Study & Development of Vanadium Redox FlowBattery
Presented byRajkumar S Tondare
1RV14MPD32
Internal Guide External GuideProf. Dr. Nanjundaradhya N V Mr. Nalin KanshalDept. of Mechanical Engg. Director (Business Development)RVCE, Bangalore Elpro Energy Dimensions Pvt. Ltd.
VISVESVARAYA TECHNOLOGICAL UNIVERSITY, BELAGAVIDepartment of Mechanical Engineering
R V College of Engineering
Study & Development of Vanadium Redox FlowBattery
Presented byRajkumar S Tondare
1RV14MPD32
Internal Guide External GuideProf. Dr. Nanjundaradhya N V Mr. Nalin KanshalDept. of Mechanical Engg. Director (Business Development)RVCE, Bangalore Elpro Energy Dimensions Pvt. Ltd.
Study & Development of Vanadium Redox FlowBattery
Presented byRajkumar S Tondare
1RV14MPD32
Internal Guide External GuideProf. Dr. Nanjundaradhya N V Mr. Nalin KanshalDept. of Mechanical Engg. Director (Business Development)RVCE, Bangalore Elpro Energy Dimensions Pvt. Ltd.
under the guidance of
December 20, 2015 1
Contents
About Company
About Departments
Task Performed
Relative Outcomes
About Company
About Departments
Task Performed
Relative Outcomes
December 20, 2015 2
Company Profile
VISION:To Promote environmentally sustainable living by
providing leading edge energy solutions to put up withimminent challenges in energy sector.
MISSION:Endeavors to sustain the “top-tier” position in giving
energy solutions to accomplish total customer satisfaction andlast but not the least to attain pinnacle niche in global market.
VISION:To Promote environmentally sustainable living by
providing leading edge energy solutions to put up withimminent challenges in energy sector.
MISSION:Endeavors to sustain the “top-tier” position in giving
energy solutions to accomplish total customer satisfaction andlast but not the least to attain pinnacle niche in global market.
VISION:To Promote environmentally sustainable living by
providing leading edge energy solutions to put up withimminent challenges in energy sector.
MISSION:Endeavors to sustain the “top-tier” position in giving
energy solutions to accomplish total customer satisfaction andlast but not the least to attain pinnacle niche in global market.
December 20, 2015 3
Elpro is one of the largest and oldest energy efficient companyfor past 16years
We provide comprehensive technical information about energysolutions to improve their processes, conserve energy andincrease their competitiveness
We are an entrenched “Energy Center” under a scheme ofIREDA-Indian Renewable Energy Development Agency underthe Ministry of New and Renewable Energy (MNRE)
Elpro is one of the largest and oldest energy efficient companyfor past 16years
We provide comprehensive technical information about energysolutions to improve their processes, conserve energy andincrease their competitiveness
We are an entrenched “Energy Center” under a scheme ofIREDA-Indian Renewable Energy Development Agency underthe Ministry of New and Renewable Energy (MNRE)
Elpro Energy Dimensions Pvt.Ltd- Your energy and water resource specialist
Awarded Best Energy ServiceCompany for the year 2004 –
05 by PCRA
Selected by World Bank under the carbonassist program for implementing a
model project
Awarded Best Energy ServiceCompany for the year 2004 –
05 by PCRA
Winner of President award forETRAC’s
Elpro Energy Dimensions Pvt.Ltd- Your energy and water resource specialist
Selected by World Bank under the carbonassist program for implementing a
model project
Selected by World bank and UNEP for a 3-countrycross exchange of ESCO’s in China
1st company to have a complete full fledged R & D centre doing cuttingedge research in energy conservation and energy efficiency.
