&C Projects Post Accident Monitoring System

ACRONYMS AND TRADEMARKS (Cont'd)

Acronyms Definition

PC Process ControlPCH Power Compensated HeadPHA Preliminary Hazards AnalysisPhAB QNX® Photon® Application BuilderPID Point IdentifierPM Processor ModulePPS Plant Protection SystemPRE Process ErrorPROM Programmable Read-Only MemoryPWD Program Wide DatabaseQA Quality AssuranceRAM Random Access MemoryRC1 Redundant Cable 1RC2 Redundant Cable 2RCP Reactor Coolant PumpRCS Reactor Coolant SystemRJT Reference Junction TemperatureRTD Resistance Temperature DetectorRVLIS Reactor Vessel Level Instrumentation SystemRVLMS Reactor Vessel Level Monitoring SystemSE Severe ErrorSLE Software Load EnableSMM Subcooled Margin MonitorSPDS Safety Parameter Display SystemSRR Software Release RecordSWE Software ErrorTCP/IP Transmission Control Protocol/Internet ProtocolUDH Uncompensated Dynamic HeadUJTC Unheated Junction ThermocoupleWDT Watchdog Timer

Advant® is a registered trademark of ABB Process Automation Corporation.

Microsoft®, Windows®, and Visual SourceSafe® are registered trademarks of Microsoft Corporation inthe United States and/or other countries.

QNX® and Photon® are registered trademarks of QNX Software Systems GmbH & Co. KG ("QSSKG")and are used under license by QSS.

VMwareTM is a registered trademark of VMware, Inc.

WatcomTM is a trademark of Watcom International.

WNA-SD-00239-WBT-NP, Rev. 4 xiv Westinghouse Non-Proprietary Class 3

Page 17: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS Comoletion Program I&C Projects

Software Requirements Specification for thePost Accident Monitorine System

ACRONYMS AND TRADEMARKS (Cont'd)

All other product and corporate names used in this document may be trademarks or registered trademarksof other companies, and are used only for explanation and to the owners' benefit, without intent toinfringe.

WNA-SD-00239-WBT-NP, Rev. 4 XV Westinghouse Non-Proprietary Class 3

Page 18: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS Completion Program I&C Proiects

Software Requirements Specification for thePost Accident Monitorin2 System

GLOSSARY OF TERMS

Standard terms used in the document are defined in WNA-PS-00016-GEN, "Standard Acronyms andDefinitions" (Reference 2) and NABU-DS-001 15-GEN, "Safety System Standard Definitions"(Reference 3), or included below to ensure unambiguous understanding of their use within this document.

Term Definitions

A0650 Analog output module that converts digital signals from the ProcessorModule (PM) to analog signals. This module has eight output channelsfor 0-20 mA, 4-20 mA, -20-20 mA, -10-1OV, 0-5V, 1-5V, and 0-1OVranges.

AAX AMPL source code file.

AC 160 Station

Addressable Constants

A1687

A1688

BAX

C1527

C1631

The entire AC 160 Controller Station, which is made up of a single basestation subrack (C163 1, PM646A, and S600 10 modules) and anyoptional I/O station or extension subracks (S600 IO modules only). AllPMs within the same AC 160 Station share the same Advant Fieldbus 100(AF 100) bus address (base station subrack thumbwheel switch).

Any value within the AC 160 software which is changeable, through anFPD.

The A1687 is a high speed analog input module that processes 0-100 mV,RTD, and Thermocouple signals.

The A1688 is a high speed analog input module that processes 0-IV,0-10V, and 4-20 mA input signals.

Database source code file.

AF100 communications interface module that provides the AF100 high-speed bus control for the PC node box (FPDS).

AF 100 communications interface module that provides the AF 100 high-speed bus control for the AC 160 station.

Control module process control (PC) element used for execution controlof modules within a PC program.

Common Q revision control system.

Methods and tools used to protect computer systems againstunauthorized access and manipulation.

CONTRM

CQRev

Cyber Security

WNA-SD-00239-WBT-NP, Rev. 4 xvi Westinghouse Non-Proprietary Class 3

Page 19: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear Automation Software Requirements Specification for theWatts Bar Unit 2 NSSS Completion Program I&C Projects Post Accident Monitoring System

GLOSSARY OF TERMS (Cont'd)

Term Definitions

DAT Database element representing values that are transferred over the

AF100. A Boolean DAT is a database element that holds 32 individualBoolean data values. An integer or floating-point DAT holds one datavalue.

Data Set Peripheral (DSP) Database element representing a block of data (up to eight DATs) to be

received or sent over the AF 100.

FUNCM Function module structure PC element that has no execution effects and

is used to help label/structure a PC program.

IDENT Numerical representation that identifies the DSP on a given AF 100.Range is between 1 and 50.

PCPGM PC program structure PC element that defines the program header and isused for execution control of the overall application program on the

Advant control system.

SYS-CRC PC element that monitors the Cyclic Redundancy Check (CRC) taken

from the operating system, the system software, all options, and the

application program.

SYSL A PC element that measures PM system load.

WNA-SD-00239-WBT-NP, Rev. 4 xvii Westinghouse Non-Proprietary Class 3WNA-SD-00239-WBT-NP, Rev. 4 xvii Westinghouse Non-Proprietary Class 3

Page 20: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear Automation Software Requirements Specification for theWatts Bar Unit 2 NSSS Completion Program I&C Projects Post Accident Monitoring System

REFERENCES

Following is a list of references used throughout this document.

1. NABU-DP-00014-GEN, Rev. 2, "Design Process for Common Q Safety Systems," WestinghouseElectric Company LLC.

2. WNA-PS-00016-GEN, Rev. 5, "Standard Acronyms and Definitions," Westinghouse ElectricCompany LLC.

3. NABU-DS-001 15-GEN, Rev. 0, "Safety System Standard Definitions," Westinghouse ElectricCompany LLC.

4. 00000-ICE-3889, Rev. 12, "Coding Standards and Guidelines for Common Q Systems,"Westinghouse Electric Company LLC.

5. WCAP-16096-NP-A, Rev. 1A, "Software Program Manual for Common Q Systems,"Westinghouse Electric Company LLC.

6. WCAP-16097-P-A, Rev. 0, "Common Qualified Platform Topical Report," Westinghouse ElectricCompany LLC.

7. 00000-ICE-30155, Rev. 9, "System Requirements Specification for the Common Q Generic FlatPanel Display," Westinghouse Electric Company LLC.

8. WNA-DS-01070-GEN, Rev. 5, "Application Restrictions for Generic Common Q Qualification,"Westinghouse Electric Company LLC.

9. 00000-ICE-3239, Rev. 13, "Software Requirements Specification for the Common Q Generic FlatPanel Display Software," Westinghouse Electric Company LLC.

10. NABU-DP-00015-GEN, Rev. 3, "Common Q Software Configuration Management Guidelines,"Westinghouse Electric Company LLC.

11. 00000-ICE-30157, Rev. 18, "Software Design Description for the Common Q Generic Flat-PanelDisplay Software," Westinghouse Electric Company LLC.

12. WNA-DS-00315-GEN, Rev. 2, "Reusable Software Element Document CRC for Calibration Data,"Westinghouse Electric Company LLC.

13. WNA-DS-01 150-GEN, Rev. 0, "Standard General Requirements for Cyber Security,"Westinghouse Electric Company LLC.

14. AN03007Sp, ABB Memo, "AC160 CPU Loading Restrictions," ABB Process AutomationCorporation.

WNA-SD-00239-WBT-NP, Rev. 4 °°°i Westinghouse Non-Proprietary Class 3

Page 21: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear Automation Software Requirements Specification for theWatts Bar Unit 2 NSSS Completion Program I&C Projects Post Accident Monitoring System

REFERENCES (Cont'd)

15. 00000-ICE-30156, Rev. 8, "System Requirements Specification for the Common Q Post AccidentMonitoring System," Westinghouse Electric Company LLC.

16. WNA-PD-00073-WBT, Rev. 0, "Project Plan Common Q Post Accident Monitoring System,"Westinghouse Electric Company LLC.

17. WNA-DS-01617-WBT-P, Rev. 4, "Watts Bar 2 NSSS Completion Program I&C Projects PostAccident Monitoring System - System Requirements Specification," Westinghouse ElectricCompany.

18. 00000-ICE-3238, Rev. 5, "Software Requirements Specification Post Accident MonitoringSystem," Westinghouse Electric Company LLC.

19. WNA-CD-00018-GEN, Rev. 3, "Commercial Dedication Report for QNX 4.25G for Common QApplications," Westinghouse Electric Company LLC.

20. WNA-IP-00152-GEN, Rev. 8, "Generic Common Q Software Installation Procedure,"Westinghouse Electric Company LLC.

21. WNA-DS-01667-WBT-P, Rev. 4, "Watts Bar 2 NSSS Completion Program I&C Projects PostAccident Monitoring System - System Design Specification," Westinghouse Electric CompanyLLC.

22. 00000-ICE-30152, Rev. 5, "Software Design Description Post Accident Monitoring System AC 160Station," Westinghouse Electric Company LLC.

23. 00000-ICE-30140, Rev. 4, "Software Design Description for the Common Q Core ProtectionCalculator System Database and Utility Functions," Westinghouse Electric Company LLC.

24. 3BDS 005 665R401, Rev. A, "Data Base Elements, Advant Controller 160, Version 1.3Reference Manual," ABB, Asea Brown Boveri.

25. 3BDS 005 666R101, Rev. C, "PC Elements Advant Controller 160, Version 1.3,Reference Manual," ABB, Asea Brown Boveri.

26. ANSI/IEEE Standard 754-1985, "IEEE Standard for Binary Floating-Point Arithmetic," Institute ofElectrical and Electronics Engineers, Inc., 1985.

27. WNA-DS-01715-GEN, Rev. 4, "Standard Reusable Software Element Document for PMDiagnostics Type Circuit," Westinghouse Electric Company LLC.

WNA-SD-00239-WBT-NP, Rev. 4 xix Westinghouse Non-Proprietary Class 3WNA-SD-00239-WBT-NP, Rev. 4 xix Westinghouse Non-Proprietary Class 3

Page 22: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear Automation Software Requirements Specification for theWatts Bar Unit 2 NSSS Completion Program I&C Projects Post Accident Monitoring System

REFERENCES (Cont'd)

28. WNA-CD-00029-GEN, Rev. 1, "Commercial Grade Dedication Report for the ABB AdvantPM646A/PM646B Firmware/Base System Software Version 1.3/8, ACC Advanced Version 1.7/1AC160 PC and DB Element Library Version 1.5/1 for Common Q Applications," WestinghouseElectric Company LLC.

29. WNA-DS-01564-GEN, Rev. 2, "Standard Reusable Software Element Document for ExclusiveModule Error Type Circuit," Westinghouse Electric Company LLC.

30. 00000-ICE-37727, Rev. 0, "Post Accident Monitoring System Software Preliminary HazardAnalysis for the Common Q Phase 3 PAMS Project," Westinghouse Electric Company LLC.

31. WNA-DS-01838-GEN, Rev. 3, "Standard Reusable Software Element Document for Fourth-OrderPolynomial Fluid Density Curve Fit Custom PC Element," Westinghouse Electric Company LLC.

32. WNA-DS-01839-GEN, Rev. 4, "Standard Reusable Software Element Document for Summation ofReference Leg Density Correction Custom PC Element," Westinghouse Electric Company LLC.

33. WNA-DS-01840-GEN, Rev. 2, "Standard Reusable Software Element Document for 2-InputMaximum Comparison with Status Control Custom PC Element," Westinghouse ElectricCompany LLC.

34. WNA-DS-01841-GEN, Rev. 2, "Standard Reusable Software Element Document for 2-InputMinimum Comparison with Status Control Custom PC Element," Westinghouse ElectricCompany LLC.

35. WNA-DS-01842-GEN, Rev. 4, "Standard Reusable Software Element Document for RVLIS StaticLevel Calculation Custom PC Element," Westinghouse Electric Company LLC.

36. WNA-DS-01845-GEN, Rev. 6, "Standard Reusable Software Element Document for DynamicHead Compensation Calculation Custom PC Element," Westinghouse Electric Company LLC.

37. WNA-DS-01846-GEN, Rev. 2, "Standard Reusable Software Element Document for NormalizedDynamic Head Compensation Custom PC Element," Westinghouse Electric Company LLC.

38. WNA-DS-01847-GEN, Rev. 2, "Standard Reusable Software Element Document for Void FractionCustom PC Element," Westinghouse Electric Company LLC.

39. WNA-DS-01848-GEN, Rev. 4, "Standard Reusable Software Element Document for the ReactorVessel Level Monitoring Custom PC Element," Westinghouse Electric Company LLC.

40. WNA-DS-01849-GEN, Rev. 2, "Standard Reusable Software Element Document for the ReactorCoolant Pump Status Custom PC Element," Westinghouse Electric Company LLC.

WNA-SD-00239-WBT-NP, Rev. 4 xx Westinghouse Non-Proprietary Class 3

Page 23: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear Automation Software Requirements Specification for theWatts Bar Unit 2 NSSS Completion Program I&C Projects Post Accident Monitoring System

REFERENCES (Cont'd)

41. WNA-DS-01994-GEN, Rev. 0, "Standard Reusable Software Element Document for a First OrderLag Filter Custom PC Element," Westinghouse Electric Company LLC.

42. WNA-DS-00306-GEN, Rev. 5, "Reusable Software Element Document Engineering UnitsConversion," Westinghouse Electric Company LLC.

43. WNA-DS-02065-GEN, Rev. 2, "Standard Reusable Software Element Document for ReactorVessel Level Alarm Custom PC Element," Westinghouse Electric Company LLC.

44. WNA-DS-01505-GEN, Rev. 0, "Standard Reusable Software Element Document for Reflash TypeCircuit," Westinghouse Electric Company LLC.

WNA-SD-00239-WBT-NP, Rev. 4 xxi Westinghouse Non-Proprietary Class 3WNA-SD-00239-WBT-NP, Rev. 4 xxi Westinghouse Non-Proprietary Class 3

Page 24: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS Completion Program I&C Projects

Software Requirements Specification for thePost Accident Monitorin2 System

REQUIREMENTS

Design and/or other requirements have been identified in this document. Following is a list of therequirement numbers and the document page on which the requirement is identified.

R2.3-1 .................... 2-3R2.3-2 .................... 2-3R2.3-3 .................... 2-3R2.3-4 .................... 2-3R2.3-5 .................... 2-3R2.3.1.1-1 .............. 2-3R2.3.1.1-2 .............. 2-4R2.3.1.2-1 .............. 2-4R2.3.1.3-1 .............. 2-4R2.3.1.4-1 .............. 2-5R2.3.2-1 ................. 2-5R2.3.2-2 ................. 2-5R2.3.2-3 ................. 2-5R2.3.2-4 ................. 2-5R2.3.2-5 ................. 2-5R2.3.2-6 ................. 2-6R2.3.2-7 ................. 2-6R2.3.2-8 ................. 2-6R2.3.2-9 ................. 2-6R2.3.2-10 ............... 2-6R2.3.2-11 ............... 2-6R2.3.2-12 ............... 2-6R2.3.2-13 ............... 2-6R2.3.2-14 ............... 2-7R2.3.2-15 ............... 2-7R2.3.2-16 ............... 2-7R2.3.2-17 ............... 2-7R3.1-1 .................... 3-1R3.1-2 .................... 3-1R3.1-3 .................... 3-1R3.1-4 .................... 3-1R3.2-1 .................... 3-2R3.2-2 .................... 3-2R3.2-3 .................... 3-2R3.2-4 .................... 3-2R3.2-5 .................... 3-2

R3.2-6 .................... 3-3

R3.2-7 .................... 3-3R3.2-8 .................... 3-3R3.2-9 .................... 3-3

R3.3-1 .................... 3-3

R3.3-2 ..................... 3-4R3.3-3 ..................... 3-4R3.3-4 ..................... 3-4R3.4-1 ..................... 3-4R3.4-2 ..................... 3-4R4.2-1 ................ 4-1R4.2-2 ..................... 4-1R4.2-3 ..................... 4-1R4.2-4 ..................... 4-1R4.2-5 ..................... 4-2R4.2-6 ..................... 4-2R4.2-7 ..................... 4-2R4.2-8 ..................... 4-2R4.2-9 ..................... 4-2R4.2-10 ................... 4-3R4.2-11 ................... 4-3R4.2-12 ................... 4-3R4.2-13 ................... 4-3R4.3.1-1 .................. 4-4R4.3.1-2 .................. 4-4R4.3.1-3 .................. 4-4R4.3.1-4 .................. 4-4R4.3.1-5 .................. 4-4R4.3.1-6 .................. 4-4R4.3.1-7 .................. 4-4R4.3.1-8 .................. 4-5R4.3.1-9 .................. 4-5R5.1-1 ..................... 5-1R5.1-2 ................ 5-IR5.1-3 ..................... 5-1R5.1.1-1 .................. 5-1R5.1.1-2 .................. 5-1R5.1.1-3 .................. 5-2R5.1.1-4 .................. 5-2R5.1.1-5 .................. 5-2R5.1.1-6 .................. 5-2R5.2.1-1 .................. 5-4R5.2.2-1 .................. 5-4R5.2.2-2 .................. 5-5R5.2.2-3 .................. 5-5R5.2.2-4 .................. 5-5

WNA-SD-00239-WBT-NP, Rev. 4 xxii Westinghouse Non-Proprietary Class 3

Page 25: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWafts Bar Unit 2 NSSS Completion Program I&C Projects

Software Requirements Specification for thePost Accident Monitoring System

R5.2.3-1 ................. 5-5R5.2.3-2 ................. 5-5R5.2.3-3 ................. 5-6R5.2.4-1 ................. 5-6R5.2.4-2 ................. 5-6R5.2.4-3 ................. 5-6

R5.3-1 .................... 5-6R5.3-2 .................... 5-6R5.3-3 .................... 5-7R5.3-4 .................... 5-7R5.3-5 .................... 5-7R5.3-6 .................... 5-7R5.3-7 .................... 5-7R5.3-8 .................... 5-7R5.3-9 .................... 5-7R5.3-10 .................. 5-8R5.3.1-1 ................. 5-8R5.3.1-2 ................. 5-8R5.3.1-3 ................. 5-8R5.3.1-4 ................. 5-8R5.3.2-1 ................. 5-9R5.3.2-2 ................. 5-9R5.3.2-3 ................. 5-9R5.3.3-1 ................. 5-9R5.3.3-2 ................. 5-9R5.3.3-3 ................. 5-10R5.3.3-4 ................. 5-10R5.3.4-1 ................. 5-10R5.3.4-2 ................. 5-10R5.3.4-3 ................. 5-10R5.3.4-4 ................. 5-11R5.3.5-1 ................. 5-11R5.3.5-2 ................. 5-11

R5.3.6-1 ................. 5-11R5.3.6-2 ................. 5-11R5.3.7-1 ................. 5-12R5.3.7-2 ................. 5-12R5.3.8-1 ................. 5-12R5.3.8-2 ................. 5-12R5.3.9-1 ................. 5-12R5.3.9-2 ................. 5-13R5.3.10-1 ............... 5-13R5.3.10-2 ............... 5-13

R5.3.11-1 ............... 5-14R5.3.11-2 ............... 5-14R5.3.11-3 ............... 5-14

R5.3.14-1 ................ 5-14R5.3.14-2 ................ 5-15R5.3.14-3 ................ 5-15R5.3.15-1 ................ 5-15R5.3.15-2 ................ 5-15R5.3.15-3 ................ 5-15R5.3.16-1 ................ 5-15R5.3.16-2 ................ 5-16R5.3.17-1 ................ 5-16R5.3.17-2 ................ 5-16

R5.3.18-1 ................ 5-16R5.3.18-2 ................ 5-16R5.3.18-3 ................ 5-16R5.3.19-1 ................ 5-17R5.3.20-1 ................ 5-17R5.3.20-2 ................ 5-17R5.3.20-3 ................ 5-17R5.3.20-4 ................ 5-17R5.3.20-5 ................ 5-17R5.3.20-6 ................ 5-17R5.3.21-1 ................ 5-18R5.3.21-2 ................ 5-18R5.3.22-1 ................ 5-18R5.3.22-2 ................ 5-18R5.3.22-3 ................ 5-18R5.3.22-4 ................ 5-18R5.3.23-1 ................ 5-19R5.3.23-2 ................ 5-19R5.3.24-1 ................ 5-19R5.3.24-2 ................ 5-19R5.3.24-3 ................ 5-19R5.3.25-1 ................ 5-20

R5.4.1 -1 .................. 5-22R5.4.1-2 .................. 5-22R5.4.1-3 .................. 5-22R5.4.1-4 .................. 5-22R5.4.1-5 .................. 5-22R5.4.1-6 .................. 5-22R5.4.1-7 .................. 5-23R5.4.1-8 .................. 5-23R5.4.1-9 .................. 5-23R5.4.2-1 .................. 5-23R5.4.2-2 .................. 5-24R5.4.3-1 .................. 5-24R5.4.3-2 ......... 5-24R5.4.3-3 .................. 5-24

WNA-SD-00239-WBT-NP, Rev. 4 xxiii Westinghouse Non-Proprietary Class 3WNA-SD-00239-WBT-NP, Rev. 4 xxiii Westinghouse Non-Proprietary Class 3

Page 26: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS Completion Program I&C Projects

Software Requirements Specification for thePost Accident Monitoring System

R5.4.3-4 ................. 5-25R5.4.3-5 ................. 5-25R5.4.3-6 ................. 5-25R5.4.3-7 ................. 5-25R5.4.3-8 ................. 5-25R5.4.6-1 ................. 5-26R5.4.6-2 ................. 5-26R5.4.6-3 ................. 5-26R5.4.7-1 ................. 5-26R5.5-1 .................... 5-28R5.5-2 .................... 5-29R5.5-3 .................... 5-29R5.5-4 .................... 5-29R5.5-5 .................... 5-29R5.5-6 .................... 5-30R5.5-7 .................... 5-30R5.5-8 .................... 5-30R5.5-9 .................... 5-30R5.5-10 .................. 5-30R5.5-11 .................. 5-30R5.5-12 .................. 5-31R6.1.2-1 ......... 6-1R6.1.2-2 ................. 6-2R6.1.2-3 ................. 6-2R6.1.2-4 ................. 6-2R6.1.2-5 ................. 6-2R6.1.2-6 ................. 6-2R6.1.2-7 ................. 6-3R6.2-1 .................... 6-3R6.2-2 .................... 6-3R6.2-3 .................... 6-3R6.2-4 .................... 6-3R6.2-5 .................... 6-4R6.2-6 .................... 6-4R6.2-7 .................... 6-4R6.2-8 .................... 6-4R7.1.2-1 ................. 7-1R7.1.3.1-1 .............. 7-3R7.1.3.1-2 .............. 7-3R7.1.3.3-1 .............. 7-3R7.1.3.3-2 .............. 7-4R7.1.3.3-3 .............. 7-4R7.1.4.1-1 .............. 7-4R7.1.4.1-2 .............. 7-4R7.1.4.1-3 .............. 7-4R7.1.4.1-4 .............. 7-5

R7.1.4.1-5 ............... 7-5R7.1.4.1-6 ............... 7-5R7.1.4.1-7 ............... 7-5R7.1.4.1-8 ............... 7-5R7.1.4.1-9 ............... 7-5R7.1.4.1-10 ............. 7-5R7.1.4.1-11 ............. 7-5R7.1.4.1-12 ............. 7-6R7.1.4.1-13 ............. 7-6R7.1.4.1-14 ............. 7-6R7.1.4.2-1 ............... 7-6R7.1.4.2-2 ............... 7-6R7.1.4.2-3 ............... 7-6R7.1.4.2-4 ............... 7-7R7.1.4.2-5 ............... 7-7R7.1.4.2-6 ............... 7-7R7.1.4.3-1 ............... 7-7R7.1.4.3-2 ............... 7-7R7.1.4.3-3 ............... 7-7R7.1.4.3-4 ............... 7-7R7.1.4.3-5 ............... 7-8R7.1.4.3-6 .............. 7-11R7.1.4.3-7 ............... 7-11R7.1.4.3-8 ............... 7-11R7.1.4.3-9 ............... 7-11R7.1.4.3-10 ............. 7-12R7.1.4.3-11 ............. 7-12R7.1.4.3-12 ............. 7-12R7.1.4.3-13 ............. 7-12R7.1.4.3-14 ............. 7-13R7.1.4.3-15 ............. 7-13R7.1.4.3-16 ............. 7-13R7.1.4.3-17 ............. 7-13R7.1.4.3-18 ............. 7-13R7.1.4.3-19 ............. 7-13R7.1.4.3-20 ............. 7-13R7.1.4.3-21 ............. 7-14R7.1.4.3-22 ............. 7-14R7.1.4.3-23 ............. 7-14R7.1.4.3-24 ............. 7-14R7.1.4.3-25 ............. 7-14R7.1.4.3-26 ............. 7-14R7.1.4.3-27 ............. 7-15R7.1.4.3-28 ............. 7-15R7.1.4.3-29 ............. 7-15R7.1.4.3-30 ............. 7-15

WNA-SD-00239-WBT-NP, Rev. 4 xxiv Westinghouse Non-Proprietary Class 3WNA-SD-00239-WBT-NP, Rev. 4 xxiv Westinghouse Non-Proprietary Class 3

Page 27: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWafts Bar Unit 2 NSSS Completion Propram I&C Proiects

Software Requirements Specification for thePost Accident Monitorin2 System

R7.1.4.3-31 ............ 7-15R7.1.4.3-32 ............ 7-16R7.1.4.3-33 ............ 7-16R7.1.4.3-34 ............ 7-16R7.1.4.3-35 ............ 7-16R7.1.4.3-36 ............ 7-17R7.1.4.3-37 ............ 7-17R7.1.4.3-38 ............ 7-17R7.1.4.3-39 ............ 7-17R7.1.4.3-40 ............ 7-17R7.1.4.3-41 ............ 7-17R7.1.4.3-42 ............ 7-17R7.1.4.3-43 ............ 7-18R7.1.4.3-44 ............ 7-18R7.1.4.3-45 ............ 7-18R7.1.4.3-46 ............ 7-18R7.1.4.3-47 ............ 7-18R7.1.4.3-48 ............ 7-18R7.1.4.3-49 ............ 7-18R7.1.4.3-50 ............ 7-19R7.1.4.3-51 ............ 7-19R7.1.4.3-52 ............ 7-19R7.1.4.3-53 ............ 7-19R7.1.4.4-1 .............. 7-19R7.1.4.4-2 .............. 7-20R7.1.4.4-3 .............. 7-20R7.1.4.4-4 .............. 7-20R7.1.4.4-5 .............. 7-20R7.1.4.4-6 .............. 7-20R7.1.4.4-7 .............. 7-20R7.1.4.4-8 .............. 7-20R7.1.4.4-9 .............. 7-21R7.1.4.4-10 ............ 7-21R7.1.4.4-11 ............ 7-21R7.1.4.4-12 ............ 7-21R7.1.4.5-1 .............. 7-21R7.1.4.6-1 .............. 7-22R7.1.4.6-2 .............. 7-22R7.1.4.6-3 .............. 7-23R7.1.4.6-4 .............. 7-23R7.1.4.6-5 .............. 7-23R7.1.4.6-6 .............. 7-23R7.1.4.6-7 .............. 7-24R7.1.4.6-8 .............. 7-24R7.1.4.7-1 .............. 7-26R7.1.4.7-2 .............. 7-26

