  • MINUTES OF 459th MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC

    HELD ON 12TH MAY 2014 AT MUMBAI ITEM No. 1: CONFIRMATION OF THE MINUTES

    Superintending Engineer(Opn), WRPC stated that the minutes of 458TH meeting

    of Operation & Coordination Sub-Committee of WRPC held on 16th April 2014 at

    Mumbai, were forwarded vide letter No. WRPC/OPN/OCC-Minutes/2014-15/3653 dated

    30.04.2014.

    EE, Daman & Diu vide letter dated have submitted their comments on item No. 8.3 and requested to include their statement in the minutes of 458th meeting as below : “In 456th OCC meeting at Vadodara, it was discussed that 66KV Vapi Dabhel line will be ready to be shifted to Powergrid network after commissioning of 400KV Magarwada in May 2014. In 458th OCC, the Powergrid representative informed that the commissioning of 400KV Magarwada is scheduled by June 2014” OCC discussed and agreed to include comments from DD as above in the ITEM NO 8.3 of minutes of 458th OCC. The minutes were confirmed with above modification. ITEM NO.2: REVIEW OF SYSTEM OPERATION DURING THE MONTH OF APRIL

    2014. SE(Operation), WRPC requested WRLDC to brief the Committee on Grid Operation experiences during April 2014. Chief Manager, WRLDC in the presentation ( copy attached at Annexure – 2 in soft copy) concentrated broadly on the performance of the grid for month of April 2014 as below: 2.1 Frequency Particulars

    The average frequency during the month of April 2014 was 49.95 Hz. The

    maximum instantaneous frequency was 50.56 Hz on 20th April 2014 while

    minimum instantaneous frequency was 49.49 Hz on 26th April 2014. The

    frequency profile during April 2014 was as under:

    01-Apr 2014 to 30-Apr- 2014 % time

    IEGC band (49.9 < f < 50.05 Hz) 52.33

    < 49.9 Hz 30.64

    > 50.05 Hz 17.03

    The detailed frequency particulars are enclosed at Annex- 2.1.

    The Sub-Committee noted.

  • 2

    459th OCCM MINUTES

    2.2 Operational Discipline There was a net inter-regional export of 3443 MUs against scheduled 3179 MUs by WR.

    2.3 Voltage Profile Voltage profile at some of 765/400 kV sub-stations during the month of April

    2014 furnished by WRLDC is enclosed at Annex-2.3.

    SE(O), WRPC intimated that region will face high voltage problem in monsoon season and therefore requested to comply with the remedies suggested by WRLDC during presentation and also requested for taking the reactor in service.

    The Sub-Committee noted as above.

    2.4 U/F Relay Operations

    As per WRLDC records during April 2014 the system frequency didn’t touch 49.2 Hz

    and UF relay operation reported by any constituents. The Sub-Committee noted as above.

    2.5 Power Cuts / Load Restrictions

    Details of Power Cuts and Regulatory measures during April 2014 as furnished by

    the state utilities are given in Annex. 2.5. The Sub-Committee noted as above.

    2.6 Details of Generating Units under Forced outages Details of generating units under forced outages during April 2014 are given in

    Annex-2.6.

    The Sub-Committee noted as above.

    2.7 Details of Generating Units under Planned outages

    The details of generating units under Planned Outages during April 2014 are given in Annex-2.7

    The Sub-Committee noted as above.

  • 3

    459th OCCM MINUTES

    ITEM NO.3: OPERATIONAL PLANNING 3.1 Proposed Planned maintenance programme of generating units.

    The maintenance programme of generating units for May 2014 & June 2014 was

    discussed. The Sub-Committee finalized the outage schedule of generating units for the above period and the modified outages plan is placed at Annexure-3.1.

    3.2 A. Outage Programme of Transmission Lines/elements

    SE(Opn), WRPC informed that for the 459th OCC transmission elements outages

    planning data, must be submitted on or before 02.06.2014. Inter-regional outages proposal must be submitted on 02.06.2014 so that it can be take up with the counterpart of other region as well as NLDC.

    The Committee discussed the maintenance Programme for transmission

    lines/elements for the months of May 2014 & June 2014 is given in Annex 3.2 A & B. The Sub-Committee discussed and finalized the maintenance programme

    proposed above. B. Line outages planned vs. implemented:

    In 453rd OCC meeting it was decided that WRLDC shall submit the list of

    planned transmission element outages vs. actual availed or emergency outages

    during the April 2014. WRLDC had submitted the list of emergency outages(Attached

    at Annexure-3.2-C).

    The Sub-Committee may discuss.

    3.3 Anticipated Power Supply Position for the months – June 2014 & July 2014 Details of anticipated restricted & un-restricted demands for the months of June 2014 &

    July 2014 are given in Annex 3.3 (A).

    ITEM NO. 4: OPERATIONAL STATISTICS FOR THE MONTH OF APRIL 2014 The details of actual generation, demand, drawl of power from grid; exchanges etc. are given in the following Annexures: Annex 4.1 - Actual Generation and Requirement for April 2014 Annex 4.2 - Peak Demand: Schedule Vs Actual for April 2014 Annex 4.3 - Integrated Operation of the System and Operation of Inter State Tie lines for April 2014 Annex 4.7 – Details of level of Major Reservoirs in Western Region for April 2014

    The Sub-Committee noted.

  • 4

    459th OCCM MINUTES

    ITEM NO. 5: SYSTEM DISTURBANCES IN WESTERN REGION

    There was no major grid disturbance in the Western Region during the month. The

    tripping details during the month received from WRLDC is enclosed at Annexure-5.

    The Sub-Committee may like to discuss. ITEM NO. 6 Healthiness status of SERs/DRs of equipment in the system.

    Constituents have furnished the status of healthiness of SER/DRs in their systems on the dates below :

    Sl No. Name of

    constituents Date of Receipt

    1 PGCIL,WRTS-I 2.05.2014 2 PGCIL,WRTS-II 7.05.2014 3 MPPTCL 12.05.20144 NTPC 6.05.20145 CSPTCL 6.05.2014 6 GETCO 7.05.2014 7 MSETCL 2.05.2014

    Constituents of WR are requested to ensure healthiness and send the information to

    this office regularly as per the recommendation of enquiry committee of Grid

    disturbances on 25.02.2007 and 28.02.2007.

    ITEM NO. 7: STATUS OF COMPLETION OF ONGOING SCHEMES FOR COMMISSIONING OF REACTORS, TRANSMISSION LINES AND GENERATING UNITS IN WR.

    7.1 Status of completion of ongoing Schemes for Commissioning of reactors. The present status regarding schedule and commissioning of reactors is as below:

    S. No.

    400 kV Sub/stn.

    Size (MVAR)

    Implementing agency

    Expected commissioning date

    1 Ranchodpura 125 MVAR GETCO Commd. On 8th July 2013 2 Varsana 125 MVAR GETCO Commd. On 25th July 2013 3 Rajkot 125 MVAR GETCO Commd. On 5th August 2013 4 Amreli 125 MVAR GETCO Commd. On 12.07.2013 5 Jetpur 63 MVAR GETCO Commd. on 11.07.2013 6 Zerda 125 MVAR GETCO Commd. in July 2013 7 Kosmba 80 MVAR GETCO Commissioned on 29.11.2013 8 Limbdi (Chornia) 125 MVAR GETCO 25th July 2013 9 Jabalpur 125 MVAR PGCIL Commissioned on 26.03.2014 10 Khandwa 125 MVAR PGCIL Commissioned on 28.03.2014

  • 5

    459th OCCM MINUTES

    11 India bulls 80 MVAR BR

    MSETCL Commissioned 26.11.2013

    12 Nagda 50 MVAR MPPTCL Commissioned in Feb-2014 13 Sasan Line

    reactor-1 240 MVAR RELIANCE Commissioned on 16.02.2014

    14 Shujalpur 125 MVAR PGCIL June 2014 15 Bhatapara 125 MVAR PGCIL June 2014 16 Raigarh 125 MVAR PGCIL June 2014 17 Aurangabad 125 MVAR PGCIL 28.04.2014 18 Nanded 125 MVAR MSETCL 2015 19 Sholapur 125 MVAR MSETCL Sept-2014 20 Kolhapur 125 MVAR MSETCL Sept-2014 21 Akola 125 MVAR MSETCL Sept-2014 22 Nagda 125 MVAR MPPTCL September 2014 23 Bhopal 80 MVAR MPPTCL June 2014 24 Damoh 125 MVAR PGCIL July 2014 25 Bachau 125 MVAR PGCIL August 2014 26 Pirana 125 MVAR PGCIL August 2014 27 Itarsi 2X125

    MVAR PGCIL August 2014

    28 Seoni 125 MVAR PGCIL August 2014 29 Parli 125 MVAR PGCIL August 2014 30 Raipur 125 MVAR PGCIL August 2014 31 Gwalior 125 MVAR PGCIL August 2014 32 ISP 125 MVAR NHDC 2015 33 Satpura 50 MVAR MPPGCL March-2015 34 Sasan Line

    reactor-2 240 MVAR RELIANCE June -2014

    35 Sasan Bus reactor

    240 MVAR RELIANCE June-2014

    7.2 Status of completion of 765/400 kV and above on going Transmission Schemes being executed/implemented by Transmission Agencies.

    The updated status on various ongoing transmission schemes for the current year as per the current information available is as follows: - S. No.

    Name of the Line Target Completion Date

    Remarks

    POWERGRID 1 400 kV Vapi(PG)-Navsari Commissioned on

    16.03.2013 2 400 kV Navsari – Kudus D/C Line June- 2014 ROW problem 3 765kV S/C Satna-Gwalior line (Ckt.-I) Commissioned on

    1.02.2014

  • 6

    459th OCCM MINUTES

    4 765kV S/C Satna-Gwalior line

    (359Km + 60Km D/C Portion) Ckt.-II May.- 2014

    5 765 kV Sasan-Satna-II Commissioned on 01.06.13

    GUJARAT 1 400 kV D/C Kosamba-Chorania line

    (Package I)(From Chorania S/S to AP-54)

    Aug -2014

    2 400 kV D/C Kosamba-Chorania line (Package II)(From Kosamba S/S to AP-54)

    Aug -2014

    3 400 kV D/C Mundra-Zerda line No. 1 August -2014 4 400 kV D/C Mundra-Zerda line No. 2 August -2014 5 400 kV D/C Vadinar-Amreli line August -2014 6 400kV Mundra-Hadala LILO to

    Halvad August -2014

    7 400 kV D/C Amreli-Kasor line(Part-1) August -2014 8 315 MVA IInd ICT at Kosamba S/S Charged on 15.11.2013 9 ICT at 400/220kV Jetpur Charged on

    27.02.2014 loaded on 05.03.2014

    MADHYA PRADESH 1 Malwa-TPH-Pithampur 400KV

    DCDS Line 23,24.10.2013

    2 Malwa TPH-Chhegaon 400 KV DCDS Line

    Ckt –I on 22.03.2013 Ckt-II on 11.07.2013

    3 Chhegaon-Julwania 400 KV DCDS Line

    June - 2014

    4 Pithampur- Indore 400KV DCDS Line June - 2014

    5 Satpura TPH-Ashta 400KV DCDS Line

    December – 2014

    CSPTCL 1 400 kV Korba (W)-Khedamara

    DCDS Ckt II LILOed at Marwa August 2013 Test charged on

    20.08.2013

    2 400 kV Khedamara- Raita -II Commissioned on 20.02.2014

    3 400kV DCDS Marwa-Raipur(Raita) Commissioned on 24.03.2014

    4 LILOof 400kV K(W)-Khedamara line at Marwa (one ckt.)

    Charged in Apr-2014

    5 50MVAR LR at Khedamara Charged on 28.02.2014 6 400 kV Khedamara-Raita ckt-I Commissioned on

    02.04.2014 MAHARASHTRA(STU)

    1 400KV D/C line from Koradi-II to Wardha S/S(PG) D/C

    June - 2014

  • 7

    459th OCCM MINUTES

    2 400 kV Chandrapur-II-Warora-II Commissioned on 16.01.2014 3 400 kV Bableshwar-Sinner Ckt-II Commissioned on 27.12.2013 4 400 kV Chandrapur-Parli-II LILO at

    Chandrapur-II S/S Commissioned on

    16.01.2014 5 765kV Tiroda – Akola(Adani) Commissioned on 23.02.2014 MAHARASHTRA (IPTC route) by WR Transmission (Mah) Pvt. Ltd

    1 400 kV Parli(PG)-Pune D/C Commissioned Ckt - 1 on 08.11.2013 Commissioned Ckt - 2 on 10.11.2013

    2 400 kV Pune (PG)-Aurangabad (MSETCL) D/C

    Commissioned Ckt - 1 on 05.12.2013 Commissioned Ckt - 2 on 04.12.2013

    3 LILO Lonikhand –Kalwa at Pune(PG) Lonikhand-Pune charged on 21:30 on 09.07.2013 and Kalwa –Pune at 21:45 on 09.07.2013.

