    State EstimationState Estimation

    Remote Terminal Unit (Remote Terminal Unit (RTURTU) installed at a substation) installed at a substation door opendoor open

  • 8/6/2019 ATPS - State Estimation S8

    2/21

    Plays very important role inPlays very important role in MonitoringMonitoring ofPSofPS

    ControlControl ofPSofPS

    Security controlSecurity control

    Economic DispatchEconomic Dispatch

    AimAim ObtainObtain bestbest system state variablessystem state variables to fit ato fit a

    scatter of datascatter of data

    Scatter of data due toScatter of data due to Imperfect measurementsImperfect measurements Variations in transmission line linear modelsVariations in transmission line linear models

    Line charging etcLine charging etc

  • 8/6/2019 ATPS - State Estimation S8

    3/21

    Imperfect measurements are due toImperfect measurements are due to Signal noiseSignal noise

    Metering accuracyMetering accuracy AA\\ D conversionD conversion

    NoisyNoisy datadata areare bestbest modeledmodeled asas randomrandom

    variablesvariables

    HenceHence estimatingestimating statestate variablesvariables isis basedbased ononstatisticalstatistical criterioncriterion

    InIn PS,PS, statestate variablesvariables areare voltagevoltage magnitudesmagnitudes && phasephase anglesangles atat systemsystem

    nodesnodes

  • 8/6/2019 ATPS - State Estimation S8

    4/21

    HistoryHistory

    MajorMajor developmentsdevelopments takentaken placeplace inin aerospaceaerospace

    fieldfield inin 2020thth centurycentury

    ProblemProblem:: LocationLocation ofof aerospaceaerospace vehiclevehicle(missile,(missile, airplane,airplane, spacespace vehicle)vehicle)

    :: EstimationEstimation of itsof its trajectorytrajectory

    (Given redundant & imperfect measurements of(Given redundant & imperfect measurements of

    position & velocity)position & velocity)

  • 8/6/2019 ATPS - State Estimation S8

    5/21

    Definition of State EstimationDefinition of State Estimation

    IsIs thethe processprocess ofof assigningassigning aa

    valuevalue toto anan unknownunknown systemsystem statestate

    variablevariable basedbased onon measurementsmeasurements fromfrom

    thatthat systemsystem accordingaccording toto somesome

    (statistical)(statistical) criteriacriteria

  • 8/6/2019 ATPS - State Estimation S8

    6/21

    State EstimatorsState Estimators

    TheyThey areare thethe methodsmethods \\ algorithmsalgorithms,,

    developeddeveloped usingusing measurementsmeasurements fromfrom

    networknetwork toto calculatecalculate statestate ofof networknetwork

    PurposePurpose::

    DetectDetect badbad // incorrectincorrect datadata DetectDetect changeschanges inin networknetwork configurationconfiguration

    ReplaceReplace faultyfaulty // missingmissing datadata

  • 8/6/2019 ATPS - State Estimation S8

    7/21

    Data collection from PSData collection from PS

  • 8/6/2019 ATPS - State Estimation S8

    8/21

    ?PS State Estimation?PS State Estimation

    Problems in monitoring transmission systemProblems in monitoring transmission system

    Nature of measurement transducersNature of measurement transducers

    Communication problemsCommunication problems in transmitting valuesin transmitting values

    back to operations control centreback to operations control centre

    Transducers are subject toTransducers are subject to errorserrors

    Telemetry equipments experience comm. channelTelemetry equipments experience comm. channel

    outout no informationno information of some part of systemof some part of system

    These are the reasons for developing PS SEThese are the reasons for developing PS SE