BEE EmpanelmentOil and GasConservation Award National Award by Dr. A.P.J Abdul
Kalam
Elpro Energy Dimensions Pvt.Ltd- Your energy and water resource specialist
Best Practice AwardPCRA Award
Central PowerResearchInstitute(CPRI) Bureau of Energy
Efficiency(BEE), Ministryof power, Government ofIndia
ElectricalInspectorate, Govt. ofKarnataka
Bureau of EnergyEfficiency(BEE), Ministryof power, Government ofIndia
PetroleumConservation ResearchAssociation
Energy EfficiencyServices Ltd
Electrical Inspectorate,Govt. of Gujarat
Elpro Energy Dimensions Pvt.Ltd- Your energy and water resource specialist
Electrical Inspectorate,Govt. of Kerala
ElectricalInspectorate, Govt. ofKarnataka
Power FinanceCorporation
Elpro Energy Dimensions Pvt.Ltd- Your energy and water resource specialist
Global Footprints....
USA
IndiaQatarDubai
December 20, 2015 9
Major focus in India
Andhra Pradesh
Karnataka
Gujarat
Madhya Pradesh
Maharashtra
Tamil Nadu
Andhra Pradesh
Karnataka
Gujarat
Madhya Pradesh
Maharashtra
Tamil Nadu
Andhra Pradesh
Karnataka
Gujarat
Madhya Pradesh
Maharashtra
Tamil Nadu
December 20, 2015 10
Products
1. ETRACS (Energy Tracking and Control System).2. ECO-START –REMOTE PUMP STARTER.3. ECO- SMART ENERGY SAVER.4. ECO-TIME SWITCH.5. ECO-LOAD CONTROLLER.6. ECO-AC ENERGY SAVER.7. ECO-LITECON ENERGY SAVER.8. T8 LED TUBELIGHT9. ECO-SOLAR SWITCH.10. SOLAR PV Based Streetlight
1. ETRACS (Energy Tracking and Control System).2. ECO-START –REMOTE PUMP STARTER.3. ECO- SMART ENERGY SAVER.4. ECO-TIME SWITCH.5. ECO-LOAD CONTROLLER.6. ECO-AC ENERGY SAVER.7. ECO-LITECON ENERGY SAVER.8. T8 LED TUBELIGHT9. ECO-SOLAR SWITCH.10. SOLAR PV Based Streetlight
1. ETRACS (Energy Tracking and Control System).2. ECO-START –REMOTE PUMP STARTER.3. ECO- SMART ENERGY SAVER.4. ECO-TIME SWITCH.5. ECO-LOAD CONTROLLER.6. ECO-AC ENERGY SAVER.7. ECO-LITECON ENERGY SAVER.8. T8 LED TUBELIGHT9. ECO-SOLAR SWITCH.10. SOLAR PV Based Streetlight
December 20, 2015 11
Services
Energy audits.
Process audits
Waste minimization audits
Power quality audits
Electricity Metering and consumer Indexing
Electrical Safety Audits
Energy audits.
Process audits
Waste minimization audits
Power quality audits
Electricity Metering and consumer Indexing
Electrical Safety Audits
Energy audits.
Process audits
Waste minimization audits
Power quality audits
Electricity Metering and consumer Indexing
Electrical Safety Audits
December 20, 2015 12
Key services & Projects
ETrACS (Energy Tracking and Control System)
Computer based monitoring system
Uses wireless communication systems for monitoring(GSM/CDMA)
Monitors day to day transactions (switching ON/OFF)
Prepares a report on energy usage
Helps greatly in cutting down ENERGY WASTAGE &POWER BILLS
used for remote tracking, monitoring & operation of streetlights in a city.
ETrACS (Energy Tracking and Control System)
Computer based monitoring system
Uses wireless communication systems for monitoring(GSM/CDMA)
Monitors day to day transactions (switching ON/OFF)
Prepares a report on energy usage
Helps greatly in cutting down ENERGY WASTAGE &POWER BILLS
used for remote tracking, monitoring & operation of streetlights in a city.
ETrACS (Energy Tracking and Control System)
Computer based monitoring system
Uses wireless communication systems for monitoring(GSM/CDMA)
Monitors day to day transactions (switching ON/OFF)
Prepares a report on energy usage
Helps greatly in cutting down ENERGY WASTAGE &POWER BILLS
used for remote tracking, monitoring & operation of streetlights in a city.