    GUJARAT (IPTC route) by WR Transmission (Guj) Pvt. Ltd

    1 400 kV Rajgarh(PG)-Karamsad (GETCO) D/C

    June -2014

    SE(O), WRPC stated that commissioning of new and important lines to be monitored

    during the year 2014-15 may be identified to be monitored on monthly basis. It was

    suggested by WRLDC and constituents that important list of line will be sent by each

    constituent to WRLDC and WRLDC will compile and furnish the list as per priority of

    commissioning.

    The Sub-Committee may noted as above.

    7.3 Commissioning of new Generating units in Western Region and the capacity expected to be commissioned during the current year 2014-15.

    The status regarding Generating units, commissioned during 2013-14/expected to be

    commissioned during the current year 2014-15 is as below:

    Name of the Power Projects Unit No. Capacity (MW)

    Date of Commissioning /Schedule Date

    GUJARAT Ukai 6 500 COD on 08.06.2013

    Pipavav CCPP- GPCL & GSPC joint venture Block-1 350

    March- 2014 Made in synchronized on 10.10.2013.

    Bhavnagar Lignite TPP-JV I 250 August 2014

  • 8

    459th OCCM MINUTES

    II 250 August 2014 UNO SUGEN 1 382.5 COD on 04.04.2013 CHHATTISGARH Marwa TPS I 500 20.12.2013 Korba (w) Ext-5 500 COD on 05.09.2013 KSK Mahanadi 3 600 COD on 14.08.2013

    VEDANTA VIDYUT 1 135 Synchronized on 11.08.13 COD on 13.04.14

    MAHARASHTRA

    INDIABULLS (Amaravati) 1 270

    Synchronized on 03.06.2013 COD on 01.02.2014

    INDIABULLS (Amaravati) 2 270 Synchronized on 1.02.2014

    INDIABULLS (Sinnar) 1 270 Synchronized on 24.02.2014

    VIPL(Butibori) 1 300 COD on 28.03.2013

    VIPL (Butibori) 2 300

    First synd. on 02.01.2013 Full load on 19.03.2013 COD on 4.05.13

    GMR EMCO 2 300 COD on 27.08.2013

    Dhariwal 1 300 Synd. On 2.9.13 COD on 11.02.2014

    Dhariwal 2 300 Synd. On 23.04.2014 Bhusawal 5 500/400 COD on 03.01.2014 APML Tiroda 4 660 COD on 1.04.2014 MADHYA PRADESH

    SINGAJI TPP 1 600

    Synchronized on 31.08.2013 Coal fired on 30.09.2013 COD on 01.02.2014

    2 600 Sep-2014 M/s Jhabua Power, Seoni 1 300 JANUARY – 2014 MB Power, Anuppur 1 300 JANUARY – 2014 Satpura

    11 250 Synd on 02.10.2013 COD on 16.03.14

    SATPURA 10 250 COD on 18.08.2013 Sasan 3 COD on 10.04.2014 Sasan 4 May 2014 CENTRAL SECTOR Vindhyachal TPP IV 12 500 27th March-14 MAUDA 2 500 30th March -14

    SE(O), WRPC requested WR utilities to identify the units to be commissioned

    during 2014-15 and intimate the schedule of commissioning to be monitored in monthly OCC meetings.

  • 9

    459th OCCM MINUTES

    ITEM NO. 8: MISCELLANEOUS OPERATIONAL ITEMS (A) FOLLOW-UP 8.1 QUARTERLY REVIEW OF CRISIS MANAGEMENT PLAN

    All the constituents were requested to submit the CMP report for the Third quarter

    (January 2014 to March 2014) for the year 2013-14.

    The Sub-Committee members may like to note and furnish details in respect of above. 8.2 STATUS OF PHYSICAL & CYBER SECURITY IN POWER SECTOR REGARDING

    SE(O), WRPC requested constituents to intimate the status of physical & cyber

    security in Power Sector for the Third quarter (January 2014 to March 2014).

    The Sub-Committee may like to note and furnish details in respect of above. 8.3 COLLECTION OF DATA REGARDING POWER SUPPLY IN

    RGGVY VILLAGES ON MONTHLY BASIS

    CE(GM), CEA vide letter No. 1/A1/MRP/GM-14/ dated 31.01.2014 intimated the

    decision by MoP to monitor the supply of power for minimum 6 – 8 hours to the

    villages electrified under RGGVY Scheme or any other rural electrification scheme.

    Members were requested to furnish the data in enclosed format to CEA/WRPC

    Secretariat at the following email addresses:

    [email protected] [email protected] [email protected] Member Secretary, WRPC stated that the above data may please be sent preferably

    by 3rd working day of each month in respect of previous month as it needs to be

    communicated by this office to CEA.

    It has been observed that data upto March 2014 except Maharashtra has been received. SE(O), WRPC intimated that nomination of coordinating officers were received from all but the data was awaited for April-2014 and requested all to send the data urgently in the prescribed formats already furnished by WRPC. The Sub Committee agreed to comply. 8.4 SHIFTING OF FEEDERS FROM GETCO TO DD & DNH

    8.4.1 During last meeting, DNH representative informed that regarding power evacuation from 400 KV Kala PGCIL S/s to DNH, due to High Court STAY for one

  • 10

    459th OCCM MINUTES

    location work was held up. Balance 220 KV line work will be completed by April 2014

    end and request was made to GETCO to consider the above situation before

    disconnecting power to DNH. The copy of the order passed by District Magistrate of Dadra and Nagar Haveli was sent to GETCO/WRPC/WRLDC/others by DNH. DNH representative intimated that petition was heard by Hon’ble JERC on 9.05.2014 and Hon’ble JERC have directed the parties to file written submissions within 4 days. PGCIL representative intimated that they would complete the line within 15 days of lifting of stay in this case. 8.4.2 Executive Engineer, DD vide letter dated 6.05.2014 (copy enclosed at Annexure-8.4) have intimated that the decision of OCC for shifting of load from 66 kV Vapi-Dabhel feeder (May-2014) after commissioning of 400 kV Magarwada (GIS) s/s. However, PGCIL vide letter dated 16.4.2014 addressed to Secretary, UT of DD and DNH have intimated that the work is delayed due to local protests and PGCIL is making all efforts to complete the Magarwada s/s by June 2014. EE, DD during the meeting intimated that the delay in commissioning of various feeders is mostly due to external factors and agencies and therefore requested SLDC, GETCO to revisit their decision to open relevant feeders. He further intimated they are completely ready with all the lines if permission is given to them to connect with ISTS network at Vapi. CE, SLDC, GETCO while agreeing to statement by EE, DD stated that they had earlier offered to repair one of the Magarwada transformer but there was not reply from DD side. Also, at Vapi there is no margins available to connect any additional load and hence currently commissioning of new S/s, transformer, feeders is must needed. PGCIL representative intimated that Vapi-Dabhel feeder would be completed by July-2014. Member Secretary, WRPC after hearing the view of all directed EE, DD to arrange for a meeting amongst DD/DNH/GETCO/SLDC Gujarat/PGCIL WR-II/WRPC/WRLDC involving Secretary (Power) from Gujarat and DD/DNH. DD representative agreed to convene a meeting shortly after finalizing with Secretary(P), DNH. 8.5 Rescheduling of SIPAT unit No. 5 for boiler license renewal: SLDC, GETCO have intimated that AGM (OS), NTPC, WR-II, vide his letter No. WR-II/OS/2014 dated 22.04.14, had requested for rescheduling of outage of Sipat unit No. 5 (500 MW of which share of GUVNL is 137 MW) for boiler license renewal from 27.04.14 to 01.05.14 instead of earlier approved period from 27.10.14 to 31.10.14 citing the reason of acute coal shortage and subsequent review of their present plant condition. Accordingly, WRPC has concurred the above outage subject to real time condition.

  • 11

    459th OCCM MINUTES

    GETCO further intimated that granting approval for such unplanned large sized unit outage especially when the system is catering its peak summer demand is not at all desirable and also, NTPC should have made all out efforts to resolve the issue of acute coal shortage and ensure full availability of coal for running their units to their full capacity at such times. GETCO requested that WRPC shall take cognizance of the constituent States in writing prior to granting such outage which is likely to create scarcity of power in the State. NTPC representative intimated that overhauling of the aforesaid unit have already been carried out as coal stock was low during that period hence the generation would not had been available to Beneficiaries even if the outage had not been taken. Member Secretary, WRPC stated that due consideration for shortage of coal during said period and utilizing opportunity outage is good for the grid as a whole but requested all the Constituents to submit the outage proposal to OCC and carry out the same only if approved in OCC. 8.6 Not availing the approved outage of 400 KV APL-Sami line No. 2 by M/s. APL SLDC, GETCO have intimated that M/s. APL had requested on 26.04.14 for availing outage of 400 KV APL-Sami line No. 2 for attending hot spot at Loc. No. 79 top phase and 159 bottom phase on 27.04.14 and they were permitted to avail the same. Accordingly, code was issued by WRLDC for taking out the FSC of the said line. After the FSC was taken out, SLDC-Gujarat requested M/s. APL to reduce their generation in view of possible overloading of 220 KV D/C Hadala-Nyara line (which was already carrying around 220 MW on each line) as line loading of 400 KV APL-Hadala would increase due to outage of 400 KV APL-Sami line No. 2. Despite repeated instructions, M/s. APL didn’t follow our advice and the FSC was taken back in service after about 40 minutes without availing the approved outage of 400 KV APL-Sami line No. 2. Such indolent attitude of M/s. APL shows that they were neither interested in availing the approved outage nor serious about the instructions given to them by the system operator. Whenever any agency wishes to avail outage of any transmission element, they should strictly adhere to the instructions of the load despatcher who is entrusted the job of maintaining the system security, safety and reliability. The instructions of the system operator should be scrupulously followed. APL representative clarified their stand as follows:

    1) APL has always followed SLDC/RLDC/NLDC instructions in letter and spirit.

    2) In the referred incidence also, switching operations of FSC were carried out only after receipt of valid code. As the code for tripping the line was not received, the said line was not opened. So in this case also we followed all the instructions of SLDC.

  • 12

    459th OCCM MINUTES

    3) We would have availed the shut down on 27-04-14, had the code been issued for the same.

    4) The transmission and Generation are two separate entities of APL

    5) DC revision can be advised by generator himself only in case of tripping, synchronization of a unit or due to change in capacity due auxiliary problems

    6) SLDC/RLDC are empowered vide grid code to reduce the generation for any constraints by revising schedules on their own. Sequence to be followed for curtailment is also well established i.e. short term first then medium term and lastly long term

    7) APL request SLDC to continue practice of advising APL generator the revised schedules in advance so as to take action as desired and without any ambiguity”

    The Sub-Committee noted as above. 8.7 Frequent tripping of 400 KV CGPL-Jetpur lines SLDC, GETCO have intimated that on 27.04.14, the 400 KV CGPL-Jetpur line No. 1 tripped on Jetpur: Z-I, R-E, 60.17 Kms. Mundra: Z-I, R-E, 271.1 Kms. at 06:08 Hrs and was restored at 06:25 Hrs and later Auto Reclosure of the said line operated repeatedly thrice during 06:44 Hrs to 06:50 Hrs. Subsequently, 400 KV CGPL-Jetpur line No. 2 also tripped on Jetpur: Z-I, B-E, 53.14 Kms. Mundra: Z-II, B-E, 279 Kms at 06:50 Hrs and was restored at 07:44 Hrs. Also, 400 KV CGPL-Jetpur line No. 2 tripped on 28.04.14 too on Mundra: R-E, Z-1, 162.2 Kms Jetpur: R-E, Z-1, 164.3 Kms at 17:15 Hrs and was restored at 17:37 Hrs. Fortunately, during the above trippings, the CGPL unit No. 10 was under AOH and the total generation from CGPL-Mundra complex was reasonably less and hence, there was no system disturbance. Had the same kind of incident happened when all the five units of CGPL-Mundra complex were running with full generation of around 3750 MW, it would have certainly caused a severe grid disturbance. It’s been quite a long time since the evacuation lines of CGPL-Mundra complex have been commissioned and the system cannot afford to have such frequent trippings of important power evacuation lines. It is highly essential that M/s. PGCIL shall do the needful in order to avoid the recurrence of such incidents at least in future so that the system is not jeopardized. CE, SLDC, GETCO requested PGCIL to carry out outage on low load day(Sundays) and staggered holiday(Wednesdays) to the extent possible. PGCIL representative intimated that lines are frequently tripping due to insulator scaling and replacement work is going on. Replying to request by GETCO, PGCIL representative intimated that they have real trouble with the manpower movement and cannot perform the insulator replacement activity in a day.