R7.1.5.1-1 ............... 7-26R7.1.5.1-2 ............... 7-26R7.1.5.1-3 ............... 7-26R7.1.5.1-4 ............... 7-27R7.1.5.1-5 ............... 7-27R7.1.5.1-6 ............... 7-27R7.1.5.2-1 ............... 7-27R7.1.5.2-2 ............... 7-28R7.1.5.2-3 ............... 7-28R7.1.5.2-4 ............... 7-28R7.1.5.2-5 ............... 7-28R7.1.5.2-6 ............... 7-28R7.1.5.4-1 ............... 7-28R7.1.5.4-2 ............... 7-29R7.1.5.4-3 ............... 7-29R7.1.5.4-4 ............... 7-29R7.1.5.4-5 ............... 7-29R7.1.5.4-6 ............... 7-29R7.1.5.4-7 ............... 7-29R7.1.5.4-8 ............... 7-30R7.1.5.4-9 ............... 7-30R7.1.5.4-10 ............. 7-30R7.1.5.4-11 ............. 7-30R7.1.5.4-12 ............. 7-30R7.1.5.4-13 ............. 7-31R7.1.6-1 .................. 7-31R7.1.6-2 .................. 7-32R7.1.6-3 .................. 7-32R7.1.8-1 .................. 7-32R7.1.8-2 .................. 7-32R7.1.10-1 ................ 7-33R7.1.10-2 ................ 7-33R7.1.11-1 ................ 7-33R7.1.12-1 ................ 7-33R7.1.13-1 ................ 7-33R7.1.14-1 ................ 7-34R7.1.15-1 ................ 7-34R7.1.16-1 ................ 7-34R7.1.17-1 ................ 7-34R7.1.24-1 ................ 7-35R7.2.2-1 .................. 7-36R7.2.2-2 .................. 7-38R7.2.2-3 .................. 7-38R7.2.2-4 .................. 7-38R7.2.2-5 .................. 7-38

R7.2.2-6 .................. 7-38

WNA-SD-00239-WBT-NP, Rev. 4 xxv Westinghouse Non-Proprietary Class 3WNA-SD-00239-WBT-NP, Rev. 4 XXV Westinghouse Non-Proprietary Class 3

Page 28: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS Completion Program I&C Proiects

Software Requirements Specification for thePost Accident Monitoring System

R7.2.2-7 ................. 7-38R7.2.2-8 ................. 7-39R7.2.2-9 ................. 7-39R7.2.2-10 ............... 7-39R7.2.2-11 ............... 7-39R7.2.2-12 ............... 7-39R7.2.2-13 ............... 7-39R7.2.2-14 ............... 7-39R7.2.2-15 ............... 7-39R7.2.2-16 ............... 7-40R7.2.3-1 ................. 7-40R7.2.3-2 ................. 7-40R7.2.4-1 ................. 7-40R7.2.4-2 ................. 7-40R7.2.4-3 ................. 7-41R7.2.4-4 ................. 7-41R7.2.4-5 ................. 7-41R7.2.4-6 ................. 7-41R7.2.4-7 ................. 7-41R7.2.4-8 ................. 7-41R7.2.4-9 ................. 7-41R7.2.4-10 ............... 7-41R7.2.5-1 ................. 7-42R7.2.5-2 ................. 7-42R7.2.6-1 ................. 7-42R7.2,6-2 ................. 7-42R7.2.7-1 ................. 7-42R7.2.7-2 ................. 7-43R7.2.7-3 ................. 7-43R7.2.7-4 ................. 7-43R7.2.7-5 ................. 7-43R7.2.7-6 ................. 7-43R7.2.7-7 ................. 7-43R7.2.7-8 ................. 7-44R7.2.8-1 ................. 7-44R7.2.8-2 ................. 7-44R7.2.8-3 ................. 7-44R7.2.8-4 ................. 7-44R7.2.8-5 ................. 7-44R7.2.8-6 ................. 7-44R7.2.9-1 ................. 7-45R7.2.9-2 ................. 7-45R7.2.9-3 ................. 7-45R7.2.10-1 ............... 7-45R7.2.10-2 ............... 7-45R7.2.11-1 ............... 7-46

R7.2.11-2 ................ 7-46R7.2.11-3 ................ 7-46R7.2.11-4 ................ 7-46R7.2.11-5 ................ 7-46R7.2.11-6 ................ 7-47R7.2.11-7 ................ 7-47R7.2.12-1 ................ 7-47R7.2.12-2 ................ 7-47R7.2.12-3 ............ 7-47R7.2.12-4 ................ 7-47R7.2.12-5 ................ 7-47R7.2.12-6 ................ 7-48R7.2.12-7 ................ 7-48R7.2.12-8 ................ 7-48R7.2.12-9 ................ 7-48R7.2.13-1 ................ 7-48R7.2.13-2 ................ 7-48R7.2.13-3 ................ 7-48R7.2.13-4 ................ 7-49R7.2.13-5 ................ 7-49R7.2.13-6 ........... 7-49R7.2.13-7 ................ 7-49R7.2.13-8 ................ 7-49R7.2.13-9 ................ 7-50R7.2.13-10 ............. 7-50R7.2.13-11 .............. 7-50R7.2.13-12 .............. 7-50R7.2.13-13 .............. 7-50R7.2.13-14 .............. 7-50R7.2.13-15 .............. 7-50R7.2.13-16 .............. 7-50R7.2.13-17 .............. 7-51R7.2.13-18 .............. 7-51R7.2.13-19 .............. 7-51R7.2.13-20 .............. 7-51R7.2.13-21 .............. 7-51R7.2.13-22 .............. 7-51R7.2.14-1 ................ 7-52R7.2.14-2 ................ 7-52R7.2.14-3 ................ 7-52R7.2.14-4 ................ 7-52R7.2.14-5 ................ 7-52R7.2.14-6 ................ 7-53R7.2.15-1 ................ 7-53R7.2.15-2 ................ 7-53R7.2.16-1 ................ 7-53

WNA-SD-00239-WBT-NP, Rev. 4 xxvi Westinghouse Non-Proprietary Class 3WNA-SD-00239-WBT-NP, Rev. 4 xxvi Westinghouse Non-Proprietary Class 3

Page 29: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS Comoletion Program I&C Proiects

Software Requirements Specification for thePost Accident Monitorine System

R7.2.16-2 ............... 7-53R7.2.16-3 ............... 7-53R7.2.16-4 ............... 7-54R7.2.16-5 ............... 7-54R7.2.16-6 ............... 7-54R7.2.16-7 ............... 7-54R7.2.17-1 ............... 7-54R7.2.17-2 ............... 7-54R7.2.17-3 ............... 7-55R7.2.17-4 ............... 7-55R7.2.17-5 ............... 7-55R7.2.17-6 ............... 7-55R7.2.17-7 ............... 7-55R7.2.17-8 ............... 7-55R7.2.17-9 ............... 7-55R7.2.17-10 ............. 7-55R7.2.17-11 ............. 7-56R7.2.18-1 ............... 7-56R7.2.18-2 ............... 7-56R7.2.18-3 ............... 7-56R7.2.18-4 ............... 7-56R7.2.18-5 ............... 7-56R7.2.18-6 ............... 7-56R7.2.19-1 ............... 7-57R7.2.19-2 ............... 7-57R7.2.19-3 ............... 7-57R7.2.19-4 ............... 7-57R7.2.20-1 ............... 7-57R7.2.20-2 ............... 7-57R7.2.20-3 ............... 7-57R7.2.20-4 ............... 7-58R7.2.20-5 ............... 7-58R7.2.20-6 ............... 7-58R7.2.21-1 ............... 7-58R7.2.21-2 ............... 7-58R7.2.21-3 ............... 7-58R7.2.21-4 ............... 7-58R7.2.22-1 ............... 7-59R7.2.22-2 ............... 7-59R7.2.22-3 ............... 7-59R7.2.22-4 ............... 7-59R7.2.22-5 ............... 7-59R7.2.23-1 ............... 7-59R7.2.23-2 ............... 7-59R7.2.23-3 ............... 7-59R7.2.23-4 ............... 7-60

R7.2.23-5 ................ 7-60R7.2.24-1 ................ 7-60R7.2.24-2 ................ 7-60R7.2.24-3 ................ 7-60R7.2.24-4 ................ 7-60R7.2.25-1 ................ 7-60R7.2.25-2 ................ 7-61R7.2.25-3 ................ 7-61R7.2.25-4 ................ 7-61R7.2.25-5 ................ 7-61R7.2.25-6 ................ 7-61R7.2.25-7 ................ 7-61R7.2.25-8 ................ 7-61R7.2.26-1 ................ 7-61R7.2.26-2 ................ 7-62R7.2.26-3 ................ 7-62R7.2.26-4 ................ 7-62R7.2.26-5 ................ 7-62R7.2.27-1 ................ 7-62R7.2.27-2 ................ 7-62R7.2.27-3 ................ 7-62R7.2.27-4 ................ 7-63R7.2.27-5 ................ 7-63R7.2.27-6 ................ 7-63R7.2.27-7 ................ 7-63R7.2.27-8 ................ 7-63R7.2.28-1 ................ 7-63R7.2.28-2 ................ 7-63R7.2.28-3 ................ 7-64R7.2.28-4 ................ 7-64R7.2.28-5 ................ 7-64R7.2.28-6 ................ 7-64R7.2.28-7 ................ 7-64R7.2.29-1 ................ 7-65R7.2.29-2 ................ 7-65R7.2.29-3 ................ 7-65R7.2.29-4 ................ 7-65R7.2.30-1 ................ 7-65R7.2.30-2 ................ 7-65R7.2.30-3 ................ 7-65R7.2.30-4 ................ 7-66R7.2.30-5 ................ 7-66R7.2.30-6 ................ 7-66R7.2.31-1 ................ 7-66R7.2.31-2 ................ 7-66R7.2.31-3 ................ 7-66

WNA-SD-00239-WBT-NP, Rev. 4 xxvii Westinghouse Non-Proprietary Class 3

Page 30: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS Completion Pro2ram I&C Prolects

Software Requirements Specification for thePost Accident Monitoring System

R7.2.31-4 ............... 7-67R7.2.32-1 ............... 7-67R7.2.32-2 ............... 7-67R7.2.32-3 ............... 7-67R7.2.32-4 ............... 7-67R7.2.33-1 ............... 7-67R7.2.33-2 ............... 7-68R7.2.33-3 ............... 7-68R7.2.33-4 ............... 7-68R7.2.33-5 ............... 7-68R7.2.34-1 ............... 7-68R7.2.34-2 ............... 7-68R7.2.34-3 ............... 7-68R7.2.34-4 ............... 7-68R7.2.34-5 ............... 7-69R7.2.34-6 ............... 7-77R7.2.34-7 ............... 7-77R7.2.34-8 ............... 7-77R7.2.34-9 ............... 7-77R7.2.34-10 ............. 7-77R7.2.34-11 ............. 7-77R7.2.34-12 ............. 7-77R7.2.35-1 ............... 7-78R7.2.35-2 ............... 7-78R7.2.35-3 ............... 7-78R7.2.35-4 ............... 7-78R7.2.35-5 ............... 7-78R7.2.36-1 ............... 7-78R7.2.36-2 ............... 7-79R7.2.36-3 ............... 7-79R7.2.36-4 ............... 7-79R7.2.37-1 ............... 7-79R7.2.37-2 ............... 7-79R7.2.37-3 ............... 7-79R7.2.38-1 ............... 7-80R7.2.40-1 ............... 7-80R7.2.40-2 ............... 7-80R7.2.40-3 ............... 7-80R7.2.40-4 ............... 7-80R7.2.40-5 ............... 7-81R7.2.40-6 ............... 7-81R7.2.41-1 ............... 7-81R7.2.41-2 ............... 7-81R7.2.41-3 ............... 7-81R7.2.42-1 ............... 7-81R7.2.42-2 ............... 7-82

R7.2.42-3 ................ 7-82R7.2.43-1 ................ 7-82R7.2.44-1 ................ 7-82R7.2.44-2 ................ 7-82R7.2.44-3 ................ 7-83R7.2.44-4 ................ 7-83R7.2.44-5 ................ 7-83R7.2.45-1 ................ 7-84R7.2.46-1 ................ 7-84R7.2.47-1 ................ 7-84R7.2.47-2 ................ 7-84R7.2.48-1 ................ 7-84R7.2.49-1 ................ 7-85R7.2.57-1 ................ 7-86R7.2.57-2 ................ 7-86R7.2.57-3 ................ 7-86R7.2.57-4 ................ 7-87R7.2.57-5 ................ 7-87R7.2.57-6 ................ 7-87R 8.2.1-1 .................. 8-1R 8.2.1-2 .................. 8-1R8.2.1-3 .................. 8-2R8.2.1-4 .................. 8-2R 8.2.1-5 .................. 8-2R 8.2.1-6 .................. 8-2R 8.2.1-7 .................. 8-2R8.2.1-8 .................. 8-2R 8.2.1-9 .................. 8-2R8.2.1 -10 ................ 8-2R8.2.1-11 ................ 8-2R8.2.1-12 ................ 8-3R8.2.1-13 ................ 8-3R8.2.1-14 ................ 8-3R8.2.1-15 ................ 8-3

(Last Page of Front Matter)

WNA-SD-00239-WBT-NP, Rev. 4 °°oii Westinghouse Non-Proprietary Class 3

Page 31: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear Automation Software Requirements Specification for theWatts Bar Unit 2 NSSS Completion Program I&C Projects Post Accident Monitoring System

SECTION 1INTRODUCTION

1.1 OVERVIEW

This document describes requirements for the major software components, design structure, informationflow, processing steps, and other required aspects that are to be implemented to satisfy the Watts Bar Unit2 Post Accident Monitoring System (PAMS) functional and system requirements. This document alsodescribes requirements that are needed to provide software standardization, meet licensing requirements,and reduce the possibility of software coding errors.

The primary functions of the PAMS are listed in Section 2.1. The major software components consist ofthe AC 160 safety algorithms (Saturation Margin Monitoring, Core Exit Thermocouples Monitoring, andReactor Vessel Level Monitoring), the AC 160 communications, the AC 160 test and maintenancefunctions, the OM and MTP graphical display program, the OM and MTP communications programs, andthe OM and MTP test and maintenance functions.

The Watts Bar Unit 2 PAMS software is implemented on the Common Qualified (Q) platform. TheAdvant® Controller 160 (AC 160) platform is described in WCAP-16097-P-A, "Common QualifiedPlatform Topical Report" (Reference 6). The platform consists of two major products: the Asea BrownBoveri (ABB) AC 160 platform and the Flat Panel Display System (FPDS) platform.

The AC 160 platform software consists of the AC 160 controller operating system (Base) software, theAC 160 application programming tool (ACC 1.7/1 Advanced), and the AC 160 application software. TheAC 160 Base software and application programming tool were developed by ABB Industrial Systems andare qualified per the requirements of WCAP-16096-NP-A, "Software Program Manual for Common QSystems" (Reference 5). The AC160 application software development should be compliant with thefollowing documents: WCAP-16097-P-A, "Common Qualified Platform Topical Report" (Reference 6),WCAP-16096, Software Program Manual for Common Q Systems (Reference 5),NABU-DP-00014-GEN, "Design Process for Common Q Safety Systems" (Reference 1), andWNA-DS-0 1 070-GEN, "Application Restrictions for Generic Common Q Qualification" (Reference 8)(see exceptions in R2.3-3).

The FPDS consists of the qualified QNX® operating system, the qualified QNX developmentenvironment (includes the WatcomTM compiler and linker), the Westinghouse FPDS generic software(e.g., Westinghouse-developed display widgets and programs), and the application-specific FPDSsoftware developed to meet Watts Bar 2 PAMS-specific requirements. The Westinghouse FPDS genericsoftware has undergone a qualification program to verify the requirements of 00000-ICE-3239, "SoftwareRequirements Specification for the Common Q Generic Flat-Panel Display Software" (Reference 9).

00000-ICE-3889, "Coding Standards and Guidelines for Common Q Systems" (Reference 4) identifiesadditional programming standards and guidelines to be used for the application software.

WNA-SD-00239-WBT-NP, Rev. 4 1-1 Westinghouse Non-Proprietary Class 3WNA-SD-00239-WBT-NP, Rev. 4 1-1 Westinghouse Non-Proprietary Class 3

Page 32: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS Comaletion Program I&C Proiects

Software Requirements Specification for thePost Accident Monitorin2 System

1.2 SCOPE

This document defines the software requirements for the Watts Bar 2 PAMS-specific application softwarefor both the AC 160 and the FPDS.

1.3 OBJECTIVE

This document provides documentation for the requirements used in the design of the Watts Bar 2 PAMSsoftware in accordance with NABU-DP-00014-GEN, "Design Process for Common Q Safety Systems"(Reference 1).

1.4 BACKGROUND

The software requirements for the Watts Bar 2 PAMS defined herein are based on 00000-ICE-3238,"Software Requirements Specification for the Common Q Post Accident Monitoring System"(Reference 18), and changes defined in WNA-DS-01617-WBT-P, "Post Accident Monitoring System -System Requirements Specification" (Reference 17). The specific sections of 00000-ICE-3238 that applyto the Watts Bar 2 PAMS are identified throughout this document. The Watts Bar 2 PAMS reactor vessellevel monitoring system will use a Westinghouse Reactor Vessel Level Instrumentation System (RVLIS)in place of the Heated Junction Thermocouple (HJTC) system.

(Last Page of Section 1)

WNA-SD-00239-WBT-NP, Rev. 4 1-2 Westinghouse Non-Proprietary Class 3

Page 33: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear Automation Software Requirements Specification for theWatts Bar Unit 2 NSSS Completion Program I&C Projects Post Accident Monitoring System

SECTION 2GENERAL DESCRIPTION

2.1 FUNCTIONAL DESCRIPTION

Watts Bar 2 PAMS, a real-time monitoring system, provides:

" Information and alarms to assist the reactor operators in mitigating plant events or accidents thathave the potential to result in inadequate cooling of the reactor core

* Information and data to the plant monitoring/safety parameter display system (SPDS) computersfor use in its control room display

The Watts Bar 2 PAMS will be composed of two separate and independent redundant trains. Each of thetwo redundant trains will be capable of performing all of the required PAMS functions, even if the otherredundant train is out of service. The overall system availability will comply with the requirementsspecified in WNA-DS-0 1617-WBT-P (Reference 17). The PAMS provides two types of indications foralarms. The FPDS provides one source of alarm indication, and the AC 160 digital outputs to the plantannunciators provide the other alarm indication.

The PAMS measures process input signals, and calculates the inadequate core cooling (ICC) functions of:

* Core Exit Temperature" Subcooled Margin* Reactor Vessel Level

and provides the following outputs:

* Plant Computer System* Annunciator* Analog Outputs

The PAMS includes an Operator's Module (OM) located at the control room that provides a graphic,man-machine interface for the display of PAMS' information. The functions of the OM include:

* Display of:

- Core Exit Thermocouples (CETs) and CET Monitoring calculation results- Reactor Vessel Level calculation results- Reactor Coolant System (RCS) process variables and Subcooled Margin calculation results- System diagnostic information- Lists of alarm and failed values

WNA-SD-00239-WBT-NP, Rev. 4 2-1 Westinghouse Non-Proprietary Class 3WNA-SD-00239-WBT-NP, Rev. 4 2-1 Westinghouse Non-Proprietary Class 3

Page 34: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear Automation Software Requirements Specification for theWatts Bar Unit 2 NSSS Completion Program I&C Projects Post Accident Monitoring System

• Alarming of:

- High CET values and CET Monitoring calculation results- Low RVLIS reactor coolant level calculation results- High RCS values and Subcooled Margin calculation results

* Maintenance functions for:

- Changing setpoints- Bypassing sensors

PAMS also includes a Maintenance and Test Panel (MTP) local to the PAMS cabinet that includes all theOM functions plus the following maintenance functions:

" On-line surveillance of PAMS operation" Off-line loading ofAC160 application software" Off-line interrogation of the error buffer in the AC 160

PAMS has two manual key lock switch inputs, which are administratively controlled. The FunctionEnable (FE) keyswitch enables the OM or MTP to bypass variables and change alarm setpoints, and theMTP to enable surveillance checks on the annunciator outputs. When the keyswitch is in the "ENABLE"position, the System Trouble annunciator will be activated.

The Software LoadEnable (SLE) keyswitch enables the MTP to enter the off-line mode. This isaccomplished via a button on the maintenance display that resets the MTP, boots the Microsoft®Windows® operating system, and starts the software development environment. In the off-line mode,configuration software can be downloaded to the AC 160, and the error buffer in the AC 160 can beinterrogated.

2.2 SYSTEM ARCHITECTURE DESCRIPTION

The Watts Bar 2 PAMS architecture is described in WNA-DS-01667-WBT-P, "Watts Bar 2 NSSSCompletion Program I&C Projects Post Accident Monitoring System - System Design Specification"(Reference 21).

The PAMS architecture will consist of two redundant trains of identical equipment. Each train consists ofone AC 160 station containing a single PM646A processor and multiple input/output (I/O) modules. AnMTP is also included with the AC160 in the same cabinet. Additionally, each train has an OM that islocated in the control room.

2.3 GENERAL CONSTRAINTS

The PAMS software will comply with the requirements and guidelines defined in WCAP-16096-NP-A,"Software Program Manual for Common Q Systems" (Reference 5) and the requirements and guidelinesdefined in 00000-ICE-3889, "Coding Standards and Guidelines for Common Q Systems" (Reference 4).

WNA-SD-00239-WBT-NP, Rev. 4 2-2 Westinghouse Non-Proprietary Class 3

Page 35: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear Automation Software Requirements Specification for theWaits Bar Unit 2 NSSS Completion Program I&C Projects Post Accident Monitoring System

R2.3-1[The PAMS software shall include functional testing and system self-testing features as defined inWNA-DS-01617-WBT-P (Reference 17).]

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.3.3-1, R2.6.3.3-1, R2.6.3.3-2, R2.6.3.3-3,R2.6.3.3-4, R2.6.3.3-5, R2.6.3.3-6, R2.6.3.3-7, and R3.3.1-1.

R2.3-2[DELETED]

R2.3-3[The PAMS software shall comply with the requirements and guidelines defined inWNA-DS-01070-GEN, "Application Restrictions for Generic Common Q Qualification" (Reference 8).]

Exception: WNA-DS-01070-GEN, S3a, shall be partially met (TIMESYNC shall be set to SLAVE).Exception: WNA-DS-01070-GEN, S7, shall be partially met (MDAT SV shall be set to NO).Exception: WNA-DS-01070-GEN, S19, shall not be met (STDADD05 contains unused elements that areunqualified).

Rationale: WNA-DS-01070-GEN (Reference 8).

R2.3-4[DELETED]

R2.3-5[The AC 160 custom PC elements shall be written in the C programming language.]

Rationale: WNA-DS-01070-GEN (Reference 8), S21.

2.3.1 Naming Conventions

The following section provides guidelines and requirements for naming conventions. It is theresponsibility of the individual software designer to follow the naming convention guidelines to thedegree that is consistent with the PAMS software design. The standard signal naming conventions to beused on the Watts Bar 2 PAMS will be consistent with the requirements in 00000-ICE-3889, "CodingStandards and Guidelines for Common Q Systems" (Reference 4). If other application-specific namingconventions are used, a detailed explanation will be documented in the subsystem requirement section ofthis document and the application-specific Software Design Description.

2.3.1.1 Node Names

R2.3.1.1-1[The ABB Advant Master Programming Language (AMPL) node names and file names shall be definedper Tables 2.3-1 and 2.3-2.]

Rationale: 00000-ICE-3889 (Reference 4), Section 3.3.1.

WNA-SD-00239-WBT-NP, Rev. 4 2-3 Westinghouse Non-Proprietary Class 3

Page 36: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS Completion Program I&C Projects

Software Requirements Specification for thePost Accident Monitoring System

R2.3.1.1-2[The Bus, Station, and DSP Station numbers shall be defined per Tables 2.3-1 and 2.3-2.]

Rationale: 00000-ICE-3889 (Reference 4), Section 3.3.1.

Table 2.3-1. Train A AMPL Naming Conventions

Processor DSPStation Module Node Bus, Station AAX File BAX FileType (PM) Name Station Numbers Name Name

PAMS PMl PAMA 0,01 01,02 PAMA PAMA

OM N/A OM 0,50 50,5 1 N/A N/A

MTP N/A MTP 0,60 60,6 1 N/A N/A

Table 2.3-2. Train B AMPL Naming Conventions

Processor DSPStation Module Node Bus, Station AAX File BAX FileType (PM) Name Station Numbers Name Name

PAMS PM1 PAMB 0,01 01,02 PAMB PAMB

OM N/A OM 0,50 50,51 N/A N/A

MTP N/A MTP 0,60 60,61 N/A N/A

2,3.1.2 AC160 PC Terminal Names

R2.3.1.2-1[AC 160 PC Terminal naming conventions shall be consistent with the requirements in 00000-ICE-3889,"Coding Standards and Guidelines for Common Q Systems" (Reference 4).]

Rationale: 00000-ICE-3889 (Reference 4), Section 3.3.1.

2.3.1.3 AC160 Communication Database (DB) Element Names

R2.3.1.3-1[Communication DB Element (DSP and DAT) naming conventions shall be consistent with therequirements in 00000-ICE-3889, "Coding Standards and Guidelines for Common Q Systems"(Reference 4) for legacy systems.]

Rationale: 00000-ICE-3889 (Reference 4), Section 3.3.1.

WNA-SD-00239-WBT-NP, Rev. 4 2-4 Westinghouse Non-Proprietary Class 3

Page 37: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear Automation Software Requirements Specification for theWatts Bar Unit 2 NSSS Completion Program I&C Projects Post Accident Monitoring System

2.3.1.4 ACI60 I/O Names

R2.3.1.4-1[The 1/0 channel instance names shall be derived from WNA-DS-01667-WBT-P (Reference 21).]

Rationale: WNA-DS-01667-WBT-P (Reference 21).

2.3.2 Configuration Control

The Watts Bar 2 PAMS software will comply with the configuration control requirements and guidelinesdefined in WCAP-16096-NP-A, "Software Program Manual for Common Q Systems" (Reference 5) andin NABU-DP-00015-GEN, "Common Q Software Configuration Management Guidelines"(Reference 10). AAX and BAX source files will contain the version and revision history information asdescribed in NABU-DP-00015-GEN (Reference 10). For type circuits, the TCS source file will containthe version and revision history information as described in NABU-DP-00015-GEN (Reference 10).

R2.3.2-1[DELETED]

R2.3.2-2[The version of the qualified AC160 base software that is used in the Watts Bar 2 PAMS software shallbe identified in each AC 160 Software Release Record (SRR) that is issued for the project.]

Rationale: WNA-PD-00073-WBT (Reference 16), Section 16.8.1 to conform with project and standardconfiguration control requirements and 00000-ICE-3889 (Reference 4), Section 3.4.3

R2.3.2-3[The version of the qualified AMPL Control Configuration (ACC) Advanced Tool that is used to developthe Watts Bar 2 PAMS software shall be identified in each AC160 SRR that is issued for the project.]

Rationale: WNA-PD-00073-WBT (Reference 16), Section 16.8.1 to conform with project and standardconfiguration control requirements.

R2.3.2-4[The version of the qualified Advant Application Builder that is used to develop the Watts Bar 2 PAMSsoftware shall be identified in each AC160 SRR that is issued for the project.]