December 20, 2015 13
Functional Departments
Production Department
Finance Department
Sales & Marketing Department
Human Resource Department
Research & Development Department
Production Department
Finance Department
Sales & Marketing Department
Human Resource Department
Research & Development Department
Production Department
Finance Department
Sales & Marketing Department
Human Resource Department
Research & Development Department
December 20, 2015 14
Production Department
The production department is responsible for converting inputs into outputsthrough the stages of production processes.
There are three production sub-functions:
1. Production and planningThey will set the standards and targets at each stage of the production process.The quantity and quality of products coming off a production line will beclosely monitored.
2. PurchasingThis department will provide the materials, components and equipmentrequired. An essential part of this responsibility is to ensure that stocks arriveon time and are of good quality
3. The design and technical support departmentThey are responsible for the design and testing of new product processes andproduct types, together with the development of prototypes through to the finalproduct.
The production department is responsible for converting inputs into outputsthrough the stages of production processes.
There are three production sub-functions:
1. Production and planningThey will set the standards and targets at each stage of the production process.The quantity and quality of products coming off a production line will beclosely monitored.
2. PurchasingThis department will provide the materials, components and equipmentrequired. An essential part of this responsibility is to ensure that stocks arriveon time and are of good quality
3. The design and technical support departmentThey are responsible for the design and testing of new product processes andproduct types, together with the development of prototypes through to the finalproduct.
The production department is responsible for converting inputs into outputsthrough the stages of production processes.
There are three production sub-functions:
1. Production and planningThey will set the standards and targets at each stage of the production process.The quantity and quality of products coming off a production line will beclosely monitored.
2. PurchasingThis department will provide the materials, components and equipmentrequired. An essential part of this responsibility is to ensure that stocks arriveon time and are of good quality
3. The design and technical support departmentThey are responsible for the design and testing of new product processes andproduct types, together with the development of prototypes through to the finalproduct.
December 20, 2015 15
Finance Department
1. The finance department records the financial transactions of abusiness and helps it plan for the future financially.
2. Finance department takes care of the financial transactionssuch as Annual expenditure over employee salaries, stationaryexpenses, material procurement, all taxes etc.
3. The department is responsible for preparing the Annual reportby the audit and declare the annual turnover.
Annual turnover of Elpro for the financial year 2013-2014 isup to US$ 30 Million (or up to Rs. 18Crore Approx.)
1. The finance department records the financial transactions of abusiness and helps it plan for the future financially.
2. Finance department takes care of the financial transactionssuch as Annual expenditure over employee salaries, stationaryexpenses, material procurement, all taxes etc.
3. The department is responsible for preparing the Annual reportby the audit and declare the annual turnover.
Annual turnover of Elpro for the financial year 2013-2014 isup to US$ 30 Million (or up to Rs. 18Crore Approx.)
1. The finance department records the financial transactions of abusiness and helps it plan for the future financially.
2. Finance department takes care of the financial transactionssuch as Annual expenditure over employee salaries, stationaryexpenses, material procurement, all taxes etc.
3. The department is responsible for preparing the Annual reportby the audit and declare the annual turnover.
Annual turnover of Elpro for the financial year 2013-2014 isup to US$ 30 Million (or up to Rs. 18Crore Approx.)
December 20, 2015 16
Sales & Marketing Department
At Elpro Sales & Marketing department is very active and hasmany marketing branches across the country.
Sales & marketing personnel's are BBA, MBA which are alsohaving technically sound knowledge of all the products.
Marketing strategy at Elpro is done by direct contact to the clientsor through emails.
Department is also responsible for arranging the exhibitions,conferences etc.
At Elpro Sales & Marketing department is very active and hasmany marketing branches across the country.
Sales & marketing personnel's are BBA, MBA which are alsohaving technically sound knowledge of all the products.
Marketing strategy at Elpro is done by direct contact to the clientsor through emails.