  • 13

    459th OCCM MINUTES

    Member Secretary, WRPC requested GETCO to let PGCIL complete the replacement of insulators work in the remaining stretch as it is going to benefit to GETCO and WR grid as whole in long run.

    GETCO agreed to do the needful. 8.8 Strengthening evacuation facility of UMPP Mundra SLDC, GETCO have intimated that a meeting was convened by the Chief Engineer (SP&PA), CEA on 06.05.2014 at CEA, New Delhi to examine the feasibility of utilizing the upcoming 400 KV D/C Essar Salaya (Stage-II) - Bhachau (Bhimasar) Triple Snowbird transmission line. CE, SLDC, GETCO intimated during the meeting that Salaya TPP is not going to be commissioned for at least three years from now and hence the transmission network created needs to be utilized for enhancing reliability of power system. It was preliminarily concluded to terminate this line at Essar Vadinar Stage-I project. Simultaneously, PGCIL is also doing additional 400 KV D/C CGPL Mundra - Bhachau transmission lines and hence, it was proposed to utilize this 400 KV D/C Essar Vadinar - Bhachau CTU line as additional evacuation facility of Mundra UMPP as all of us are aware that there is acute need of enhancing the evacuation facility of Mundra UMPP. OCC appreciated the proposal submitted by GETCO. Member Secretary, WRPC requested to approach SP&PA division of CEA with the proposal and request them to hold special meeting of Standing Committee urgently so take the decision. The decision can then be vetted by WRPC in forthcoming meeting during June 2014.

    The Sub-Committee noted as above. ITEM No. 9 : ITEMS FROM WRLDC: WRLDC enumerated the problems that could be encountered during monsoon and requested constituents to follow following suggestions to mitigate the situation. 9.1 Preparedness for the ensuing monsoon season:

    The following situations are anticipated based on previous experience during the monsoon.

    • Reduction in agricultural load • Sudden reduction of load due to tripping of 11kV/lower kV lines due to stormy

    and inclement weather conditions leading to high frequency. Less requisition at all ISGS units during all the day except for 2-3 hours during peak where the requisitions are maximum.

    • Sudden rise in demand during dry spells leading to low frequency during peak hours.

    • High voltages and network depletion due to manual opening of EHV lines on high voltage or due to tripping of trunk lines on tower collapse

    • Violation of flow gates limits and TTC/ATC limits of inter-regional corridors

    Suggestion to tackle the above expected scenarios:

  • 14

    459th OCCM MINUTES

    • Ensuring that all L/Rs and B/Rs are healthy and kept in service. • MVAR absorption by generating units to the machine’s reactive capability limit • Coordination of taps of GTs, UATs and STs at power stations • Review of ICT taps at load centers • Review Voltage grading and time grading adopted in O/V relays. • Shunt capacitor bank switching at distribution level • Availing Reserve Shutdown and controlling of under drawal / over injection. • Weather forecast to be duly considered during operation planning.

    Member Secretary, WRPC emphasized the suggestions of WRLDC and requested constituents to be more vigilant during coming months.

    9.2 Controlling high voltage scenario in Monsoon

    WRLDC explained that controlling high voltage situation in WR grid was a challenge during the last monsoon season. The nodes where high voltage was observed during last year monsoon are given under.

    Name of the State where voltage was above IEGC specified limit (>420 kV / >800 kV) for more than 50% of time

    June 2013 July 2013 August 2013

    Maharashtra Bhusawal, Dhule, Bhadrawati, Akola, Karad, Kolhapur, Chandrapur, Sholapur,

    Bhudsawal,Dhule, Bhadrawati, Karad, Akola

    Dhule, Karad, Akola. Bhadrawati.

    Madhya Pradesh Satna, Jabalpur, Birsinghpur, Damoh,Khandwa, Nagda

    Jabalpur, Birsinghpur, Damoh, Khandwa

    Itarsi, Birsinghpur, Damoh

    Gujarat - - -

    Chhattisgarh Raipur, Raigarh, Bhilai Raipur, Raigarh, Bhilai

    Bhilai, Raipur, Raigarh

    The envisaged Bus reactors that are yet to commissioned are as under:

  • 15

    459th OCCM MINUTES

    Madhya Pradesh: Commissioning of Bus Reactors envisaged at Sujalpur, Bhopal, Damoh, Gwalior, Nagda (50 MVAR), Indirasagar, Satpura, Sasan (Line Reactor-2), Sasan (Bus Reactor), Itarsi, Seoni to be expedited. Maharashtra: Bus Reactors envisaged at Aurangabad, Nanded, Sholapur, Kolhapur, Akola, Parli are yet to be commissioned. Status of Dhule CSR may be apprised. Chhattisgarh: Bus Reactors envisaged at Bhatapara, Raipur, Raigarh to be expedited. Gujarat: Reactors envisaged at Pirana & Bachau are yet to be commissioned. It was requested the implementing agencies may expedite the progress of commissioning of the envisaged shunt reactors to contain expected high voltage condition in the ensuing monsoon season.

    OCC noted as above. 9.3 Updating List of Important Grid elements of Western Region:

    WRLDC representative stated that draft list of Important Grid elements of Western Regional Grid for 2014 – 15 is available on website of WRLDC. Members were requested to review the list. Corrections received upto 20th May 2014 shall be incorporated and final list shall be uploaded on 23rd May 2014.

    The criteria used for including elements in the above list are as under a. All 400 kV and higher kV lines, EHV AC and HVDC links/poles irrespective of

    ownership b. All ICTs connected at 400 kV level and above. c. All 220 kV lines emanating from ISTS / ISGS substations d. All Inter Regional transmission lines irrespective of voltage level/ownership e. All Inter-state transmission lines irrespective of voltage level and ownership f. All shunt reactive elements connected at 400 kV and higher level of voltage g. All FACT devices in the WR grid h. All generating units mandated for FGMO/RGMO under sec 5.2(f) of IEGC.

    As per the outage coordination procedure, proposal from planned outage of the above elements for construction / maintenance related activities scheduled in a month have to be submitted in OCC meeting of the preceding month. After concurrence in OCC meeting preparedness to avail the outage shall be sent to WRLDC in D-3 for reliability consent. In line with IEGC section 5.2 (c) and (d), switching of elements included in the above list to be done only after prior concurrence / operation code from WRLDC control room

  • 16

    459th OCCM MINUTES

    in real time. Manual / Automatic tripping of the above elements to be reported to WRLDC and concerned SLDC as per the IEGC reporting format. Section 5.2. (c) and (d) of IEGC are reproduced under for reference. Section 5.2.c: “No important element of the National/Regional grid shall be deliberately opened or removed from service at any time, except when specifically instructed by RLDC or with specific and prior clearance of RLDC. The list of such important grid elements on which the above stipulations apply shall be prepared by the RLDC in consultation with the concerned Users, CTU and STUs, and be available at the websites of NLDC/RLDC/SLDCs. In case of opening/removal of any important element of the grid under an emergency situation, the same shall be communicated to RLDC at the earliest possible time after the event. RLDC shall inform the opening/removal of the important elements of the regional grid, to NLDC, and to the concerned Regional Entities (whose grid would be affected by it) as specified in the detailed operating procedure by NLDC.” Section 5.2.d: “Any tripping, whether manual or automatic, of any of the above elements of Regional grid shall be precisely intimated by the concerned SLDC/CTU/User to RLDC as soon as possible, say within ten minutes of the event. The reason (to the extent determined) and the likely time of restoration shall also be intimated. All reasonable attempts shall be made for the elements’ restoration as soon as possible. RLDC shall inform the tripping of the important elements of the regional grid, to NLDC and to the concerned Regional Entities (whose grid would be affected by it) as specified in the detailed operating procedure by NLDC.”

    OCC noted as above. 9.4 Status of telemetry in Western Region WRLDC representative stated that CERC vide its suo motu order in petition SM/007/2014 dated 25-April-2014 has directed as under: “The Commission vide order dated 19.12.2013 in Petition No. 56/SM/2013 had directed as under: We are at pains to observe that despite the Commission’s sustained initiative for the implementation of the statutory mandate, the progress achieved is far from satisfactory. We are constrained to place on record that the overall scenario is very precarious. Accordingly, we issue the following directions: (a) POWERGRID shall complete the telemetry on all its sub-stations within six months of the issue of order failing which action under Section 142 of the Act may be initiated. After six months, NLDC/ RLDC shall submit status report in this regard.

  • 17

    459th OCCM MINUTES

    (b) Notice under section 142 of the Electricity Act, 2003 be issued against utilities which have not responded to NLDC as contained in the Annexure to this order.” Non availability of telemetry from substations within Maharashtra was discussed in the

    457th and 458th OCC meeting wherein it was committed that the data would be made

    available from 88 stations by 30th April 2014.

    As per last updated status on 30th April 2014, integration of the only the following 17

    out of 88 locations has been completed and data are reporting to MSETCL through

    Tata Teleservices (TTSL) links and to WRLDC on ICCP.

    Sr.No. Date of receipt of

    data on TTL RTU Location

    1 14/3/2014 400 KV Kalwa2 2 14/3/2014 400 KV Khargar 3 27/3/2014 220 KV Ambazari 4 04/1/2014 220 KV Khaperkheda 5 04/3/2014 400 KV Akola 6 04/3/2014 400 KV Aurangabad3 7 04/8/2014 220 KV Mulund 8 04/8/2014 220 KV Warora 9 04/9/2014 220 KV Aurangabad2

    10 14/4/2014 400 KV Chakan 11 17/4/2014 220 KV Badnera 12 17/4/2014 220 KV Amravati 13 21/4/2014 400 KV Padge2 14 21/4/2014 220 KV Boisar 15 22/4/2014 220 KV Uran 16 25/4/2014 400 KV Karad2 17 26/4/2014 220 KV Akola1

    MSETCL apprised the status of availability of telemetry from the remaining stations of Maharashtra. During the 457th OCC meeting it was confirmed by Chhattisgarh that the issues pertaining to Korba (W) extn, 220 kV Saraipalli and 400 kV Raita would be resolved within 45 days. Likewise DD informed that the telemetry issues of Magarwada substation would be attended within two months. Representatives from Madhya Pradesh, Goa, and DNH informed that they would revert back regarding the progress of pending telemetry issues. POWERGRID had assured that the communication link for availability of PMU Data from Satna, Dehgam, and Boisar would be made available

  • 18

    459th OCCM MINUTES

    within one month at WRLDC. However the same is yet to be established. POWERGRID had also assured that the telemetry issues with 765 kV Gwalior, Durg, Kotra and Tamnar would be resolved on priority. MPPTCL vide letter dated 29.04.2014 have intimated that telemetry discrepancies for following PGCIL lines are persisting since long time :

    1. 400 kV SGTPS-Balco (from SGTPS end) 2. 400 kV Indore(MPPTCL)-Indore(PGCIL)-1 (at 400 kV Indore MPPTCL s/s) 3. 400 kV Indore(MPPTCL)-Indore(PGCIL)-2 (at 400 kV Indore MPPTCL s/s)

    The Sub-Committee noted as above.

