Post on 05-Jul-2020
transcript
Agenda and General Informa/on IEEE 802.3 Gigabit Ethernet over Plas/c Op/cal Fiber
Study Group
Robert M. Grow RMG Consul/ng Norfolk, VA, USA 12 May 2014
IEEE 802 GEPOF Study Group, May 2014, Norfolk, VA, USA 1
Agenda • Welcome and Introduc/ons • Appointment of Recording Secretary • Approve Agenda • Confirma/on of SG Chair (/ming per availability of WG Chair)
• General Informa/on • Liaisons and Communica/ons • Presenta/ons • Mo/ons • Next mee/ng • Adjourn
IEEE 802 GEPOF Study Group, May 2014, Norfolk, VA, USA 2
Study Group decorum
IEEE 802 GEPOF Study Group, May 2014, Norfolk, VA, USA 3
%
• Press (i.e., anyone repor/ng publicly on this mee/ng) are to announce their presence
(December 2013 IEEE-‐SA Standards Board Ops Manual 5.3.3.5) • Photography or recording by permission only (December 2013 IEEE-‐SA Standards
Board Ops Manual 5.3.3.4) • Cell phone ringers off • Wear your badges at all /mes in mee/ng areas
– Help the hotel security staff improve the general security of the mee/ng rooms – PCs HAVE BEEN STOLEN at previous mee/ngs – DO NOT assume that mee/ng areas are secure
• Please observe proper decorum in mee/ngs
Goals for the mee/ng • Presenta/ons
– Why do a GEPOF project – Market and technical requirements for GEPOF – Is a GEPOF PHY feasible
• Work on project objec/ves • Work on and possibly approve project documents for submission to IEEE 802 – PAR – CSD (including 5 Criteria)
IEEE 802 GEPOF Study Group, May 2014, Norfolk, VA, USA 4
Reflector and web • To subscribe to the GEPOF reflector, send an email to:
ListServ@ieee.org with the following in the body of the message (do not include “<>”): subscribe stds-‐802-‐3-‐GEPOF <yourfirstname> <yourlastname> end
• Send GEPOF reflector messages to: stds-‐802-‐3-‐GEPOF@listserv.ieee.org
• Study Group web page URL: hEp://www.ieee802.org/3/GEPOFSG/index.html
IEEE 802 GEPOF Study Group, May 2014, Norfolk, VA, USA 5
Ground rules • Follow governing rules
– Procedures use Robert’s Rules of Order as a guide – Anyone in the room may speak – Anyone in the room may vote
• RESPECT… give it, get it • NO product pitches • NO corporate pitches • NO prices!!!
– This includes costs, ASPs, etc. no majer what the currency
• NO restric/ve no/ces
IEEE 802 GEPOF Study Group, May 2014, Norfolk, VA, USA 6
IEEE-‐SA Structure
IEEE 802 GEPOF Study Group, May 2014, Norfolk, VA, USA 7
IEEE-‐SA Standards Board
IEEE 802 LMSC Sponsor Group
NesCom New Stds. Commijee
RevCom Review Commijee
IEEE 802.3 Working Group
IEEE 802.3 Study Group
Standards Process
Approval Process
Technical Activities
Standards Process
IEEE Standards Association
Important Bylaws and Rules • IEEE-‐SA OperaPons Manual
hSp://standards.ieee.org/develop/policies/sa_opman/
• IEEE-‐SA Standards Board Bylaws hSp://standards.ieee.org/develop/policies/bylaws/
• IEEE-‐SA Standards Board OperaPons Manual hSp://standards.ieee.org/develop/policies/opman/
• IEEE 802 LAN/MAN Standards CommiSee (LMSC) Policies and Procedures hSp://standards.ieee.org/about/sasb/audcom/pnp/LMSC.pdf
• IEEE 802 LAN/MAN Standards CommiSee (LMSC) OperaPons Manual hSp://www.ieee802.org/devdocs.shtml
• IEEE 802 LAN/MAN Standards CommiSee (LMSC) Working Group (WG) Policies and Procedures
hSp://www.ieee802.org/devdocs.shtml
• IEEE 802.3 Working Group OperaPng Rules hSp://ieee802.org/3/rules/P802_3_rules.pdf
IEEE 802 GEPOF Study Group, May 2014, Norfolk, VA, USA 8
25 Mar 2008
Guidelines for IEEE-SA Meetings All IEEE-SA standards meetings shall be conducted in compliance with all
applicable laws, including antitrust and competition laws. Don’t discuss the interpretation, validity, or essentiality of patents/patent claims. Don’t discuss specific license rates, terms, or conditions.