  • 8/6/2019 ATPS - State Estimation S8

    9/21

    Principles of State EstimationPrinciples of State Estimation

    ConsiderConsider aa DCDC loadload flowflow exampleexample ofof 33--busbus

    systemsystem

    OnlyOnly informationinformation providedprovided isis byby threethree MWMW

    powerpower flowflow metersmeters asas shownshown inin figfig.. meter meter

    placementplacement

    OnlyOnly TwoTwo ofof thethe metersmeters areare requiredrequired toto

    calculatecalculate busbus phasephase angles,angles, loadload &&

    generationgeneration valuesvalues fullyfully

  • 8/6/2019 ATPS - State Estimation S8

    10/21

    33 -- bus systembus system

  • 8/6/2019 ATPS - State Estimation S8

    11/21

    Meter placementMeter placement

  • 8/6/2019 ATPS - State Estimation S8

    12/21

    Case 1Case 1

    SupposeSuppose metersmeters MM1313 && MM3232 areare usedused

    SupposeSuppose MM1313 && MM3232 givegive usus perfectperfect readingsreadings ofof

    flowsflows onon theirtheir respectiverespective transmissiontransmission lineslines

    MM1313 = 5 MW = 0.05 pu= 5 MW = 0.05 pu

    MM3232 = 40 MW = 0.40 pu= 40 MW = 0.40 pu

    FlowsFlows onon lineslines 11--33 && 33--22 cancan bebe setset toto metermeter readingsreadings

  • 8/6/2019 ATPS - State Estimation S8

    13/21

    puMxf 05.0)(

    11331

    1313 !!! UU

    puMx

    f 40.0)(1

    322332

    32 !!! UU

    We knowWe know 33 = 0, s= 0, solve the above equationsolve the above equations

    rad02.01 !U rad10.02 !U&&

  • 8/6/2019 ATPS - State Estimation S8

    14/21

    Case 2Case 2

    All three meter readings have slight errorsAll three meter readings have slight errors

    Suppose readings obtained areSuppose readings obtained are

    Suppose meters MSuppose meters M1313 & M& M3232 are used as beforeare used as before

    puW 62.06212 !!

    puMWM 06.0613 !!

    puW 37.03732 !!

  • 8/6/2019 ATPS - State Estimation S8

    15/21

    Calculate phase anglesCalculate phase angles

    This results in system flows as shown in fig.This results in system flows as shown in fig.

    Flow on line 1Flow on line 1--2 does not match2 does not match

    rad0925.02 !U

    rad03 !U

    rad024.01 !U

  • 8/6/2019 ATPS - State Estimation S8

    16/21

    Flows resulting from use of meters MFlows resulting from use of meters M1313 & M& M3232

  • 8/6/2019 ATPS - State Estimation S8

    17/21

    Case 3Case 3

    Suppose meters MSuppose meters M1212 & M& M3232 are usedare used

    Calculate phase angles & line flowsCalculate phase angles & line flows

    This results in system flows as shown in fig.This results in system flows as shown in fig.

    Flow on line 1Flow on line 1--3 does not match3 does not match

  • 8/6/2019 ATPS - State Estimation S8

    18/21

    Flows resulting from use of meters MFlows resulting from use of meters M1212 & M& M3232

  • 8/6/2019 ATPS - State Estimation S8

    19/21

    ConclusionConclusion

    AA procedureprocedure isis neededneeded thatthat usesuses

    informationinformation availableavailable fromfrom allall metersmeters toto

    produceproduce thethe bestbest estimateestimate ofof actualactualangles,angles, lineline flows,flows, busbus loadload && generationsgenerations

  • 8/6/2019 ATPS - State Estimation S8

    20/21

    ReferenceReference

    AllenAllen JJ..WoodWood andand BruceBruce FF..Woolenberg,Woolenberg,

    PowerPower generation,generation, operationoperation andand

    control,control, JohnJohn WileyWiley && sonssons IncInc..

    GeorgeGeorge LL Kusic,Kusic, ComputerComputer--AidedAided

    Power

    Power SystemsSystems Analysis,Analysis,

    Prentice

    Prentice--HallHallofof India,India, PvtPvt.. LtdLtd..

  • 8/6/2019 ATPS - State Estimation S8

    21/21

    RTURTU

    Provides interface for measurements ofProvides interface for measurements of

    voltage, current , power flow, status .. tovoltage, current , power flow, status .. to

    be transferred to the central computer viabe transferred to the central computer viatelemetrytelemetry

    Also implements commands from the centralAlso implements commands from the centralcomputer to equipmentcomputer to equipment

    backback