    9.5 Mock Black start Exercise a) Black start at SSP (by NCA /Gujarat)

    During the 456th OCCM and the 54th PSC meeting of NCA it was decided that NCA

    would organize a separate meeting of SLDC-GETCO along with other stakeholders

    (preferably at SSP, Gujarat) to finalize the procedure for mock black start drill of

    RBPH unit. Tentative date was suggested on 22nd May, 2014.

    b) Healthiness of black start facilities in hydro stations in Madhya Pradesh During the last OCC-M, SLDC-Madhya Pradesh had reported non-availability of DG set at Pench and Bargi. Likewise Governor problem was reported at Tons, Birsinghpur and Medikheda, Rajghat.

    SLDC MP representatative intimated that on 22.05.2014 a meeting is scheduled in MP to discuss the dates of testing of black start facilities alongwith other modalities. Proposed dates for black start are as below : Gandhisagar : 21.05.2014 ISP : 30.05.2014 Pench : 09.06.2014 9.6 Commissioning of SPS at 400/220 kV Vapi

    During the special meeting on 18.03.2013 at Dadra, an SPS for automatic load shedding subsequent to tripping of 400/220 kV ICT at Vapi was approved as under. It was decided that POWERGRID would extend trip signal from Vapi ICTs to the requisite feeders. Contingency Envisaged SPS

    action Identified Feeders

    Tripping of any Automatic Load DNH :

  • 19

    459th OCCM MINUTES

    one ICT at 400/200 Vapi Sub-Station

    Shedding of 100MW. 1) 66 kV-Kharadpara-Rakholi-I: 50 MW 2) 66 kV Khadoli-Khadoli-3: 30 MW DD: 1) 66 kV Magarwada-Kachigam: 60 MW

    In this regard communication were sent from WRLDC on 22nd Oct 2013 as well on 02nd May 2014. POWERGRID also has been raising the issue vide its letter dated 31st Oct 2013 and 23rd April 2014. It is a matter of concern that even after one year, the scheme approved by WRPC is yet to be commissioned by UT-DNH. The MVA loading of one of the three ICTs at Vapi in April 2014 is illustrated below:

    CE, SLDC, GETCO intimated that a demo of similar scheme was shown to DD/ DNH representatives. Member Secretary, WRPC once again stressed the importance of early implementation of SPS at Vapi for grid security. DD/DNH representatives agreed to complete the SPS within a month. 9.7 SPS at Sipat

    WRLDC vide letter No. WRLDC/MO-I/1719/2013 dt 21.6.13 requested to take up this matter with the concerned for early implementation of the SPS.

    NTPC representative intimated that corporate approval for the above SPS scheme has been obtained and accordingly ICT shutdown have been proposed and approved on 20-21.05.2014 and hence the SPS will be ready and operational by this month end. 9.8 Modification of SPS at CGPL Mundra for tripping of evacuation feeders.

    A blackout occurred at CGPL Mundra on 12.03.2014. During discussion in the meeting at Mumbai on 19.03.2014 it was agreed to review the existing SPS at CGPL Mundra for tripping of one or more evacuation lines. WRPC vide its letter dated 25th March 2014 sent a revised SPS proposal with two alternate options (Option-A and

  • 20

    459th OCCM MINUTES

    Option-B) was to CGPL for their comments. CGPL vide its letter dated 29th March 2014 proposed a third option (Option-C). Thereafter SLDC GETCO vide its letter suggested to include tripping of 400 kV Bachau-Vadavi (Ranchodpura) in the SPS logic. WRLDC vide its letter dated 11th April 2014 suggested that the envisaged SPS for N-2 contingencies that were already agreed by CTU, SLDC GETCO and CGPL, were inadvertently missed in the revised scheme. The matter was therefore discussed again in 458th OCCM. After due deliberations in the 458th OCC, the following revised scheme was agreed.

    CGPL representatives intimated that since the disturbance two-three meetings on

    SPS requirement have been taken place and every time change in the SPS scheme is

    proposed.

    Member Secretary, WRPC stated that PCM meeting is scheduled on 15.05.2014 and

    final SPS scheme to be implemented will be deliberated and finalized during the PCM.

    9.9 SPS at 4x300 MW Balco IPP The SPS at 2010 MW Balco (4x67.5MW + 4x135 MW + 4x300 MW) was to be commissioned by Nov 2013 before commissioning of first unit of 4x300 MW Balco IPP. For the new SPS scheme envisaged for the Balco CTU connection, namely the Grid Islanding and Load Management Scheme (GILMS), Balco had reported to have placed an order with M/s SEL. As discussed earlier, the scheme suggested by WRLDC may be implemented before commissioning of first unit of 300 MW. It was intimated during the 456th OCCM by the Balco representatives that the SPS shall be commissioned by March 2014.

    M/s Balco representative intimated that the SPS have been implemented on 30.04.2014.

  • 21

    459th OCCM MINUTES

    9.10 Taking 220 kV Kolhapur-Mudsinghi-Chikodi- Belgam line in service for

    exchange of power

    The matter was discussed in the 458th OCC meeting wherein, MSETCL representative stated that the matter is sub-judice in MERC and hearing was scheduled on 16.4.2014. SLDC, MSETCL representative intimated that on 30.04.2014 hearing was held and case was closed and final order is awaited.

    9.11 RGMO / FGMO of mandated generators in Western Region

    The list of state/utility wise RGMO/FGMO mandated units in WR is as under as per the information available with WRLDC. As recommended by the WRPC report [item 4.0(v)] on the black out at CGPL dated 17.04.14 all these units were to give their MW vs. frequency plot showing their compliance to sec 5.2(f) of IEGC by 22.04.2014. The status as on 8.5.2014 is also given in the table in the last column.

    Name of Entity No of

    Eligible units

    RGMO/FGMO available at

    RGMO/FGMO Not available

    at

    Data Recived Status (wrt WRPC Report dt

    17.04.14) Maharashtra 90 37 53 Not Received

    Madhya Pradesh* 58* 36* 22*

    Not Received

    Gujarat 35 19 16 SCADA Snap shot

    received only for a few units

    Chhattisgarh 10 3 7 Not Received CGPL 5 5 0 Not Received NCA 11 6 5 Not Received

    SASAN 2 1 1 Received

    NTPC 24 16 8

    Only VSTPS report format is OK. Other

    stations data ambiguous. No data for

    Mouda ESSAR_Mahan 1 1 0 Not Received

    NSPCL 2 2 0 Not Received KSK 1 1 0 Not Received

    KWPCL 1 0 1 Not Received DB POWER 1 1 0 Not Received

    JPL 5 4 1 Ambiguous data LANCO 2 2 0 Not Received

    IEPL 1 0 1 Not Received EMCO 2 0 2 Not Received

    WR_Total 251 134 117

  • 22

    459th OCCM MINUTES

    All the utilities may submit the details as recommended by the WRPC at the earliest in excel file. *SLDC MPPTCL, intimated in 458th OCCM that in Madhya Pradesh total FGMO/RGMO mandated units are 52 out of which FGMO/RGMO is available at 12 units and not available at 40 units. MPPTCL was requested to furnish the exact unit wise break-up for the above statistics, to WRLDC and WRPC. That data is yet to be submitted by MPPTCL. SLDC MPPTCL may kindly submit the same as soon as possible for updating and further reporting to the CEA and the CERC. Governor Response on 12.03.2014 MPPTCL vide letter dated 30.04.14 have furnished governor response on 12.03.2014. NCA representative intimated that M/s BHEL are delaying installation work of RGMO in units of CHPH. The matter is being persued with M/s BHEL for early commissioning of RGMO. Sub-Committee noted as above. 9.12 Revival of transmission elements under Long outage

    As per the information available at WRLDC following elements are out for a long

    period.

    Sl. No

    Element Date of outage

    Reason

    ISTS/IPP

    1 50 MVAR L/R OF BIRSINGPUR-I @ DAMOH

    23-Nov-13 REF & Buchholtz operated

    2 50 MVAR B/R @ GWALIOR

    1-Mar-14 Up-gradation work of bus reactor to 125 MVAR

    3 240 MVAR L/R OF DURG-1@KOTRA

    2-Apr-14 DGA violation at Kotra end

    4 50 MVAR B/R @ ITARSI-I

    20-Apr-14 Up-gradation work of bus reactor to 125 MVAR

    5 63 MVAR LR of CGPL-JETPUR-II @ CGPL

    21-Apr-14 Oil temparature high

    765 kV DURG-KOTRA-I 25-Apr-14 L/R problem @ kotra end

    400/220kV ICT-III @ PUNE

    25-Apr-14 System constraint

  • 23

    459th OCCM MINUTES

    Sl. No

    Element Date of outage

    Reason

    MSETCL

    1 765 kV Tiroda-Akola-I 23.03.2014 To control line loading

    2 400 kV RGPPL-New

    Koyna

    29.04.2014 Insulator Washing

    MPPTCL

    1 400 kV DAMOH-KATNI-S/C

    25-Apr-14 B ph to earth fault

    2 400 kV BIRSINGPUR-KATNI - I

    2-Apr-14 High voltage

    3 400 kV SINGHAJI-PITAMPURA-II

    15-Apr-14 No generation @ Singaji

    4 400 kV SINGHAJI-CHHEGAON S/C

    17-Apr-14 No generation @ Singaji

    5 400 kv INDORE (MP)-INDORE-S/C

    27-Apr-14 Y PH CT of 220 KV Indore-Indore line burst.

    CSPTCL

    1 50 MVAR L/R OF SEONI-BHIAI @ BHILAI

    05.03.2014 DGA violation

    The Sub-Committee noted as above.

    9.13 Implementation of the revised AUFLS in Goa, DD and DNH

    It was decided during the 455th and 456th OCC meeting as well as during 25th WRPC meeting that Goa, DD and DNH shall complete the implementation of the revised AUFLS in Goa, DD and DNH at the earliest. Goa has intimated in the 458th meeting that the AUFLS has been implemented. Representatives from the DD and DNH indicated that due to election code of conduct tendering and other processes were stalled and they would initiate action and comply with decision of WRPC.

    9.14 Crisis Management Plan for Railways Member Secretary, WRPC requested Western Railway representative to give the status on the issue. Railway Representative stated that pursuant to the Grid Disturbance in July 2012, a meeting to review the Crisis Management Plan (CMP) in respect of back-up arrangement of Indian Railways was convened by Director (OM), Ministry of Power on 5th June 2013, in New Delhi wherein Director Electrical Engineering (PS), Ministry of Railways and Chief Electrical Distribution Engineer, Northern

  • 24

    459th OCCM MINUTES

    Railways attended. Few decisions taken in the meeting that were to be implemented at SLDCs and RLDCs are briefly listed below: a. Feeders supplying to Railways to be clearly displayed in SLDCs so that these

    can be monitored easily - Done b. In case of grid events power supply to Railways to be restored on priority.

    SLDCs/RLDCs shall coordinate with the Nodal officers nominated by Railways for this purpose. – Being prepared. Target Nov. 2014

    c. The procedure for restoration of traction supply to be prepared in coordination with Indian Railways and included in the Operating manual of SLDCs and RLDCs - Being prepared. Target Nov. 2014

    d. Railways shall be invited for participation in the Operation Coordination Meeting of all RPCs so that issues of Railways are properly addressed : Done

    WRLDC & GETCO representative stated that decision taken and explained by

    Western Railway are meticulously followed and due care is taken regarding restoration of supply to railway on priority in case of disturbance. ITEM NO. 10: DATE AND VENUE OF NEXT OCC MEETING 460th OCC meeting will be hosted by PGCIL WRTS-I, at Nagpur on 13.06.2014. 461st

    OCC will be hosted by NTPC, HQ-II Raipur.