Rationale: WNA-PD-00073-WBT (Reference 16), Section 16.8.1 to conform with project and standardconfiguration control requirements.

R2.3.2-5[The version of the qualified Advant Function Chart Builder (FCB) that is used to develop the WattsBar 2 PAMS software shall be identified in each AC 160 SRR that is issued for the project.]

Rationale: WNA-PD-00073-WBT (Reference 16), Section 16.8.1 to conform with project and standardconfiguration control requirements.

WNA-SD-00239-WBT-NP, Rev. 4 2-5 Westinghouse Non-Proprietary Class 3

Page 38: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear Automation Software Requirements Specification for theWatts Bar Unit 2 NSSS Completion Program I&C Projects Post Accident Monitoring System

R2.3.2-6[The version of the standard FCB PC and DB elements library shall be identified in each AC 160 SRR thatis issued for the project.]

Rationale: WNA-PD-00073-WBT (Reference 16), Section 16.8.1 to conform with project and standardconfiguration control requirements.

R2.3.2-7[The version of any option loaded in the AC 160 processor module shall be identified in each AC 160 SRRthat is issued for the project.]

Rationale: WNA-PD-00073-WBT (Reference 16), Section 16.8.1 to conform with project and standardconfiguration control requirements.

R2.3.2-8[The System (base software/options) Cyclic Redundancy Check (CRC) value shall be identified in eachAC160 application SRR that is issued for the project.]

Rationale: WNA-PD-00073-WBT (Reference 16), Section 16.8.1 to conform with project and standardconfiguration control requirements.

R2.3.2-9[The application CRC value shall be identified in each AC 160 application SRR that is issued for the

project.]

Rationale: WNA-PD-00073-WBT (Reference 16), Section 16.8.1 to conform with project and standardconfiguration control requirements.

R2.3.2-10[DELETED]

R2.3.2-11[DELETED]

112.3.2-12[The date in the FCB document footer shall be the date that the node PC section (AAX) and/or DBsection (BAX) were last changed.]

Rationale: WNA-PD-00073-WBT (Reference 16), Section 16.8.1 to conform with project and standardconfiguration control requirements.

R2.3.2-13[The application program AMPL directory shall be kept under configuration control in the VisualSourceSafe® library as described in 00000-ICE-3889 (Reference 4).]

Rationale: 00000-ICE-3889 (Reference 4), Section 3.3.7.

WNA-SD-00239-WBT-NP, Rev. 4 2-6 Westinghouse Non-Proprietary Class 3

Page 39: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS Completion Program I&C Prolects

Software Requirements Specification for thePost Accident Monitoring System

R2.3.2-14[The version of the qualified FPDS QNX operating system that is used in the Watts Bar 2 PAMS software

shall be identified in each FPDS SRR that is issued for the project.]

Rationale: WNA-PD-00073-WBT (Reference 16), Section 16.8.1 to conform with project and standardconfiguration control requirements.

R2.3.2-15[The FPDS application programs for the OM and MTP shall be kept under configuration control in theCQRev source code control system as described in 00000-ICE-3889 (Reference 4).]

Rationale: 00000-ICE-3889 (Reference 4), Section 3.3.7.

R2.3.2-16[The version of the generic flat panel display (FPD) software as described in 00000-ICE-30157,"Software Design Description for the Common Q Generic Flat-Panel Software" (Reference 11) that isused to develop the Watts Bar 2 PAMS software shall be identified in each FPD SRR that is issued for theproject.]

Rationale: WNA-PD-00073-WBT (Reference 16), Section 16.8.1 to conform with project and standardconfiguration control requirements.

R2.3.2-17[The FPD-calculated checksum value(s) shall be identified in each FPD SRR that is issued for theproject.]

Guidance: At a minimum, the SRR should include the on-line checksums for each of the project-specificbinaries files. These on-line checksums are generated using the calcsum program described in00000-ICE-30157 (Reference 11), subsection 5.5.23.

Rationale: WNA-PD-00073-WBT (Reference 16), Section 16.8.1 to conform with project and standardconfiguration control requirements.

(Last Page of Section 2)

WNA-SD-00239-WBT-NP, Rev. 4 2-7 Westinghouse Non-Proprietary Class 3

Page 40: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear Automation Software Requirements Specification for theWatts Bar Unit 2 NSSS Completion Program I&C Projects Post Accident Monitoring System

SECTION 3STANDARD SOFTWARE DESCRIPTION

3.1 AC160 BASE SYSTEM SOFTWARE

The AC 160 processor operating system software consists of the standard AC 160 family of systemsoftware products developed by ABB Industrial Systems. The AC 160 system software resides in theAC 160 Central Processing Unit (CPU) module flash PROM (non-volatile memory). A generaldescription of the AC 160 system software is given in WCAP-16097-P-A, "Common Qualified PlatformTopical Report" (Reference 6).

R3.1-1[AC 160 Base Software Version 1.3/8 shall be used for all processors.]

Guidance: This software version will be specified in the AC 160 application SRR.WNA-CD-00029-GEN, "Commercial Grade Dedication Report for the ABB Advant PM646A/PM646BFirmware/Base System Software Version 1.3/8 for Common Q Applications" (Reference 28) providesguidance on the use of this software.

Rationale: This base software version is required for use with the A1687 and A1688 modules as describedin WNA-CD-00029-GEN (Reference 28).

R3.1-2[All PC or DB element restrictions documented in WNA-DS-01070-GEN (Reference 8) shall befollowed.]

Exception: WNA-DS-01070-GEN, S3a, shall be partially met (TIMESYNC shall be set to SLAVE).Exception: WNA-DS-01070-GEN, S7, shall be partially met (MDATSV shall be set to NO).Exception: WNA-DS-01070-GEN, S 19, shall not be met (STDADD05 contains unused elements that areunqualified).

Rationale: WNA-DS-01070-GEN (Reference 8).

R3.1-3[Only the options needed for the application shall be loaded on the processors.]

Rationale: Engineering Judgment. To minimize memory usage and reduce system complexity.

R3.1-4[The loading and reloading of options shall be performed in the order documented in the SRR of theprocessor module.]

Rationale: WNA-DS-01 070-GEN (Reference 8), S23. Loading options in different orders will result indifferent system CRC values.

WNA-SD-00239-WBT-NP, Rev. 4 3-1 Westinghouse Non-Proprietary Class 3

Page 41: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear Automation Software Requirements Specification for theWatts Bar Unit 2 NSSS Completion Program I&C Projects Post Accident Monitoring System

3.2 AC160 APPLICATION SOFTWARE DEVELOPMENT

The ACC Advanced Tool, for configuration and programming software, is used in the generation of theWatts Bar 2 PAMS AC 160 software. The ACC Advanced Tool consists of Application Builder and FCB.The ACC Advanced Tool also requires a library of standard PC and DB elements.

R3.2-1[ABB ACC Advanced Tool Version 1.7/1 shall be used in all Watts Bar 2 PAMS software developmentworkstations.]

Guidance: This software version will be specified in the AC160 application SRR.

Rationale: This tool software version is required for use with the A1687 and A1688 modules as describedin WNA-CD-00029-GEN (Reference 28).

R3.2-2[The ACC Advanced Tool shall only be used on the designated Windows Operating System for which itis qualified.]

Guidance: It is acceptable for the development to be performed under a virtual environment such asVMwareTM.

Rationale: 00000-ICE-3889 (Reference 4), Section 3.1.

R3.2-3[Application Builder Version (Version 2.7/1) shall be used in all Watts Bar 2 PAMS softwaredevelopment workstations.]

Guidance: This software version will be specified in the AC 160 application SRR.

Rationale: This tool software version is required for use with the A1687 and A1688 modules as describedin WNA-CD-00029-GEN (Reference 28).

R3.2-4[FCB Version (Version 4.8/1) shall be used in all Watts Bar 2 PAMS software developmentworkstations.]

Guidance: This software version will be specified in the AC160 application SRR.

Rationale: This tool software version is required for use with the A1687 and A1688 modules as describedin WNA-CD-00029-GEN (Reference 28).

R3.2-5[AMPL PC and DB element libraries shall be used in all Watts Bar 2 PAMS software developmentworkstations.]

WNA-SD-00239-WBT-NP, Rev. 4 3-2 Westinghouse Non-Proprietary Class 3

Page 42: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear Automation Software Requirements Specification for theWatts Bar Unit 2 NSSS Completion Program I&C Projects Post Accident Monitoring System

Guidance: This software version will be specified in the AC160 application SRR.

Rationale: Only these libraries are compatible and have been qualified for use with the AC 160 platformas described in WNA-CD-00029-GEN (Reference 28).

R3.2-6[The Page Layout Template for the printout of the node PC section (AAX) and DB section (BAX)programs shall be WEC US Letter Landscape English.]

Rationale: 00000-ICE-3889 (Reference 4), Section 3.3.8 and engineering judgment.

R3.2-7[Type circuit design and implementation shall comply with the requirements and guidelines defined in00000-ICE-3889 (Reference 4).]

Rationale: 00000-ICE-3889 (Reference 4).

R3.2-8[Custom PC element design and implementation shall comply with the requirements and guidelinesdefined in 00000-ICE-3889 (Reference 4).]

Rationale: 00000-ICE-3889 (Reference 4).

R3.2-9[The type circuits and custom PC elements that shall be used in Watts Bar 2 PAMS are given in theTable 7.1-1 .]

Guidance: Standard type circuits will be developed and used wherever possible.

Rationale: The items in Table 7.1-1 are approved for use in Common Q systems and satisfy thefunctional requirements of the Watts Bar 2 PAMS.

3.3 FPDS APPLICATION SOFTWARE DEVELOPMENT ENVIRONMENT

The FPDS application software is programmed in C language and executes on the QNX operating system.The software is composed of standard QNX Photon® display components and software procedures;generic Common Q FPD display components, software procedures, and programs; and additionalapplication software components that are implemented as needed to provide project-specific capabilities.

R3.3-1[The FPDS software development environment shall match the environment described in Section 7.2,Table 1 and Section 7.3, Table 2 ofWNA-CD-00018-GEN, "Commercial Dedication Report forQNX 4.25G for Common Q Applications" (Reference 19).]

Rationale: WNA-DS-01 617-WBT-P (Reference 17), R2.6.2-9.

WNA-SD-00239-WBT-NP, Rev. 4 3-3 Westinghouse Non-Proprietary Class 3

Page 43: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear Automation Software Requirements Specification for theWatts Bar Unit 2 NSSS Completion Program I&C Projects Post Accident Monitoring System

R3.3-2[The FPDS development environment shall be installed by following the steps defined in Section 2.4.4 of

WNA-IP-00152-GEN, "Generic Common Q Software Installation Procedure" (Reference 20).]

Rationale: WNA-IP-00152-GEN (Reference 20), Section 2.4.4.

R3.3-3[The Generic FPD library shall be installed prior to developing Common Q display applications in Photonby following the procedure in Appendix C of 00000-ICE-30157, "Software Design Description for theCommon Q Generic Flat-Panel Display Software" (Reference 11).]

Rationale: 00000-ICE-30157 (Reference 11), Appendix C.

R3.3-4[QNX application program design and implementation shall comply with the requirements and guidelinesdefined in 00000-ICE-3889, "Coding Standards and Guidelines for Common Q Systems" (Reference 4).]

Rationale: 00000-ICE-3889 (Reference 4).

3.4 FPDS APPLICATION SOFTWARE DEPLOYMENT

The FPDS application software will be deployed on a Class 1-E qualified FPD "nodebox" running theQNX operating system and QNX Photon graphical display system.

R3.4-1[The FPDS runtime environment shall match the environment described in Section 7.2, Table I ofWNA-CD-00018-GEN, "Commercial Dedication Report for QNX 4.25G for Common Q Applications"(Reference 19).]

Guidance: The applicable software versions will be specified in the SRR for Watts Bar 2 PAMS.

Rationale: WNA-CD-00018-GEN (Reference 19), Section 7.2, Table 2.

R3.4-2[The FPDS runtime environment shall be installed by following the steps defined in Section 2.4.3 ofWNA-IP-00152-GEN, "Generic Common Q Software Installation Procedure" (Reference 20).]

Exception: The name of the site-specific installation script will use the name "install-wbtpams" insteadof "install fpdsw" as recommended by this reference.

Rationale: WNA-IP-00152-GEN (Reference 20), Section 2.4.3.

(Last Page of Section 3)

WNA-SD-00239-WBT-NP, Rev. 4 3-4 Westinghouse Non-Proprietary Class 3

Page 44: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS Completion Proiyram I&C Projects

Software Requirements Specification for thePost Accident Monitorin2 System

SECTION 4AC160 DATABASE CONFIGURATION

4.1 OVERVIEW

The AC 160 database (DB section) defines the configuration parameters of the PM646A processormodule, C1631 communication interface module, S600 series I/O modules/channels, and communicationelements (DSP and DAT).

4.2 HARDWARE DB ELEMENT CONFIGURATION

R4.2-1 a,c

Rationale: This requirement provides consistency with WNA-DS-01070-GEN (Reference 8), Table 2-1and 3BDS 005 665R401, "Data Base Elements, Advant Controller 160, Version 1.3 Reference Manual"(Reference 24), Page 326.

R4.2-2[The Mode switch on the PM646 controller shall be set to the COLD START position (Position "1")except when loading base software or options.]

Guidance: This requirement ensures that the AC 160 processor module will attempt to restart theapplication software upon power-up or reset conditions.

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.5.l1 -1 and R2.9.4-2.

R4.2-3

IRationale: WNA-DS-01070-GEN (Reference 8), S3a.

a,c

]R4.2-4 a,c

WNA-SD-00239-WBT-NP, Rev. 4 4-1 Westinghouse Non-Proprietary Class 3

Page 45: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS ComDletion Program I&C Projects

Software Requirements Specification for thePost Accident Monitoring System

a,c

Rationale: WNA-DS-01617-WBT-P (Reference 17), Figure 2.1-2 and R2.7-3, WNA-DS-01070-GEN(Reference 8), DB Reference Manual, 3BDS 005 665R401 (Reference 24), 00000-ICE-30156(Reference 15), subsection 2.6.3.

R4.2-5

Ia c

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.7-3.

R4.2-6

Ea c

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.7-3.

R4.2-7

Rationale: WNA-DS-01617-WBT-P (Reference 17), Figure 2.1-2 and R4.1-1.

R4.2-8

Rationale: WNA-DS-01667-WBT-P (Reference 21), R4.2.1-5 and R4.4.1.2-7.

R4.2-9

a,c

a,c

a,c

WNA-SD-00239-WBT-NP, Rev. 4 4-2 Westinghouse Non-Proprietary Class 3WNA-SD-00239-WBT-NP, Rev. 4 4-2 Westinghouse Non-Proprietary Class 3

Page 46: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS Comnletion Procram I&C Proiects

Software Requirements Specification for thePost Accident Monitorin2 System

Rationale: WNA-DS-0 1617-WBT-P (Reference 17), Figure 2.1-2 and R4. 1-1.

R4.2-10

Rationale: WNA-DS-01667-WBT-P (Reference 21), R4.4.1.2-2.

R4.2-11

a,c

a,c

Rationale: WNA-DS-01617-WBT-P (Reference 17), Figure 2.1-2 and DB Reference Manual, 3BDS 005665R401 (Reference 24).

R4.2-12 a,c

Rationale: WNA-DS-01617-WBT-P (Reference 17), Figure 2.1-2, WNA-DS-01667-WBT-P(Reference 21), R4.4.1.2-4, and DB Reference Manual, 3BDS 005 665R401 (Reference 24).

R4.2-13 a,c

Rationale: WNA-DS-01617-WBT-P (Reference 17), Figure 2.1-2 and R4.1-1 and DB Reference Manual,313DS 005 665R401 (Reference 24).

4.3 COMMUNICATION DB ELEMENT CONFIGURATION

4.3.1 DSP/DAT Configuration Requirements

DSP station numbers are manually assigned by the software designer as specified in the "DSP StationNumbers" column of Tables 2.3-1 and 2.3-2.

WNA-SD-00239-WBT-NP, Rev. 4 4-3 Westinghouse Non-Proprietary Class 3

Page 47: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS Completion Propram I&C Proiects

Software Requirements Specification for thePost Accident Monitorin2 System

R4.3.1-1[Sending DSPs shall be assigned the station numbers from the "DSP Station Numbers" column of theapplicable Table 2.3-1 or 2.3-2.]

RR4.3.1-2 a,

R4.3.1-3[DELETED]

R4.3.1-4 a,c

Rationale: 00000-ICE-3889 (Reference 4), subsection 3.3.2.1.

R4.3.1-5 a,c

F ]

a,c

c

7Rationale: This requirement is an engineering judgment to avoid unnecessary bandwidth usage of theAdvant Fieldbus 100 (AF 100).

R4.3.1-6

Ka,c

Rationale: This requirement is an engineering judgment to avoid unnecessary bandwidth usage of theAF100. This requirement also satisfies coding standards from 00000-ICE-3889 (Reference 4).

R4.3.1-7

Ea c

Rationale: This requirement is an engineering judgment to avoid automatic re-addressing of existingreference DATs when new reference DATs are added to a DSP. Defined within the DBReference Manual, 3BDS 005 665R401 (Reference 24).

WNA-SD-00239-WBT-NP, Rev. 4 4-4 Westinghouse Non-Proprietary Class 3WNA-SD-00239-WBT-NP, Rev. 4 4-4 Westinghouse Non-Proprietary Class 3

Page 48: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear Automation Software Requirements Specification for theWatts Bar Unit 2 NSSS Completion Program I&C Projects Post Accident Monitoring System

R4.3.1-8 a,c

Rationale: This requirement is an engineering judgment to minimize AF100 bandwidth.

R4.3.1-9 a,c

Rationale: This requirement is an engineering judgment to avoid unnecessary bandwidth usage of theAFIO0.

4.3.2 MDAT Configuration Requirements

MDATs are not utilized in the Watts Bar 2 PAMS.

Rationale: WNA-DS-0 1617-WBT-P (Reference 17), Figure 2.1-2.

4.3.3 High Speed Link (HSL) Configuration Requirements

HSLs are not utilized in the Watts Bar 2 PAMS.

Rationale: WNA-DS-01617-WBT-P (Reference 17), Figure 2.1-2.

(Last Page of Section 4)

WNA-SD-00239-WBT-NP, Rev. 4 4-5 Westinghouse Non-Proprietary Class 3

Page 49: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS Completion Program i&C Projects

Software Requirements Specification for thePost Accident Monitoring System

SECTION 5PROCESS CONTROL PROGRAMMING

5.1 GENERAL

R5.1-1

R5.1-2[DELETED]

R5.1-3

Rationale: Engineering Judgment. The AC 160 represents floating-point numbers in single precision(32bit) ANSI/IEEE Standard 754-1985, "IEEE Standard for Binary Floating-Point Arithmetic,ANSI/IEEE Std 754-1985" (Reference 26) format.

a,c

a,c

5.1.1 Initialization

R5.1.1-1 a

Rationale: All signals with an associated quality attribute will be defaulted to a known condition until theCONTRM containing the supervisory function has been executed.

R5.1.1-2[DELETED]

WNA-SD-00239-WBT-NP, Rev. 4 5-1 Westinghouse Non-Proprietary Class 3WNA-SD-00239-WBT-NP, Rev. 4 5-1 Westinghouse Non-Proprietary Class 3

Page 50: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear Automation Software Requirements Specification for theWatts Bar Unit 2 NSSS Completion Program I&C Projects Post Accident Monitoring System

R5.1.1-3[DELETED]

R5.1.1-4[DELETED]

R5.1.1-5[The initialization requirements defined in 00000-ICE-30156 (Reference 15), subsection 2.5.1, shallapply.]

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.5.1-1 and R2.9.4-2.

R5.1.1-6 a,c

I ]Rationale: WNA-DS-0 1617-WBT-P (Reference 17), R2.9.4-3.

5.2 STRUCTURE ELEMENT CONFIGURATION

This section of the document defines the requirements for the AC 160 process control structure elementsPCPGM, CONTRM, and FUNCM. Execution order of PCPGM and CONTRM is dependent upon cycletime and priority parameter values.

The PCPGM or CONTRM element(s) with a shorter cycle time have priority over other PCPGM orCONTRM element(s) with a longer cycle time. Execution order of the PCPGM or CONTRM elementswith the same cycle time is based on their respective second call parameter (placement in the cycle time[priority] table). The element with the higher priority (lower number) value will execute before anelement of lower priority. If necessary, the PCPGM or CONTRM element(s) of higher priority willinterrupt the lower priority PCPGM or CONTRM element(s). Once execution of the higher priorityPCPGM or CONTRM element(s) is complete, the lower priority PCPGM or CONTRM element(s)resumes execution.

The following factors should be considered when determining a PCPGM or CONTRM cycle timeparameter.

" The CONTRM cycle times must be set to a value high enough to prevent the processor load fromexceeding the values specified in Requirement R5.1-1.

" For better sending or receiving DSP efficiency, the cycle times parameters for the CONTRMsthat send or receive DSPs should be set equal to that of the PCPGM cycle time. This will ensurethat these functions are performed synchronously.

" When the CONTRM cycle time parameter and the PCPGM cycle time parameters are equal, inorder to obtain a shorter time response for sending DSPs, the PCPGM priority should be less than

WNA-SD-00239-WBT-NP, Rev. 4 5-2 Westinghouse Non-Proprietary Class 3

Page 51: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear Automation Software Requirements Specification for theWatts Bar Unit 2 NSSS Completion Program I&C Projects Post Accident Monitoring System

that of the CONTRM. This allows the DSP values to be written to the Communication Interface(CI) immediately after generation.

When the CONTRM cycle time parameter and the PCPGM cycle time parameters are equal, inorder to obtain a shorter time response for receiving DSPs, the PCPGM priority should be greaterthan that of the CONTRM. This allows the DSP values to be received in the CONTRMimmediately after being received from the CI.

The purpose of the FUNCM is to control the arrangement of the documented application code in the FCB.The FUNCM cannot affect execution. Typically, a software designer will enter information into the nameattribute of the FUNCM which communicates the functionality of the subordinate PC elements (forexample: STARTUP ANDSUPERVISION or SLPRESSTRIPBISTABLELOGIC). PC elementnames must be unique and have a maximum length of 72 characters.

ac

LII

WNA-SD-00239-WBT-NP, Rev. 4 5-3. Westinghouse Non-Proprietary Class 3WNA-SD-00239-WBT-NP, Rev. 4 5-3. Westinghouse Non-Proprietary Class 3

Page 52: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS Completion Program I&C Projects

Software Requirements Specification for thePost Accident Monitoring System

Figure 5.2-1. [ Ia,c

5.2.1 General

R5.2.1-1

Rationale: 00000-ICE-3889 (Reference 4), subsection 3.3.2.2.

a,c

5.2.2 PCPGM Structure Element

R5.2.2-1

LIa,c

]

WNA-SD-00239-WBT-NP, Rev. 4 5-4 Westinghouse Non-Proprietary Class 3WNA-SD-00239-WBT-NP, Rev. 4 5-4 Westinghouse Non-Proprietary Class 3

Page 53: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS Completion Program I&C Proiects

Software Requirements Specification for thePost Accident Monitoring System

a,c

R5.2.2-2 a,c

R5.2.2-3 a,c

Rationale: PC Reference Manual, 3BDS 005 666R101 (Reference 25).

R5.2.2-4 a,c

Rationale: WNA-DS-0 1617-WBT-P (Reference 17), R2. 10-1 and R2. 10.1 - 1.

5.2.3 CONTRM Structure Element

R5.2.3-1

R5.2.3-2

a,c

a,c

WNA-SD-00239-WBT-NP, Rev. 4 5-5 Westinghouse Non-Proprietary Class 3WNA-SD-00239-WBT-NP, Rev. 4 5-5 Westinghouse Non-Proprietary Class 3

Page 54: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS Comnletion Proaram I&C Proiects

Software Requirements Specification for thePost Accident Monitorin2 System

R5.2.3-3 a~c

Rationale: WNA-DS-01617-WBT-P (Reference 17), R3.2.2-1. This system requirement referenceaddresses overall system response time. This CONTRM speed is selected to satisfy this overall systemresponse time requirement.

5.2.4 FUNCM Structure Element

R5.2.4-1[The FUNCM element shall be used liberally to assist in the identification of implemented requirements.]

Rationale: 00000-ICE-3889 (Reference 4), subsection 3.3.4. This requirement provides for orderlysubdivision of the PC program into several functionally associated parts for readability and requirementstraceability efficiency.

R5.2.4-2[The FUNCM name field shall include a unique identifier where used.]

Rationale: 00000-ICE-3889 (Reference 4), subsection 3.3.4. To support readability and organization ofthe documented code.

R5.2.4-3 a,c

I ]Rationale: 00000-ICE-3889 (Reference 4), subsection 3.3.4.

5.3 SUPERVISORY LOGIC

This section of the document defines the requirements for processor diagnostic monitoring and alarmgeneration within the application program. The CONTRM containing the Supervisory function anddiagnostic monitoring will produce error status data that is ultimately sent to the OM and MTP foralarming and indication.

5.3-1

a c

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.9-1, and R2.9.2-5.

R5.3-2

EIa c

Rationale: Engineering Judgment. To monitor the controller error conditions.

WNA-SD-00239-WBT-NP, Rev. 4 5-6 Westinghouse Non-Proprietary Class 3

Page 55: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS Completion Program I&C Projects

R5.3-3

Rationale: Engineering Judgment. To monitor the variou

R5.3-4

EGuidance: The STATUS 1 terminal should not be confuse

Rationale: Engineering Judgment. To monitor the PM64

R5.3-5

I

Software Requirements Specification for thePost Accident Monitoring System

a,c

.s error conditions.

a c

•d with STATUS1:ERR in Figure 5.3-1.

6A error conditions.

Guidance:

R5.3-6

ERationale:

R5.3-7

ERationale:

R5.3-8

R5.3-9

See Figure 5.3-1.

a c

Engineering Judgment. To monitor the PM646A error conditions.

a c

WNA-DS-01617-WBT-P (Reference 17), R2.9-1 and R2.9.2-1.

a,c

a,c

WNA-SD-00239-WBT-NP, Rev. 4 5-7 Westinghouse Non-Proprietary Class 3

Page 56: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS Completion Propram I&C Proiects

Software Requirements Specification for thePost Accident Monitorin2 System

Ia,c

]R5.3-10 a,c

Rationale: Provides a standardized detection method for AC 160 station errors in PM health surveillanceas per DB Reference Manual, 3BDS 005 665R401 (Reference 24).

5.3.1 CPU Load Error

R5.3.1-1 Iac

R5.3.1-2

R5.3.1-3

a,c

a,c

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.9-1 and R2.9.3-1.

R5.3.1-4 a,c

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.9-1 and R2.9.3-1.

WNA-SD-00239-WBT-NP, Rev. 4 5-8 Westinghouse Non-Proprietary Class 3

Page 57: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS Completion Program I&C Projects

Software Requirements Specification for thePost Accident Monitoring System

5.3.2 CRC Invalid Error

R5.3.2-1

R5.3.2-2

R5.3.2-3

a,c

a,c

a

Rationale:errors.

