Finance and administrative hub of Gujarat
-
.
1.45 million vehicles, growing at 7% per year
-
Bus trips 0.9 million per day
.
8/6/2019 Ahmedabad BRT - Janmarg Update 01 2009
2/23
8/6/2019 Ahmedabad BRT - Janmarg Update 01 2009
3/23
Chandkheda
JANMARG CORRIDOR PHASING
Sabarmati Rl .
(58 km)
Phase 2 corridors(30.5 km)
Naroda
villageRanipSola RoB
Naroda
AhmedabadAirport.Naroda GIDC
stn
RTOElevated Corridor
Odhav
Bopal KalupurRly. Stn.
Shivranjani Nehrunagar Soni ni
OdhavIndustrial
estate
GandhigramRly. stn
Gujarat
University
Railway Stations
GSRTC terminals
Airport
Maninagar Rly.
stn.
c aaUniversity/ educationalcampus
Industrial estates
GeetaMandir
LEGEND
RESIDENTIAL
AHMEDABAD -LANDUSE PLANNarol
Industrialestate
INDUSTRIAL
INSTITUTIONAL
8/6/2019 Ahmedabad BRT - Janmarg Update 01 2009
4/23
AHMEDABAD - Public transit network
BRT
Feeder
AMTS
8/6/2019 Ahmedabad BRT - Janmarg Update 01 2009
5/23
BRT trunk routes boarding/alighting
8/6/2019 Ahmedabad BRT - Janmarg Update 01 2009
6/23
BRT Corridor work in progress
8/6/2019 Ahmedabad BRT - Janmarg Update 01 2009
7/23
Cycle tracks on Nehrunagar Park edge
8/6/2019 Ahmedabad BRT - Janmarg Update 01 2009
8/23
Cycle tracks on Nehrunagar Park edge
Retaining existing trees from existing park
Redevelo in the ark with c cle tracks edestrian aths
Cycle trackBRT bus stopExisting park/
treesGSRTC busstop
Pedestrian path
8/6/2019 Ahmedabad BRT - Janmarg Update 01 2009
9/23
Corridor design trees being protected
Existing trees retained and incorporated in design
8/6/2019 Ahmedabad BRT - Janmarg Update 01 2009
10/23
BRT and Flyovers System access
TREATMENT BY PROVISION
OF SPLIT FLYOVERS WITH
BRT AT GRADE
8/6/2019 Ahmedabad BRT - Janmarg Update 01 2009
11/23
Intersection design
Signalized
Round about
(square about)
movement volume
component of geometric
design
Short signal cycleessential avoid jam
Short signal cycle gives
frequent pedestriancrossing time
8/6/2019 Ahmedabad BRT - Janmarg Update 01 2009
12/23
Intersection design square about
8/6/2019 Ahmedabad BRT - Janmarg Update 01 2009
13/23
TWO PHASE OPTIONS
Only straightmovementallowed at
Right turningmovementthrough
phase signals-turn - e t turn
combination
8/6/2019 Ahmedabad BRT - Janmarg Update 01 2009
14/23
BUS STATION LOCATION
Fewer lanes to crossto reach BRT station
Synchronized signals forsafe pedestrian crossing
INTERSECTION
INTERSECTION
Median Station allows
for easy transfers
More space for mixedtraffic at intersection
JUNCTIONDESIGN
8/6/2019 Ahmedabad BRT - Janmarg Update 01 2009
15/23
BRT Station - design elements
0
System Identity andStation Name
42
17
High ceiling with partialroof cover over Bus
57
Route
information
210
Safe distancebetween Bus and
75
(250mm)
Platform extensionfor close docking
of bus
(>125mm)
8/6/2019 Ahmedabad BRT - Janmarg Update 01 2009
16/23
BRT Station
8/6/2019 Ahmedabad BRT - Janmarg Update 01 2009
17/23
BRT Station
8/6/2019 Ahmedabad BRT - Janmarg Update 01 2009
18/23
8/6/2019 Ahmedabad BRT - Janmarg Update 01 2009
19/23
8/6/2019 Ahmedabad BRT - Janmarg Update 01 2009
20/23
BUS STATION LOCATION
Station setback from Intersection
Station at Intersection
8/6/2019 Ahmedabad BRT - Janmarg Update 01 2009
21/23
Car free day CG road
Source: Shreya Gadepalli, ITDP
8/6/2019 Ahmedabad BRT - Janmarg Update 01 2009
22/23
Car free day CG road
Source: Shreya Gadepalli, ITDP
8/6/2019 Ahmedabad BRT - Janmarg Update 01 2009
23/23
Kankaria Lakefront Development