    *****************

  • ANNEXURE-I

    Sl.No. Organisation, Name & Designation E-mail Mobile

    I WRPC1 Shri S.D. Taksande, M.S. [email protected] 98208783842 Shri M.M. Dhakate, S.E. [email protected] 8108787778

    II MSETCL / MSEDCL/MahaGenco3 Shri Ajit V. Pachori, E.E. [email protected] 96194614204 Shri V.D. Pande, E.E. [email protected] 98207419415 Ms. S.P. Mahajan, A.E. [email protected]

    III MPPTCL / MPPGCL6 Shri K.K. Parbhakar, S.E. [email protected]

    IV CSPTCL / CSPGCL7 Shri Sandeep Gupta, S.E. [email protected]

    V GETCO / GSLDC/ GSECL8 Shri B.B. Mehta, C.E. [email protected] 9879200736

    VI D D / DNH ELE.DEPT. 9 Shri Vishwambhar Singh, E.E. [email protected] 987905832810 Shri Jay Solanki, J.E. ed-aesldc-dd.nic.in 909993986611 Shri Mayur D. Dave, J.E. [email protected]

    VIII WRLDC / POWERGRID12 Shri N.K. Ohdar, G.M. [email protected] 940930627813 Shri V.K. Shrivastav, A.G.M. [email protected] 986945022114 Shri K.S. Devaprasad, D.G.M. 986948390415 Smt. Pushpa Seshadri, C.M. [email protected] 986940448216 Smt. Sachala Mishra, C.M. [email protected] 986945022317 Shri Nitin Bhoyar, Mgr. [email protected] 942307428318 Ms. Sumegha Katiyar, Sr. Engr. [email protected] Shri Rajkumar A., Sr. Eng. [email protected] Shri D. Bruhananda, Mgr. [email protected] 942850427921 Shri C.P. Awasthi, Mgr. [email protected] 942540965722 Shri Abhishek Kr. Gupta, Dy. Mgr. abhishek_all @yahoo.com 986940465023 Shri Aditya P. Das, Dy. Mgr. [email protected] 986940456924 Ms. Chitrankshi Ghangrekar, Dy. Mgr. [email protected]

    IX NTPC25 Shri Pradeep B. Behere, G.M. pbbehere @ntpc.co.in 900449708826 Shri M.P. Deb, A.G.M. [email protected] 900449714127 Shri A.K.Chandeliya, D.G.M. [email protected] 9004497151

    X NCA28 Shri N.N. Das, A.E. [email protected] 9425053309

    XI NHDC29 Shri Vinod K. Singh [email protected]

    XII WESTERN RAILWAY30 Shri Devender Kumar, Dy. Chief Ele.En [email protected]

    LIST OF PARTICIPANTS OF 459th OCC MEETING OF WRPC HELD ON 12.05.2014

  • 31 Shri R.S. Yadav, Sr. Stn. Eng. [email protected]

    XIII TATA POWER32 Shri P.R. Gadave, A.G.M. [email protected] 922355334133 Shri U.V. Likhite, G.H. [email protected] 9227295452

    XIV NSPCL 34 Shri P.M. Chandrakar, Suptdt. [email protected]

    XV APL 35 Shri C.S. Bobade, G.M. [email protected] 898080225536 Shri Anshul Garg, D.G.M. [email protected] 8980802414

    XVI RINFRA37 Shri Pinal C. Desai, A.V.P. [email protected] 932511074738 Shri Sumit Rathi, Mgr. [email protected] 932192541439 Shri Venkata Ramana, Mgr. [email protected] 7498255874

    XVII KSK Mahanadi40 Shri C. Narasimha [email protected] 995944490341 Shri Manish G. Upadhyay, A.G.M. [email protected] 9630080704

    XVIII NPCIL42 Shri R.K. Gupta, O.S. [email protected] Shri S. Maskey, O.S. [email protected]

    XIX ESSAR 44 Shri Kamlesh Garg, Jt. G.M. [email protected] 987910284945 Shri D.J. Saxena [email protected] 987910126846 Shri Vinod Tiwari, Mgr. [email protected] 9909993276

    XX TORRENT POWER LTD.47 Shri M.H.Kshatriya, G.M. [email protected] 922741014848 Shri Kamal K. Vyas, Mgr. [email protected] 9974079657

    XIX STERLITE GRID LTD49 Shri Sachin Deshpande, G.M. [email protected] 896690304750 Shri Dilip Pradhan, Line Mgr. [email protected] 8966903772

    VEDANTA51 Shri A. Albert Arokiaraj, Mgr. [email protected]

    ACBIL 52 Shri Subhajit Mahato, Asst. Mgr. [email protected]

  • Anaulagnak 2.1

    maah ApOla 2014

    1. INTEGRATED OVER AN-HOURek GaMTo maoM samaakilat

    1.1 MAXIMUM FREQUENCY 50.29 Hz. BETWEEN 1700 Hrs & 1800 Hrs Hrs. ON 20.04.2014AiQaktma AavaRi%t

    1.2 MINIMUM FREQUENCY 49.71 Hz. BETWEEN 2200 Hrs & 2300 Hrs Hrs. ON 26.04.2014nyaUnatma AavaRi%t

    1.3 AVERAGE FREQUENCY 49.95 Hz.AaOsat AavaRi%t

    2. INSTANTANEOUS ta%kailak

    2.1 MAXIMUM FREQUENCY 50.56 Hz. AT 18:02:47 Hrs. ON 20.04.2014AiQaktma AavaRi%t

    2.2 MINIMUM FREQUENCY 49.49 Hz. AT 21:05:59 Hrs. ON 26.04.2014nyaUnatma AavaRi%t

    3. %AGE OF TIME WHEN FREQUENCY WAS APRIL 2014 MARCH 2014 FEBRUARY 2014

    AavaRi%t ka samaya p`itSat maoM

    3.1 BELOW 48.5 Hz. 0.00 0.00 0.00 48.5 hT\ja ko naIcao3.2 BETWEEN 48.5 Hz. AND 48.8 Hz. 0.00 0.00 0.00 48.5 hT\ja AaOr 48.8 hT\ja ko baIca3.3 BETWEEN 48.8 Hz. AND 49.2 Hz. 0.00 0.00 0.00 48.8 hT\ja AaOr 49.2 hT\ja ko baIca3.4 BETWEEN 49.2 Hz. AND 49.5 Hz. 0.00 0.00 0.01

    49.2 hT\ja AaOr 49.5 hT\ja ko baIca3.5 BETWEEN 49.5 Hz. AND 49.7 Hz. 1.23 0.25 0.41 49.5 hT\ja AaOr 49.7 hT\ja ko baIca3.6 BETWEEN 49.7 Hz. AND 49.9 Hz. 29.41 12.65 10.69 49.7 hT\ja AaOr 50.2 hT\ja ko baIca3.7 BETWEEN 49.9 Hz. AND 50.05 Hz. 52.33 47.83 40.14

    49.9 hT\ja AaOr 50.05 hT\ja ko baIca3.8 BETWEEN 50.05 Hz. AND 51.5 Hz. 17.03 39.27 48.76

    50.05 hT\ja AaOr 51.5 hT\ja ko baIca3.9 ABOVE 51.5 Hz. 0.00 0.00 0.00

    51.5 hT\ja ko }pr

    4.1 NO. OF TIMES FREQUENCY 0 0 0 TOUCHED 48.80 Hz. AavaRi%t 48.80 hT\ja kao CUhI

    4.2 NO. OF TIMES FREQUENCY 0 0 0 TOUCHED 48.60 Hz. AavaRi%t 48.60 hT\ja kao CUhI

    4.3 NO. OF TIMES FREQUENCY 0 0 0 TOUCHED 51.00 Hz. AavaRi%t 51.00 hT\ja kao CUhI

    maoM AavaRi%t ko AaMkD,aoM ka ivavarNa

    FREQUENCY PARTICULARS DURING APRIL 2014

    (AS PER FREQUENCY REPORT OF WRLDC)

    (piScama xao~ Baar p`oYaNa kond` kI AavaRi%t irpaoT- ko AaQaar pr)

  • Voltage Profile during the month of Apr. 2014

    दनांकDate

    अिधकतम युनतम अिधकतम युनतम अिधकतम युनतम अिधकतम युनतम अिधकतम युनतम अिधकतम युनतम अिधकतम युनतम अिधकतम युनतमMax. Kv Min. Kv Max. Kv Min. Kv Max. Kv Min. Kv Max. Kv Min. Kv Max. Kv Min. Kv Max. Kv Min. Kv Max. Kv Min. Kv Max. Kv Min. Kv

    1 411 394 413 400 429 407 420 399 416 404 417 405 418 410 416 4012 411 394 413 400 429 411 420 400 416 404 417 405 418 410 416 4013 411 393 415 397 428 400 426 400 414 410 420 402 414 406 418 4014 411 394 414 399 429 403 425 401 416 402 417 407 412 404 415 3985 413 394 416 400 409 409 408 408 414 401 415 403 411 405 415 4016 420 403 423 408 429 402 434 400 415 402 422 406 419 419 424 4077 412 397 417 403 409 409 408 408 413 400 415 404 412 401 414 4018 413 400 418 406 409 409 408 408 414 401 415 404 415 407 415 4009 412 394 417 401 409 409 408 408 413 399 416 405 419 407 413 400

    10 409 393 413 397 428 409 419 394 412 399 416 405 416 408 417 40111 410 394 415 399 409 409 408 408 415 402 418 406 418 411 418 40312 409 390 411 397 409 409 408 408 417 400 415 404 416 406 416 40313 411 394 417 400 425 400 430 411 414 402 412 404 417 407 414 40114 411 389 415 396 428 402 425 400 414 400 420 407 417 407 418 399

    जेतपुरIndore Itarsi Karad Dhule Asoj Kasor Bhilai Jetpur

    व ूतदाब परेखा अूैल 2014 सं नक Annex-2.3

    इंदौर इटारसी कराड धलुे असोज कासोर िभलाई

    15 410 395 414 399 428 402 424 400 413 401 418 405 420 414 418 40216 409 393 413 394 409 409 408 408 414 398 416 405 416 407 414 40317 414 396 417 399 409 409 408 408 413 397 417 401 420 409 414 40218 416 397 419 401 426 403 418 398 414 400 414 403 419 411 413 40319 416 400 418 403 429 406 419 405 414 400 415 403 417 411 415 39820 420 402 423 404 409 409 408 408 420 404 417 405 420 411 420 40321 416 396 417 399 427 402 415 395 418 399 416 403 416 409 414 40222 416 396 417 399 428 402 424 401 414 404 421 410 419 413 414 40223 415 401 421 407 433 402 426 400 415 403 421 406 422 414 416 40424 416 405 420 410 409 409 408 408 416 404 416 407 417 411 415 40225 415 396 419 402 429 404 408 408 416 400 416 407 416 409 413 40226 416 397 417 400 433 405 417 401 417 400 416 405 416 409 415 40127 414 401 424 406 435 412 421 405 414 402 413 404 418 410 415 39528 414 399 418 402 432 402 408 408 413 400 414 405 417 410 413 40229 409 397 423 402 424 405 424 409 421 406 422 401 420 408 419 40630 417 400 426 410 433 403 426 401 413 406 415 409 420 413 412 400

    420 389 426 394 435 400 434 394 421 397 422 401 422 401 424 395

  • दनांकDate

    अिधकतम युनतम अिधकतम युनतम अिधकतम युनतम अिधकतम युनतम अिधकतम युनतम अिधकतम युनतम अिधकतम युनतम अिधकतम युनतमMax. Kv Min. Kv Max. Kv Min. Kv Max. Kv Min. Kv Max. Kv Min. Kv Max. Kv Min. Kv Max. Kv Min. Kv Max. Kv Min. Kv Max. Kv Min. Kv

    1 413 403 407 390 419 404 420 396 754 735 775 743 760 748 775 7592 419 406 412 397 419 404 420 405 754 735 779 750 787 765 797 7663 415 401 408 392 419 398 421 398 758 734 777 743 781 748 780 7594 415 402 408 394 419 403 421 405 750 738 770 745 782 756 783 7585 416 404 409 397 419 402 421 403 751 734 774 753 785 760 788 7646 419 405 414 389 423 406 428 406 746 733 772 749 785 754 780 7507 417 408 414 402 419 403 423 405 756 741 770 755 796 773 789 7738 419 411 410 406 419 406 421 406 758 739 769 749 787 773 792 7789 417 405 411 398 418 401 423 402 751 736 771 744 788 761 788 766

    10 413 402 409 397 415 398 420 400 749 736 759 743 783 762 779 76111 413 402 409 397 417 400 424 402 755 739 766 749 781 758 781 76612 409 399 402 383 417 399 420 402 757 745 767 747 771 755 774 75513 415 402 406 396 418 400 424 403 760 746 777 751 779 760 786 76514 414 399 405 395 417 396 423 398 757 741 775 741 775 757 780 75515 411 403 400 394 416 400 421 401 756 743 776 755 767 754 780 765