00000-ICE-3889 (Reference 4), Section 3.4.3. This will allow for the monitoring of CRC

5.3.3 Application Program CRC Error

R5.3.3-1

R5.3.3-2

a,c

a,c

WNA-SD-00239-WBT-NP, Rev. 4 5-9 Westinghouse Non-Proprietary Class 3

Page 58: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS Completion Program I&C Projects

Software Requirements Specification for thePost Accident Monitoring System

a,c

a,cR5.3.3-3

Rationale: 00000-ICE-3889 (Reference 4), Section 3.4.3. This will allow for the monitoring of theapplication CRC.

R5.3.3-4

Rationale: Provides indication on system health displays.

a,c

5.3.4 System Software CRC Error

R5.3.4-1

R5.3.4-2

Rationale: WNA-DS-01070-GEN (Reference 8), S 17.

R5.3.4-3

E

a,c

a,c

a c

WNA-SD-00239-WBT-NP, Rev. 4 5-10 Westinghouse Non-Proprietary Class 3WNA-SD-00239-WBT-NP, Rev. 4 5-10 Westinghouse Non-Proprietary Class 3

Page 59: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS Completion Program I&C Projects

Software Requirements Specification for thePost Accident Monitorine System

Ka c

Rationale: 00000-ICE-3889 (Reference 4), Section 3.4.3. This will allow for the monitoring of thesystem CRC.

R5.3.4-4 a,c

Rationale: Provides indication on system health displays.

5.3.5 DSP Error

R5.3.5-1 a,c

R5.3.5-2 a,c

Rationale: 00000-ICE-3889 (Reference 4), subsections 3.3.3.3 and 3.4.8. This will allow for themonitoring of DSP error conditions.

5.3.6 Processor Module (PM646A) Error

R5.3.6-1 a,c

R5.3.6-2 a

Rationale: 00000-ICE-3889 (Reference 4), subsection 3.3.3.3. This will allow for the monitoring ofprocessor module error conditions.

WNA-SD-00239-WBT-NP, Rev. 4 5-11 Westinghouse Non-Proprietary Class 3

Page 60: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS Completion Program I&C Projects

5.3.7 Communication Module (C1631) Error

R5.3.7-1

R5.3.7-2

E

Software Requirements Specification for thePost Accident Monitoring System

a,c

a c

Guidance: See Figure 5.3-1.

Rationale: 00000-ICE-3889 (Reference 4), subsection 3.3.3.3. This will allow for the monitoring of thecommunication module error conditions.

5.3.8 PROM Checksum Error

R5.3.8-1

R5.3.8-2

F

a,c

a c

Guidance: See Figure 5.3-1.

Rationale: 00000-ICE-3889 (Reference 4), Section 3.4.3. This will allow for the monitoring of thePROM Checksum CRC.

5.3.9 PM Statusl Word Error

R5.3.9-1 a,c

WNA-SD-00239-WBT-NP, Rev. 4 5-12 Westinghouse Non-Proprietary Class 3

Page 61: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS Comnletion Program I&C Projects

Software Requirements Specification for thePost Accident Monitorin2 Svstem

a,c

Table 5.3-1. [ Ia,ca,c

4

+

R5.3.9-2

Ea c

Rationale: 00000-ICE-3889 (Reference 4), subsection 3.3.3.3. This will allow for the monitoring of theprocessor module error conditions defined 00000-ICE-3889 (Reference 4), Appendix C.

5.3.10 CONTRM Run Error

R5.3.10-1 at,C

75..10-2a c

Guidance: See Figure 5.3-1.

Rationale: 00000-ICE-3889 (Reference 4), subsection 3.3.3.3. This will allow for the monitoring of CPUruntime error conditions.

WNA-SD-00239-WBT-NP, Rev. 4 5-13 Westinghouse Non-Proprietary Class 3

Page 62: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS Completion Pro2ram I&C Proiects

Software Requirements Specification for thePost Accident Monitorin2 System

5.3.11 I/O Module Errors

R5.3.1 1-1

LIRationale: Provides a standardized method of error detection within a module for PM diagnosticssurveillance as defined within DB Reference Manual 3BDS 005 665R401 (Reference 24).

R5.3.11-2

Rationale: Provides a standardized method of error detection within a module for PM diagnosticssurveillance as defined within DB Reference Manual 3BDS 005 665R401 (Reference 24).

a,c

]

a,c

R5.3.11-3

Ea,c

-IGuidance: See Figure 5.3-1.

Rationale: 00000-ICE-3889 (Reference 4), subsection 3.3.3.3. This will allow for the monitoring ofmodule error conditions.

5.3.12 MDAT Error

MDATs are not utilized in the Watts Bar 2 PAMS. See WNA-DS-01617-WBT-P (Reference 17),Figure 2.1-2.

5.3.13 HSL Receive Channel 1 and 2 Errors

HSLs are not utilized in the Watts Bar 2 PAMS. See WNA-DS-01617-WBT-P (Reference 17),Figure 2.1-2.

5.3.14 Addressable Constants CRC Error

R5.3.14-1

Guidance: See Section 5.5.

Rationale: Provides a standardized detection method of a failed CRC when no last good value isavailable.

a,c

]

WNA-SD-00239-WBT-NP, Rev. 4 5-14 Westinghouse Non-Proprietary Class 3

Page 63: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear Automation Software Requirements Specification for theWatts Bar Unit 2 NSSS Completion Program I&C Projects Post Accident Monitoring System

R5.3.14-2 a,c

Guidance: See Section 5.5.

Rationale: Provides a standardized detection method of a failed CRC when no last good value isavailable.

R5.3.14-3 a c

EGuidance: See Figure 5.3-1.

5.3.15 Addressable Constants CRC Warning

R5.3.15-1 a,c

I IGuidance: See Section 5.5.

Rationale: Provides a standardized detection method of a failed CRC when a last good value is available.

R5.3.15-2 a,c

I ]Guidance: See Section 5.5.

Rationale: Provides a standardized detection method of a failed CRC when a last good value is available.

R5.3.15-3

Guidance: See Figure 5.3-1.

5.3.16 Application Trouble Error

i. 3. 16-1

WNA-SD-00239-WBT-NP, Rev. 4 5-15 Westinghouse Non-Proprietary Class 3

Page 64: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear Automation Software Requirements Specification for theWatts Bar Unit 2 NSSS Completion Program I&C Projects Post Accident Monitoring System

R5.3.16-2 ac

Guidance: See Figure 5.3-1.

5.3.17 Controller Ready Error

R5.3.17-1

EGuidance: See subsection 5.4.2 for further information.

Rationale: Provides controller ready status indicated on the PM diagnostic screens.

R5.3.17-2 ac

Guidance: See Figure 5.3-1.

5.3.18 Processor In-Test Alarm

R5.3.18-1 a,c

R5.3.18-2 a,c

IGuidance: Provides a standardized detection method of a "processor currently in test" in PM healthsurveillance.

R5.3.18-3 ac

EGuidance: See Figure 5.3-1.

5.3.19 Application Specific Errors

Other application-specific monitoring/alarming will be documented in the subsystem requirement sectionof this document and the application-specific Software Design Description.

WNA-SD-00239-WBT-NP, Rev. 4 5-16 Westinghouse Non-Proprietary Class 3

Page 65: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS Completion Program I&C Projects

R5.3.19-1

EGuidance: See APPLTRBLERR in Figure 5.3-1.

5.3.20 Cabinet Status Alarms

R5.3.20-1

I

Software Requirements Specification for thePost Accident Monitoring System

a c

a,c

]Rationale:

R5.3.20-2

LRationale:

R5.3.20-3

ERationale:

R5.3.20-4

IRationale:

R5.3.20-5

ERationale:

R5.3.20-6

K

WNA-DS-01617-WBT-P (Reference 17), R2.9.2-5, R3.1.1-5 and R4.2.2-6.

a c

WNA-DS-01617-WBT-P (Reference 17), R4.2.2-6.

a c

WNA-DS-0 1617-WBT-P (Reference 17), R4.2.2-6.

WNA-DS-01617-WBT-P (Reference 17), R3.1.1-5.

a c

WNA-DS-01617-WBT-P (Reference 17), R2.9.2-5.

a,c

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.9.5-3.

5.3.21 1/0 Channel Errorsa,c

WNA-SD-00239-WBT-NP, Rev. 4 5-17 Westinghouse Non-Proprietary Class 3

Page 66: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS Comuletion Program I&C Protects

Software Requirements Specification for thePost Accident Monitorin2 Svstem

R5.3.21-1

R5.3.21-2

E

a,c

ac

Guidance: See Figure 5.3-1.

Rationale: 00000-ICE-3889 (Reference 4), subsection 3.3.3.3. This will allow for the monitoring of 1/0module error conditions.

5.3.22 Heartbeata,c

R5.3.22-1 a,c

R5.3.22-2

a,c

]Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.6.2.1-2, R2.6.3.1-10, and R2.9.1-1.

R5.3.22-3

IRationale: WNA-DS-01617-WBT-P (Reference 17), R2.6.2.1-2, R2.6.3.1-10, and R2.9.1-1.

R5.3.22-4

I

Rationale: WNA-DS-O 161 7-WVBT-P (Reference 17), R2.6.2. 1-5, R2.6.3.1-6, and R2.9. 1- 1.

a,c

a,c

]

WNA-SD-00239-WBT-NP, Rev. 4 5-18 Westinghouse Non-Proprietary Class 3

Page 67: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS Completion Program I&C Projects

Software Requirements Specification for thePost Accident Monitoring System

5.3.23 Watchdog Timer Supervision

R5.3.23-1

Rationale: 00000-ICE-3238 (Reference 18), subsection 3.2.7.3.

R5.3.23-2

Rationale: WNA-DS-0 1617-WBT-P (Reference 17), R4.4. 1-1.

a,c

a c

5.3.24 Failure Notification, Indication, and Display

R5.3.24-1

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.5.2.1-2, R2.6.2.5-1, R2.6.3.1-1, R2.9.1-1,R2.9.2-2, R2.9.2-4, R2.9.4-1, R2.9.4-4, R2.9.5-4, R2.9.5-5, R2.9.5-6, and R4.2.2-3.

a,c

R5.3.24-2[Detectable failures of the safety system shall be indicated as defined by 00000-ICE-3238 (Reference 18),with the exception of the HJTC inputs.]

Guidance: Detectable hardware and software failures in this PAMS implementation will be indicatedusing the flat panel displays (color changes, event lists, etc.) and digital annunciator outputs as defined in00000-ICE-3238, (Reference 18).

Rationale: 00000-ICE-3238 (Reference 18), subsections 3.1.1, 3.1.1.1, 3.1.1.2, 3.2.5, 3.2.6, 3.2.6.3, and3.2.7.3.

R5.3.24-3[Failures of the safety system shall be displayed as required by 00000-ICE-30156 (Reference 15).]

Guidance: Detectable hardware and software failures in this PAMS implementation will be displayedusing the flat panel displays (color changes, event lists, etc.) as defined in 00000-ICE-30156(Reference 15).

WNA-SD-00239-WBT-NP, Rev. 4 5-19 Westinghouse Non-Proprietary Class 3

Page 68: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear Automation Software Requirements Specification for theWatts Bar Unit 2 NSSS Completion Program I&C Projects Post Accident Monitoring System

Rationale: 00000-ICE-30156 (Reference 15), subsections 2.6.2.4, 2.6.3.1, and 2.6.3.2.

5.3.25 Error Recovery

R5.3.25-1 ac

F

WNA-SD-00239-WBT-NP, Rev. 4 5-20 Westinghouse Non-Proprietary Class 3WNA-SD-00239-WBT-NP, Rev. 4 5-20 Westinghouse Non-Proprietary Class 3

Page 69: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS Completion Program I&C Projects

Software Requirements Specification for thePost Accident Monitoring System

a,c

Figure 5.3-1. [ I a,c

WNA-SD-00239-WBT-NP, Rev. 4 5-21 Westinghouse Non-Proprietary Class 3

Page 70: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS ComDletion Propram I&C Projects

Software Requirements Specification for thePost Accident Monitorin2 System

5.4 SIGNAL QUALITY PROCESSINGa,c

5.4.1 General

R5.4.1-1[Watts Bar 2 PAMS software shall comply with the signal BYPASS requirements and guidelines definedin 00000-ICE-3238 (Reference 18).]

Rationale: 00000-ICE-3238 (Reference 18), subsections 2.1.2, 2.3, 3.1.1.1, 3.1.1.2, 3.2.2, 3.2.4, 3.2.6.5,and 3.2.6.5.2.

R5.4.1-2[Watts Bar 2 PAMS software shall also comply with the signal BYPASS requirements and guidelinesdefined in WNA-DS-01617-WBT-P (Reference 17), subsection 2.5.2.1.2.]

Rationale: WNA-DS-01617-WBT-P (Reference 17), subsection 2.5.2.1.2 and R4.2.2-3.

R5.4.1-3

ER5.4.1-4

K

a c

a,c

]R5.4.1-5 a,c

R5.4.1-6 a,c

WNA-SD-00239-WBT-NP, Rev. 4 5-22 Westinghouse Non-Proprietary Class 3

Page 71: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS Completion Proeram I&C Prolects

Software Requirements Specification for thePost Accident Monitorin2 System

IR5.4.1-7

R5.4.1-8

IR5.4.1-9

5.4.2 Controller Ready

R5.4.2-1

a,c

]a,c

a,c

]

a,c

]a,c

]a,c

WNA-SD-00239-WBT-NP, Rev. 4 5-23 Westinghouse Non-Proprietary Class 3

Page 72: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS Completion Program I&C Projects

Software Requirements Specification for thePost Accident Monitoring System

Rationale: Provides a standardized method of deriving PM health used for quality processing. Inaddition to specific application errors, all signal quality attributes will be dependent upon the ControllerReady signal as per DB Reference Manual 3BDS 005 665R401 (Reference 24).

Table 5.4-1. [ I a,c

a,c

R5.4.2-2 a,c

5.4.3 Input Signal Quality Processing

R5.4.3-1

Ea c

Rationale: 00000-ICE-3889 (Reference 4), subsection 3.3.3.3.

R5.4.3-2 a,c

Rationale: 00000-ICE-3889 (Reference 4), subsection 3.3.3.3.

R5.4.3-3

GI

Guidance: See Figure 5.4-1.

a,c

]

WNA-SD-00239-WBT-NP, Rev. 4 5-24 Westinghouse Non-Proprietary Class 3WNA-SD-00239-WBT-NP, Rev. 4 5-24 Westinghouse Non-Proprietary Class 3

Page 73: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear Automation Software Requirements Specification for theWatts Bar Unit 2 NSSS Completion Program I&C Projects Post Accident Monitoring System

Rationale: Provides a standardized method of deriving DI Input health used for quality processing.

R5.4.3-4 a,c

K ]Guidance: See Figure 5.4-1.

Rationale: Provides a standardized method of deriving Al Input health used for quality processing.

R5.4.3-5[DELETED]

R5.4.3-6 a,cI ]

R5.4.3-7 a,c

R5.4.3-8 a,c

5.4.4 HSL Receive Error Processing

HSLs are not utilized in Watts Bar 2 PAMS.

Rationale: WNA-DS-0 1617-WBT-P (Reference 17), Figure 2.1-2.

5.4.5 MDAT Receive Error Processing

MDATs are not utilized in Watts Bar 2 PAMS.

Rationale: WNA-DS-01617-WBT-P (Reference 17), Figure 2.1-2.

WNA-SD-00239-WBT-NP, Rev. 4 5-25 Westinghouse Non-Proprietary Class 3WNA-SD-00239-WBT-NP, Rev. 4 5-25 Westinghouse Non-Proprietary Class 3

Page 74: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS Completion Program I&C Proiects

Software Requirements Specification for thePost Accident Monitoring System

5.4.6 DAT (AF100) Receive Error Processing

R5.4.6-1

ERationale: 00000-ICE-3889 (Reference 4), subsection 3.3.3.3.

R5.4.6-2

Guidance: See Figure 5.4-1.

a c

a,c

Rationale: 00000-ICE-3889 (Reference 4), subsection 3.3.3.3. This provides a standardized method ofderiving DAT input health used for quality processing.

R5.4.6-3

1ia c

Guidance: See Figure 5.4-1.

Rationale: 00000-ICE-3889 (Reference 4), subsection 3.3.3.3. This provides a standardized method ofderiving DAT input health used for quality processing.

5.4.7 Plant Computer Datalink

a,c

E]1R5.4.7-1

a,c

7Rationale: WNA-DS-01617-WBT-P (Reference 17), R4.3.3-3.

WNA-SD-00239-WBT-NP, Rev. 4 5-26 Westinghouse Non-Proprietary Class 3WNA-SD-00239-WBT-NP, Rev. 4 5-26 Westinghouse Non-Proprietary Class 3

Page 75: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS Completion Program I&C Projects

Software Requirements Specification for thePost Accident Monitoring System

a,c

Figure 5.4-1. 1 I 8,C

WNA-SD-00239-WBT-NP, Rev. 4 5-27 Westinghouse Non-Proprietary Class 3WNA-SD-00239-WBT-NP, Rev. 4 5-27 Westinghouse Non-Proprietary Class 3

Page 76: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear Automation Software Requirements Specification for theWatts Bar Unit 2 NSSS Completion Program I&C Projects Post Accident Monitoring System

5.5 ADDRESSABLE CONSTANTS DATA PROCESSINGa,c

R5.5-1 a,c

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.5.2.1-1, R2.6.2.5-1, R2.6.3.1-1, R2.6.3.2-1,R3.1.6- 1, and R4.2.2-3.

WNA-SD-00239-WBT-NP, Rev. 4 5-28 Westinghouse Non-Proprietary Class 3

Page 77: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS Comoletion Pro2ram I&C Proiects

Software Requirements Specification for thePost Accident Monitoring System

R5.5-2

R5.5-3

Rationale: WNA-DS-00315-GEN (Reference 12).

R5.5-4

a,c

a,c

a,c

Rationale: WNA-DS-00315-GEN (Reference 12).

R5.5-5

Rationale: WNA-DS-00315-GEN (Reference 12).

a,c

WNA-SD-00239-WBT-NP, Rev. 4 5-29 Westinghouse Non-Proprietary Class 3

Page 78: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS Completion Program I&C Projects

Software Requirements Specification for thePost Accident Monitorin2 System

R5.5-6

R5.5-7

R5.5-8

Guidance: See Figure 5.5-1.

R5.5-9

R5.5-10

R5.5-11

a,c

a,c

a,c

a,c

a,c

a,c

Guidance: See Figure 5.5-1.

WNA-SD-00239-WBT-NP, Rev. 4 5-30 Westinghouse Non-Proprietary Class 3

Page 79: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear Automation Software F•Watts Bar Unit 2 NSSS Completion Program I&C Projects

Rationale: Supports the Addressable Constants data verification process.

S.5-12

Rationale: Supports the Addressable Constants data verification process.

•equirements Specification for thePost Accident Monitorin2 System

a,c

VVNA-SD-00239-WBT-NP, Rev. 4 5-31 Westinghouse Non-Proprietary Class 3

Page 80: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS Completion Program I&C Projects

Software Requirements Specification for thePost Accident Monitoring System

a,c

Figure 5.5-1. 1 I a,e(Last Page of Section 5)

WNA-SD-00239-WBT-NP, Rev. 4 5-32 Westinghouse Non-Proprietary Class 3WNA-SD-00239-WBT-NP, Rev. 4 5-32 Westinghouse Non-Proprietary Class 3

Page 81: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS Comnletion Procram I&C Projects

Software Requirements Specification for thePost Accident Monitoring Svstem

SECTION 6SURVEILLANCE TESTING FEATURES

This section of the document defines the general surveillance testing requirements in accordance with00000-ICE-3238, "Software Requirements Specification for the Common Q Post Accident MonitoringSystem" (Reference 18). The Watts Bar 2 PAMS software design includes a combination of continuousdiagnostic features, continuous self-checking features, and manual initiated testing features. Successfultesting consists of verifying that the capability of the system to perform the safety function has not failedor degraded.

Application-specific testing features will be documented in the subsystem requirement section of thisdocument and the application-specific Software Design Description.

6.1 CONTINUOUS ONLINE DIAGNOSTICS

6.1.1 AC160 Online Diagnosticsa,c

No AC160 continuous online diagnostics will adversely affect any PAMS' safety function.

6.1.2 Flat Panel Display Online Diagnosticsa,c

No OM or MTP continuous online diagnostics will adversely affect any PAMS' safety function.

R6.1.2-1 a,c

Rationale: 00000-ICE-3239 (Reference 9), subsection 3.2.11.

WNA-SD-00239-WBT-NP, Rev. 4 6-1 Westinghouse Non-Proprietary Class 3

Page 82: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS Comnletion Program I&C Projects

Software Requirements Specification for thePost Accident Monitorin2 System

R6.1.2-2

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.9-1 and 00000-ICE-3239 (Reference 9),subsection 3.2.13.

R6.1.2-3

a,c

a,c

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.9-1 and 00000-ICE-30155, "SystemRequirements Specification for the Common Q Generic Flat Panel Display" (Reference 7), R2.5.1-6.

R6.1.2-4 a,c

Rationale: This supports the storage of addressable constants (setpoints) in flash in fulfillment ofWNA-DS-01617-WBT-P (Reference 17), R2.5.2.1.2-4.

R6.1.2-5 a,c

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.6.2.1 -1 and 00000-ICE-3239 (Reference 9),subsection 3.2.7.

R6.1.2-6

Fa,c

I a,c

WNA-SD-00239-WBT-NP, Rev. 4 6-2 Westinghouse Non-Proprietary Class 3

Page 83: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS Completion Program I&C Projects

Software Requirements Specification for thePost Accident Monitoring System

Rationale: To support event list and event log requirements in WNA-DS-01617-WBT-P (Reference 17),R2.6.2.1-1, R2.6.2.2.11-1, and R2.6.3.1-1 (guidance - to justify sameness between the OM and the MTP)

and 00000-ICE-3239 (Reference 9), subsections 3.2.2, 3.2.2.4, 3.2.2.5, and 3.2.16.

R6.1.2-7 a,c

Rationale: To support the FPD status list requirements in WNA-DS-01617-WBT-P (Reference 17),R2.6.2.1-1, R2.6.2.2.13-1, and R2.6.3.1-1 (guidance - to justify sameness between the OM and the MTP)and 00000-ICE-3239 (Reference 9), subsections 3.2.2.2, and 3.2.6.

6.2 MANUALLY INITIATED TESTINGa,c

R6.2-1

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.3.3-1.

a,c

R6.2-2

Ea,c

]Rationale: WNA-DS-0 1617-WBT-P (Reference 17), R2.6.3.2- 1.

R6.2-3

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.3.3-1.

R6.2-4

a,c

a,c

WNA-SD-00239-WBT-NP, Rev. 4 6-3 Westinghouse Non-Proprietary Class 3WNA-SD-00239-WBT-NP, Rev. 4 6-3 Westinghouse Non-Proprietary Class 3

Page 84: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS Comnletion Proeram I&C Proiects

Software Requirements Specification for thePost Accident Monitorine Svstem

Rationale: WNA-DS-0 1617-WBT-P (Reference 17), R2.6.2.2.19-3.

R6.2-5

Rationale: WNA-DS-01 617-WBT-P (Reference 17), R2.6.2.2.19-4.

a,c

]a,c

R6.2-6 a,c

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.6.2.2.19-11 and R2.6.3.3-7.

7-72

a,c

Rationale: WNA-DS-0 1617-WBT-P (Reference 17), R2.6.2.2.19-11.

a,c

Rationale: WNA-DS-0 1617-WBT-P (Reference 17), R2.6.2.2.19-11.

(Last Page of Section 6)

WNA-SD-00239-WBT-NP, Rev. 4 6-4 Westinghouse Non-Proprietary Class 3

Page 85: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS ComDletion Propram I&C Proiects

Software Requirements Specification for thePost Accident MonitorinE System

SECTION 7WATTS BAR 2 PAMS DESCRIPTIONS/REQUIREMENTS

7.1 WATTS BAR 2 PAMS AC160 SOFTWARE

7.1.1 General

7.1.2 Type Circuits and Custom PC Elements

R7.1.2-1

a,c

a,c

Table 7.1-1. [ I 8,Ca,c

WNA-SD-00239-WBT-NP, Rev. 4 7-1 Westinghouse Non-Proprietary Class 3

Page 86: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS Comlletion Program I&C Prolects

Software Requirements Specification for thePost Accident Monitoring System

Table 7.1-1. [ Ia,Ca,c

WNA-SD-00239-WBT-NP, Rev. 4 7-2 Westinghouse Non-Proprietary Class 3WNA-SD-00239-WBT-NP, Rev. 4 7-2 Westinghouse Non-Proprietary Class 3

Page 87: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear Automation Software Requirements Specification for theWatts Bar Unit 2 NSSS Completion Program I&C Projects Post Accident Monitoring System

7.1.3 Inputs

7.1.3.1 Analog/Digital Inputsa,c

R7.1.3.1-1[The analog inputs to the Watts Bar 2 PAMS AC 160 system shall be configured as defined inWNA-DS-01667-WBT-P (Reference 21), Table 4.4-2, Table 4.4-3, Table 4.4-7A, Table 4.4-7B, Table4.4-8A, Table 4.4-8B, Table 4.4-9A, Table 4.4-9B, Table 4.4-10A, and Table 4.4-1OB.]

Guidance: The configuration of the A1687 and A1688 modules are defined in Section 4.2. Additionally,WNA-DS-01667-WBT-P (Reference 21) specifies the analog card type, position in the chassis, andchannel assignment for each of the analog inputs.

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.5.3.5-2, R2.5.3.5-3, R3.2.1-1, R3.2.1-2, R4.2-1,and R4.2.1-5, and WNA-DS-01667-WBT-P (Reference 21), R4.4.1.2-2, R4.4.1.2-3, R4.4.1.2-7, R4.4.1.2-8, R4.4.1.2-9, and R4.4.1.2-10.

R7.1.3.1-2[The digital inputs to the Watts Bar 2 PAMS AC160 system shall be configured as defined inWNA-DS-01667-WBT-P (Reference 21), Table 4.4-1.]

Guidance: The configuration of the D1620 module is defined in Section 4.2. Additionally,WNA-DS-01667-WBT-P (Reference 21) specifies the digital card type, position in the chassis, andchannel assignment for each of the digital inputs.

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.5.3.4.9-4, R3.2.1-1, R4.2-1, and R4.2.2-1, andWNA-DS-0 1 667-WBT-P (Reference 21), R4.4.1.2-1.

7.1.3.2 HSL Inputs

HSLs are not utilized in Watts Bar 2 PAMS.

7.1.3.3 AF100 Inputs

A description of the AF100 interface between the Watts Bar 2 PAMS AC 160 system and the FPDS canbe found in 00000-ICE-3238 (Reference 18).

* .1.3.3-1

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.3.3-1 and 00000-ICE-30156 (Reference 15),subsection 2.3.3.

WNA-SD-00239-WBT-NP, Rev. 4 7-3 Westinghouse Non-Proprietary Class 3

Page 88: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS Comnletion Pro2ram I&C Proiects

Software Requirements Specification for thePost Accident Monitoring System

.1.3 .3 -2a,c

Rationale: 00000-ICE-3238 (Reference 18), subsection 2.1.2.

R7.1.3.3-3

Lia,c

I1Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.6.2.1-2, R2.6.3.1 -10, and R2.9.1 -1, and00000-ICE-3238 (Reference 18), subsection 3.2.7.2.

7.1.3.4 MIDAT Inputs

MDATs are not utilized in Watts Bar 2 PAMS.

