150
BASIC PRICES Trade Materials Description Unit Basic Price EXCAVATION Dry hard earth with transport cost cube. EXCAVATION Quarry dust with transport cost cube. EXCAVATION 1 1/2" thick plank (class 11) S. ft EXCAVATION 2" x 4" joist (class 11) L. ft EXCAVATION 2" x 6" joist (class 11) L. ft EXCAVATION Wire nails kg. CONCRETE Cement bag 850.00 CONCRETE Sand cube. 12,500.00 CONCRETE Metal 3/4 " cube. CONCRETE Metal 1 " cube. CONCRETE Metal 2 " cube. CONCRETE Water gal. FORM WORK 1" thick plank class 11 S. ft FORM WORK 2 " x 4 " class 11 L. ft FORM WORK 2 " x 2 " class 11 L. ft FORM WORK 2 " x 1 " class 11 L. ft FORM WORK Wire nails kg. FORM WORK Mould oil ltr FORM WORK 16mm bolt Nr Tor Steel 25mm kg. REINFORCEMEN T REINFORCEMEN T
Transcript

Basic PricesBASIC PRICESTradeMaterialsLabourPlantDescriptionUnitBasic PriceDescriptionUnitBasic PriceDescriptionUnitBasic PriceEXCAVATIONDry hard earth with transport costcube.Skilledday1,000.00TractorEXCAVATIONQuarry dust with transport costcube.EXCAVATION1 1/2" thick plank (class 11)S. ftUn skilledday600.00EXCAVATION2" x 4" joist (class 11)L. ftEXCAVATION2" x 6" joist (class 11)L. ftEXCAVATIONWire nailskg.CONCRETECementbag850.00Skilled Labourday1,200.00Concrete MixerCONCRETESandcube.12,500.00Un Skilled Labourday1,000.00VibratorCONCRETEMetal 3/4 "cube.Vibrator Operatorday1,200.00CONCRETEMetal 1 "cube.Concrete Mixer operatorday1,000.00CONCRETEMetal 2 "cube.CONCRETEWatergal.FORM WORK1" thick plank class 11S. ftSkilled Labourday1,000.00FORM WORK2 " x 4 " class 11L. ftUn Skilled Labourday600.00FORM WORK2 " x 2 " class 11L. ftFORM WORK2 " x 1 " class 11L. ftFORM WORKWire nailskg.FORM WORKMould oilltrFORM WORK16mm boltNrREINFORCEMENTTor SteelSkilled labourday700.00REINFORCEMENT25mmkg.Un skilled labourday450.00REINFORCEMENT20mmkg.REINFORCEMENT16mmkg.REINFORCEMENT12mmkg.REINFORCEMENT10mmkg.REINFORCEMENTbinding wirekg.REINFORCEMENTMild steelREINFORCEMENT10mmkg.REINFORCEMENT6mmkg.RUBBLE & CEMENT BLOCKSRubblecube.Skilled labourday1,000.00RUBBLE & CEMENT BLOCKScementbagUn skilled labourday600.00RUBBLE & CEMENT BLOCKSsandcube.RUBBLE & CEMENT BLOCKSwatergal.RUBBLE & CEMENT BLOCKS8" thick cemrnt hollow blockNrRUBBLE & CEMENT BLOCKS6" thick cemrnt hollow blockNrRUBBLE & CEMENT BLOCKS4" hick cemrnt hollow blockNrBRICK WORKCementbagSkilled Labourday1,000.00BRICK WORKSandcube.Un Skilled Labourday600.00BRICK WORKWatergal.BRICK WORKBricksNrWATER PROOFINGCementbagSkilled Labourday1,000.00WATER PROOFINGSandcube.Un Skilled Labourday600.00WATER PROOFINGDPC tarltrDOORS & WINDOWS4" X 3" Class 1 timberL. ft.Painterday1,000.00DOORS & WINDOWS4" X 2" Class 1 timberL. ft.Carpenterday1,000.00DOORS & WINDOWS11/4 thick planks. ft.Skilled labourday1,000.00DOORS & WINDOWSPly wood door sash size 3' 0" x 6' 9"NrUn skilled labourday600.00DOORS & WINDOWS1" thick plank 6" wideL. ft.DOORS & WINDOWS5mm.glaze sheet.s. ft.DOORS & WINDOWS4" BrushNrDOORS & WINDOWSSand paperNrDOORS & WINDOWSWood primerltr.DOORS & WINDOWSEnamel paintltr.DOORS & WINDOWS4" x 3" Butt hingespair.DOORS & WINDOWS4" x 