    वािलयर बनाBina Gwalior Nagda Khandwa Sipat seoni Gwalior Bina

    बना वािलयर नागदा खंडवा िसपत िसविन

    15 411 403 400 394 416 400 421 401 756 743 776 755 767 754 780 76516 411 400 404 389 414 396 421 396 758 736 773 751 777 746 775 76017 411 400 404 389 419 399 426 401 756 740 773 751 777 746 775 76018 417 407 410 399 420 402 424 404 760 747 784 765 781 762 788 77119 419 407 409 392 420 404 422 406 756 743 779 751 781 750 788 76320 422 407 406 397 425 407 426 407 758 746 777 755 776 757 790 76721 417 401 404 394 419 405 419 397 754 742 769 746 770 753 781 75822 414 405 410 391 419 405 419 397 754 742 780 733 782 747 788 75223 421 410 410 399 421 407 430 411 757 743 789 758 784 761 794 77524 420 412 410 399 421 410 427 413 757 746 782 759 782 762 792 77525 418 409 407 400 421 402 424 405 756 738 770 765 779 763 785 76826 418 406 409 399 420 402 423 403 755 744 771 752 780 760 787 76827 423 406 418 395 420 407 427 411 755 744 783 760 800 755 805 76728 416 404 409 397 419 403 424 405 760 748 782 759 783 760 792 76929 416 406 407 397 416 405 418 403 759 740 781 764 781 761 789 77330 421 413 410 400 423 409 432 411 767 754 796 764 789 765 801 779

    423 399 418 383 425 396 432 396 767 733 796 733 800 746 805 750

  • Annexure-2.5

    Power Cut/Restrictions in Western Region for the month of April-2014 k : gaujarat Gujarat

    1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM 1 Power Cut/ Restriction on Industries a) All industries are allowed to run their units on all days of week & if they want to avail staggered holiday,

    then they will have to staggered on notified day only & cannot avail as per their choice. b) All industries are required to keep their recess timings staggered. 2 kRiYa va ga`amaINa xao~aoM kao ivaVut AapUit- 2. Power supply to Agricultural & Rural Sectors

    a) Only 8 Hrs. Power supply in staggered form in rotation of day & night is given to Ag. Single Phase supply during rest of 16 Hrs by providing LSTC.

    b) Jyotigram Yojana 24 hrs. 3 Anya jaanakarI 3. Any other information: NIL. K : maQya p`doSa Madhya Pradesh 1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM / pabMaidyaaM , rajya maoM Baar inayamana Aaid 1 Power Cut/ Restriction on Industries, Load Shedding in the state etc

    ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

    power cut (MW)

    pabandI ka samayaRestriction Timing

    p`it idna kula }jaa- kTaOtITotal Energy Cut

    (MUs /day sao From tk To (a) Power Restrictions(Evening peak Hour) on non continuous process HT/LT IndustriesM (b) Baar inayamana Load Shedding

    SaUnya Nil SaUnya Nil

    SaUnya Nil

    SaUnya Nil

    SaUnya Nil

    SaUnya Nil

    SaUnya Nil

    SaUnya Nil

    (c) Anya jaanakarI Other information 1.Weekly Off 2.Staggering of power supply

    SaUnya Nil SaUnya Nil

    SaUnya Nil SaUnya Nil

    SaUnya Nil SaUnya Nil

    SaUnya Nil SaUnya Nil

    2 kRiYa xao~ kao ivaVut AapUit- 2. Power supply to Agricultural Sector: -

    ivavarNa Details sao From idnaaMk Date

    tk To idnaaMk Date

    p`it idna AapUit- GaMTo Supply Hours per day Max. (Hrs) Min. (Hrs) Average (Hrs)

    2.1 Three-Phase Supply(DLF)

    01.04.2014 30.04.2014 23:54 23:13 23:38

    2.1 Three-Phase Supply(Irrigation)

    01.04.2014 30.04.2014 09:55 09:43 09:51

    2.1 Three-Phase Supply(Mixed)

    01.04.2014 30.04.2014 23:53 23:13 23:35

  • 3 Anya jaanakarI 3. Any other information

    SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban Areas ivavarNa Details sao From

    idnaaMk Date tk To idnaaMk

    Date Aaosat p`itidna Average Supply AapUit- GaMTo Hours per day

    Max. (Hrs)

    Min. (Hrs) Average (Hrs)

    3.1 Commissionary H. Qtrs. 01.04.2014 30.04.2014 23:58 23:31 23:50 3.2 District Head Qtrs. 01.04.2014 30.04.2014 23:59 23:35 23:50 3.3 Tehsil Head Qtrs. 01.04.2014 30.04.2014 23:55 23:29 23:44

    ga : maharaYT/ Maharashtra 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM / pabMaidyaaM , rajya maoM Baar inayamana Aaid 1. Power Cut/ Restriction on Industries, Load Shedding in the state etc

    ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

    power cut (MW)

    pabandI ka samayaRestriction Timing

    p`it idna kula }jaa- kTaOtITotal Energy Cut

    (MUs /day From To (a) Power Cuts/Restriction on HT/ LT Industries (b) Load Shedding From 01.04.14 to 30.04.14

    SaUnya Nil

    @ 0-970MW

    SaUnya Nil

    00.00

    SaUnya Nil 24.00

    SaUnya Nil

    @ 6 MUs/day

    (c) Any other information 1.Weekly Off 2. Staggering of power supply Industrial Staggering LS withdrawn from 03/02/2012

    SaUnya Nil

    SaUnya Nil

    SaUnya Nil

    SaUnya Nil

    2 kRiYa xao~ kao ivaVut AapUit- 2. Power supply to Agricultural Sector

    ivavarNa Details sao From idnaaMk Date

    tk To idnaaMk Date

    p`it idna AapUit- GaMTo Supply Hours per day

    Max. (Hrs) Min. (Hrs) Average (Hrs) 2.1 Three-Phase Supply 01.04.2014 30.04.2014 10:00 08:00 09:00

    2.2 Single-Phase Supply 01.04.2014 30.04.2014 18:00 18:00 18:00 3 Anya jaanakarI Any other information:

    There is no load shedding on industrial feeders in Maharashtra

  • Ga : C%tIsagaZ, Chhattisgarh: 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM / pabMaidyaaM , rajya maoM Baar inayamana Aaid 1 Power Cut/ Restriction on Industries, Load Shedding in the state etc

    ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of power cut (MW)

    pabandI ka samaya Restriction Time

    p`it idna kula }jaa- kTaOtI

    Total Energy Cut (MUs /day)

    sao From tk To

    (A) Scheduled (a) (i) Power Cuts/ Restriction on HT Industries (ii) Power Cuts/Restriction on LT Industries (iii) Power Cuts/Restriction on Rural (iv) Agriculture pump* (v)Urban/ Sub-Urban (iv)Town feeders(C-1to C-6) (B) Un-Scheduled (a) Load Shedding

    00.00(Av)

    00.00(Av)

    00.00 (Av)

    45.67 (Av) of 28 days 00.00(Av) 00.00 (Av)

    1.Rural 73.28 (Av) 2.Town Feeders (C-1to C-6 & X) : 0.00(Av)

    - - -

    17.00 - - -

    - - -

    23.00 - - - -

    - - -

    0.274 - -

    0.130 -

    3. HT Industries 82.50 (Av) 0.018 Total Energy Cut/day ( b) Any other information 1.Weekly Off/staggering of power supply

    1day (In a week as per consumer’s option) 50MW(Av.)

    -

    -

    0.422

    2 kRiYa xao~ kao ivaVut AapUit- 2. Power supply to Agricultural Sector

    ivavarNa Details sao From idnaaMk Date

    tk To idnaaMk Date

    p`it idna AapUit- GaMTo Supply Hours per day Max. (Hrs) Min. (Hrs) Average (Hrs)

    2.1 Three-Phase Supply 01.04.2014- 30.04.2014, 6.00 Hrs (Power cut)

    18.00

    2.2 Single-Phase Supply - - - - - 2.3 Remarks/Note/ - - - - -

    *-up till 30/3/2014, as conveyed to SLDC, CSPTCL for power cut under Atal Jyoti scheme by Raipur & Durg region, CSPDCL 3 Anya jaanakarI / Any other information: SaUnya Nil ca : gaaovaa Goa: SaUnya Nil

  • प म े ऽय भार ूेषण कि, मु बई ूणाली ूचालन-ISO-I

    संल नकAnnex-2.6 पावर िसःटम ऑपरेशन कारपोरेशन िलिमटेड

    (पावरिमड क एक पूण ःवािम व वाली कंपनी)

    प म े ऽय भार ूेषण के ि,मु बई Power System Operation Corporation Ltd. (A wholly owned subsidiary company of POWERGRID)

    Western Regional Load DespatchCentre,Mumbai

    अिनवाय युिनट आऊटेज का अूैल2014का वःता रत यौरा Details of forced unit outages during the month ofApril.2014

    अन ुबमांक Sl.No

    यिुनट Unit

    सघंटक Constituent/IPP

    मता मेगावॉटCap.MW

    स o From

    समय दनांक

    स o From

    समय दनांक

    कारण Reason

    Time Date Date

    1. एःसार Essar-2

    गुरा विनिल GSECL

    172 12:12 22-Feb-13 अनपुल ध Still out

    अनपुल ध Still out

    Shortage of gas

    2. ड जीबीपी DGBP-2

    गुरा विनिल GSECL

    112 10:57 1-Apr-14 6:43 10-Apr-14 Less requisition

    3. एएलट पीएस ALTPS - 1

    गुरा विनिल GSECL

    125 23:17 3-Apr-14 NA 06-Apr-14 Boiler fins problem

    4. डब यूट पीएस WTPS-2

    गुरा विनिल GSECL

    210 22:26 8-Apr-14 20:30 19-Apr-14 Turbine axial shift high

    5. एएलट पीएस ALTPS-2

    गुरा विनिल GSECL

    125 16:30 11-Apr-14 7:40 16-Apr-14 BTL

    6. एएलट पीएस ALTPS-1

    गुरा विनिल GSECL

    125 14:20 21-Apr-14 14:22 29-Apr-14 BTL

    7. एसएलपीपी SLPP - 4

    गुरा विनिल GSECL

    125 19:32 29-Apr-14 13:17 2-May-14 BTL

    8. एपीएल APL-1

    अदानी ADANI

    330 12:15 17-Apr-14 16:04 20-Apr-14 Condenser tube leakage

    9. एपीएल APL-8

    अदानी ADANI

    660 10:19 20-Apr-14 0:16 27-Apr-14 Air pre-heater problem

    10. वीआईपीएल VIPL-I

    मारा वउकंिल MSPGCL

    300 1:05 2-Oct-13 12:49 1-Apr-14 Turbine bearing vibration probl em

    11. टाटा TATA-8

    मारा वउकंिल MSPGCL

    250 22:55 9-Jan-14 अनपुल ध Still out

    अनपुल ध Still out

    H/T due to fire near turbine generator desk

    12. डब यूपीसीएल WPCL-1

    मारा वउकंिल MSPGCL

    135 12:45 30-Jan-14 अनपुल ध Still out

    अनपुल ध Still out

    Furnace press high

    13. कोराड Koradi-5

    मारा वउकंिल MSPGCL

    300 4:04 23-Feb-14 12:12 10-Apr-14 Electrical fault

    14. एपीएमएल APML-2

    मारा वउकंिल MSPGCL

    660 11:32 20-Mar-14 2:03 14-Apr-14 BTL

  • प म े ऽय भार ूेषण कि, मु बई ूणाली ूचालन-ISO-I

    15. पल Parli-5

    मारा वउकंिल MSPGCL

    210 12:18 25-Mar-14 17:32 10-Apr-14 Stator earth fault

    16. वीआईपीएल VIPL-I

    मारा वउकंिल MSPGCL

    300 1:05 1-Apr-14 10:47 8-Apr-14 BTL

    17. डब यूपीसीएल WPCL-4

    मारा वउकंिल MSPGCL

    135 0:01 3-Apr-14 Ready Ready Less requisition

    18. नािसक NASIK-3

    मारा वउकंिल MSPGCL

    210 17:15 5-Apr-14 12:25 9-Apr-14 BTL

    19. कोराड Koradi-6

    मारा वउकंिल MSPGCL

    210 1:01 8-Apr-14 14:03 13-Apr-14 ID fan problem

    20. जयगढ Jaigarh(JSW)