Department is also responsible for arranging the exhibitions,conferences etc.
At Elpro Sales & Marketing department is very active and hasmany marketing branches across the country.
Sales & marketing personnel's are BBA, MBA which are alsohaving technically sound knowledge of all the products.
Marketing strategy at Elpro is done by direct contact to the clientsor through emails.
Department is also responsible for arranging the exhibitions,conferences etc.
December 20, 2015 17
Sales & Marketing Department
Main focus of the department is on following four key areas :
Obtaining new major clients
Keeping existing clients
Introducing new technologies and services in solar products
Continuing to develop the Elpro brand.
Main focus of the department is on following four key areas :
Obtaining new major clients
Keeping existing clients
Introducing new technologies and services in solar products
Continuing to develop the Elpro brand.
Main focus of the department is on following four key areas :
Obtaining new major clients
Keeping existing clients
Introducing new technologies and services in solar products
Continuing to develop the Elpro brand.
December 20, 2015 18
H R Department
1. HR department or Administrative department is responsible for managing
the workforce of the organisation.
2. HR department takes care of all employees right from their recruitment to
retirement.
3. HR department schedule the interviews as well as management meetings.
4. Prepares the annual calendar for holidays, office timings, rules and
regulations at the premises etc.
5. As per the requirement HR department arranges the training program for the
employee as well as takes care of the code of conduct and confidentiality of
the organisations research work.
1. HR department or Administrative department is responsible for managing
the workforce of the organisation.
2. HR department takes care of all employees right from their recruitment to
retirement.
3. HR department schedule the interviews as well as management meetings.
4. Prepares the annual calendar for holidays, office timings, rules and
regulations at the premises etc.
5. As per the requirement HR department arranges the training program for the
employee as well as takes care of the code of conduct and confidentiality of
the organisations research work.
1. HR department or Administrative department is responsible for managing
the workforce of the organisation.
2. HR department takes care of all employees right from their recruitment to
retirement.
3. HR department schedule the interviews as well as management meetings.
4. Prepares the annual calendar for holidays, office timings, rules and
regulations at the premises etc.
5. As per the requirement HR department arranges the training program for the
employee as well as takes care of the code of conduct and confidentiality of
the organisations research work.
December 20, 2015 19
R & D Department
1. As Elpro is mainly small R & D organisation, this department isvery active.
2. A company's research and development department plays anintegral role in the life cycle of a product.
3. A thorough understanding of the functions of the research anddevelopment department allows you to maximize those dutiesat your small business, even if you don't have a bigdepartment.
1. As Elpro is mainly small R & D organisation, this department isvery active.
2. A company's research and development department plays anintegral role in the life cycle of a product.
3. A thorough understanding of the functions of the research anddevelopment department allows you to maximize those dutiesat your small business, even if you don't have a bigdepartment.
1. As Elpro is mainly small R & D organisation, this department isvery active.
2. A company's research and development department plays anintegral role in the life cycle of a product.
3. A thorough understanding of the functions of the research anddevelopment department allows you to maximize those dutiesat your small business, even if you don't have a bigdepartment.
December 20, 2015 20
Functionality of R&D Department
1. New Product Research
2. New Product Development
3. Existing Product Updates
4. Quality Checks
5. Innovation
1. New Product Research
2. New Product Development
3. Existing Product Updates
4. Quality Checks
5. Innovation
1. New Product Research
2. New Product Development
3. Existing Product Updates
4. Quality Checks
5. Innovation
December 20, 2015 21
Ongoing Projects
1. Automatic Meter Reading System
2. Building Management System
3. Fuel Cell Product Unit and Development
4. Membrane Coating Machine
5. Development of Vanadium Redox Flow Battery
6. Programmable DC Load
7. Development of Heat Pump
8. Outdoor Static LED Display System
9. 24-W Universal Off-Line Fly back Converter x Flow Battery
1. Automatic Meter Reading System
2. Building Management System
3. Fuel Cell Product Unit and Development
4. Membrane Coating Machine
5. Development of Vanadium Redox Flow Battery
6. Programmable DC Load
7. Development of Heat Pump
8. Outdoor Static LED Display System
9. 24-W Universal Off-Line Fly back Converter x Flow Battery
1. Automatic Meter Reading System
2. Building Management System
3. Fuel Cell Product Unit and Development
4. Membrane Coating Machine
5. Development of Vanadium Redox Flow Battery
6. Programmable DC Load
7. Development of Heat Pump
8. Outdoor Static LED Display System
9. 24-W Universal Off-Line Fly back Converter x Flow Battery
December 20, 2015 22
Design & Development of Vanadium RedoxFlow Battery
December 20, 2015 23
Objectives
To design and development of Vanadium Redox Flow
battery for 1kW.