2" Butt hingespair.DOORS & WINDOWS3/4" brass screwsNrDOORS & WINDOWS1/2" brass screwsNrDOORS & WINDOWS6" long barrel boltNrDOORS & WINDOWS12" long barrel boltNrDOORS & WINDOWSMortice lockNrDOORS & WINDOWSHold fastNrDOORS & WINDOWScasement fastnerNrDOORS & WINDOWScasement stayNrROOF1" thick Ginisapu planks. ft.Skilled Labourday1,000.00ROOF3/4" thick Ginisapu planks. ft.Un Skilled Labourday600.00ROOFClass 1 timberc. ft.ROOFCalicut tileNrROOFCalicut pattern ridge tileNrROOFHalf round tileNrROOFAsbestos roofing sheets. ft.ROOFReepers 2" x 1"l. ft.ROOFWire nailskg.ROOFColouring powderkg.ROOFCementbagROOFSandcubeROOFLimekg.ROOF" J " boltNrROOFWood primerltrROOFEnamel paintltrROOFWood preservativeltrROOF3/4" x 9" timber for valance boardS. ft.ROOFAsbestos close fittingpairROOFRoofing screwsNrROOFBrass screws 11/2NrFLOORLimekg.Skilled Labourper day1,000.00FLOORCementcube.Un Skilled Labourper day600.00FLOORSandcube.FLOORwatergall.FLOORBricksNrFLOORFloor tile 6" x 6"NrFLOORFlor tile 8" x 8"NrFLOORFloor tile 12" x 12"NrFLOORTile groutkg.WALLCementbagSkilled Labourper day1,000.00WALLSandcubeUn Skilled Labourper day600.00WALLLimekg.WALLwatergalWALLWall tile 6" x 6"NrWALLWall tile 8" x 12"NrWALLWall tile 8" x 8"NrWALLTile groutkg.CEILINGCementbagSkilled Labourper day1,000.00CEILINGSandcubeUn Skilled Labourper day600.00CEILINGLimekg.CEILINGwatergalCEILING4" x 2" class 1 timberl. ft.CEILING2" x 2" class 1 timberl. ft.CEILING2" x 1" class 1 timberl. ft.CEILING11/2" x 11/2" cove mouldingl. ft.CEILING1/2" x 1/2" beadingl. ft.CEILING3/4 " thick timber ceiling plank (lunumidella )s. ft.CEILINGAsbestos ceiling sheets. ft.CEILINGWire nailskg.CEILINGEmulsion paintltrPAINTINGEmulsion paintltrSkilled Labourper day1,000.00PAINTINGWeathersheild paintltrUn Skilled Labourper day600.00PAINTINGBrush 4"NrPAINTINGAcrylic fillerltrPAINTINGSand paperNrPAINTINGWatergalPLUMBINGPVC Pipe Type 400 (12 ft Standard Length pipes)Skilled Labourper day1,000.00PLUMBING20mm dia pipe (1/2 ")NrUn Skilled Labourper day600.00PLUMBING25mm dia pipe (3/4")NrPLUMBING32mm dia pipe (1")NrPLUMBING40mm dia pipe (11/4")NrPLUMBING50mm dia pipe (11/2")NrPLUMBING63mm dia pipe (2")NrPLUMBING75mm dia pipe (21/2")NrPLUMBING90mm dia pipe (3")NrPLUMBINGPVC Pipe Type 600 (12 ft Standard Length pipes)PLUMBING20mm dia pipe (1/2 ")NrPLUMBING25mm dia pipe (3/4")NrPLUMBING32mm dia pipe (1")NrPLUMBING40mm dia pipe (11/4")NrPLUMBING50mm dia pipe (11/2")NrPLUMBING63mm dia pipe (2")NrPLUMBING75mm dia pipe (21/2")NrPLUMBING90mm dia pipe (3")NrPLUMBINGPVC Pipe Type 1000 (12 ft Standard Length pipes)PLUMBING20mm dia pipe (1/2 ")NrPLUMBING25mm dia pipe (3/4")NrPLUMBING32mm dia pipe (1")NrPLUMBING40mm dia pipe (11/4")NrPLUMBING50mm dia pipe (11/2")NrPLUMBING63mm dia pipe (2")NrPLUMBING75mm dia pipe (21/2")NrPLUMBING90mm dia pipe (3")NrPLUMBINGPVC Pipe fitting - TeePLUMBING20mm dia pipe (1/2 ")NrPLUMBING25mm dia pipe (3/4")NrPLUMBING32mm dia pipe (1")NrPLUMBING40mm dia pipe (11/4")NrPLUMBING50mm dia pipe (11/2")NrPLUMBING63mm dia pipe (2")NrPLUMBING75mm dia pipe (21/2")NrPLUMBING90mm dia pipe (3")NrPLUMBINGPVC Pipe fitting - BendPLUMBING20mm dia pipe (1/2 ")NrPLUMBING25mm dia pipe (3/4")NrPLUMBING32mm dia pipe (1")NrPLUMBING40mm dia pipe (11/4")NrPLUMBING50mm dia pipe (11/2")NrPLUMBING63mm dia pipe (2")NrPLUMBING75mm dia pipe (21/2")NrPLUMBING90mm dia pipe (3")NrPLUMBINGPVC Pipe fitting - ElbowPLUMBING20mm dia pipe (1/2 ")NrPLUMBING25mm dia pipe (3/4")NrPLUMBING32mm dia pipe (1")NrPLUMBING40mm dia pipe (11/4")NrPLUMBING50mm dia pipe (11/2")NrPLUMBING63mm dia pipe (2")NrPLUMBING75mm dia pipe (21/2")NrPLUMBING90mm dia pipe (3")NrPLUMBINGPVC Pipe fitting - Value socketPLUMBING20mm dia pipe (1/2 ")NrPLUMBING25mm dia pipe (3/4")NrPLUMBING32mm dia pipe (1")NrPLUMBING40mm dia pipe (11/4")NrPLUMBING50mm dia pipe (11/2")NrPLUMBING63mm dia pipe (2")NrPLUMBING75mm dia pipe (21/2")NrPLUMBING90mm dia pipe (3")NrPLUMBINGPVC Pipe fitting - Faucet SocketPLUMBING20mm dia pipe (1/2 ")NrPLUMBING25mm dia pipe (3/4")NrPLUMBING32mm dia pipe (1")NrPLUMBING40mm dia pipe (11/4")NrPLUMBING50mm dia pipe (11/2")NrPLUMBING63mm dia pipe (2")NrPLUMBING75mm dia pipe (21/2")NrPLUMBING90mm dia pipe (3")NrPLUMBINGPVC Pipe fitting - SocketPLUMBING20mm dia pipe (1/2 ")NrPLUMBING25mm dia pipe (3/4")NrPLUMBING32mm dia pipe (1")NrPLUMBING40mm dia pipe (11/4")NrPLUMBING50mm dia pipe (11/2")NrPLUMBING63mm dia pipe (2")NrPLUMBING75mm dia pipe (21/2")NrPLUMBING90mm dia pipe (3")NrPLUMBINGSolvent cementkg.

Basic RatesBasic PricesMATERIALSLABOURPLANTItem No.DescriptionCode No.UnitPrice ( Rs.)Item No.DescriptionCode No.UnitPrice ( Rs.)Item No.DescriptionCode No.UnitPrice ( Rs.)1AcidM-001Gal254.001PainterL-001Day1,200.001Hire of MixerP-001Day1,500.002Anti Corrosive PrimerM-002litre245.002PlumberL-002Day1,200.002Hire of VibratorP-002Day1,000.003Asbestos Corrugated SheetM-003Sq.ft42.003SK LabourL-003Day1,200.003Vibrating RammerP-003Day1,000.004Barrel BoltM-004No75.004SK Labour (Vibrator)L-004Day1,200.005Binding Wire - 16 BWM-005Lbs200.005TinkerL-005Day1,200.006BitumenM-006Gal500.006TilerL-006Day1,200.007Blasting PowderM-007Lbs200.007U / SK LabourerL-007Day1,000.008BlueM-008Ozs10.008CarpenterL-008Day1,200.009Boild LimeM-009Cwt300.009MasonL-009Day1,200.0010Bolts 16mm 18"M-010No75.0010GlazierL-010Day1,200.0011Brass Fanlight ChtchesM-011No45.0012Brass Nails - 1 1/2"M-012Lbs50.0013Brass Pannel PinsM-013Doz1.0014Brass scews - 1"M-014No2.5015Brass Screws 1 1/2"M-015No3.7516Brass Screws - 1/2 "M-016No1.3017Brass Screws - 3/4"M-017No1.2518Brass Screws - 4" LongM-018No7.5019BricksM-019No6.0020Brush - 3"M-020No210.0021Brush - 6"M-021No495.0022Brush 2"M-022No165.0023Butt HingesM-023No70.0024Casement FastenersM-024No55.0025Casement StaysM-025No55.0026CementM-026Bag850.0027Clear Glass panesM-027Sq.ft25.0028Clips and Nails - 1 "M-028No7.0029Clips and Nails - 1 1/2 "M-029No10.5030Clips and Nails - 1 1/4 "M-030No8.7531Clips and Nails - 2 "M-031No10.7532Clips and Screws - 3 "M-032No34.0033Clout Nails - 1/4"M-033Lbs25.0034Coir Brush - 6"M-034No45.0035Coloured PigmentM-035Lbs175.0036Colouring PowderM-036Lbs175.0037Cotton