    मारा वउकंिल MSPGCL

    300 11:05 13-Apr-14 13:22 13-Apr-14 Low vacuum pressure

    21. पल Parli-7

    मारा वउकंिल MSPGCL

    250 13:11 13-Apr-14 16:17 13-Apr-14 Low drum level

    22. एपीएमएल APML-4

    मारा वउकंिल MSPGCL

    660 4:35 14-Apr-14 6:24 28-Apr-14 Evocation constraint

    23. भुसावल Bhusawal - 4

    मारा वउकंिल MSPGCL

    500 23:07 14-Apr-14 23:32 18-Apr-14 BTL

    24. भुसावल Bhusawal - 5

    मारा वउकंिल MSPGCL

    500 14:59 17-Apr-14 19:10 22-Apr-14 BTL

    25. चंिपुर Chandrapur-I

    मारा वउकंिल MSPGCL

    210 22:30 17-Apr-14 7:05 21-Apr-14 Boiler validity extension

    26. इं डयाबलु Indiabulls(A)-1

    मारा वउकंिल MSPGCL

    270 19:50 19-Apr-14 17:41 28-Apr-14 Coal shortage

    27. भुसावल Bhusawal - 2

    मारा वउकंिल MSPGCL

    210 4:10 20-Apr-14 6:03 24-Apr-14 Bearing temp high

    28. पल Parli-4

    मारा वउकंिल MSPGCL

    210 17:52 25-Apr-14 अनपुल ध Still out

    अनपुल ध Still out

    Flame failure

    29. एपीएमएल APML-3

    मारा वउकंिल MSPGCL

    660 0:33 26-Apr-14 6:37 1-May-14 BTL

    30. आरजीपीपीएल RGPPL-2B

    आरजीपीपीएल RGPPL

    320 0:00 16-Jan-14 13:43 8-Apr-14 Less requisition

    31. आरजीपीपीएल RGPPL 3B

    आरजीपीपीएल RGPPL

    320 12:30 8-Feb-14 Ready Ready Less requisition

    32. आरजीपीपीएल RGPPL-1B

    आरजीपीपीएल RGPPL

    320 23:00 31-Mar-14 अनपुल ध Still out

    अनपुल ध Still out

    Less requisition

    33. आरजीपीपीएल RGPPL-3A

    आरजीपीपीएल RGPPL

    320 0:00 31-Mar-14 18:57 17-Apr-14 Boiler certification

    34. आरजीपीपीएल RGPPL 2A

    आरजीपीपीएल RGPPL

    320 0:00 31-Mar-14 Ready Ready Less requisition

    35. आरजीपीपीएल RGPPL-1A

    आरजीपीपीएल RGPPL

    320 20:00 2-Apr-14 Ready Ready Less requisition

    36. आरजीपीपीएल RGPPL-2B

    आरजीपीपीएल RGPPL

    320 19:45 12-Apr-14 Ready Ready Less requisition

    37. आरजीपीपीएल RGPPL-3A

    आरजीपीपीएल RGPPL

    320 18:57 17-Apr-14 अनपुल ध Still out

    अनपुल ध Still out

    Less requisition

  • प म े ऽय भार ूेषण कि, मु बई ूणाली ूचालन-ISO-I

    38. सातपुरा Satpura-11

    मू वउकंिल MPPGCL

    250 23:44 12-Apr-14 16:10 16-Apr-14 ETL

    39. िसंघाजी Singhaji-1

    मू वउकंिल MPPGCL

    600 00:10 14-Apr-14 अनपुल ध Still out

    अनपुल ध Still out

    Boiler inspection

    40. अमरकनटक Amarkantak-3

    मू वउकंिल MPPGCL

    120 21:30 17-Apr-14 0:45 2-May-14 BTL

    41. सातपुरा Satpura-11

    मू वउकंिल MPPGCL

    250 18:52 23-Apr-14 23:11 1-May-14 Electrical protectionOperated

    42. सातपुरा Satpura-6

    मू वउकंिल MPPGCL

    200 21:15 24-Apr-14 21:00 27-Apr-14 BTL

    43. जेपी बना JP BINA-1

    मू वउकंिल MPPGCL

    250 22:06 26-Apr-14 1:44 3-May-14 GT bushing prob.

    44. अमरकनटक Amarkantak-4

    मू वउकंिल MPPGCL

    120 11:13 30-Apr-14 अनपुल ध Still out

    अनपुल ध Still out

    Electrical fault

    45. ससान SASAN-2

    रलायंस RELIANCE

    660 19:16 22-Apr-14 6:05 28-Apr-14 Water leakage BFP RC line NRV

    46. ससान SASAN-2

    रलायंस RELIANCE

    660 20:14 28-Apr-14 3:55 7-May-14 Air pre heater problem

    47. लॅ को Lanco-2

    लॅ को Lanco

    300 12:20 21-Aug-13 अनपुल ध Still out

    अनपुल ध Still out

    Coal shortage

    48. वंदना Vandana-1

    वंदना Vandana

    135 1:49 12-Jan-14 अनपुल ध Still out

    अनपुल ध Still out

    BTL

    49. जेपीएल ःटेज JPL-stage-II-I

    जेपीएल JPL 600 16:41 7-Apr-14 13:50 12-Apr-14 GT protection (Y-Phase) 50. जेपीएल तामनार

    JPL Tamnar-2 जेपीएल JPL 600 9:20 15-Apr-14 22:37 21-Apr-14 CHP problem

    51. जेपीएल JPL II जेपीएल JPL 600 23:42 29-Apr-14 अनपुल ध Still out

    अनपुल ध Still out

    Bunkering problem

    52. कावास Kawas-1B

    एनट पीसीNTPC 164 18:43 16-Mar-14 11:21 4-Apr-14 Less requisition

    53. गांधार Gandhar-3

    एनट पीसीNTPC 219 0:24 26-Mar-14 9:38 3-May-14 Less requisition

    54. कावासKawas2B एनट पीसीNTPC 164 15:52 26-Mar-14 8:30 31-Mar-14 Turbine compartment fan tripped

    55. कावास Kawas 2A

    एनट पीसीNTPC 164 1:51 28-Mar-14 Ready Ready Less requisition

    56. कावासKawas2B एनट पीसीNTPC 164 8:30 31-Mar-14 5:07 16-Apr-14 Less requisition

    57. कॅ स KAPS-2

    एनपीसी NPC

    220 2:07 7-Apr-14 अनपुल ध Still out

    अनपुल ध Still out

    Maintenance

    58. मौदा MOUDA-2 एनट पीसीNTPC 500 1:30 7-Apr-14 10:07 10-Apr-14 BTL 59. कावास Kawas-1A एनट पीसीNTPC 164 0:33 12-Apr-14 8:19 15-Apr-14 Less requisition 60. कावासKawas 2B एनट पीसीNTPC 164 0:23 17-Apr-14 5:48 29-Apr-14 Less requisition 61. िसपत SIPAT-5 एनट पीसीNTPC 500 0:01 27-Apr-14 9:42 1-May-14 Boiler license renewal

    Note: Units out for more than 72 hrs are only included.

  • प म े ऽय भार ूेषण कि, मु बई ूणाली ूचालन-ISO-I

    संल नकAnnex-2.7 पावर िसःटम ऑपरेशन कारपोरेशन िलिमटेड

    (पावरिमड क एक पूण ःवािम व वाली कंपनी)

    प म े ऽय भार ूेषण के ि,मु बई Power System Operation Corporation Ltd. (A wholly owned subsidiary company of POWERGRID)

    Western Regional Load DespatchCentre,Mumbai

    िनयो जत युिनट आऊटेज का अूैल 2014 का वःता रत यौरा Details of planned unit outages during the month of April.2014

    अन ुबमांक Sl.No

    यिुनट Unit

    सघंटक Constituent/IPP

    मता मेगावॉटCap.MW

    स o From

    समय दनांक

    सo From

    समय दनांक

    कारण Reason

    Time Date Time Date

    1. पल ParlI-3

    मारा वउकंिल MSPGCL

    210 23:51 13-Feb-13 अनपुल ध Still out

    अनपुल ध Still out

    AOH

    2. Khaperkheda-3 मारा वउकंिल MSPGCL

    210 5:14 1-Apr-14 19:08 3-May-14 AOH

    3. जयगढ Jaigad-3

    मारा वउकंिल MSPGCL

    300 23:45 14-Apr-14 2:30 29-Apr-14 AOH

    4. कोराड Koradi-5

    मारा वउकंिल MSPGCL

    200 19:21 10-Apr-14 अनपुल ध Still out

    अनपुल ध Still out

    Coal conservation

    5. सीजीपीएल CGPL-10

    टाटा TATA

    830 1:32 1-Apr-14 अनपुल ध Still out

    अनपुल ध Still out

    AOH

    6. वीएसट पीएस VSTPS - 4

    एनट पीसीNTPC 210 0:10 1-Apr-14 23:30 7-Apr-14 AOH

    7. वीएसट पीएस VSTPS-2

    एनट पीसीNTPC 210 0:05 8-Apr-14 14:36 27-Apr-14 AOH

    8. कोरबा Korba - 5

    एनट पीसीNTPC 500 0:04 15-Apr-14 अनपुल ध Still out

    अनपुल ध Still out

    AOH

    9. वीएसट पीएस VSTPS-I

    एनट पीसीNTPC 210 20:10 28-Apr-14 अनपुल ध Still out

    अनपुल ध Still out

    AOH

  • Annex- 3.1

    (MW) sao From tk To1 gau}ivainaila GUVNL

    1.1 EPGL 1 500 15-May-14 8-Jun-14 AOH

    1.2 STPS 1 120 29-May-14 18-Jun-14 AOH

    1.3 DGB 2 112 13-Jun-14 27-Jun-14 HGPI

    1.4 UTPS 4 200 15-Jun-14 19-Jul-14 COH

    1.5 SLPP 2 125 15-Jun-14 4-Jul-14 COH

    1.6 GTPS 4 210 20-Jun-14 10-Jul-14 AOH

    1.7 WTPS 5 210 20-Jun-14 29-Jul-14 COH1.8 SUGEN 20 382.5 26.05.14 01.06.14 MINOR INSPECTION

    2NIL

    3 Craiva]kMila CSPGCL

    3.1 KORBA-E 3 50 21.05.14 30.06.14 COH

    4

    NIL

    5 koMd``Iya xao~ Central Sector5.1

    KSTPS 4500 13-Jun-14 11-Aug-14

    AOH

    5.2VSTPS 3 210

    22-May-14 28-May-14LICENCE RENEWAL

    5.3VSTPS

    8 500 1-Jun-14 15-Jul-14COH

    5.4 SSTPS 2 500 3-May-14 18-Jun-14 COH5.5 KGPP 2A 106 17-Jun-14 16-Aug-14 R&M5.6 VSTPS GT1 144 15-May-14 28-Jun-14 C ISP+R&M5.7 CGPL 50 800 1-Jun-14 30-Jun-14 COH5.8 KGPP 2C 116 28-Jun-14 11-Aug-14 R&M

    DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING MAY 2014 AND JUNE 2014

    Capacity Outage as per Annual Maintenance Plan

    maraiva]kMila MSPGCL

    map`iva]kMila MPPGCL

    ReasonS. No. Unit No.