To design and development of Vanadium Redox Flow
battery for 1kW.
December 20, 2015 24
Weekly task performed
Sl.No.
Weeks >Task Planned
1-2 3-5 6-9 10-16 16-20
1 Project background and objective ofproject
Preparation of PERT chart.
Project background and objective ofproject
Preparation of PERT chart.2 Research on existing technology.Comparative analysis of existing systemin market.
3 Study of individual components in cellstack.
Contacting the supplier aboutcomponents.
Collecting technical data, price list andcomparing it.
Study of individual components in cellstack.
Contacting the supplier aboutcomponents.
Collecting technical data, price list andcomparing it.
5 Procurement of different components.
December 20, 2015 25
Comparison of Energy Storage Systems
Typical Power Typical Energy Typicaldurationdischarge
Maturity
Batteries (lead-acid)
kW – 500 kW MWh – 100 MWh 1 h – 8 h MatureBatteries (lead-acid)
Flywheels 500 kW – 1 MW 100 kWh – 100MWh
< 5 minutes Mature
Pumped hydro 100 MW –4000MW
500 MW - 15 GWh 4 – 12 h Mature
CAES 25 MW – 3000MW
200 MWh - 10GWh
1 – 20 hours Developed, first generationdemonstrated
NaS 1 MW 1 MWh 1 hour Developed & commerciallyavailableDeveloped & commerciallyavailable
SMES 10 kW – 10 MW 10 kWh – 1 MWh 1 – 30 minutes Developed, not commercialYET
Super capacitors < 250 kW 10 kWh < 1 minute Developed
Flow batteries 100 kW – 10 MW 1 – 100 MWh 10 hours Developed, stage ofdemonstration projects
December 20, 2015 26
Background
Is a energy storage technology.Can be designed for high power and long storage duration.The battery is charged and discharged by reversible chemical reaction
between the liquid electrolyte.The development of flow battery had reached demonstration project in
India, there is no manufacturing unit.
Is a energy storage technology.Can be designed for high power and long storage duration.The battery is charged and discharged by reversible chemical reaction
between the liquid electrolyte.The development of flow battery had reached demonstration project in
India, there is no manufacturing unit.
December 20, 2015 27
Characteristics ofFlow Batteries
High power.
Long duration.
The system is re-fillable, electrolytes can be replaced easily.
Most redox reactions are very rapid (fast reaction kinetics), which
makes the reaction time very short about 1/1000 s.
The full-cycle efficiency of the battery is relatively low (75% - 80%),
due to the energy needed to circulate the electrolyte and losses due to
chemical reactions, e.g. forming of hydrogen.
The system does not have any self-discharge, as the electrolytes cannot
react when they are stored separately
High power.
Long duration.
The system is re-fillable, electrolytes can be replaced easily.
Most redox reactions are very rapid (fast reaction kinetics), which
makes the reaction time very short about 1/1000 s.
The full-cycle efficiency of the battery is relatively low (75% - 80%),
due to the energy needed to circulate the electrolyte and losses due to
chemical reactions, e.g. forming of hydrogen.
The system does not have any self-discharge, as the electrolytes cannot
react when they are stored separately
High power.
Long duration.
The system is re-fillable, electrolytes can be replaced easily.