Relative costs, including licensing costs of essential patent claims, of different technical approaches may be discussed in standards development meetings.
Technical considerations remain primary focus
Don’t discuss or engage in the fixing of product prices, allocation of customers, or division of sales markets.
Don’t discuss the status or substance of ongoing or threatened litigation. Don’t be silent if inappropriate topics are discussed… do formally object.
--------------------------------------------------------------- If you have questions, contact the IEEE-SA Standards Board Patent Committee Administrator at
patcom@ieee.org or visit http://standards.ieee.org/about/sasb/patcom/index.html
See IEEE-SA Standards Board Operations Manual, clause 5.3.10 and “Promoting Competition and Innovation: What You Need to Know about the IEEE Standards Association's Antitrust and Competition Policy” for more
details.
This slide set is available at https://development.standards.ieee.org/myproject/Public/mytools/mob/slideset.ppt
Overview of IEEE 802.3 Standards Process (1/5)-‐ Study Group Phase
Yes
Idea
Call for Interest
802.3 Form
SG
802 EC Form
SG
Study Group Meetings
802.3 Approve
No
Yes
802 EC Approve
SASB Approve
Approved PAR
Yes Yes
Yes No
No
No
No
Draft PAR
Draft Objectives
Check Point
Check Point
Check Point
RIP
Check Point
Note: At "Check Point", either the activity is ended, or there may be various options that would allow reconsideration of the approval.
YOU ARE HERE
NesCom recommendation
Draft CSD (5 Criteria)
Approved Objectives
Approved CSD
Task Force Meetings
Proposals Selected
Task Force Review
TF Review Done
Yes
Yes
Objectives
Approved PAR
No
D1.0
D1.(n+1)
No
No
Yes
A
D2.0
Overview of IEEE 802.3 Standards Process (2/5) – Task Force Comment Phase
To 802.3 WG
Ballot
802.3 WG BALLOT
Yes
Yes
No
D3.0
No
A
A
Yes
D2.(n+1)
Yes
B
A
No 802 EC
Forward to Sponsor Ballot
802.3 Forward to
Sponsor Ballot
No
TF Resolves Comments
Substantive Changes
> 75%
Yes
No
Overview of IEEE 802.3 Standards Process (3/5) – Working Group Ballot Phase
Notes: At "Check Point", either the activity is ended, or there may be various options that would allow reconsideration of the approval.
See 802.3 Operating Rules 7.1.4 and listed references for complete description
In Scope New
Negatives
Check Point
B
LMSC Sponsor BALLOT
Yes
Yes
No
No
B
Yes
D3.(n+1)
Yes
C
B
No 802 EC Forward to
RevCom
802.3 Forward to
RevCom
No
TF Resolves Comments
Substantive Changes
> 75%
Yes
No
Overview of IEEE 802.3 Standards Process (4/5)-‐ Sponsor Ballot Phase
Notes: At "Check Point", either the activity is ended, or there may be various options that would allow reconsideration of the approval.
See 802.3 Operating Rules 7.1.5 and listed references for complete description
In Scope New
Negatives
Check Point
Standard
Publication Preparation
Approved Draft
Notes: At "Check Point", either the activity is ended, or there may be various options that would allow resubmission for approval.
Overview of IEEE 802.3 Standards Process (5/5) – Final Approvals / Standard Release
RevCom Review
SASB Approval
No
Yes
Check Point
C
RevCom recommendation
Study Group • Normal func/on is to dral a complete PAR and and Criteria For Standards
Development (CSD) which includes the Five Criteria responses • Op/onally provide a plenary week tutorial to the LMSC • Gain project approval at the IEEE 802.3 WG, IEEE 802 EC, IEEE-‐SA NesCom
and IEEE-‐SA Standards Board. • SG only exists for 6 months
– Extensions can be requested – Voted on by IEEE 802.3 – Ra/fied by IEEE 802 EC
• Development of Objec/ves helps set the goals for the Task Force • Consensus required to move forward
• Not a goal – choosing a solu/on!
IEEE 802 GEPOF Study Group, May 2014, Norfolk, VA, USA 15
Charter of this study group
Authorize forma/on of a Study Group to develop a Project Authoriza/on Request (PAR) and Criteria for Standards Development (CSD) document for Gigabit Ethernet over Plas/c Op/cal Fibre.