7.1.4 Processing

This section defines the software requirements for the functional algorithms to be used for Watts Bar

PAMS. These requirements are based on those defined for a Common Q PAMS system in00000-ICE-3238 (Reference 18). The subsections in this document, with the exception of the RVLIS,correspond to the Functional Requirements sections in 00000-ICE-3238 (Reference 18). The Functionalrequirements for the RVLIS can be found in WNA-DS-01617-WBT-P (Reference 17).

7.1.4.1 Input Processing

R7.1.4.1-1[The requirements of 00000-ICE-3238 (Reference 18), subsection 3.2.1, "Input Processing," shall applyfor the inputs of the Watts Bar 2 PAMS, with the exception of the HJTC inputs.]

Guidance: HJTC inputs do not apply to Watts Bar 2 PAMS per WNA-DS-01617-WBT-P (Reference 17),R2.3.1 -1.

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.3. 1 -1 and R2.5.3.l -1.

R7.1.4.1-2 a,c

Rationale: 00000-ICE-30152, "Software Design Description for the Common Q Phase 3 Post AccidentMonitoring System AC160 Station" (Reference 22), Section 6.3.

R7.1.4.1-3 a,c

WNA-SD-00239-WBT-NP, Rev. 4 7-4 Westinghouse Non-Proprietary Class 3

Page 89: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS Comrletion Propram I&C Projects

Software Requirements Specification for thePost Accident Monitoring System

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.5.3.5-4.

.1.4 .1-4

Rationale: WNA-DS-0 1617-WBT-P (Reference 17), R2.5.3.5-5.

R7.1.4.1-5

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.5.3.5-6.

R7.1.4.1-6

a,c

I1

a,c

a,c

Rationale: WNA-DS-0 1617-WBT-P (Reference 17), R2.5.3.5-7.

R7.1.4.1-7[The analog input processing requirements defined in 00000-ICE-30156 (Reference 15), subsection2.5.3.1, shall apply.]

Rationale: WNA-DS-0 1617-WBT-P (Reference 17), R2.5.3. 1-1.

R7.1.4.1-8

Rationale: WNA-DS-0 1617-WBT-P (Reference 17), R2.5.3.1-2.

a,c

R7.1.4.1-9 a,c

Rationale: WNA-DS-0 1617-WBT-P (Reference 17), R2.5.3.1-3.

R7.1.4.1-10

Rationale: WNA-DS-0 1617-WBT-P (Reference 17), R2.5.3.1-4.

S4.1-11

a,c

a,c

WNA-SD-00239-WBT-NP, Rev. 4 7-5 Westinghouse Non-Proprietary Class 3

Page 90: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear Automation Software Requirements Specification for the

Watts Bar Unit 2 NSSS Completion Program I&C Projects Post Accident Monitoring System

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.5.3.5-8.

a,c1.4.1-1

Rationale: WNA-DS-0 1617-WBT-P (Reference 17), R2.5.3.5-9.

R7.1.4.1-13 a,c

Rationale: WANA-DS-01617-WvBT-P (Reference 17), R2.5.3.5-10.

R7.1.4.1-14 a,c

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.5.3.5-11.

7.1.4.2 CET Monitoring

The Core Exit Thermocouple Monitoring System (CETMS) monitors CET temperatures to detect andalarm inadequate core cooling conditions.

a,cR7.1.4.2-1

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.5.3.5-I.

R7.1.4.2-2[The requirements for CET monitoring defined in subsection 3.2.2 of 00000-ICE-3238 (Reference 18)shall apply.]

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.5.3.5-1 and 00000-ICE-30156 (Reference 15),subsection 2.5.3.4.

R7.1.4.2-3 a,c

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.5.3.5-1 and R2.6.2.2.5-5 and 00000-ICE-3238(Reference 18), subsection 2.5.1.

WNA-SD-00239-WBT-NP, Rev. 4 7-6 Westinghouse Non-Proprietary Class 3

Page 91: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS Completion Program I&C Projects

Software Requirements Specification for thePost Accident Monitoring System

R7.1.4.2-4

Rationale: WNA-DS-0 1617-WBT-P (Reference 17), R2.5.2. 1.1 -1 and R4.2.2-3.

R7.1.4.2-5F_

a,c

a,c

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.5.2.1.1-2 and R4.2.2-3.

a,c7.1.4.2-6

]Rationale: 00000-ICE-3238 (Reference 18), subsection 3.2.2.

7.1.4.3 RVLIS Monitoring

The RVLIS monitors the collapsed liquid level above the fuel alignment plate to indicate the approach ofan inadequate core cooling situation.

R7.1.4.3-1

Rationale: WNA-DS-01617-WBT-P (Reference 17), subsections 2.5.3.3, 2.5.3.4, 2.5.3.4.1, 2.5.3.4.2,2.5.3.4.3, 2.5.3.4.4, 2.5.3.4.5, 2.5.3.4.6, 2.5.3.4.7, 2.5.3.4.8, 2.5.3.4.9, 2.5.3.4.10, 2.5.3.4.11, 2.5.3.4.12,2.5.3.4.13, 2.5.3.4.14, 2.5.3.4.15, 2.5.3.4.16, 2.5.3.4.17, 2.5.3.4.18, 2.5.3.4.19, and 2.5.3.4.20.

R7.1.4.3-2[The RVLIS inputs defined in Table 2.5-4 of WNA-DS-01617-WBT-P (Reference 17) shall apply.]

Rationale: WNA-DS-0 1617-WBT-P (Reference 17), subsection 2.5.3.3.

R7.1.4.3-3[The RVLIS monitoring input processing requirements defined in subsection 2.5.3.3 ofWNA-DS-01617-WBT-P (Reference 17) shall apply.]

Rationale: WNA-DS-01617-WBT-P (Reference 17), subsection 2.5.3.3.

R7.1.4.3-4[The RVLIS monitoring requirements defined in subsections 2.5.3.4 through 2.5.3.4.20 ofWNA-DS-01617-WBT-P (Reference 17) shall apply.]

WNA-SD-00239-WBT-NP, Rev. 4 7-7 Westinghouse Non-Proprietary Class 3

Page 92: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear Automation Software Requirements Specification for theWatts Bar Unit 2 NSSS Completion Program I&C Projects Post Accident Monitoring System

Rationale: WNA-DS-0 1617-WBT-P (Reference 17), subsections 2.5.3.4, 2.5.3.4.1, 2.5.3.4.2, 2.5.3.4.3,2.5.3.4.4, 2.5.3.4.5, 2.5.3.4.6; 2.5.3.4.7, 2.5.3.4.8, 2.5.3.4.9, 2.5.3.4.10, 2.5.3.4.11, 2.5.3.4.12, 2.5.3.4.13,2.5.3.4.14, 2.5.3.4.15, 2.5.3.4.16, 2.5.3.4.17, 2.5.3.4.18, 2.5.3.4.19, and 2.5.3.4.20.

R7.1.4.3-5[The Reactor Vessel Level shall be calculated using different algorithms based on whether the plant is inStatic or Dynamic conditions.]

Guidance: See Figures 7.1-1 and 7.1-2.

Rationale: WNA-DS-01617-WBT-P, subsections 2.5.3.4.6, 2.5.3.4.7, 2.5.3.4.9, 2.5.3.4.10, 2.5.3.4.11,2.5.3.4.12, 2.5.3.4.13, 2.5.3.4.14, 2.5.3.4.15, 2.5.3.4.16, 2.5.3.4.17, 2.5.3.4.18, and 2.5.3.4.19.

WNA-SD-00239-WBT-NP, Rev. 4 7-8 Westinghouse Non-Proprietary Class 3

Page 93: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWhets Bar Unit 2 NSSS Completion Program I&C Projects

Software Requirements Specification for thePost Accident Monitorina SystemPost Accident Monitoring System

ac

Figure 7.1-1. 1

WNA-SD-00239-WBT-NP, Rev. 4 7-9 Westinghouse Non-Proprteeary Class 3

WNA-SD-00239-WBT-NP, Rev. 4 7-9 Westinghouse Non-Proprietary Class 3

Page 94: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS Completion Program I&C Projects

Software Requirements Specification for thePost Accident Monitoring System

a,c

Figure 7.1-2. 1 I.,

WNA-SD-O0239-WBT-NP, Rev. 4 7-10 Westinghouse Non-Proprietary Class 3

Page 95: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS Completion Program I&C Projects

Software Requirements Specification for thePost Accident Monitoring System

R7.1.4.3-6 a,c

Rationale: WNA-DS-0 1617-WBT-P (Reference 17), R2.5.3.4.18-1.

R7.1.4.3-7 a,c

Rationale: WNA-DS-0 1617-WBT-P (Reference 17), R2.5.3.4.18-2.

R7.1.4.3-8

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.5.3.3-14 and R2.5.3.3-16.

R7.1.4.3-9

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.5.3.4.1-1, R2.5.3.4.1-2, R2.5.3.4.1-3,R2.5.3.4.1-4, R2.5.3.4.1-5, and R2.5.3.4.1-6.

a,c

a,c

WNA-SD-00239-WBT-NP, Rev. 4 7-11 Westinghouse Non-Proprietary Class 3WNA-SD-00239-WBT-NP, Rev. 4 7-11 Westinghouse Non-Proprietary Class 3

Page 96: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS Completion Program I&C Projects

Software Requirements Specification for thePost Accident Monitoring System

R7.1.4.3-10 a,

Rationale: WNA-DS-0 1617-WBT-P (Reference 17), R2.5.3.4.1-1.

R7.1.4.3-11[The three corrected differential pressures used in the RVLIS monitoring calculation shall be determinedas described in subsection 2.5.3.4.2 of WNA-DS-01617-WBT-P (Reference 17).]

a,

Rationale: WNA-DS-0 1617-WBT-P (Reference 17), R2.5.3.4.2- 1, R2.5.3.4.2-2, R2.5.3.4.2-3,R2.5.3.4.2-4, and R2.5.3.4.2-5.

C

c

7.1.4.3-12

a,c

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.5.3.4.2-2.

R7.1.4.3-13[The reactor vessel density calculation for liquid conditions defined in subsection 2.5.3.4.3 ofWNA-DS-0 1617-WBT-P (Reference 17) shall apply.]

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.5.3.4.3-1, R2.5.3.4.3-2, R2.5.3.4.3-3,R2.5.3.4.3-4, R2.5.3.4.3-5, R2.5.3.4.3-6, and R2.5.3.4.3-7.

WNA-SD-00239-WBT-NP, Rev. 4 7-12 Westinghouse Non-Proprietary Class 3

Page 97: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear Automation Software Requirements Specification for theWatts Bar Unit 2 NSSS Completion Program I&C Projects Post Accident Monitoring System

R7.1.4.3-14[The reactor vessel density calculation for gaseous conditions defined in subsection 2.5.3.4.4 ofWNA-DS-01617-WBT-P (Reference 17) shall apply.]

Rationale: WNA-DS-0 1617-WBT-P (Reference 17), R2.5.3.4.4-1, R2.5.3.4.4-2, R2.5.3.4.4-3,R2.5.3.4.4-4, R2.5.3.4.4-5, R2.5.3.4.4-6, and R2.5.3.4.4-7.

R7.1.4.3-15[The auctioneered high RCS hot leg temperature (TRcs) calculation used in the RVLIS calculation shall bedetermined as defined in subsection 2.5.3.4.5 of WNA-DS-01617-WBT-P (Reference 17).]

Rationale: WNA-DS-0 1617-WBT-P (Reference 17), R2.5.3.4.5- 1, R2.5.3.4.5-2, R2.5.3.4.5-3,R2.5.3.4.5-4, R2.5.3.4.5-5, and R2.5.3.4.5-6.

R7.1.4.3-16[The algorithm to determine the static conditions upper range reactor vessel level (hi) and lower rangereactor vessel level (h2) described in subsection 2.5.3.4.6 of WNA-DS-01617-WBT-P (Reference 17)shall apply.]

Rationale: WNA-DS-0 1617-WBT-P (Reference 17), R2.5.3.4.6- 1, R2.5.3.4.6-2, R2.5.3.4.6-3,R2.5.3.4.6-4, and R2.5.3.4.6-5.

a,c

1.4.3-17ac

Rationale: WNA-DS-0 1617-WBT-P (Reference 17), R2.5.3.4.19-2.

R7.1.4.3-18[The algorithm that determines the cross-over point between the static conditions upper range reactorvessel level (hj) and lower range reactor vessel level (h2) defined in subsection 2.5.3.4.7 ofWNA-DS-01617-WBT-P (Reference 17) shall apply.]

Rationale: WNA-DS-0 1617-WBT-P (Reference 17), subsection 2.5.3.4.7.

R7.1.4.3-19 acERationale: WNA-DS-01617-WBT-P (Reference 17), R2.5.3.4.7-4.

R7.1.4.3-20[When a hydraulic isolator status is "off scale," any vessel level associated with that hydraulic isolatorshall be assigned a status of "Failed."]

Rationale: WNA-DS-0 1617-WBT-P (Reference 17), subsection 2.5.3.4.8-1.

WNA-SD-00239-WBT-NP, Rev. 4 7-13 Westinghouse Non-Proprietary Class 3WNA-SD-00239-WBT-NP, Rev. 4 7-13 Westinghouse Non-Proprietary Class 3

Page 98: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS ComDletion Program I&C Projects

Software Requirements Specification for thePost Accident Monitoring System

R7.1.4.3-21

Rationale: WNA-DS-0 1617-WBT-P (Reference 17), R2.5.3.4.9-2.

S1.4.3-22

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.5.3.4.9-3.

R7.1.4.3-23

Rationale: WNA-DS-O 1617-WBT-P (Reference 17), R2.5.3.4.14-1 and R2.5.3.4.14-2.

R7.1.4.3-24

Rationale: WNA-DS-0 1617-WBT-P (Reference 17), R2.5.3.4.14-3.

R7.1.4.3-25

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.5.3.4.14-3.

R7.1.4.3-26E_

a,c

a,c

a,c

a,c

a,c

a,c

WNA-SD-00239-WBT-NP, Rev. 4 7-14 Westinghouse Non-Proprietary Class 3

Page 99: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS Completion Program I&C Projects

Software Requirements Specification for thePost Accident Monitoring System

Rationale: WNA-DS-0 1617-WBT-P (Reference 17), R2.5.3.4.14-3.

a,c

]R7.1.4.3-27 a,c

Rationale: WNA-DS-0 1617-WBT-P (Reference 17), R2.5.3.4.14-4.

R7.1.4.3-28[The algorithm for the expected uncompensated dynamic head (EUDH) calculation defined insubsection 2.5.3.4.10 of WNA-DS-0 1617-WBT-P (Reference 17) shall apply.] a,c

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.5.3.4. 10-1, R2.5.3.4.10-2, R2.5.3.4.10-3,R2.5.3.4.10-4, R2.5.3.4.10-5, and R2.5.3.4.10-6.

R7.1.4.3-29a,c

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.5.3.4.10-1.

R7.1.4.3-30[The algorithm for the uncompensated dynamic head (UDH) calculation defined in subsection 2.5.3.4.11of WNA-DS-01617-WBT-P (Reference 17) shall apply.] a,c

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.5.3.4.1 1-1, R2.5.3.4.11-2, R2.5.3.4.11-3,R2.5.3.4.11-4, and R2.5.3.4.11-5.

R7.1.4.3-31[The algorithm for the power compensated head (PDH) calculation defined in subsection 2.5.3.4.12 ofWNA-DS-01617-WBT-P (Reference 17) shall apply.]

WNA-SD-00239-WBT-NP, Rev. 4 7-15 Westinghouse Non-Proprietary Class 3

Page 100: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS Completion Program I&C Projects

Software Requirements Specification for thePost Accident Monitoring System

a,c

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.5.3.4.12-1, R2.5.3.4.12-2, R2.5.3.4.12-3,R2.5.3.4.12-4, R2.5.3.4.12-5, and R2.5.3.4.12-6.

R7.1.4.3-32 a,c

Rationale: WNA-DS-0 1617-WBT-P (Reference 17), R2.5.3.4.12-2.

R7.1.4.3-33[The algorithm for the normalized dynamic head (NDH) calculation defined in subsection 2.5.3.4.13 ofWNA-DS-01617-WBT-P (Reference 17) shall be applied when some but not all reactor coolant pumpsare operational.]

a,c

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.5.3.4.13-1, R2.5.3.4.13-2, R2.5.3.4.13-3,R2.5.3.4.13-4, R2.5.3.4.13-5, R2.5.3.4.13-6, R2.5.3.4.13-7, R2.5.3.4.13-8 and R2.5.3.4.13-9.

*1.4.-3a,c

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.5.3.4.13-1, R2.5.3.4.13-2, R2.5.3.4.13-3,R2.5.3.4.13-4, R2.5.3.4.13-5, R2.5.3.4.13-6, R2.5.3.4.13-7, R2.5.3.4.13-8 and R2.5.3.4.13-9.

R7.1.4.3-35[The reactor vessel level shall be scaled as specified in subsection 2.5.3.4.15 of WNA-DS-01617-WBT-P(Reference 17).]

Rationale: WNA-DS-O 1617-WBT-P (Reference 17), R2.5.3.4.15-1, R2.5.3.4.15-2, R2.5.3.4.15-3,R2.5.3.4.15-4, and R2.5.3.4.15-5.

WNA-SD-00239-WBT-NP, Rev. 4 7-16 Westinghouse Non-Proprietary Class 3

Page 101: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear Automation Software Requirements Specification for theWatts Bar Unit 2 NSSS Completion Program I&C Projects Post Accident Monitoring System

R7.1.4.3-36 a,c

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.5.3.4.15-1, R2.5.3.4.15-2, R2.5.3.4.15-3,R2.5.3.4.15-4, and R2.5.3.4.15-5.

R7.1.4.3-37 a,c

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.5.3.4.15-1, R2.5.3.4.15-2, R2.5.3.4.15-3,R2.5.3.4.15-4, and R2.5.3.4.15-5.

1.4.3-38 a,c

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.5.3.4.15-1, R2.5.3.4.15-2, R2.5.3.4.15-3,R2.5.3.4.15-4, and R2.5.3.4.15-5.

R7.1.4.3-39[The reactor vessel level algorithm shall support the off-scale requirements specified insubsection 2.5.3.4.16 of WNA-DS-01617-WBT-P (Reference 17).]

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.5.3.4.16-1 and R2.5.3.4.16-2.

R7.1.4.3-40 a,c

F IRationale: WNA-DS-0 1617-WBT-P (Reference 17), R2.5.3.4.16-1 and R2.5.3.4.16-2.

R7.1.4.3-41 a,c

Rationale: WNA-DS-0 1617-WBT-P (Reference 17), R2.5.3.4.16-I and R2.5.3.4.16-2.

R7.1.4.3-42 a,c

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.5.3.4.16-1 and R2.5.3.4.16-2.

WNA-SD-00239-WBT-NP, Rev. 4 7-17 Westinghouse Non-Proprietary Class 3WNA-SD-00239-WBT-NP, Rev. 4 7-17 Westinghouse Non-Proprietary Class 3

Page 102: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear Automation Software Requirements Specification for theWatts Bar Unit 2 NSSS Completion Program I&C Projects Post Accident Monitoring System

R7.1.4.3-43[The RVLIS level alarms and setpoint requirements specified in subsection 2.5.3.4.17 ofWNA-DS-01617-WBT-P (Reference 17) shall apply.]

ac

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.5.3.4.17-1, R2.5.3.4.17-2, R2.5.3.4.17-3,R2.5.3.4.17-4, R2.5.3.4.17-5, R2.5.3.4.17-6, R2.5.3.4.17-7, and R2.5.3.4.17-8.

R7.1.4.3-44 a,c

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.5.3.4.17-1, R2.5.3.4.17-2, and R2.5.3.4.17-4.

a,c1.4.3-45

1

Rationale: WNA-DS-0 1617-WBT-P (Reference 17), subsection 2.5.3.4.20-1.

R7.1.4.3-46 a,c

I ]Rationale: WNA-DS-0 1617-WBT-P (Reference 17), subsection 2.5.3.4.20-2.

R7.1.4.3-47 a,c

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.5.3.3-17.

a,cR7.1.4.3-48

ERationale: WNA-DS-01617-WBT-P (Reference 17), R2.5.3.4-1.

R7.1.4.3-49 a,c

WN-D023-B-P Rv47-8WsnhoeNnPrp Ietr ls

WNA-SD-00239-WBT-NP, Rev. 4 7-18 Westinghouse Non-Proprietary Class 3

Page 103: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS Comoletion Procram I&C Proiects

Software Requirements Specification for thePost Accident Monitoring System

Rationale: WNA-DS-0 1617-WBT-P (Reference 17), R2.5.3.4-2.

R7.1.4.3-50

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.5.3.3-13.

R7.1.4.3-51

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.5.3.4.8-3 and R2.6.2.2.8-1.

R7.1.4.3-52

Rationale: WNA-DS-0 1617-WBT-P (Reference 17), R2.5.3.4.20-3.

R7.1.4.3-53

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.5.3.3-15.

7.1.4.4 Saturation Margin Monitoring

R7.1.4.4-1

Rationale: WNA-DS-0 1617-WBT-P (Reference 17), subsection 2.5.3.2.

a,c

a,c

ac

a,c

aIC

ac

WNA-SD-00239-WBT-NP, Rev. 4 7-19 Westinghouse Non-Proprietary Class 3

Page 104: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS Comnletion Program I&C Projects

Software Requirements Specification for thePost Accident Monitorin2 Svstem

R7.1.4.4-2[The requirements for the Saturation Margin Monitoring algorithm defined in subsection 2.5.3.2 ofWNA-DS-01617-WBT-P (Reference 17) shall apply.]

Rationale: WNA-DS-0 1617-WBT-P (Reference 17), subsection 2.5.3.2.

R7.1.4.4-3[The inputs to the Saturation Margin Monitoring algorithm shall be as defined in Table 2.5-1 ofWNA-DS-01617-WBT-P (Reference 17).]

Rationale: WNA-DS-0 1617-WBT-P (Reference 17), R2.5.3.2-3.

R7.1.4.4-4

Rationale: WNA-DS-0 1617-WBT-P (Reference 17), R2.5.3.2-3.

R7.1.4.4-5

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.5.3.2-3.

R7.1.4.4-6

a,c

a,c

a,c

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.5.3.2-3.

17 1.4.4-7

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.5.3.2-15.

R7.1.4.4-8

F

a c

a,c

IWNA-SD-00239-WBT-NP, Rev. 4 7-20 Westinghouse Non-Proprietary Class 3

Page 105: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS Completion Program I&C Projects

Software Requirements Specification for thePost Accident Monitoring System

a,c

Rationale: WNA-DS-0 1617-WBT-P (Reference 17), R2.5.3.2-15.

R7.1.4.4-9

Rationale: WNA-DS-O 1617-WBT-P (Reference 17), R2.5.3.2-16.

R7.1.4.4-10

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.5.3.2-1 1.

R7.1.4.4-11

Rationale: WNA-DS-O 1617-WBT-P (Reference 17), R2.3.1 -1.

R7.1.4.4-12

Rationale: WNA-DS-0 1617-WBT-P (Reference 17), R2.5.3.2-3.

7.1.4.5 Timestamp Processing

R7.1.4.5-1

Rationale: 00000-ICE-3238 (Reference 18), subsection 3.2.5.

a,c

Ia,c

a,c

a,c

a,c_1a.c

WNA-SD-00239-WBT-NP, Rev. 4 7-21 Westinghouse Non-Proprietary Class 3

Page 106: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS Comuletion Program I&C Projects

Software Requirements Specification for thePost Accident Monitoring System

7.1.4.6 System Status

R7.1.4.6-1E_

a~c

a,c

Table 7.1-2. [ la,ca,c

_____________________________________________________________________ I _____________________________________________

-i

-J 4-

-l 1-

4 4-

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.5.2.1-2, R2.6.2.5-1, R2.6.3.1-1, R2.6.3.2-1,R2.9.1-1, R2.9.2-2, R2.9.2-4, R2.9.4-1, R2.9.4-4, R2.9.5-4, R2.9.5-5, R2.9.5-6, and R4.2.2-3.

R7.1.4.6-2

EIa,c

WNA-SD-00239-WBT-NP, Rev. 4 7-22 Westinghouse Non-Proprietary Class 3

Page 107: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS ComDletion Program I&C Proiects

Software Requirements Specification for thePost Accident Monitorin2 System

a,c

Rationale: WNA-DS-0 1617-WBT-P (Reference 17), R4.3.2-6.

Table 7.1-3. 1],Ca,c

R7.1.4.6-3

ac

Rationale: WNA-DS-01617-WBT-P, R4.3.2-4, R4.3.2-5, R4.3.2-6, and R4.3.2-7.

a,cR7.1.4.6-4

Rationale: WNA-DS-01617-WBT-P (Reference 17), R4.3.2-8.

R7.1.4.6-5 a,c

Rationale: WNA-DS-01617-WBT-P (Reference 17), R4.3.2-8.

R7.1.4.6-6a,c

WNA-SD-00239-WBT-NP, Rev. 4 7-23 Westinghouse Non-Proprietary Class 3

Page 108: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS Comnletion Program I&C Proiects

Software Requirements Specification for thePost Accident Monitoring System

a,c

Rationale: WNA-DS-0 1617-WBT-P (Reference 17), R4.3.2-8.

Table 7.1-4. a ]c

R7.1.4.6-7 a,c

Rationale: WNA-DS-0 1617-WBT-P (Reference 17), R4.4. 1-1.

R7.1.4.6-8 a,c

a,c

WNA-SD-00239-WBT-NP, Rev. 4 7-24 Westinghouse Non-Proprietary Class 3

Page 109: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS Completion Program I&C Projects

Software Requirements Specification for thePost Accident Monitoring System

a,c

Table 7.1-5. [ I a~c

a,c

4. 4

+

4. 1~

+ 4.

4. 4.

4. 1*

4 4.

1~

4 4.

4. ~1*

4 +

4. 1*

+ 4.

WNA-SD-00239-WBT-NP, Rev. 4 7-25 Westinghouse Non-Proprietary Class 3

Page 110: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS Completion Program I&C Proiects

Software Requirements Specification for thePost Accident Monitoring System

7.1.4.7 Analog Output Testing

7 1.4.7-1

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.6.2.2.19-1 1.

R7.1.4.7-2

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.6.2.2.19-1 1.

a,c

a,c

7.1.5 Outputs

7.1.5.1 Analog Outputs

The analog outputs defined in WNA-DS-01667-WBT-P (Reference 21) will be determined and processedby the Watts Bar 2 PAMS software and sent to the appropriate analog output module and channels.

R7.1.5.1-1a,c

Rationale: WNA-DS-01617-WBT-P (Reference 17), R3.2.1-1, R4.2-1, R3.2.1-3, R4.3.1-1, R4.3.1-3, andR4.3.1-4 and WNA-DS-01667-WBT-P (Reference 21), R4.4.1.2-4 and R4.4.2.1-5.

R7.1.5.1-2 a,c

Rationale: WNA-DS-0 1617-WBT-P (Reference 17), R4.3.1 -1.

R7.1.5.1-3

FIa,c

7

WNA-SD-00239-WBT-NP, Rev. 4 7-26 Westinghouse Non-Proprietary Class 3WNA-SD-00239-WBT-NP, Rev. 4 7-26 Westinghouse Non-Proprietary Class 3

Page 111: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS Comnletion Program I&C Projects

Software Requirements Specification for thePost Accident Monitoring System

Rationale: WNA-DS-0 1617-WBT-P (Reference 17), R4.3.1-3.

7_!.5.1-4

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.6.1-2, R4.3.1-3, and R4.3.1-4.