Most redox reactions are very rapid (fast reaction kinetics), which
makes the reaction time very short about 1/1000 s.
The full-cycle efficiency of the battery is relatively low (75% - 80%),
due to the energy needed to circulate the electrolyte and losses due to
chemical reactions, e.g. forming of hydrogen.
The system does not have any self-discharge, as the electrolytes cannot
react when they are stored separately
December 20, 2015 28
FLOW BATTERIES
REDOXFLOW
BATTERIESHYBRIDTypes of Flow
Batteries
December 20, 2015 29
About Vanadium redoxflow battery
First patent of VRFB by Maria Skyllas- Kazacos andcoworkers in 1986 at University of New South Wales inAustralia
Each cell of VRFB consists of 2 half cell separated bymembrane.
Vanadium exist in 4 different oxidation states so in both thetank same chemical species can be used.
First patent of VRFB by Maria Skyllas- Kazacos andcoworkers in 1986 at University of New South Wales inAustralia
Each cell of VRFB consists of 2 half cell separated bymembrane.
Vanadium exist in 4 different oxidation states so in both thetank same chemical species can be used.
First patent of VRFB by Maria Skyllas- Kazacos andcoworkers in 1986 at University of New South Wales inAustralia
Each cell of VRFB consists of 2 half cell separated bymembrane.
Vanadium exist in 4 different oxidation states so in both thetank same chemical species can be used.
December 20, 2015 30
Common Oxidation states of Vanadium
The common oxidation states of vanadium are +2 ,+3,+4and+5.
Colour of Vanadium in different oxidation states:
+2: Lilac/Violet
+3: Green
+4: Blue
+5: Yellow
Isotopes of Vanadium:48V 49V 50V 51V
The common oxidation states of vanadium are +2 ,+3,+4and+5.
Colour of Vanadium in different oxidation states:
+2: Lilac/Violet
+3: Green
+4: Blue
+5: Yellow
Isotopes of Vanadium:48V 49V 50V 51V
The common oxidation states of vanadium are +2 ,+3,+4and+5.
Colour of Vanadium in different oxidation states:
+2: Lilac/Violet
+3: Green
+4: Blue
+5: Yellow
Isotopes of Vanadium:48V 49V 50V 51V
December 20, 2015 31
Operation
The electrolyte is prepared by dissolving vanadium pent-oxide(V2O5) in sulphuric acid (H2SO4).
The Negative half cells of electrolyte contains only V2+ and V3+
ions and the positive half-cell electrolyte contains onlyVO2+(V4+) and VO2
+(V5+) ions.
Both the electrolyte solution are stored separately in storage tankand pump is used to circulate through cell.
The reaction take place on graphite felt electrode and electronsare transferred to other cell.
The electrolyte is prepared by dissolving vanadium pent-oxide(V2O5) in sulphuric acid (H2SO4).
The Negative half cells of electrolyte contains only V2+ and V3+
ions and the positive half-cell electrolyte contains onlyVO2+(V4+) and VO2
+(V5+) ions.
Both the electrolyte solution are stored separately in storage tankand pump is used to circulate through cell.
The reaction take place on graphite felt electrode and electronsare transferred to other cell.
The electrolyte is prepared by dissolving vanadium pent-oxide(V2O5) in sulphuric acid (H2SO4).
The Negative half cells of electrolyte contains only V2+ and V3+
ions and the positive half-cell electrolyte contains onlyVO2+(V4+) and VO2
+(V5+) ions.
Both the electrolyte solution are stored separately in storage tankand pump is used to circulate through cell.
The reaction take place on graphite felt electrode and electronsare transferred to other cell.
December 20, 2015 32
Cell reactions
December 20, 2015 33
Cell reactions
December 20, 2015 34
Components identified
Membrane- Nafion
Electrode – Graphite felt
Bipolar plate- Graphite.
Current collector – gold plated copper plate.
Tanks
Pump
End frame
Flow Frame
Membrane- Nafion
Electrode – Graphite felt
Bipolar plate- Graphite.