IEEE 802 GEPOF Study Group, May 2014, Norfolk, VA, USA 16
Ajendance • Tutorial Material on ajendance tool
– hjp://ieee802.org/3/minutes/nov13/1113_imat.pdf
• Access details – URL: hjp://imat.ieee.org/ – (For interim) Password will be provided
IEEE 802 GEPOF Study Group, May 2014, Norfolk, VA, USA 18
Note: Password does not appear in version of slides posted on the public web site.
Monday
IEEE 802 GEPOF Study Group, May 2014, Norfolk, VA, USA 19
Time Presenter Employer/Affilia/on Title File Name 8:45 Study Group organiza/on 9:05 Bob Grow RMG Consul/ng / KDPOF Agenda and General Informa/on Agenda_GEPOF_1_0514 9:50 Shigeru Kobayashi TE Connec/vity GEPOF for Automo/ve / O-‐GEAR Kobayashi_GEPOF_1_0514 10:10 Break 10:30 Carlos Pardo KDPOF Home Networking Use Cases Pardo_GEPOF_2_0514 11:00 Carlos Pardo KDPOF Comparison of electrical and op/cal
transmission for Ethernet v. 1.0 Pardo_GEPOF_1_0514
12:00 Rubén Pérez-‐Aranda KDPOF Link Budget Requirements for Gigabit Ethernet over POF
Perez_GEPOF_1_0514
12:30 Lunch 13:45 Rubén Pérez-‐Aranda KDPOF Op/cal Transmijer Characteris/cs Perez_GEPOF_2_0514 14:15 Rubén Pérez-‐Aranda KDPOF Op/cal Receiver Characteris/cs Perez_GEPOF_3_0514 14:45 Naoshi Serizawa Yazaki Gigibit Ethernet for Automo/ve Industry Serizawa_GEPOF_01_0514
15:00 Lawrence Thorne Firecomms Market Study Observa/ons for Gigabit Ethernet over Plas/c Op/cal Fiber
Thorne_GEPOF_1_0514
15:25 Break 15:45 John Lambkin Firecomms IEEE 802.3 Gigabit Ethernet over Plas/c
Op/cal Fiber Lambkin_GEPOF_1_0514
15:45 Yoshihiro Tsukamoto Mitsubishi Plas/c Op/cal Fiber POF technology for Automo/ve, Home network systems
Tsukamoto_GEPOF_01_0514
16:05 Rubén Pérez-‐Aranda KDPOF Plas/c Op/cal Fiber Characteris/cs Perez_GEPOF_4_0514 16:35 Recess for the day
Tuesday
IEEE 802 GEPOF Study Group, May 2014, Norfolk, VA, USA 20
Time Presenter Employer/Affilia/on Title File Name 9:00 Rubén Pérez-‐Aranda KDPOF Shannon's Capacity Analysis of GEPOF Perez_GEPOF_5_0514 9:30 Bob Grow RMG Consul/ng/KDPOF Project Documents Overview Grow_GEPOF_2_0514 10:15 Break 10:35 Discussion, straw polls, mo/ons Criteria for Standards Development DralCSD_GEPOF_1_0514 12:05 Lunch 13:20 Project Authoriza/on Request PARfields_GEPOF_1_0514
DralPAR_GEPOF_1_0514 13:50 Carlos Pardo KDPOF Objec/ves Objec/ves_GEPOF_1_0514 14:50 Break 15:10 Objec/ves Objec/ves_GEPOF_1_0514 15:40 Closing business 15:50 Adjourn
Future mee/ngs • See: hjp://www.ieee802.org/3/interims/index.html
• July IEEE 802 Plenary – San Diego, CA, USA – Manchester Grand Hyaj – July 14-‐17 (GEPOF SG meets 15-‐17)
• September 802. 3 Interims – Kanata (near Ojawa), ON, Canada– Brookstreet Hotel – September 8-‐12 (GEPOF SG dates TBD)
• November IEEE 802 Plenary – San Antonio, TX, USA – Grand Hyaj San Antonio – November 3-‐6 (SG meets 4-‐6)
• Anyone interested in hos/ng an interim mee/ng contact me or the IEEE
802.3 Execu/ve Secretary Steve Carlson
IEEE 802 GEPOF Study Group, May 2014, Norfolk, VA, USA 21