1. 5.1-5

Rationale: WNA-DS-0 1617-WBT-P (Reference 17), R2.6.1-2, R4.3.1-3, and R4.3.1-4.

R7A.5.1-6

a,c

a,c

a,c

Rationale: WNA-DS-01617-WBT-P (Reference 17), R4.3.1-5.

7.1.5.2 Digital Outputs

The digital outputs defined in WNA-DS-01667-WBT-P (Reference 21) will be determined and processedby the Watts Bar 2 PAMS software and written to the appropriate module and channels.

a,cR7.1.5.2-1

Rationale: WNA-DS-01617-WBT-P (Reference 17), R3.2.1-1, R4.3.2-1, R4.3.2-2, R4.3.2-3, R4.3.2-4,R4.3.2-5, R4.3.2-6, and R4.3.2-7, and WNA-DS-01667-WBT-P (Reference 21), R4.4.1.2-6.

WNA-SD-00239-WBT-NP, Rev. 4 7-27 Westinghouse Non-Proprietary Class 3

Page 112: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS Completion Program I&C Projects

R7.1.5.2-2

Rationale: WNA-DS-01617-WBT-P (Reference 17), R4.3.2-3.

R7.1.5.2-3

Rationale: WNA-DS-0 1617-WBT-P (Reference 17), R4.3.2-4.

R7.1.5.2-4

Rationale: WNA-DS-01617-WBT-P (Reference 17), R4.3.2-5.

7.1.5.2-5

Software Requirements Specification for thePost Accident Monitoring System

a,c

a,c

a,c

a,c

]Rationale: WNA-DS-0 1617-WBT-P (Reference 17), R4.3.2-6.

R7.1.5.2-6

Rationale: WNA-DS-0 1617-WBT-P (Reference 17), R4.3.2-7.

7.1.5.3 HSL Outputs

HSLs are not utilized in the Watts Bar 2 PAMS.

Rationale: WNA-DS-01617-WBT-P (Reference 17), Figure 2.1-2.

7.1.5.4 AF100 Outputs

R7.1.5.4-1

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.6.2.2-4, R2.6.2.2-5, and R2.6.2.2-6.

a,c

a,c

a,c

WNA-SD-00239-WBT-NP, Rev. 4 7-28 Westinghouse Non-Proprietary Class 3WNA-SD-00239-WBT-NP, Rev. 4 7-28 Westinghouse Non-Proprietary Class 3

Page 113: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS Completion Prog~ram I&C Projects

Software Requirements Specification for thePost Accident Monitoring System

R7.1.5.4-2

Rationale: WNA-DS-01617-WBT-P (Reference 17), R4.3.3-2.

R7.1.5.4-3

Rationale: WNA-DS-0 1617-WBT-P (Reference 17), R2.6.2.2.16-1, R2.9- 1, R2.9. 1-1, R2.9.2-5, and00000-ICE-30156 (Reference 15), subsection 2.6.2.2.17.

R7.1.5.4-4

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.6.2.1-3, R2.9-1, and R2.9.1-1.

R7.1.5.4-5 a,c

[E

a,c

a,c

,c

IRationale: WCAP-16097-P-A (Reference 6), Section 6.2.2.3.2.2, CAPS Issue 08-044-W006.

R7.1.5.4-6

Rationale: WCAP-16097-P-A (Reference 6), Section 6.2.2.3.2.2, CAPS Issue 08-044-W006.

a,c

R7.1.5.4-7[The Watts Bar 2 PAMS AC 160 shall transmit all the analog and digital inputs as they are received fromthe I/O module prior to any signal processing by the PAMS application to the OM and MTP.]

WNA-SD-00239-WBT-NP, Rev. 4 7-29 Westinghouse Non-Proprietary Class 3

Page 114: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear Automation Software Requirements Specification for theWatts Bar Unit 2 NSSS Completion Program I&C Projects Post Accident Monitoring System

Guidance: This data must be transmitted to the OM and MTP from the AC 160 so that it may bedisplayed.

Rationale: WNA-DS-0 1617-WBT-P (Reference 17), R2.6.2.2.20-3.

R,1.5.4-8 a,c

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.7-2 and R2.9.3-1.

R7.1.5.4-9 a,c

Rationale: WNA-DS-0 1617-WBT-P (Reference 17), R2.6.2.2.16-3.

R7.1.5.4-10 a,c

Rationale: WNA-DS-0 1617-WBT-P (Reference 17), R2.5.3.4.18-4.

R7-1.5.4-11 a,c

Rationale: WNA-DS-0 1617-WBT-P (Reference 17), R2.5.3.4.18-5.

R7.1.5.4-12 a,c

WNA-SD-00239-WBT-NP, Rev. 4 7-30 Westinghouse Non-Proprietary Class 3

Page 115: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS Completion Program I&C Proiects

Software Requirements Specification for thePost Accident Monitoring System

Rationale: WNA-DS-0 1617-WBT-P (Reference 17), R2.5.3.4.18-3.

R7.1.5.4-13 a,c

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.6.2.2.7-1.

7.1.5.5 MDAT Outputs

MDATs are not utilized in the Watts Bar 2 PAMS.

7.1.6 Timing

General timing requirements and guidelines for the Watts Bar 2 PAMS are given in Sections 4 and 5 ofthis document.

R7.1.6-1 a,c

Rationale: WNA-DS-01617-WBT-P (Reference 17), R3.2.2-1, R3.2.2-2, and 00000-ICE-3238(Reference 18), Section 3.3.

Table 7.1-6. [ I a,c

a,c

+ I I

.1. 4 4

WNA-SD-00239-WBT-NP, Rev. 4 7-31 Westinghouse Non-Proprietary Class 3WNA-SD-00239-WBT-NP, Rev. 4 7-31 Westinghouse Non-Proprietary Class 3

Page 116: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS Completion Program I&C Projects

Software Requirements Specification for thePost Accident Monitoring System

R7.1.6-2 a,c

Rationale: WNA-DS-01617-WBT-P (Reference 17), R3.2.2-1 and 00000-ICE-3238 (Reference 18),

Section 3.3.

R7.1.6-3 a,c

Rationale: WNA-DS-01617-WBT-P (Reference 17), R3.2.2-1 and 00000-ICE-3238 (Reference 18),Section 3.3.

7.1.7 Response to Abnormal Conditions

See supervisory and quality processing functions described in Sections 5.3 and 5.4, respectively, forstandard responses to detected hardware and software failures.

7.1.8 Application-Specific Errors a,c

R7.1.8-1

FIa c

Rationale: 00000-ICE-3238 (Reference 18), subsection 3.2.2.

R7.1.8-2

FRationale: 00000-ICE-3238 (Reference 18), subsection 3.2.4.

a,c _]

7.1.9 Error Recovery

General error and "BAD" quality recovery requirements for the Watts Bar 2 PAMS are given inSections 5.3 and 5.4 of this document.

WNA-SD-00239-WBT-NP, Rev. 4 7-32 Westinghouse Non-Proprietary Class 3

Page 117: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear Automation Software Requirements Specification for theWatts Bar Unit 2 NSSS Completion Program I&C Projects Post Accident Monitoring System

7.1.10 Initialization

General initialization requirements for the Watts Bar 2 PAMS are given in Section 5.1 of this document.

R7.1.10-1

R7.1.10-2

7.1.11 Communication DB Element Models

R7.1.11-1

FRationale: Engineering Judgment.

7.1.12 Naming Conventions

R7.1.12-1

Rationale: 00000-ICE-3889 (Reference 4).

7.1.13 AC160 Constraints

a,c

a,c

a,c

R7.1.13-1

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.4-1 and 00000-ICE-3238 (Reference 18),Section 2.4.

a c

WNA-SD-00239-WBT-NP, Rev. 4 7-33 Westinghouse Non-Proprietary Class 3

Page 118: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear Automation Software Requirements Specification for theWatts Bar Unit 2 NSSS Completion Program I&C Projects Post Accident Monitoring System

7.1.14 AC160 Performance

R7.1.14-1[The AC 160 software performance requirements specified in Section 3.3 of 00000-ICE-3238, "SoftwareRequirements Specification for the Common Q Post Accident Monitoring System" (Reference 18) shallapply.]

Rationale: 00000-ICE-3238 (Reference 18), Section 3.3.

7.1.15 AC160 Reliability

R7.1.15-1[To ensure high software quality, the Watts Bar 2 PAMS AC 160 software shall be developed followingthe 00000-ICE-3889, "Coding Standards and Guidelines for Common Q Systems" (Reference 4).]

Rationale: 00000-ICE-3889 (Reference 4).

7.1.16 AC160 Maintainability

R7.1.16-1[The Watts Bar 2 PAMS ACI60 software shall meet the maintainability requirements specified insubsection 3.6.4 of 00000-ICE-3238, "Software Requirements Specification for the Common Q PostAccident Monitoring System" (Reference 18).]

Rationale: 00000-ICE-3238 (Reference 18), subsection 3.6.4.

7.1.17 AC160 Portability

R7.1.17-1[The Watts Bar 2 PAMS AC 160 software shall meet the portability requirements specified insubsection 3.6.5 of 00000-ICE-3238, "Software Requirements Specification for the Common Q PostAccident Monitoring System" (Reference 18).]

Rationale: 00000-ICE-3238 (Reference 18), subsection 3.6.5.

7.1.18 AC160 Memory Constraintsac

7.1.19 AC160 Operations

The Watts Bar 2 PAMS AC160 normal and special operations are all initiated through the FPDS userinterfaces as defined in subsection 7.2.5 1.

WNA-SD-00239-WBT-NP, Rev. 4 7-34 Westinghouse Non-Proprietary Class 3

Page 119: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear Automation Software Requirements Specification for theWatts Bar Unit 2 NSSS Completion Program I&C Projects Post Accident Monitoring System

7.1.20 AC160 Site Adaptation Requirements

This AC 160 software is designed or selected specifically for the Watts Bar Unit 2 site and therefore thereare no site-specific adaptations requirements.

7.1.21 AC160 User Characteristicsa,c

No AC 160 software maintenance should be performed without first reading and understanding thisdocument in its entirety.

7.1.22 AC160 Assumptions and Dependencies

Refer to the Open Items list at the start of this document for any assumptions and dependencies applicableto these AC 160 software requirements.

7.1.23 AC160 Apportioning of Requirements

All of the AC 160 requirements listed in this document are applicable to the design of the AC 160 andnone of these requirements may be altered, omitted, or delayed.

7.1.24 AC160 Availability

R7.1.24-1[The availability requirements defined in WNA-DS-01617-WBT-P (Reference 17), R3.3.3-1 and00000-ICE-30156 (Reference 15), subsection 3.3.3 shall apply.]

Rationale: WNA-DS-01617-WBT-P (Reference 17), R3.3.3-1 and 00000-ICE-30156 (Reference 15),subsection 3.3.3.

WNA-SD-00239-WBT-NP, Rev. 4 7-35 Westinghouse Non-Proprietary Class 3

Page 120: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS Completion Program I&C Projects

Software Requirements Specification for thePost Accident Monitoring System

7.2 WATTS BAR 2 PAMS FPDS SOFTWARE

7.2.1 General

The human-machine interface (HMI) for the Watts Bar 2 PAMS is provided by the FPDS softwarelocated in the OM and MTP. Both the OM and MTP will provide pre-formatted displays of PAMS'dynamic information. The OM and MTP will provide the real-time display processing of the:

* CET monitoring* Reactor vessel level monitoring* Subcooled margin monitoring

Specific details of information displayed by the Watts Bar 2 PAMS FPDS are defined inWNA-DS-01617-WBT-P, "Watts Bar 2 NSSS Completion Program I&C Projects Post AccidentMonitoring System - System Requirements Specification" (Reference 17). 00000-ICE-30156, "SystemRequirements Specification for the Common Q Post Accident Monitoring System" (Reference 15) definesthe system requirements for the generic Common Q PAMS. 00000-ICE-30155, "System RequirementsSpecification for the Generic Flat Panel Display" (Reference 7) and 00000-ICE-3239, "SoftwareRequirements Specification for the Common Q Generic Flat-Panel Display Software" (Reference 9)provide the functional and software requirements for the generic FPD, respectively. a,c

7.2.2 Display Pages

R7.2.2-1[The Display Pages that shall be implemented for the Watts Bar 2 PAMS are defined in Section 2.6 ofWNA-DS-01617-WBT-P, "Watts Bar 2 NSSS Completion Program I&C Projects Post AccidentMonitoring System - System Requirements Specification" (Reference 17).]

WNA-SD-00239-WBT-NP, Rev. 4 7-36 Westinghouse Non-Proprietary Class 3WNA-SD-00239-WBT-NP, Rev. 4 7-36 Westinghouse Non-Proprietary Class 3

Page 121: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS ComDletion Pro2ram I&C Proiects

Software Requirements Specification for thePost Accident Monitorin2 System

a,c

WNA-SD-00239-WBT-NP, Rev. 4 7-37 Westinghouse Non-Proprietary Class 3

Page 122: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS Comoletion Program I&C Projects

Software Requirements Specification for thePost Accident Monitoring System

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.6.2.2-1, Table 2.6-1, R2.6.1-3, and R2.6.3.2-1.

The following requirements are applicable to all OM and MTP display pages.

R7.2.2-2 a,c

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.6.2.1-9 and engineering judgment with regard toplacement.

ý* 2.2-3a c

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.6.2.1-10 and R2.6.3.1-1 (guidance), andengineering judgment with regard to placement.

R7.2.2-4

Fa,c

IRationale: Engineering judgment and to provide consistency with other Common Q systems.

R7.2.2-5

Rationale: Engineering judgment and to provide consistency with other Common Q systems.

ac

R7.2.2-6 a,c

Rationale: WNA-DS-0 1617-WBT-P (Reference 17), Table 2.6.1, R2.6.3.2-1, and engineering judgmentwith regard to placement.

a,cR7.2.2-7

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.6.1-1, R2.6.2.2-7, and R2.6.3.1-12.

WNA-SD-00239-WBT-NP, Rev. 4 7-38 Westinghouse Non-Proprietary Class 3

Page 123: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS ComDletion Pro2ram I&C Projects

Software Requirements Specification for thePost Accident Monitoring System

R7.2.2-8 a,c

Rationale: WNA-DS-0 1617-WBT-P (Reference 17), R2.6.1 -1, R2.6.2.2-7, and R2.6.3.1-12.

R7.2.2-9E_ a,c

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.6.2.2-8, R2.6.3.1-13, and R2.6.3.2-1.

R7.2.2-10 a,c

Rationale: WNA-DS-0 1617-WBT-P (Reference 17), R2.6.2.2-9, R2.6.3.1-14, and R2.6.3.2- 1.

.2-11 a,c

Rationale: WNA-DS-0 1617-WBT-P (Reference 17), R2.6.2.2-10, R2.6.3.1-15, and R2.6.3.2-1.

K 2.2-12

ac

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.6.2.2-1 1, R2.6.3.1-16, and R2.6.3.2-1.

R7.2.2-13

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.6.3.2-1 (regarding navigation) and engineering

judgment to provide consistency with other Common Q systems.

R7.2.2-14 a,c

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.9.4-5, R2.9.4-6, and R2.6.2.2-2.

R7.2.2-15 a,c

WNA-SD-00239-WBT-NP, Rev. 4 7-39 Westinghouse Non-Proprietary Class 3WNA-SD-00239-WBT-NP, Rev. 4 7-39 Westinghouse Non-Proprietary Class 3

Page 124: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS Completion Program I&C Projects

Software Requirements Specification for thePost Accident Monitoring System

a~c

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.6.2.1-3, R2.6.3.1-5, R2.9.5-4, R2.9.5-5, R2.9.5-

6, and R4.2.2-6.

-R7-2.2-16 a,c

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.6.2.4-1, Table 2.6-5, R2.9.5-4, R2.9.5-5, andR2.9.5-6.

7.2.3 Directory

R7-2.3-1

Rationale: WNA-DS-01617-WBT-P (Reference 17), Table 2.6-1, R2.6.2.1-1, and R2.6.3.2-1.

R7.2.3-2

Rationale: WNA-DS-01617-WBT-P (Reference 17), Table 2.6-1 and R2.6.2.1-1.

a,c

a,c

7.2.4 ICC Summary

2.4-1 a,c

I1Rationale: WNA-DS-01617-WBT-P (Reference 17), Table 2.6-1 and R2.6.3.1-1 (guidance).

R7.2.4-2

E :Rationale: WNA-DS-01I617-VBT-P (Reference 17), R2.6.2.2.2- 1.

a,c

WNA-SD-00239-WBT-NP, Rev. 4 7-40 Westinghouse Non-Proprietary Class 3

Page 125: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS Comoletion Proeram I&C Proiects

Software Requirements Specification for thePost Accident Monitorine System

R7.2.4-3 a,c

Rationale: WNA-DS-0 1617-WBT-P (Reference 17), R2.6.2.2.2- 1.

R7.2.4-4

FRationale: WNA-DS-O 1617-WBT-P (Reference 17), R2.6.2.2.2- 1.

R7.2.4-5

l

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.6.2.2.2-1.

R7.2.4-6

F_

a c

a c

a,c

_]Rationale: Engineering judgment to provide information available on Watts Bar Unit I PAMS.

R7.2.4-7

Rationale: Engineering judgment to provide information available on Watts Bar Unit I PAMS.

R7.2.4-8

Rationale: Engineering judgment to provide information available on Watts Bar Unit I PAMS.

R7.2.4-9

F_Rationale: Engineering judgment to be consistent with other displays in this system.

a,c

ac

ac

~~2.4-10 a,c]

Rationale: Engineering judgment to provide information available on Watts Bar Unit I PAMS.

WNA-SD-00239-WBT-NP, Rev. 4 7-41 Westinghouse Non-Proprietary Class 3

Page 126: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear Automation Software Requirements Specification for theWatts Bar Unit 2 NSSS Completion Program I&C Projects Post Accident Monitoring System

7.2.5 Core Summary Display

a c.2.5-1

Rationale: WNA-DS-01617-WBT-P (Reference 17), Table 2.6-1 and R2.6.3.1-1 (guidance).

R7.2.5-2 a,c

Rationale: WNA-DS-O 1617-WBT-P (Reference 17), R2.6.2.2. 1-1.

7.2.6 Saturation Margin Display

a,c2.6-1

a -c

Rationale: WNA-DS-01617-WBT-P (Reference 17), Table 2.6-1 and R2.6.3.1-1 (guidance).

R7.2.6-2 a,c

Rationale: WNA-DS-0 1617-WBT-P (Reference 17), R2.6.2.2.3- 1.

7.2.7 Reactor Vessel Level Display

The Reactor Vessel Level Display page provides the operator with a graphical depiction of the reactorvessel level and will display other RVLIS parameters.

R(2.7-i

a ,c

Rationale: W~NA-DS-01617-WYBT-P (Reference 17), Table 2.6-1 and R2.6.3. 1-1 (guidance).

WNA-SD-00239-WBT-NP, Rev. 4 7-42 Westinghouse Non-Proprietary Class 3

Page 127: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS Comoletion Program I&C Projects

Software Requirements Specification for thePost Accident Monitorin2 System

R7.2.7-2

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.6.2.2.6-1.

.17-3

a,c

a,c

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.6.2.2.6-2.

R7.2.7-4

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.5.3.4.18-4 and R2.6.2.2.6-3.

R7.2.7-5

Rationale: Engineering Judgment

R7.2.7-6

a,c

a,c

a,c

Rationale: WNA-DS-0 1617-WBT-P (Reference 17), R2.5.3.4.18-3.

3 1.7-7

Rationale: WNA-DS-0 1617-WBT-P (Reference 17), R2.5.3.4.18-5.

ac

WNA-SD-00239-WBT-NP, Rev. 4 7-43 Westinghouse Non-Proprietary Class 3

Page 128: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS Completion Program I&C Proiects

Software Requirements Specification for thePost Accident Monitoring System

7 2.7-8

ac

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.6.2.2.6-4.

7.2.8 Level Bar Graphs Display

R7.2.8-1

Ea,c

IRationale: WNA-DS-01617-WBT-P (Reference 17), Table 2.6-1 and R2.6.3.1-1 (guidance).

R7.2.8-2

Rationale: WNA-DS-0 1617-WBT-P (Reference 17), R2.6.2.2.7- 1.

R7.2.8-3

Rationale: Engineering judgment to match the Reactor Vessel Level Display page requirement,WNA-DS-01617-WBT-P (Reference 17), R2.5.3.4.18-3.

R7.2.8-4

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.6.2.2.7-3.

R7.2.8-5

Rationale: Engineering judgment to match the Reactor Vessel Level Display page requirement,WNA-DS-O 1617-WBT-P (Reference 17), R2.5.3.4.18-5.

R7.2.8-6

E

an

ac

ac

ajc

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.6.2.2.7-2.

WNA-SD-00239-WBT-NP, Rev. 4 7-44 Westinghouse Non-Proprietary Class 3WNA-SD-00239-WBT-NP, Rev. 4 7-44 Westinghouse Non-Proprietary Class 3

Page 129: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS Completion Program I&C Proiects

Software Requirements Specification for thePost Accident Monitorinp System

7.2.9 Reactor Vessel Level Sensors Display

R7.2.9-1

FRationale: WNA-DS-01617-WBT-P (Reference 17), Table 2.6-1 and R2.6.3.1-1 (guidance).

R7.2.9-2

a,c

I

Rationale: WNA-DS-O 1617-WBT-P (Reference 17), R2.6.2.2.8-1 and R2.6.3.1-9.

R7.2.9-3

I

Rationale: WNA-DS-01I617-WvBT-P (Reference 17), R3.2.3-2.

a,c

7.2.10 Core Exit Thermocouples Display

R7.2.10-1

IRationale: WNA-DS-01617-WBT-P (Reference 17), Table 2.6-1 and R2.6.3.1-1 (guidance).

7.2.10-2

a,c

a,c

a,c

WNA-SD-00239-WBT-NP, Rev. 4 7-45. Westinghouse Non-Proprietary Class 3WNA-SD-00239-VVBT-NP, Rev. 4 7-45. Westinghouse Non-Proprietary Class 3

Page 130: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS Completion Program I&C Projects

SoftwareRequirements Specification for thePost Accident Monitorine System

ac

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.6.2.2.4-1.

7.2.11 Core Map Display

IR7.2.1 1-1 a,c

I ]Rationale: WNA-DS-01617-WBT-P (Reference 17), Table 2.6-1 and R2.6.3.1-1 (guidance).

R7.2.11-2

Rationale: WNA-DS-0 1617-WBT-P (Reference 17), R2.6.2.2.5-2.

R7.2.11-3 a,c

E ]

a.c

I

a,c

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.6.2.2.5-2.

R7.2.11-4

IRationale: WNA-DS-01617-WBT-P (Reference 17), R2.6.2.2.5-5.

R7.2.11-5

ERationale: WNA-DS-01617-WBT-P (Reference 17), R2.6.2.2.5-1, R2.6.2.2.5-2, and R2.6.3.1-9.

a,c

]a,c

WNA-SD-00239-WBT-NP, Rev. 4 7-46 Westinghouse Non-Proprietary Class 3

Page 131: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS Compietion Proeram i&C Proiects

Software Requirements Specification for thePost Accident Monitoring System

R7.2.11-6

Rationale: WNA-DS-0 1617-WBT-P (Reference 17), R2.6.2.2.5-3.

a,c

a,cR7.2.11-7

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.6.2.2.5-4.

7.2.12 RCS Display

The RCS Display page will show a graphical depiction of the reactor coolant system indicating importanttemperatures, pressures, and levels.

R7.2.12-1

Iaxc

IRationale: WNA-DS-01617-WBT-P (Reference 17), Table 2.6-1 and R2.6.3.1-1 (guidance).

7.2.12-2 a

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.6.2.2.9-1 and engineering judgment to match toother RCS display pages for Common Q PAMS.

R7.2.12-3

Iac

]Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.6.2.2.9-1 and engineering judgment to match toother RCS display pages for Common Q PAMS.

R7.2.12-4 axc

E ]Rationale: Engineering judgment to match to other reactor vessel level graphical depictions in the WattsBar 2 Common Q PAMS.

R7.2.12-5

Fac

]WNA-SD-00239-WBT-NP, Rev. 4 7-47 Westinghouse Non-Proprietary Class 3WNA-SD-00239-WBT-NP, Rev. 4 7-47 Westinghouse Non-Proprietary Class 3

Page 132: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear Automation SoftWatts Bar Unit 2 NSSS Completion Program I&C Projects

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.6.2.2.9-1.

R7.2.12-6 a,

I

ware Requirements Specification for thePost Accident Monitoring System

C

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.6.2.2.9-1 and R2.6.3.1-9.

R7.2.12-7 a.c

Li ]Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.6.2.2.9-1 and R2.6.3.1-9 as well as engineering

judgment to provide information available on Watts Bar Unit I PAMS.

R7.2.12-8 axc

E ]Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.6.2.2.9-1.

R7.2.12-9

IRationale: WNA-DS-01617-WBT-P (Reference 17), R2.6.2.2.9-2.

7.2.13 Trends

R7.2.13-1

a,c

a,c

Rationale:

R7.2.13-2

IRationale:

R7.2.13-3

WNA-DS-01617-WBT-P (Reference 17), Table 2.6-1 and R2.6.3.1-1 (guidance).

a1r

WvNA-DS-01I617-WvBT-P (Reference 17), R2.6.2.2. 10- 1.

a,c

Rationale: WNA-DS-0 1617-WBT-P (Reference 17), R2.6.2.2. 10-1.

WNA-SD-00239-WBT-NP, Rev. 4 7-48 Westinghouse Non-Proprietary Class 3WNA-SD-00239-WBT-NP, Rev. 4 7-48 Westinghouse Non-Proprietary Class 3

Page 133: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS Completion Program I&C Projects

Software Requirements Specification for thePost Accident Monitoring System

R7.2.13-4

Rationale: WNA-DS-0 1617-WBT-P (Reference 17), R2.6.2.2. 10-1.

a,c

a,c

R7.2.13-5

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.6.2.2.10-5.

R7.2.13-6

R7.2.13-7

Rationale: WNA-DS-01 617-WBT-P (Reference 17), R2.6.2.2.10-7.

R7.2.13-8

a,c

a,c

a,c

WNA-SD-00239-WBT-NP, Rev. 4 7-49 Westinghouse Non-Proprietary Class 3WNA-SD-00239-WBT-NP, Rev. 4 7-49 Westinghouse Non-Proprietary Class 3

Page 134: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS Comnletion Proaram I&C Proiects

Software Requirements Specification for thePost Accident Monitorin2 System

Kac

I

Rationale: Engineering judgment to provide a reasonable amount of historical data for anticipated usage.

R7.2.13-9

Ia,c

]Rationale: Standard Common Q trend functionality.

R7.2.13-10

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.6.2.2.10-2, R2.6.2.2.10-3, and R2.6.2.2.10-4.

a,c

R7.2.13-1 1

1a,c

IRationale: Standard Common Q trend limitation.

R7.2.13-12

ERationale: Standard Common Q trend limitation.

R7.2.13-13

ERationale: Engineering judgment

R7.2.13-14

F

a,c

I

a,c

]

a,c

IRationale: Engineering judgment

R7.2.13-15a,c

IRationale: Standard Common Q trend functionality.

R7.2.13-16

Fa,c

]WNA-SD-00239-WBT-NP, Rev. 4 7-50 Westinghouse Non-Proprietary Class 3

Page 135: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS Completion Program I&C Pro

Rationale: Standard Common Q trend functionality.