Current collector – gold plated copper plate.
Tanks
Pump
End frame
Flow Frame
Membrane- Nafion
Electrode – Graphite felt
Bipolar plate- Graphite.
Current collector – gold plated copper plate.
Tanks
Pump
End frame
Flow Frame
December 20, 2015 35
3D Modelling
End PlateCurrent Collector
Membrane
End Plate
December 20, 2015 36
Bipolar Plate
Flow Frame
Felt Electrode
Market Survey
SL.NO COMPANY DESCRIPTION PRICESL.NO COMPANY DESCRIPTION PRICE
1. GEFC, China 2.5 KW X 6 hr INR 1625000
2. Big Power,China
1 KW X 6 hr INR 1000000Big Power,China
December 20, 2015 37
Applications
It is mainly used in Power stations for storing electricity It can used for storing the renewable energy It can be used to reduce the cost of power bill in industries It is eco friendly replacement to conventional storage media, as
they do not release toxic gases during operations
It is mainly used in Power stations for storing electricity It can used for storing the renewable energy It can be used to reduce the cost of power bill in industries It is eco friendly replacement to conventional storage media, as
they do not release toxic gases during operations
December 20, 2015 38
Technical problems in design
Electrolyte starts precipitating.
Corrosion of bipolar plate.
Puncture of membrane.
Leakage through the cell.
Losses.
Electrolyte starts precipitating.
Corrosion of bipolar plate.
Puncture of membrane.
Leakage through the cell.
Losses.
December 20, 2015 39
Relative Outcomes
TECHNICAL OUTCOMES:Project planning.Knowledge about emerging technologies in energy sector.Technical report writing.NON-TECHNICAL OUTCOMES:Sending enquiriesReceiving quotations from vendors.Preparation of comparative statement based on
technical and financial aspects.Oral communication with suppliers.Meeting etiquettes.Corporate social responsibilities.Communication with other department.
TECHNICAL OUTCOMES:Project planning.Knowledge about emerging technologies in energy sector.Technical report writing.NON-TECHNICAL OUTCOMES:Sending enquiriesReceiving quotations from vendors.Preparation of comparative statement based on
technical and financial aspects.Oral communication with suppliers.Meeting etiquettes.Corporate social responsibilities.Communication with other department.
TECHNICAL OUTCOMES:Project planning.Knowledge about emerging technologies in energy sector.Technical report writing.NON-TECHNICAL OUTCOMES:Sending enquiriesReceiving quotations from vendors.Preparation of comparative statement based on
technical and financial aspects.Oral communication with suppliers.Meeting etiquettes.Corporate social responsibilities.Communication with other department.
December 20, 2015 40
What I like to take back with me?
My Experience –
How to communicate in an organization
How to present myself in meetings
How to talk to clients
How to do the literature survey
How to look towards the financial aspect
How to prepare Brochure, DPR
My Experience –
How to communicate in an organization
How to present myself in meetings
How to talk to clients
How to do the literature survey
How to look towards the financial aspect
How to prepare Brochure, DPR
December 20, 2015 41
My Experience –
How to communicate in an organization
How to present myself in meetings
How to talk to clients
How to do the literature survey
How to look towards the financial aspect
How to prepare Brochure, DPR
Conclusion
Overall Internship is a wonderful experience. Also it aware me
about the new eco friendly technologies like -
Vanadium redox-flow battery is promising as an energy storage
technology. I believe it would not take too long to overcome the
limits and realize the commercialization of this technology.
Overall Internship is a wonderful experience. Also it aware me
about the new eco friendly technologies like -
Vanadium redox-flow battery is promising as an energy storage
technology. I believe it would not take too long to overcome the
limits and realize the commercialization of this technology.
Overall Internship is a wonderful experience. Also it aware me
about the new eco friendly technologies like -
Vanadium redox-flow battery is promising as an energy storage
technology. I believe it would not take too long to overcome the
limits and realize the commercialization of this technology.
December 20, 2015 42
Thank You !!!