  • SN KV Line Basis Reason System  Agency TypeDate Time Date Time

    1 400 Bina ‐ Shujalpur Ckt. 1&2 14‐May‐14 8:00 31/May/14 18:00 Daily Online replacement of E/W with OPGW.   POWERGRID WR‐II2

    400 Bus ‐1 shutdown AT CGPL 15‐May‐14 8:00 15‐May‐14 18:00 DailyBus ‐1 shutdown for insulator replacement  of unit 10 Gantry as well as bus isolator 

    checking purposeCGPL CGPL R

    3 765 Dharamjaygarh‐Bilspur line 17‐May‐14 8:00 18/May/14 18:00 Continous LILO works WRTS‐I POWERGRID C4 765 Dharamjaygarh‐Ranchi‐2 line 17‐May‐14 8:00 18/May/14 18:00 Continous LILO works WRTS‐I POWERGRID C5 765 765KV Bay no.‐, 705 (Seoni‐1  Tie) at Bilaspur S/s 17‐May‐14 8:00 18/May/14 18:00 Daily CSD (Control switching)Commissioning 

    work WRTS‐I POWERGRID C

    6 400 Raipur‐Bhadrawati ckt‐II 17‐May‐14 10 17/May/14 18 Daily  bushing replacement of LR WRTS‐I POWERGRID R7 220 KV Kawas‐Haldarva‐1 17‐May‐14 9:00 17/May/14 19:00 Daily distance relay testing. NTPC NTPC R8 400 Amreli‐Jetpur‐1 17‐May‐14 8:00 17/May/14 18:00 Daily PMM GETCO GETCO R9 765 1500 ICT‐1, Durg PS 17‐May‐14 8:00 17/May/14 18:00 Daily for commissioing  RTCC WRTS‐I POWERGRID C

    10 765BUS ‐1 , Kotra PS

    17‐May‐14 8:00 20/May/14 18:00 Daily Rectification of construction defects of Bus Isolator

    WRTS‐I POWERGRID C

    11 400 Satna‐Bina#2 17‐May‐14 10:00 Hrs 17/May/14 18:00 Hrs Daily Commissioning of CSD Relay in ABB make Main CB at Satna

    POWERGRID WR‐II

    12 220 Kawas‐Ichhapore 1 +Bus 2 @ Kawas 17‐May‐14 9:00 17/May/14 18:00 Daily RTV Coating NTPC NTPC13 220 Bhilad ‐ Vapi (PG) ‐ 2 17‐May‐14 8:00 17/May/14 18:00 Daily PMM GETCO GETCO14 400

    Chorania Hadala17‐May‐14 8:00 17/May/14 18:00 Daily PMM GETCO GETCO

    C

    15 400 400 KV D h(PGCIL) K t i Ckt 17 M 14 8 00 17/M /14 18 00 D il F i t k MPPTCL EHT M& I C

    ANNEXURE‐3.2A

    Outages Proposal of Transmission elements during the month of MAY -2014       From To   

    15 400 400 KV Damoh(PGCIL)‐Katni Ckt 17‐May‐14 8.00 17/May/14 18.00 Daily For maintenance work MPPTCL EHT‐ M& I C16 400 Dehgam‐Ranchodpura‐1 17‐May‐14 8:00 18/May/14 18:00 Daily PMM GETCO GETCO R

    17 765 Bus‐I ,Dharamjaygarh 18‐May‐14 8:00 19/May/14 18:00 Continous For line dropper , Bus connection and  WRTS‐I POWERGRID C18 765 1500 MVA ICT‐1, Tamnar PS 18‐May‐14 8:00 18/May/14 18:00 Daily For commissioing of CSD  WRTS‐I POWERGRID C19 765 Bus‐II ,Dharamjaygarh 19‐May‐14 8:00 20/May/14 18:00 Continous For line dropper , Bus connection and  WRTS‐I POWERGRID C20 220 KV Kawas‐Haldarva‐2 19‐May‐14 9:00 19/May/14 19:00 Daily distance relay testing. NTPC NTPC R

    21 400KVKorba Korba(West)

    19‐May‐14 9:00 20/May/14 19:00 Continuous  Bay  Maint., equipment testing and protection testing.

    NTPC NTPC R

    22 765 1500 ICT‐2, Tamnar PS 19‐May‐14 8:00 19/May/14 18:00 Daily For commissioing of CSD  WRTS‐I POWERGRID C23 765 765KV Bay no.‐717, 718 (ICT#3 Dia) at Bilaspur 

    s/s19‐May‐14 8:00 20/May/14 18:00 Daily CSD (Control switching)Commissioning 

    workWRTS‐I POWERGRID C

    24 400 SSP‐Dhule‐1 19‐May‐14 8:00 20/May/14 18:00 Daily Relay testing at RBPH /SSP NCA25 400 Korba(west) ‐ Raita line‐I at korba 19‐May‐14 8:30am 24/May/14 18:00 Daily For replacement of existing control &  CSPTCL CSPTCL M26

    400 Korba Korba(West) 19‐May‐14 08:30 Hrs 20/May/14 17:30 Hrs. days continuo Bay  Maint., equipment testing and 

    protection testing.NTPC NTPC

    27 220 Kawas‐Ichhapore 2 +Bus 2 @ Kawas 19‐May‐14 9:00 19/May/14 18:00 daily RTV Coating NTPC NTPC28 220 Bhilad ‐ Vapi (PG) ‐ 3 19‐May‐14 8:00 19/May/14 18:00 Daily PMM GETCO GETCO29 220 Pithampur‐Rajgarh(PGCIL)  Ckt ‐ II 19‐May‐14 9.00 19/May/14 17.00 daily For maintenance work MPPTCL EHT ‐M&I C30 400 315 MVA 400/220Kv X‐mer III At Nagda S/S 19‐May‐14 8.00 19/May/14 17.00 daily For maintenance work MPPTCL EHT ‐M&I R31

    400 Bhachau‐ Ranchhodpura #1&2 19‐May‐14 8:00 26/May/14 18:00 ContinuousTower shifting work at canal 

    crossing/Insulator replacement workPOWERGRID WR‐II / GETCO C

    32 765 Seoni ‐ Bina ‐ Main bay (727) 19‐May‐14 8:00 19‐May‐14 18:00 Daily basis AMP works WRTS‐1 Powergrid33 765 765kV D/C Raigarh (Kotra) – Raigarh (Tamnar) 20‐May‐14 8:00 28/May/14 18:00 Continuous For diversion of certain portion of the line 

    near Monnet Expansion areaWRTS‐I POWERGRID c

    34 400 Soja ‐ Wanakbori 20‐May‐14 8:00 20/May/14 18:00 Daily PMM GETCO GETCO R35 400

    400 KV   Indore ‐ Itarsi Ckt‐II20‐May‐14 8:00 21/May/14 18:00 daily Crossing /stringing work of 400 kv Sarni‐

    Ashta LinePGCIL  EHT‐ M& I C

  • 36 400/220 ICT‐1 at Khedamara 20‐May‐14 8:00 21/May/14 18:00 Delta testing CSPTCL CSPTCL R

    37 400Seoni‐Khandwa # 2

    20‐May‐14 10:30 20/May/14 12:30 Daily Calibration of OTI & WTI of reactor at Seoni. Line outage is required for taking 

    Reactor out & in.

    WRTS‐2 WRTS‐I R

    38 400 Kolhapur‐Mapusa # 1 20‐May‐14 8:00 25/May/14 0:00 Daily Insulator replacement work WRTS‐I WRTS‐I R39 400 400 KV  S/C Sarni ‐ Itarsi Ckt 20‐May‐14 8:00 21/May/14 18:00 daily Crossing /stringing work of 400 kv Sarni‐ PGCIL EHT‐ M& I C40 765 1500 ICT‐3, Tamnar PS 20‐May‐14 9:00 20/May/14 18:00 Daily For commissioing of CSD  WRTS‐I POWERGRID C41 400

    Bus‐I at Raigarh20‐May‐14 8:00 20/May/14 18:00 Daily Construction of bay shifting of Kotra‐2 & 

    Raipur ckt‐4WRTS‐I POWERGRID C

    42 400 Dgen‐Navsari‐2 20‐May‐14 9:00 21/May/14 18:00 Continuous Maintenance job and EMVT Checking tel‐dgen tel‐dgen m43 400 220 KV DHULE DONDAICHA LINE( Sec11/0‐12/0)  20‐May‐14 8:00 25/May/14 18:00 Continous Hot line Crossing of Dhule‐Vadodara 765 kv  MSETCL BDTCL  line cross44 400 Koradi‐Satpura 20‐May‐14 9:00 20/May/14 18:00 Daily Earthwire tighting work damaged during 

    Crossing workWRTS‐I ADANI

    45 400 Bina‐Bina#4 20‐May‐14 10:00 Hrs 20/May/14 15:00 Hrs Daily AMP POWERGRID WR‐II46

    400 400 KV   Nagda‐Rajgarh(PGCIL) Ckt‐I 20‐May‐14 9.00 20/May/14 18.00 daily For maintenance work MPPTCL  EHT‐ M& I C

    47 220 GWL(PGCIL)‐Malanpur Ckt‐II 20‐May‐14 9.00 21/May/14 17.00 daily For maintenance work MPPTCL EHT ‐M&I C

    48 765 1000MVA ICT#1 at Sipat 20‐May‐14 08:00 Hrs 20/May/14 19:00 Hrs Daily SPS Implementation works NTPC NTPC R49 765 Seoni ‐ Bina ‐ Main bay (727) 20‐May‐14 8:00 20‐May‐14 18:00 Daily basis AMP works WRTS‐1 Powergrid50 400 Soja ‐ Wanakbori 21‐May‐14 8:00 21/May/14 18:00 Daily PMM GETCO GETCO R51 765

    Seoni‐Wardha‐I Switchable L/R at Seoni21‐May‐14 8:00 25/May/14 18:00 Daily Construction of firewall & Commissioning 

    of CSD in reactor breaker & with /

    WRTS‐1 WRTS‐1 C

    52 400 Navsari‐Kala‐Vapi line 21‐May‐14 0.33 21/May/14 18.00 Daily Balance work in Navasari‐ Boisar line on same M/C tower

    WRTS‐II WRTS‐I C

    53 400 S it h bl 50M R t (B R t ) t 21 M 14 0 33 26/M /14 18 00 C ti R l t f 50MV R t b WRTS I WRTS I C53 400 Switchable 50Mvar Reactor (Bus Reactor) at Seoni

    21‐May‐14 0.33 26/May/14 18:00 Conti. Replacement of 50MVar Reactor by 125MVar Reactor

    WRTS‐I WRTS‐I C

    54 400Bus‐1 at Seoni

    21‐May‐14 0.33 23/May/14 18:00 Daily Erection of New 125MVar Bus Reactor at Seoni.

    WRTS‐I WRTS‐I C

    55 220Vapi ‐ Khadoli # 2

    21‐May‐14 8:00 21/May/14 18:00 Daily LILO of 220kV Vapi‐ Khadoli Ckt.2 at Kala SS Powergrid WR‐II C

    56 765BUS ‐2,Kotra PS

    21‐May‐14 8:00 24/May/14 18:00 Daily Rectification of construction defects of Bus Isolator

    WRTS‐I POWERGRID C

    57 400Bus‐II at Raigarh

    21‐May‐14 8:00 21/Jun/14 18:00 Daily Construction of bay shifting of Kotra‐2 & Raipur ckt‐4

    WRTS‐I POWERGRID C

    58 400 SSP‐Kasor 21‐May‐14 8:00 23/May/14 18:00 Cont. Relay testing59

    400 Indore (PG) ‐ Indore (MP) Ckt.1 21‐May‐148:00

    21/May/1418:00 Daily Stringing of Circuit 2  portion of 765kV 

    Indore ‐ Vadodara linePOWERGRID

    WR‐IIC

    60400 Indore (PG) ‐ Vadodara (Asoj) 21‐May‐14

    8:0021/May/14

    18:00 Daily Stringing of double circuit portion of 765kV Indore ‐ Vadodara line

    POWERGRIDWR‐II

    C

    61 400 Raipur‐Wardha # 1 21‐May‐14 9:00 21/May/14 18:00 Daily Balance construction works WRTS‐I WRTS‐I62 400 Bus Reactor#1 at Satna 21‐May‐14 10:00 Hrs 21/May/14 18:00 Hrs Daily Commissioning of CSD Relay in ABB make 

    Main CB at SatnaPOWERGRID WR‐II

    63 400KV Solapur(MS)‐Parli(MS)‐S/c 21‐May‐14 9.00 21/May/14 17.00 Daily Q.M.work. MSETCL MSETCL64 220 Navsari ‐ Nasik ‐ 1 21‐May‐14 8:00 24/May/14 18:00 Daily PMM GETCO/MSETCL GETCO R

    65 400 400 KV   Nagda‐Rajgarh(PGCIL) Ckt‐II 21‐May‐1