R7.2.13-17

ERationale: Standard Common Q trend functionality.

R7.2.13-18

IRationale: Standard Common Q trend functionality.

R7.2.13-19

Software Requirements Specification for theaIects Post Accident Monitoring System

a,c

]

a,c

]a,c

R7.2.13-20

Rationale: Standard Common Q trend functionality.

R7.2.13-21

I

a,c

a,c

]Rationale: Engineering judgment

R7.2.13-22

I

Rationale: Engineering judgment

a,c

WNA-SD-00239-WBT-NP, Rev. 4 7-51 Westinghouse Non-Proprietary Class 3WNA-SD-00239-WBT-NP, Rev. 4 7-51 Westinghouse Non-Proprietary Class 3

Page 136: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS Completion Program I&C Projects

Software Requirements Specification for thePost Accident Monitoring System

7.2.14 System Events

R7.2.14-1 a,c

Rationale: WNA-DS-01617-WBT-P (Reference 17), Table 2.6-1 and R2.6.3.1-1 (guidance).

R7.2.14-2 a,c

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.6.2.1-1, R2.6.2.2.1 1-1, and 00000-ICE-30156(Reference 15), subsection 2.6.2.2.2.

R7.2.14-3 a,c

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.6.2.2.1 1-1, and 00000-ICE-30156(Reference 15), subsection 2.6.2.2.2.

R7.2.14-4

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.6.2.1-1, R2.6.2.2.12-1, and 00000-ICE-30156(Reference 15), subsection 2.6.2.2.8.

a,c

R7.2.14-5

La,c

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.6.2.2.12-1, and 00000-ICE-30156 (Reference15), subsection 2.6.2.2.8.

WNA-SD-00239-WBT-NP, Rev. 4 7-52 Westinghouse Non-Proprietary Class 3WNA-SD-00239-WBT-NP, Rev. 4 7-52 Westinghouse Non-Proprietary Class 3

Page 137: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear Automation Software Requirements Specification for theWatts Bar Unit 2 NSSS Completion Program I&C Projects Post Accident Monitoring System

R7.2.14-6 a.c

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.6.2.2.12-1, R2.6.3.2-1, and 00000-ICE-30156(Reference 15), subsection 2.6.2.2.8.

7.2.15 FPD Status List

1R7.2.15-1 a,c

Rationale: WNA-DS-01617-WBT-P (Reference 17), Table 2.6-1 and R2.6.3.1-1 (guidance).

R7.2.15-2[The FPD Status List Display page requirements defined in subsection 2.6.2.2.3 of 00000-ICE-30156,"System Requirements Specification for the Common Q Post Accident Monitoring System"(Reference 15) shall apply.]

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.6.2.1-1 and R2.6.2.2.13-1, and 00000-ICE-30156, (Reference 15), subsection 2.6.2.2.3.

7.2.16 Alarms

R7.2.16-1 a,c

Rationale: WNA-DS-01617-WBT-P (Reference 17), Table 2.6-1, R2.6.3.1-1 (guidance), and R2.6.3.2-1.

R7.2.16-2[The alarm processing requirements defined in subsection 2.6.2.4 of 00000-ICE-30156, "SystemRequirements Specification for the Common Q Post Accident Monitoring System" (Reference 15) shallapply.]

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.6.2.4-1, R2.6.3.2-1, and 00000-ICE-30156(Reference 15), subsection 2.6.2.4.

R7.2.16-3[The Alarm List Display page requirements defined in subsection 2.6.2.2.1 of 00000-ICE-30156, "SystemRequirements Specification for the Common Q Post Accident Monitoring System" (Reference 15) shall.apply.]

WNA-SD-00239-WBT-NP, Rev. 4 7-53 Westinghouse Non-Proprietary Class 3

Page 138: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS Completion Program I&C Projects

Software Requirements Specification for thePost Accident Monitoring System

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.6.2.1 -1, R2.6.2.2.14-1, R2.6.3.2-1, and 00000-ICE-30156 (Reference 15), subsection 2.6.2.2.1.

R7.2.16-4 a,c

Rationale: WNA-DS-0 1617-WBT-P (Reference 17), R2.6.2.2.14-1, R2.6.3.2- 1, and 00000-ICE-30156(Reference 15), subsection 2.6.2.2.1.

R7.2.16-5[The Alarm Log Display page requirements defined in subsection 2.6.2.2.9 of 00000-ICE-30156, "SystemRequirements Specification for the Common Q Post Accident Monitoring System" (Reference 15) shallapply.]

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.6.2.1-1, R2.6.2.2.15-1, R2.6.3.2-1, and 00000-ICE-30156 (Reference 15), subsection 2.6.2.2.9.

R7.2.16-6

Ia,c

IRationale: WNA-DS-01617-WBT-P (Reference 17), R2.6.2.2.15-1, R2.6.3.2-1, and 00000-ICE-30156(Reference 15), subsection 2.6.2.2.9.

a,cR7.2.16-7

I[Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.6.2.2.15-1, R2.6.3.2-1, and 00000-ICE-30156(Reference 15), subsection 2.6.2.2.9.

7.2.17 System Health Display

7.2.17-1 a,c

IRationale: WNA-DS-01617-WBT-P (Reference 17), Table 2.6-1 and R2.6.3.1-1 (guidance).

R7.2.17-2

Ia,c

WNA-SD-00239-WBT-NP, Rev. 4 7-54 Westinghouse Non-Proprietary Class 3WNA-SD-00239-WBT-NP, Rev. 4 7-54 Westinghouse Non-Proprietary Class 3

Page 139: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS Completion Program I&C Projects

Software Requirements Specification for thePost Accident Monitoring System

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.6.2.2.16-1, and 00000-ICE-30156 (Reference15), subsection 2.6.2.2.17.

a,cR17.2.17-3

]Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.6.2.2.16-1, and 00000-ICE-30156 (Reference15), subsection 2.6.2.2.17.

R7.2.17-4

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.6.2.2-1 1.

a,c

]R7.2.17-5

Ea,c

]Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.9.5-1.

R7.2.17-6

Ea,c

]Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.6.2.2.16-1, R2.6.3.1-9, and R2.9.5-1.

7.2.17-7a,c

]Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.6.2.2.16-1, R2.7-2, and R2.9.3-1.

R7.2.17-8

Ea,c

]Rationale: Engineering Judgment

R7.2.17-9

KRationale: WNA-DS-0 1617-WBT-P (Reference 17), R2.6.2.2.16-2.

7.2.17-10

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.9.2-5.

a,c

I

a,c

I

WNA-SD-00239-WBT-NP, Rev. 4 7-55 Westinghouse Non-Proprietary Class 3WNA-SD-00239-WBT-NP, Rev. 4 7-55 Westinghouse Non-Proprietary Class 3

Page 140: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS Completion Program I&C Projects

7.2.17-11

Software Requirements Specification for thePost Accident Monitoring System

a,c

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.9.2-3.

7.2.18 CRC and System Info

R7.2.18-1

Fa,c

]Rationale:

R7.2.18-2

IRationale:

R7.2.18-3

IRationale:

R7.2.18-4

WNA-DS-01617-WBT-P (Reference 17), Table 2.6-1 and R2.6.3.1 -1 (guidance).

ac

WNA-DS-O 1617-WBT-P (Reference 17), R2.6.2.2.16-3.

a,c

WNA-DS-01617-WBT-P (Reference 17), R2.6.2.2.16-3.

a,c

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.6.2.2.16-3.

R7.2.18-5

IRationale: Engineering Judgment

R7.2.18-6

Rationale: WNA-DS-0 1617-WBT-P (Reference 17), R2.6.2.2.16-3.

a,c

]a,c

WNA-SD-00239-WBT-NP, Rev. 4 7-56 Westinghouse Non-Proprietary Class 3

Page 141: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS Completion Program I&C Projects

Software Requirements Specification for thePost Accident Monitoring System

7.2.19 Setpoint Display

Ia,c

]R7.2.19-1

Ia,c

IRationale: WNA-DS-01617-WBT-P (Reference 17), Table 2.6-1 and R2.6.3.1-1 (guidance).

R7.2.19-2

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.6.2.1-1 and R2.6.2.2.17-1, and 00000-ICE-30156 (Reference 15), subsection 2.6.2.2.4.

a,c

R7.2.19-3

Ea,c

IRationale: WNA-DS-0 1617-WBT-P (Reference 17), R2.6.2.2.17-2.

R7.2.19-4[The setpoint requirements in 00000-ICE-30156, "System Requirements Specification for the Common QPost Accident Monitoring System" (Reference 15), subsection 2.6.2.2.6 shall apply.]

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.6.2.1-1 and R2.6.2.2.17-3, and 00000-ICE-30156 (Reference 15), subsection 2.6.2.2.6.

7.2.20 Bypass Display

R7.2.20-1

Ia,c

]Rationale: WNA-DS-01617-WJBT-P (Reference 17), Table 2.6-1 and R2.6.3.1-1 (guidance).

7.2.20-2 a,c]Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.6.2.1 -1 and R2.6.2.2.18-1, and 00000-ICE-30156 (Reference 15), subsection 2.6.2.2.5.

R7.2.20-3[The point bypass requirements in 00000-ICE-30156, "System Requirements Specification for theCommon Q Post Accident Monitoring System" (Reference 15), subsection 2.6.2.2.5 shall apply, exceptfor the HJTC and UJTC bypass requirements.]

WNA-SD-00239-WBT-NP, Rev. 4 7-57 Westinghouse Non-Proprietary Class 3

Page 142: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear Automation Software Requirements Specification for theWatts Bar Unit 2 NSSS Completion Program I&C Projects Post Accident Monitoring System

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.3.1 - 1, R2.6.2.1-1, and R2.6.2.2.18-1, and00000-ICE-30156 (Reference 15), subsection 2.6.2.2.5.

R7.2.20-4 a,c

E ]Rationale: WNA-DS-0 1617-WBT-P (Reference 17), R2.6.2.2.18-2.

R7.2.20-5 a,c

E ]Rationale: WNA-DS-0 1617-WBT-P (Reference 17), Table 2.6-5.

R7.2.20-6

ERationale: WNA-DS-01617-WBT-P (Reference 17), Table 2.6-5.

7.2.21 Modify Setpoint/Bypass

a,c

]

R7.2.21-1 a,c

E IRationale: WNA-DS-01617-WBT-P (Reference 17), Table 2.6-1, R4.4-1, and R2.6.3.1-1 (guidance).

7.2.21-2

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.5.2.1-1, R2.6.2.5-1, R2.6.3.1-1, R2.6.3.2-l,R3.1.6-1, R4.2.2-3, and R4.4-1.

R7.2.21-3

LIRationale: WNA-DS-01617-WBT-P (Reference 17), R2.5.2.1-1, R2.6.2.5-1, R2.6.3.1-1, R2.6.3.2-1,R3.1.6-1, R4.2.2-3, and R4.4-1.

R7.2.21-4

a,c

a,c

a,c

WNA-SD-00239-WBT-NP, Rev. 4 7-58 Westinghouse Non-Proprietary Class 3WNA-SD-00239-WBT-NP, Rev. 4 7-58 Westinghouse Non-Proprietary Class 3

Page 143: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear Automation SWaits Bar Unit 2 NSSS Completion Program I&C Projects

Rationale: WNA-DS-0 1617-WBT-P (Reference 17), R2.5.2.1-3.

7.2.22 Functional Tests Display

_7.2.22-1

ftware Requirements Specification for thePost Accident Monitoring System

a,c

IRationale:

R7.2.22-2

EI

WNA-DS-01617-WBT-P (Reference 17), Table 2.6-1 and R2.6.3.1-1 (guidance).

a,c

]Rationale: WNA-DS-0 1617-WBT-P (Reference 17), R2.6.2.2.19-1 and R2.6.2.2.19-2.

LR7.2.22-3 a,c

]Rationale: WNA-DS-0 1617-WBT-P (Reference 17), R2.6.2.2.19-1 and R2.6.2.2.19-2.

R7.2.22-4

Rationale: WNA-DS-0 1617-WBT-P (Reference 17), R2.6.2.2.19-1 and R2.6.2.2.19-2.

R7.2.22-5

ERationale: WNA-DS-0 1617-WBT-P (Reference 17), R2.6.2.2.19-1 and R2.6.2.2.19-2.

7.2.23 Annunciator Test Display

R7.2.23-1 a,c

I JRationale: WNA-DS-01617-WBT-P (Reference 17), Table 2.6-1 and R2.6.3.1-1 (guidance).

ý7.2.23-2

Rationale: WNA-DS-0 1617-WBT-P (Reference 17), R2.6.3.2-1 and R2.6.3.3-2.

R7.2.23-3

a,c

I

a,c

I

a,c

]

a,c

WNA-SD-00239-WBT-NP, Rev. 4 7-59 Westinghouse Non-Proprietary Class 3

Page 144: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear Automation Software Requirements Specification for theWatts Bar Unit 2 NSSS Completion Program I&C Prolects Post Accident Monitoring System

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.6.2.2.19-3 and R2.6.3.3-2.

R7.2.23-4 a,c

IRationale: WNA-DS-01617-WBT-P (Reference 17), R2.6.2.2.19-3 and R2.6.3.3-2.

R7.2.23-5

IRationale: WNA-DS-01617-WBT-P (Reference 17), R2.6.2.2.19-3 and R2.6.3.3-2.

7.2.24 Display Pixel Test

a,c

]

R7.2.24-1

ERationale:

R7.2.24-2

Rationale:

R7.2.24-3

LIRationale:

R7.2.24-4

I

a,c

]WNA-DS-01617-WBT-P (Reference 17), Table 2.6-1, R2.6.3.3-6, and R2.6.3.1-1 (guidance).

ac

WNA-DS-01617-WBT-P (Reference 17), R2.6.2.2.19-4 and R2.6.3.3-6.

a,c

]WNA-DS-01617-WBT-P (Reference 17), R2.6.2.2.19-5 and R2.6.2.2.19-6.

a,c

Rationale: WNA-DS-0 1617-WBT-P (Reference 17), R2.6.2.2.19-7.

7.2.25 Saturation Margin Test Display

R7.2.25-1 a,c

E ]Rationale: WNA-DS-01617-WBT-P (Reference 17), Table 2.6-1 and R2.6.3.1 -1 (guidance).

WNA-SD-00239-WBT-NP, Rev. 4 7-60 Westinghouse Non-Proprietary Class 3

Page 145: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS Completion Program I&C Projects

R7.2.25-2

Rationale: WNA-DS-0 1617-WBT-P (Reference 17), R2.

R7.2.25-3

IRationale: WNA-DS-01617-WBT-P (Reference 17), R2.

R7.2.25-4

IRationale: WNA-DS-01617-WBT-P (Reference 17), R2.

R7.2.25-5

LI

Software Requirements Specification for thePost Accident Monitoring System

a,c

]5.2.1-1, R2.6.3.2-1, and R4.2.2-3.

a,c

6.2.2.19-8 and R2.6.3.3-1.

a,c

]6.2.2.19-9.

a,c

IRationale:

R7.2.25-6

IRationale:

R7.2.25-7

Rationale:

R7.2.25-8

I

WNA-DS-0 1617-WBT-P (Reference 17), R2.6.2.2.19-10.

a,c

IWNA-DS-0 1617-WBT-P (Reference 17), R2.6.2.2.19-10.

a,c

Engineering Judgment

a,c

Rationale: Engineering Judgment

7.2.26 Analog Output Test Display

R7.2.26-1

Ia,c

]WNA-SD-00239-WBT-NP, Rev. 4 7-61 Westinghouse Non-Proprietary Class 3WNA-SD-00239-WBT-NP, Rev. 4 7-61 Westinghouse Non-Proprietary Class 3

Page 146: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear Automation Software Requirements Specification for theWatts Bar Unit 2 NSSS Completion Program i&C Projects Post Accident Monitoring System

Rationale: WNA-DS-01617-WBT-P (Reference 17), Table 2.6-1, R2.6.3.3-7, and R2.6.3.1-1 (guidance).

R7.2.26-2 a,c

Rationale:

R7.2.26-3

IRationale:

R7.2.26-4

Rationale:

7.2.26-5

WNA-DS-01617-WBT-P (Reference 17), R2.5.2.1-1, R2.6.3.2-1, and R4.2.2-3.

a,c

WNA-DS-0 1617-WBT-P (Reference 17), R2.6.2.2.19-11.

a,c

Engineering Judgment

a,c

Rationale: Engineering Judgment to ensure that test data is not mistaken for live data.

7.2.27 Maintenance Display

R7.2.27-1 a,c

I IWNA-DS-0 1617-WBT-P (Reference 17), R2.6.2.2.20-1 and R2.6.3.1 -1.Rationale:

R7.2.27-2 a,c

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.6.2.2.20-2 and R2.6.2.2.20-5.

R7.2.27-3

I oRationale: WNA-DS-01617-WBT-P (Reference 17), R2.6.2.2.20-6, R2.6.3.2-1, and R3.1.6-1.

a,c

]

WNA-SD-00239-WBT-NP, Rev. 4 7-62 Westinghouse Non-Proprietary Class 3

Page 147: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS Completion Pro2ram I&C Projects

Software Requirements Specification for thePost Accident Monitoring System

R7.2.27-4 a,i

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.6.3.2-1. Additionally, this is the chosenimplementation to indicate reboot button is enabled to support WNA-DS-01617-WBT-P, R2.6.2.2.20-6.

7.2.27-5

a,c

IRationale: WNA-DS-01617-WBT-P (Reference 17), R2.6.2.2.20-2.

R7.2.27-6

IRationale: WNA-DS-01617-WBT-P (Reference 17), R2.6.2.2.20-2.

R7.2.27-7

ERationale: WNA-DS-0 1617-WIBT-P (Reference 17), R2.6.2.2.20-2.

R7.2.27-8

LRationale: WNA-DS-0 1617-WBT-P (Reference 17), R2.6.2.2.20-2.

7.2.28 RVLIS Constants

a,c

Ia,cI

a,c

]

R7.2.28-1

Ia,c

IRationale: WNA-DS-01617-WBT-P (Reference 17), Table 2.6-1 and R2.6.3.1-1.

R7.2.28-2

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.5.3.4.19-1 and R2.6.2.2.20-7.

a,c

WNA-SD-00239-WBT-NP, Rev. 4 7-63 Westinghouse Non-Proprietary Class 3

Page 148: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS Comnletion Program I&C Proiects

Software Requirements Specification for thePost Accident Monitorine System

R7.2.28-3

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.5.3.4.19-2 and R2.6.2.2.20-7.

a,c

R7.2.28-4

LIa,c

IRationale: WNA-DS-01617-WBT-P (Reference 17), R2.5.3.4.19-3 and R2.6.2.2.20-7.

R7.2.28-5

IRationale: WNA-DS-0 1617-WBT-P (Reference 17), R2.5.3.4.19-4 and R2.6.2.2.20-7.

R7.2.28-6

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.5.3.4.19-5.

R7.2.28-7

a,c

a,c

a,c

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.5.3.4.19-6.

7.2.29 Loading AC160 Softwarea,c

WNA-SD-00239-WBT-NP, Rev. 4 7 -64 Westinghouse Non-Proprietary Class 3

Page 149: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS Completion Proeram I&C Projects

Software Requirements Specification for thePost Accident Monitorin2 System

R7.2.29-1

Ea,c

IRationale: WNA-DS-01617-WBT-P (Reference 17), Table 2.6-1, R2.6.3-2, R2.6.3.1-1, and R2.6.3.3-5.

R7.2.29-2 a,c

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.5.2.2-1, R2.6.3-1, R2.6.3.2-1, R2.6.3.3-5,R3.1.6-1, and R4.2.2-3.

R7.2.29-3 a,c

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.5.2.2-2, R2.6.3.2-1, and R4.2.2-3.

R7.2.29-4 a,c

Rationale: WNA-DS-0 1617-WBT-P (Reference 17), R2.6.3.3-4.

7.2.30 Input Monitoring

R7.2.30-1

IRationale: WNA-DS-01617-WBT-P (Reference 17), Table 2.6-1 and R2.6.3.1-1.

R7.2.30-2

KRationale: WNA-DS-01617-WBT-P (Reference 17), R2.6.2.2.20-3.

7.2.30-3

a,c

a,c

]

a,c

]WNA-SD-00239-WBT-NP, Rev. 4 7-65 Westinghouse Non-Proprietary Class 3

Page 150: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS Comnletion Pro2ram I&C Proiects

Software Requirements Specification for thePost Accident Monitoring System

F Ii a,c

Rationale: WNA-DS-0 1617-WBT-P (Reference 17), R2.6.2.2.20-3.

R7.2.30-4

ERationale: WNA-DS-01617-WBT-P (Reference 17), R2.6.2.2.20-4.

R7.2.30-5

ERationale: WNA-DS-0 1617-WBT-P (Reference 17), R3.2.3-6.

a,c

]

ac

]

R7.2.30-6[DELETED]

7.2.31 Load and Save Addressable Constantsa,c

R7.2.31-1 a,c

Rationale: WNA-DS-01617-WBT-P (Reference 17), Table 2.6-1 and R2.6.3.1-1.

R7.2.31-2

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.6.2.2.20-8 and R2.6.3.3-3.

R7.2.31-3

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.6.2.2.20-9 and R2.6.3.3-3.

a,c

a,c

WNA-SD-00239-WBT-NP, Rev. 4 7-66 Westinghouse Non-Proprietary Class 3WNA-SD-00239-WBT-NP, Rev. 4 7-66 Westinghouse Non-Proprietary Class 3

Page 151: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS Comoletion Pro2ram I&C Proiects

Software Requirements Specification for thePost Accident Monitorin2 System

R7.2.31-4

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.6.2.2.20-1 1, R2.6.3.2-1, and R3.1.6-1.

7.2.32 Analog Output Selection

I

a,c

a,c

IiR7.2.32-1

LIa,c

Rationale: WNA-DS-01617-WBT-P (Reference 17), Table 2.6-1 and R2.6.3.1-1.

R7.2.32-2

Rationale: WNA-DS-0 1617-WBT-P (Reference 17), R2.6.2.2.20- 10, R4.3.1-4.

R7.2.32-3

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.6.2.2.20-1 1, R2.6.3.2-1, and R3.1.6-1.

R7.2.32-4

7.2.33 Modify Timeout/Modify Default

a,c

a,c

Ia,c

a,c

R7.2.33-1

Ea,c

Rationale: WNA-DS-0 1617-WBT-P (Reference 17), R2.6.2.2.21-2.

WNA-SD-00239-WBT-NP, Rev. 4 7-67 Westinghouse Non-Proprietary Class 3

Page 152: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS Completion Program I&C Projects

R7.2.33-2

Software Requirements Specification for thePost Accident Monitoring System

a,c

Rationale: WNA-DS-01 617-WBT-P (Reference 17), R2.6.2.2.2 1-1 and R2.6.2.2.21-3.

7.2.33-3

Rationale: WNA-DS-0 1617-WBT-P (Reference 17), R2.6.2.2.21 -1 and R2.6.2.2.21-4.

7.2.33-4

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.6.2.2.21-3 (guidance).

R7.2.33-5

LI

a,c

Ia,c

a,c

]Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.6.2.2.21-5.

7.2.34 Plant Computer Datalink Processing

Ia,c

R7.2.34-1

IRationale:

R7.2.34-2

ER7.2.34-3

FRationale:

R7.2.34-4

a,c

IWNA-DS-0 1617-WBT-P (Reference 17), R4.3.3- 1.

a,cIa,c

IWNA-DS-01617-WBT-P (Reference 17), R4.3.3-3.

ac

WNA-SD-00239-WBT-NP, Rev. 4 7-68 Westinghouse Non-Proprietary Class 3

Page 153: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS Comoletion Proeram I&C Proiects

Software Requirements Specification for thePost Accident Monitoring System

I

R7.2.34-5

a c

Ia,c

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.5.2.1.2-5, R4.2.2-3, and R4.3.3-2.

Table 7.2-1. [ .,ca,c

I

WNA-SD-00239-WBT-NP, Rev. 4 7-69 Westinghouse Non-Proprietary Class 3

Page 154: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear Automation Software Requirements Specification for theWatts Bar Unit 2 NSSS Completion Program I&C Projects Post Accident Monitoring System

Table 7.2-1. 2 ac

ac

* 4

4 4 +

* 1-

4 4 .4.

4 -t *4.

4 -4. .4.

* 4.

4 4. 4

4 4. +

4 4. .4.

4 I 4

4. 4. 4

L .1.

WNA-SD-00239-WBT-NP, Rev. 4 7-70 Westinghouse Non-Proprietary Class 3

Page 155: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS ComDletion Pro2ram I&C Proiects

Software Requirements Specification for thePost Accident Monitorine System

Table 7.2-1. [ I a,Ca,c

4 1-

4 4

* .t ~1*

4 -t

I I-

4 4 .4.

4 4 4

4 4 .4

4 4 4

4. * I

+ I 4

4. 4 4

4. 4 4

+ 1 4

4. 4 4

+ 1 4

4- 4 4

4. 4 *

WNA-SD-00239-WBT-NP, Rev. 4 7-71 Westinghouse Non-Proprietary Class 3

Page 156: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS Comoletion Pro2ram I&C Proiects

Software Requirements Specification for thePost Accident Monitoring Svstem

Table 7.2-1. [ I a,c

a,c

WNA-SD-00239-WBT-NP, Rev. 4 7-72 Westinghouse Non-Proprietary Class 3

Page 157: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS Completion Pro2ram I&C Proiects

Software Requirements Specification for thePost Accident Monitorin2 Svstem

Table 7.2-1. 1 a,c

a,c

4 4 4

+ I 4

.4. 4 4

Table 7.2-2. [ I a,c

a,c

WNA-SD-00239-WBT-NP, Rev. 4 7-73 Westinghouse Non-Proprietary Class 3

Page 158: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS Completion Pro2ram I&C Prolects

Software Requirements Specification for thePost Accident MonitorinM System

Table 7.2-2. [ Ia,ca,c

WNA-SD-00239-WBT-NP, Rev. 4 7-74 Westinghouse Non-Proprietary Class 3

Page 159: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS Completion Program I&C Projects

Software Requirements Specification for thePost Accident Monitoring System

Table 7.2-2. [ Ia,c

a,c

__ i __ ___

WNA-SD-00239-WBT-NP, Rev. 4 7-75 Westinghouse Non-Proprietary Class 3WNA-SD-00239-WBT-NP, Rev. 4 7-75 Westinghouse Non-Proprietary Class 3

Page 160: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS Completion Program I&C Projects

Software Requirements Specification for thePost Accident Monitoring System

Table 7.2-2. [ la,ca,c

WNA-SD-00239-WBT-NP, Rev. 4 7-76 Westinghouse Non-Proprietary Class 3WNA-SD-00239-WBT-NP, Rev. 4 7-76 Westinghouse Non-Proprietary Class 3

Page 161: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS Completion Program I&C Projects

Software Requirements Specification for thePost Accident Monitoring Svstem

Table 7.2-2. [ ]a,c

a,c

R7.2.34-6

Ij7.2.34-7

a c

a,c

]R7.2.34-8

R7.2.34-9

IR7.2.34-10

7.2.34-11

R7.2.34-12

I

a,c

a c

a,c

a, c

a,c

WNA-SD-00239-WBT-NP, Rev. 4 7-77 Westinghouse Non-Proprietary Class 3

Page 162: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS Completion Program I&C Proects

Software Requirements Specification for thePost Accident Monitoring System

a,c

7.2.35 Legend Bar

R7.2.35-1

Ia,c

IRationale:

R7.2.35-2

KRationale:

R7.2.35-3

ERationale:

R7.2.35-4

IRationale:

R7.2.35-5

I

WNA-DS-0 1617-WBT-P (Reference 17), R2.6.2.1-7 and R2.6.3.1-3.

a c

WNA-DS-01617-WBT-P (Reference 17), R2.6.2.1-6 and R2.6.3.1-2.

a,c

WNA-DS-0 1617-WBT-P (Reference 17), R2.6.2. 1-6, R2.6.2. 1-7, R2.6.3.1-2, and R2.6.3. 1-3.

a2cWNA-DS-0 1617-WBT-P (Reference 17), R2.6.2.1-8 and R2.6.3.1-4.

a c

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.6.2.1-8 and R2.6.3.1-4.

7.2.36 FPDS Heartbeat

The FPDS heartbeat is the heartbeat generated by the OM and the MTP FPDS.

R7.2.36-1

Ka c

Rationale: WNA-DS-0 1617-WBT-P (Reference 17), R2.9. 1-1.

WNA-SD-00239-WBT-NP, Rev. 4 7-78 Westinghouse Non-Proprietary Class 3WNA-SD-00239-WBT-NP, Rev. 4 7-78 Westinghouse Non-Proprietary Class 3

Page 163: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear Automation Software Requirements Specification for theWatts Bar Unit 2 NSSS Completion Program I&C Projects Post Accident Monitoring System

R7.2.36-2 a,c

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.6.2.1-2, R2.6.3.1 -10, and R2.9.1 - 1.

R7.2.36-3

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.6.2.1-4, R2.6.3.1 -11, and R2.9.1-1.

R7.2.36-4

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.6.2.1-4, R2.6.3.1-11, and R2.9.1-1.

7.2.37 ACI60 Heartbeat

R7.2.37-1

Rationale: WNA-DS-0 1617-WBT-P (Reference 17), R2.9. 1-1.

R7.2.37-2 a,c

FThe AC 160 heartbeat shall be indicated in the form of a date and time.] ]

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.6.2.1-9 and R2.9.1-1.

R7.2.37-3

Rationale: WNA-DS-0 1617-WBT-P (Reference 17), R2.6.2.1-3, R2.6.3.1-5, R2.6.3.1-6, and R2.9.1 -1.

7.2.38 FPDS Shared Memory Databasea-c

WNA-SD-00239-WBT-NP, Rev. 4 7-79 Westinghouse Non-Proprietary Class 3

Page 164: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS Completion Program I&C Projects

R7.2.38-1

Software Requirements Specification for the

Post Accident Monitoring System

a,c

Rationale: 00000-ICE-3238 (Reference 18), Section 3.4.2.

7.2.39 FE Keyswitch Interlocka,c

a,c7.2.40 FPDS System File Checker

R7.2.40-1

Ia,c

IRationale: 00000-ICE-3239 (Reference 9), Section 3.2.24.

R7.2.40-2LRationale: 00000-ICE-3239 (Reference 9), Section 3.2.24.

R7.2.40-3

LIRationale: 00000-ICE-3239 (Reference 9), Section 3.2.24.

R7.2.40-4

Rationale: 00000-ICE-3239 (Reference 9), Section 3.2.24.

a c

ac

a,c

WNA-SD-00239-WBT-NP, Rev. 4 7-80 Westinghouse Non-Proprietary Class 3

Page 165: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear Automation Software Requirements Specification for theWatts Bar Unit 2 NSSS Completion Program I&C Prolects Post Accident Monitoring System

R7.2.40-5

Rationale: 00000-ICE-3239 (Reference 9), Section 3.2.24.

R7.2.40-6 ac

Rationale: 00000-ICE-3239 (Reference 9), Section 3.2.24.

7.2.41 FPDS Screen Savers

R7.2.41-1 a,c

Rationale: WNA-DS-01 617-WBT-P (Reference 17), R2.6.3.1-7.

R7.2.41-2 a,c

Rationale: WNA-DS-0 1617-WBT-P (Reference 17), R2.6.2.2.21-5.

R7.2.41-3 a,c

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.6.3.1-7.

7.2.42 FPDS Software Development and Program Generationaxc

R7.2.42-1

Rationale: 00000-ICE-30155 (Reference 7), subsection 2.1.

WNA-SD-00239-WBT-NP, Rev. 4 7-81 Westinghouse Non-Proprietary Class 3WNA-SD-00239-WBT-NP, Rev. 4 7-81 Westinghouse Non-Proprietary Class 3

Page 166: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS ComDletion Propram I&C Prolects

Software Requirements Specification for thePost Accident Monitoring System

R7.2.42-2

I

Rationale: 00000-ICE-30 155 (Reference 7), subsection 2.6.

a,c

R7.2.42-3[The software generation procedure described in subsection 2.1.5.1 of 00000-ICE-3239, "SoftwareRequirements Specification for the Common Q Generic Flat-Panel Display Software" (Reference 9) shallbe followed for software development for the Watts Bar 2 OM and MTP FPDS.]

Rationale: 00000-ICE-3239 (Reference 9), subsection 2.1.5.1.

7.2.43 FPDS RS232 Serial Communications Port

R7.2.43-1 a,c

Rationale: WNA-DS-0 1617-WBT-P (Reference 17), R2.6.3.3-5.

7.2.44 Display Resolution Requirements

R7.2.44-1

Rationale: WNA-DS-01617-WBT-P (Reference 17), R3.2.3-1, R3.2.3-6, and R3.2.3-7.

a,c

R7.2.44-2[DELETED]

WNA-SD-00239-WBT-NP, Rev. 4 7-82 Westinghouse Non-Proprietary Class 3

Page 167: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS Completion Program I&C Proiects

Software Requirements Specification for thePost Accident Monitoring System

,R7.2.44-3 a,c

Rationale: WNA-DS-01617-WBT-P (Reference 17), R3.2.3-2 and R3.2.3-7.

R7.2.44-4[DELETED]

R7.2.44-5

Rationale: WNA-DS-01617-WBT-P (Reference 17), R3.2.3-3, R3.2.3-4, R3.2.3-6, and R3.2.3-7.

a,c

WNA-SD-00239-WBT-NP, Rev. 4 7-83 Westinghouse Non-Proprietary Class 3WNA-SD-00239-WBT-NP, Rev. 4 7-83 Westinghouse Non-Proprietary Class 3

Page 168: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear Automation Software Requirements Specification for theWatts Bar Unit 2 NSSS Completion Program I&C Projects Post Accident Monitoring System

7.2.45 FPDS Constraints

R7.2.45-1[The constraints listed in Section 2.4 of 00000-ICE-3239, "Software Requirements Specification for theCommon Q Generic Flat-Panel Display Software" (Reference 9) shall apply to the Watts Bar 2 OM andMTP FPDS.]

Rationale: 00000-ICE-3239 (Reference 9), Section 2.4.

7.2.46 FPDS Performance

R7.2.46-1[The Watts Bar 2 PAMS FPDS software shall meet the performance requirements specified in Section 3.3of 00000-ICE-3239, "Software Requirements Specification for the Common Q Generic Flat-PanelDisplay Software" (Reference 9).]

Rationale: 00000-ICE-3239 (Reference 9), Section 3.3.

7.2.47 FPDS Reliability

R7.2.47-1[The Watts Bar 2 PAMS FPDS software shall meet the reliability requirements specified in Section 3.5.1of 00000-ICE-3239, "Software Requirements Specification for the Common Q Generic Flat-PanelDisplay Software" (Reference 9).]

Rationale: 00000-ICE-3239 (Reference 9), Section 3.5.1.

R7.2.47-2 ac

Rationale: 00000-ICE-3239 (Reference 9), Section 3.2.24.

7.2.48 FPDS Maintainability

R7.2.48-1[The Watts Bar 2 PAMS FPDS software shall meet the maintainability requirements specified inSection 3.5.3 of 00000-ICE-3239, "Software Requirements Specification for the Common Q GenericFlat-Panel Display Software" (Reference 9).]

Rationale: 00000-ICE-3239 (Reference 9), Section 3.5.3.

WNA-SD-00239-WBT-NP, Rev. 4 7-84 Westinghouse Non-Proprietary Class 3WNA-SD-00239-WBT-NP, Rev. 4 7-84 Westinghouse Non-Proprietary Class 3

Page 169: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS Comnletion Program I&C Projects

Software Requirements Specification for thePost Accident Monitoring System

7.2.49 FPDS Portability

R7.2.49-1[The Watts Bar 2 PAMS FPDS software shall meet the portability requirements specified in Section 3.5.4of 00000-ICE-3239, "Software Requirements Specification for the Common Q Generic Flat-PanelDisplay Software" (Reference 9).]

Rationale: 00000-ICE-3239 (Reference 9), Section 3.5.4.

7.2.50 FPDS Memory Constraintsa,c

7.2.51 FPDS Operations

The normal and special operations specific to the Watts Bar 2 PAMS FPDS are identified in Section 2.1.7of 00000-ICE-3239, "Software Requirements Specification for the Common Q Generic Flat-PanelDisplay Software" (Reference 9).

a,c

7.2.52 FPDS Site Adaptation Requirements

This FPDS software is designed or selected specifically for the Watts Bar Unit 2 site and therefore thereare no site-specific adaptations requirements.

7.2.53 FPDS User Characteristicsa,c

WNA-SD-00239-WBT-NP, Rev. 4 7-85 Westinghouse Non-Proprietary Class 3

Page 170: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear Automation Software Requirements Specification for theWatts Bar Unit 2 NSSS Completion Program I&C Projects Post Accident Monitoring System

7.2.54 FPDS Assumptions and Dependencies

Refer to the Open Items list at the start of this document for any assumptions and dependencies applicableto these FPDS software requirements.

7.2.55 FPDS Apportioning of Requirements

All of the FPDS requirements listed in this document are applicable to the design of the FPDS and noneof these requirements may be altered, omitted, or delayed.

7.2.56 FPDS Availability

The availability requirements for the FPDS are defined in subsection 7.1.24.a.c

7.2.57 Print Screen

R7.2.57-1 a,c

ERationale: WNA-DS-01617-WBT-P (Reference 17), R2.5.2.1.3-1.

R7.2.57-2 a,c

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.5.2. 1-1 and R2.5.2.1.3-1

R7.2.57-3 a,c

Rationale: WNA-DS-0 1617-WBT-P (Reference 17), R2.5.2. 1-1 and R2.5.2.1.3-2.

WNA-SD-00239-WBT-NP, Rev. 4 7-86 Westinghouse Non-Proprietary Class 3WNA-SD-00239-WBT-NP, Rev. 4 7-86 Westinghouse Non-Proprietary Class 3

Page 171: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS Comoletion Program I&C Proiects

Software Requirements Specification for thePost Accident Monitoring Svstem

R7.2.57-4

Rationale: WNA-DS-016,17-WBT-P (Reference 17), R2.5.2.1-1 and R2.5.2.1.3-3.

R7.2.57-5

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.5.2.1-1 and R2.5.2.1.3-3.

R7.2.57-6

Rationale: WNA-DS-01617-WBT-P (Reference 17), R2.5.2.1.3-4

a,c

a,c

a,c

(Last Page of Section 7)

WNA-SD-00239-WBT-NP, Rev. 4 7-87 Westinghouse Non-Proprietary Class 3

Page 172: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS Completion Program I&C Projects

Software Requirements Specification for thePost Accident Monitoring System

SECTION 8SAFETY AND SECURITY REQUIREMENTS

8.1 SAFETY

00000-ICE-37727, "Post Accident Monitoring System Software Preliminary Hazard Analysis for theCommon Q Phase 3 PAMS Project" (Reference 30) provides the Preliminary Hazards Analysis (PHA)pertaining to the generic software for the Watts Bar 2 PAMS.

8.2 SECURITY

8.2.1 Cyber Security

R8.2.1-1I[DELETED]

R8.2.1-2

a,c

a,c

WNA-SD-00239-WBT-NP, Rev. 4 8-1 Westinghouse Non-Proprietary Class 3

Page 173: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear Automation SoWatts Bar Unit 2 NSSS Completion Program I&C Projects

Rationale: WNA-PD-00073-WBT (Reference 16), Section 16.6.

R8.2.1-3

Rationale: WNA-DS-01 150-GEN (Reference 13), Section 2.3,

8.2.1-4

•ftware Requirements Specification for thePost Accident Monitoring System

a,c

]Design & Implementation Phase."

a,c

]Rationale:

R8.2.1-5

FRationale:

R8.2.1-6

IRationale:

S8.2.1-7

Rationale:

R8.2.1-8

KRationale:

R8.2.1-9

ERationale:

R8.2.1-10

ERationale:

R8.2.1-11

E

WNA-DS-01 150-GEN (Reference 13), Section 2.3, "Design & Implementation Phase."

a,c

]WNA-DS-01 150-GEN (Reference 13), Section 2.3, "Design & Implementation Phase."

a,c

]WNA-DS-01 150-GEN (Reference 13), Section 2.3, "Design & Implementation Phase."

a,c

]WNA-DS-01 150-GEN (Reference 13), Section 2.3, "Design & Implementation Phase."

a,c

]WNA-DS-01 150-GEN (Reference 13), Section 2.3, "Design & Implementation Phase."

a,c

]WNA-DS-01 150-GEN (Reference 13), Section 2.3, "Design & Implementation Phase."

a,c

WNA-DS-01 150-GEN (Reference 13), Section 2.3, "Design & Implementation Phase."

a,c

WNA-SD-00239-WBT-NP, Rev. 4 8-2 Westinghouse Non-Proprietary Class 3

Page 174: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS Comnletion Program I&C Proiects

Software Requirements Specification for thePost Accident Monitoring System

IRationale: WNA-DS-01 150-GEN (Reference 13), Section 2.3, "Design & Implementation Phase."

R8.2.1-12

Rationale: WNA-DS-01 150-GEN (Reference 13), Section 2.3, "Design & Implementation Phase."

a,c

a,c

R8.2.1-13

Ea,c

]Rationale: WNA-DS-01 150-GEN (Reference 13), Section 2.3, "Design & Implementation Phase."

R8.2.1-14

KRationale: WNA-DS-01 150-GEN (Reference 13), Section 2.3, "Design & Implementation Phase."

R8.2.1-15

IRationale: WNA-DS-01 150-GEN (Reference 13), Section 2.3, "Design & Implementation Phase."

(Last Page of Section 8)

a,c

]

a,c

]

WNA-SD-00239-WBT-NP, Rev. 4 8-3 Westinghouse Non-Proprietary Class 3

Page 175: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Nuclear AutomationWatts Bar Unit 2 NSSS Comuletion Pro2ram I&C Proiects

Software Requirements Specification for thePost Accident Monitorina System

SECTION 9PROGRAM WIDE DATABASE (PWD) USAGE

The PWD is not used in the Watts Bar 2 PAMS per the Project Plan, WNA-PD-00073-WBT(Reference 16).

(Last Page of Section 9)

WNA-SD-00239-WBT-NP, Rev. 4 9-1 Westinghouse Non-Proprietary Class 3

Page 176: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

TVA Letter Dated February 25, 2011

Attachment 17

Westinghouse Electric Company CAW-1 1-3102, Application for Withholding ProprietaryInformation from Public Disclosure, WNA-SD-00239-WBT-P, Revision 4, "Nuclear

Automation Watts Bar 2 NSSS Completion Program I&C Projects, Software RequirementsSpecification for the Post Accident Monitoring System" (Proprietary),

Dated February 10, 2011

Page 177: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

( Westinghouseweoo..e ft singhuseWestinghouse Electric CompanyNuclear Services

1000 Westinghouse Drive

Cranberry Township, Pennsylvania 16066USA -0

U.S. Nuclear Regulatory Commission Direct tel: (412) 374-4643Document Control Desk Direct fax: (724) 720-075411555 Rockville Pike e-mail: [email protected], MD 20852 Proj letter: WBT-D-2910

CAW-11-3102

February 10, 2011

APPLICATION FOR WITHHOLDING PROPRIETARYINFORMATION FROM PUBLIC DISCLOSURE

Subject: WNA-SD-00239-WBT-P, Rev. 4, "Nuclear Automation Watts Bar Unit 2 NSSS CompletionProgram I&C Projects, Software Requirements Specification for the Post Accident MonitoringSystem" (Proprietary)

The proprietary information for which withholding is being requested in the above-referenced report isfurther identified in Affidavit CAW- 11-3102 signed by the owner of the proprietary information,Westinghouse Electric Company LLC. The affidavit, which accompanies this letter, sets forth the basison which the information may be withheld from public disclosure by the Commission and addresses withspecificity the considerations listed in paragraph (b)(4) of 10 CFR Section 2.390 of the Commission'sregulations.

Accordingly, this letter authorizes the utilization of the accompanying affidavit by Tennessee ValleyAuthority.

Correspondence with respect to the proprietary aspects of the application for withholding or theWestinghouse affidavit should reference this letter, CAW-1 1-3102, and should be addressed toJ. A. Gresham, Manager, Regulatory Compliance, Westinghouse Electric Company LLC, Suite 428,1000 Westinghouse Drive, Cranberry Township, Pennsylvania 16066.

Very truly yours,

A. Gresham, ManagerRegulatory Compliance

Enclosures

Page 178: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

CAW- 11-3102

AFFIDAVIT

COMMONWEALTH OF PENNSYLVANIA:

ss

COUNTY OF BUTLER:

Before me, the undersigned authority, personally appeared J. A. Gresham, who, being by me duly

sworn according to law, deposes and says that he is authorized to execute this Affidavit on behalf of

Westinghouse Electric Company LLC (Westinghouse), and that the averments of fact set forth in this

Affidavit are true and correct to the best of his knowledge, information, and belief:

J. A. Gresham, Manager

Regulatory Compliance

Sworn to and subscribed before me

this 10th day of February 2011

Notary ulc!!:

COMMONWEALTH OF PENNSYLVANIANotarial Seal

Cynthia Olesky, Notary PublicManor Boro, Westmoreland County

My Commission Expires July 16, 2014Member, Pennsylvania Assocation of Notaries

Page 179: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

2 CAW-1 1-3102

(1) I am Manager, Regulatory Compliance, in Nuclear Services, Westinghouse Electric

Company LLC (Westinghouse), and as such, I have been specifically delegated the function of

reviewing the proprietary information sought to be withheld from public disclosure in connection

with nuclear power plant licensing and rule making proceedings, and am authorized to apply for

its withholding on behalf of Westinghouse.

(2) I am making this Affidavit in conformance with the provisions of 10 CFR Section 2.390 of the

Commission's regulations and in conjunction with the Westinghouse Application for Withholding

Proprietary Information from Public Disclosure accompanying this Affidavit.

(3) 1 have personal knowledge of the criteria and procedures utilized by Westinghouse in designating

information as a trade secret, privileged or as confidential commercial or financial information.

(4) Pursuant to the provisions of paragraph (b)(4) of Section 2.390 of the Commission's regulations,

the following is furnished for consideration by the Commission in determining whether the

information sought to be withheld from public disclosure should be withheld.

(i) The information sought to be withheld from public disclosure is owned and has been held

in confidence by Westinghouse.

(ii) The information is of a type customarily held in confidence by Westinghouse and not

customarily disclosed to the public. Westinghouse has a rational basis for determining

the types of information customarily held in confidence by it and, in that connection,

utilizes a system to determine when and whether to hold certain types of information in

confidence. The application of that system and the substance of that system constitutes

Westinghouse policy and provides the rational basis required

Under that system, information is held in confidence if it falls in one or more of several

types, the release of which might result in the loss of an existing or potential competitive

advantage, as follows:

(a) The information reveals the distinguishing aspects of a process (or component,

structure, tool, method, etc.) where prevention of its use by any of

Page 180: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

3 CAW-1 1-3102

Westinghouse's competitors without license from Westinghouse constitutes a

competitive economic advantage over other companies.

(b) It consists of supporting data, including test data, relative to a process (or

component, structure, tool, method, etc.), the application of which data secures a

competitive economic advantage, e.g., by optimization or improved

marketability.

(c) Its use by a competitor would reduce his expenditure of resources or improve his

competitive position in the design, manufacture, shipment, installation, assurance

of quality, or licensing a similar product.

(d) It reveals cost or price information, production capacities, budget levels, or

commercial strategies of Westinghouse, its customers or suppliers.

(e) It reveals aspects of past, present, or future Westinghouse or customer funded

development plans and programs of potential commercial value to Westinghouse.

(f) It contains patentable ideas, for which patent protection may be desirable.

There are sound policy reasons behind the Westinghouse system which include the

following:

(a). The use of such information by Westinghouse gives Westinghouse a competitive

advantage over its competitors. It is, therefore, withheld from disclosure to

protect the Westinghouse competitive position.

(b) It is information that is marketable in many ways. The extent to which such

information is available to competitors diminishes the Westinghouse ability to

sell products and services involving the use of the information.

(c) Use by our competitor would put Westinghouse at a competitive disadvantage by

reducing his expenditure of resources at our expense.

Page 181: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

4 CAW-1 1-3102

(d) Each component of proprietary information pertinent to a particular competitive

advantage is potentially as valuable as the total competitive advantage. If

competitors acquire components of proprietary information, any one component

may be the key to the entire puzzle, thereby depriving Westinghouse of a

competitive advantage.

(e) Unrestricted disclosure would jeopardize the position of prominence of

Westinghouse in the world market, and thereby give a market advantage to the

competition of those countries.

(f) The Westinghouse capacity to invest corporate assets in research and

development depends upon the success in obtaining and maintaining a

competitive advantage.

(iii) The information is being transmitted to the Commission in confidence and, under the

provisions of 10 CFR Section 2.390; it is to be received in confidence by the

Commission.

(iv) The information sought to be protected is not available in public sources or available

information has not been previously employed in the same original manner or method to

the best of our knowledge and belief.

(v) The proprietary information sought to be withheld in this submittal is that which is

appropriately marked in WNA-SD-00239-WBT-P, Rev. 4, "Nuclear Automation

Watts Bar Unit 2 NSSS Completion Program I&C Projects, Software Requirements,

Specification for the Post Accident Monitoring System" (Proprietary) dated

February 2011, for submittal to the Commission, being transmitted by Tennessee Valley

Authority, Watts Bar Unit 2 letter and Application for Withholding Proprietary

Information from Public Disclosure, to the Document Control Desk. The proprietary

information as submitted by Westinghouse is that associated with software requirements

for the Post Accident Monitoring System (PAMS) and may be used only for that purpose.

Page 182: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

5 CAW- 11-3102

This information is part of that which will enable Westinghouse to:

(a) Obtain NRC review of the Westinghouse Post Accident Monitoring System.

Further this information has substantial commercial value as follows:

(a) Westinghouse plans to sell the use of similar information to its customers for

purpose of licensing and implementing the Westinghouse Post Accident

Monitoring System.

(b) Its use by a competitor would improve their competitive position in the design

and licensing of a similar product.

(c) The information requested to be withheld reveals the distinguishing aspects of a

methodology which was developed by Westinghouse.

Public disclosure of this proprietary information is likely to cause substantial harm to the

competitive position of Westinghouse because it would enhance the ability of

competitors to provide similar specifications and licensing defense services for

commercial power reactors without commensurate expenses. Also, public disclosure of

the information would enable others to use the information to meet NRC requirements for

licensing documentation without purchasing the right to use the information.

The development of the technology described in part by the information is the result of

applying the results of many years of experience in an intensive Westinghouse effort and

the expenditure of a considerable sum of money.

In order for competitors of Westinghouse to duplicate this information, similar technical

programs would have to be performed and a significant manpower effort, having the

requisite talent and experience, would have to be expended.

Further the deponent sayeth not.

Page 183: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

PROPRIETARY INFORMATION NOTICE

Transmitted herewith are proprietary and/or non-proprietary versions of documents furnished to the NRCin connection with requests for generic and/or plant-specific review and approval.

In order to conform to the requirements of 10 CFR 2.390 of the Commission's regulations concerning theprotection of proprietary information so submitted to the NRC, the information which is proprietary in theproprietary versions is contained within brackets, and where the proprietary information has been deletedin the non-proprietary versions, only the brackets remain (the information that was contained within thebrackets in the proprietary versions having been deleted). The justification for claiming the informationso designated as proprietary is indicated in both versions by means of lower case letters (a) through (f)located as a superscript immediately following the brackets enclosing each item of information beingidentified as proprietary or in the margin opposite such information. These lower case letters refer to thetypes of information Westinghouse customarily holds in confidence identified in Sections (4)(ii)(a)through (4)(ii)(f) of the affidavit accompanying this transmittal pursuant to 10 CFR 2.390(b)(1).

COPYRIGHT NOTICE

The reports transmitted herewith each bear a Westinghouse copyright notice. The NRC is permitted tomake the number of copies of the information contained in these reports which are necessary for itsinternal use in connection with generic and plant-specific reviews and approvals as well as the issuance,denial, amendment, transfer, renewal, modification, suspension, revocation, or violation of a license,permit, order, or regulation subject to the requirements of 10 CFR 2.390 regarding restrictions on publicdisclosure to the extent such information has been identified as proprietary by Westinghouse, copyrightprotection notwithstanding. With respect to the non-proprietary versions of these reports, the NRC ispermitted to make the number of copies beyond those necessary for its internal use which are necessary inorder to have one copy available for public viewing in the appropriate docket files in the public documentroom in Washington, DC and in local public document rooms as may be required by NRC regulations ifthe number of copies submitted is insufficient for this purpose. Copies made by the NRC must includethe copyright notice in all instances and the proprietary notice if the original was identified as proprietary.

Page 184: TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse … · 2012-12-04 · TVA Letter Dated February 25, 2011 Attachment 16 Westinghouse Electric Company WNA-SD-00239-WBT-NP,

Tennessee Valley Authority

Letter for Transmittal to the NRC

The following paragraphs should be included in your letter to the NRC:

Enclosed are:

1. _ copies of WNA-SD-00239-WBT-P, Rev. 4, "Nuclear Automation Watts Bar Unit 2 NSSSCompletion Program I&C Projects, Software Requirements Specification for the Post AccidentMonitoring System" (Proprietary)

2. _ copies of WNA-SD-00239-WBT-NP, Rev. 4, "Nuclear Automation Watts Bar Unit 2 NSSSCompletion Program I&C Projects, Software Requirements Specification for the Post AccidentMonitoring System" (Non-Proprietary)

Also enclosed is the Westinghouse Application for Withholding Proprietary Information from PublicDisclosure CAW- 11-3102, accompanying Affidavit, Proprietary Information Notice, and CopyrightNotice.

As Item 1 contains information proprietary to Westinghouse Electric Company LLC, it is supported by anaffidavit signed by Westinghouse, the owner of the information. The affidavit sets forth the basis onwhich the information may be withheld from public disclosure by the Commission and addresses withspecificity the considerations listed in paragraph (b)(4) of Section 2.390 of the Commission's regulations.

Accordingly, it is respectfully requested that the information which is proprietary to Westinghouse bewithheld from public disclosure in accordance with 10 CFR Section 2.390 of the Commission'sregulations.

Correspondence with respect to the copyright or proprietary aspects of the items listed above or thesupporting Westinghouse affidavit should reference CAW- 11-3102 and should be addressed toJ. A. Gresham, Manager, Regulatory Compliance, Westinghouse Electric Company LLC, Suite 428,1000 Westinghouse Drive, Cranberry Township, Pennsylvania 16066.