WasteM-037Lbs12.5038D. D. T. PowderM-038Lbs25.0039Diesel FuelM-039Ltr70.0040Door CloserM-040No1,850.0041Draw RingsM-041No22.5042Earth Delivered at SiteM-042Cube1,500.0043Emulsion PaintM-043litre280.0044Enamel PaintM-044litre354.0045Fibre / Plastic PlugsM-045No1.5046Fire WoodM-046Lbs250.0047Flannel ClothM-047Yards70.0048Flat Asbestos Ceiling SheetsM-048Sq.ft15.0049Floor BrushM-049No210.0050Fuel ForgeM-050Ltr100.0051Fuse wireM-051L.ft10.0052Galvanised iron sheet(8'X4') - 18 B.W.G (1.2 mm)M-052No2,200.0053Gravel delivered to siteM-053Cube2,000.0054Gutter BracketsM-054No55Gutter joinerM-055No56Half Round Clay TilesM-056No5.0057Hollow Cement Block - 8" thk.M-057No30.0058Hollow Cement Blocks - 4" thk.M-058No27.0059Hollow Cement Blocks - 6" thk.M-059No22.0060Iron Nails - 1 1/2M-060Kg.25.0061Iron Screws - 3/4"M-061No0.5562Jumper SteelM-062Lbs65.0063Jute HessianM-063Sq.ft3.5064Metal - 1 "M-064Cube8,000.0065Metal - 1 1/2 "M-065Cube3,500.0066Metal - 3/4 "M-066Cube9,000.0067Mild Steel Dowels - 5/8" , 4" Long.M-067No6.0068Mild Steel Rods including transport to siteM-068Kg.109.0069Mineral Turpentine or ThinnerM-069litre80.0070Mortice lock with screwsM-070No960.0071Mould OilM-071litre35.0072Nails - 2"M-072Lbs50.0073Nails - 3/4"M-073Lbs20.0074Plywood Sash - 6' 9" X 2' 9"M-074No2,000.0075PrimerM-075litre180.0076PVC Elbows / Bent / Socket - 3/4"M-076No15.0077PVC Sockets - 1"M-077No14.0078PVC down pipes - 12' lengthM-078No79PVC elbow - for rainwater down pipes.M-079No80PVC Elbows / Bent / Socket - 1 1/2"M-080No69.0081PVC Elbows / Bent / Socket - 1 1/4"M-081No42.0082PVC Elbows / Bent / Socket - 1"M-082No21.0083PVC Elbows / Bent / Socket - 1/2"M-083No10.5084PVC Elbows / Bent / Socket - 2 1/2"M-084No350.0085PVC Elbows / Bent / Socket - 2"M-085No110.0086PVC Elbows / Bent / Socket - 3"M-086No580.0087PVC End capM-087No88PVC gutter - 12' lengthM-088No89PVC gutter head - 6"M-089No90PVC joiner - 3 1/2"M-090No91PVC mitre bend 6" diaM-091No92PVC Pipes - 1 1/2"M-092L.ft46.0093PVC Pipes - 1 1/4"M-093L.ft32.0094PVC Pipes - 1"M-094L.ft21.0095PVC Pipes - 1/2"M-095L.ft7.5096PVC Pipes - 2"M-096L.ft79.0097PVC Pipes - 3"M-097L.ft185.0098PVC Pipes - 3/4"M-098L.ft14.0099PVC ShoeM-099No100PVC Sockets - 1 1/2"M-100No29.50101PVC Sockets - 1 1/4"M-101No19.50102PVC Sockets - 2"M-102No48.00103PVC Sockets - 3"M-103No192.00104PVC StrapsM-104No105Ridge Tiles (calicut)M-105No35.00106Ridges 3' 8" Long (Asbestos)M-106Pair245.00107Rim Lock with ScrewsM-107No500.00108Roof tiles - calicutM-108No16.00109Roofing Screws and WashersM-109No3.50110Roofing Screws or BoltsM-110No3.50111Rubble - 6" - 9"M-111Cube2,500.00112SaltM-112Lbs10.00113SandM-113Cube12,500.00114Sand PapersM-114No3.50115Slaked LimeM-115Lbs275.00116Soldering LeadM-116Lbs13.75117Solvent CementM-117Grms1.40118Spur StoneM-118No15.00119TarnapM-119Gal450.00120Tee - 1 " DiaM-120No31.25121Tee - 1 1/2 " DiaM-121No102.00122Tee - 1/2 " DiaM-122No15.50123Tee - 2 " DiaM-123No165.50124Tee - 2 1/2" DiaM-124No526.00125Tee - 3 " DiaM-125No875.00126Tee - 3/4 " DiaM-126No21.50127Tee - Dia 1 1/4 "M-127No63.50128Tee HingesM-128Pair165.00129Tiles Pressed - 12" X 12"M-129No180.00130Tiles Pressed - 8" X 8"M-130No125.00131Tiles Terrazzo - 6" X 6"M-131No100.00132Tiles Terrazzo - 12" X 12"M-132No150.00133Timber Beading - 1/2" X 1/2"M-133L.ft1.50134Timber Beadings - 1 1/2"X1/2" (Halmilla)M-134L.ft12.00135Timber Ceiling Plank - 6"x3/4" (Lunumidella)M-135Sq.ft28.00136Timber Class IM-136Cu.ft1,200.00137Timber Class I - 3" x 1'1/2"M-137L.ft45.00138Timber Class I - 4"X3"M-138Cu.ft1,300.00139Timber Class I Planks - 1 1/2"M-139Sq.ft140.00139aTimber Class I Planks - 1"M-139aSq.ft110.00140Timber Class IIM-140Cu.ft750.00141Timber Class II - 1" ThickM-141Sq.ft65.00142Timber Class II - 2" x 1"M-142L.ft12.00143Timber Class II - 2" x 2"M-143L.ft22.00144Timber class II - 4"X 2"M-144L.ft65.00145Timber Cove Molding - 2"X2" (Halmilla)M-145Sq.ft35.00146Timber ceiling Joists - 4" x 2"M-146L.ft65.00147Timber Planks - 1" (Valance board)M-147Sq.ft65.00148Timber PurlinsM-148L.ft100.00149Timber Reepers - 2"X1"M-149L.ft12.00150Timber Strips - 2" X 1/4"M-150L.ft5.00151Timber WedgesM-151No5.00152Tor Steel Rods including transport to siteM-152Kg.109.00153Tower / Skeleton Brass BoltsM-153No145.00154VarnishM-154Ltr355.00155Wall Tiles Glazed 6" x 6"M-155No75.00156Wall Tiles Glazed 8" x 12"M-156No100.00157WaterM-157Gal0.30158Wax PolishM-158Lbs150.00159White Cement/ tile groutM-159Lbs17.50160Wire BrushM-160No65.00161Wire NailsM-161Lbs50.00162Wire Nails 2" LongM-162Lbs25.00163Wire Nails 6" LongM-163Lbs25.00164Wirecut BricksM-164No8.75165Wood PreservativeM-165Gal450.00166Yellow OchreM-166Lbs15.00

ActivityActivity1Site Preparation & Excavation2Earth work support and Filling3Anti Termite Treatment & DPC4Random Rubble Masonry Work5Concrete Work6FormworkNote7ReinforcementRate Break Downs of all trades are according to the Building Schedule of Rates of the Department of Buildings except the Rate Break Downs of Concrete Works8Block Work9Brick Work10Roof11Doors and Windows12Plumbing & Drainage13Plastering14Tiling15Ceiling16Painting

0101. Site Preparation & ExcavationA.Site PreparationB.ExcavationSite Preparation01.A. 01Clearing site and grubbing up all small trees not exceeding 500mm girth and including bushes, scrubs, undergrowth hedges etc.Analysis for1SqrNo.Item DescriptionItem RefUnitQuantityRateAmount1U / SK LabourerL-007Day0.751,000.00750.001.01Allow 2.5% of Items ( 1.01 ) for Tools18.75Total for1Sqr768.75Rate for 1Sqrs768.75Rate(Say)1Sqr768.75Rate(Say)1ft27.69Rate(Say)1m282.7201.A.02Cutting turf Sods, loading to hand carts and transporting up to 30 Yards, laying and watering for 30 days(Royalty for Turf, pegging, transporting beyond 30yds paid separately)Analysis for1SqrNoItem DescriptionItem RefUnitQuantityRateAmount1.0099999905U / SK Labourer - cutting turf sods, loading & unloadingL-007Day2.51,000.002,500.001.0199999809U / SK Labourer - laying turf sodsL-007Day0.51,000.00500.001.0299999714U / SK Labourer - wateringL-007Day1.51,000.001,500.001.0399999619WaterM-157Gal600.3018.00Total for1Sqr4,518.00Rate for 1Sqr4,518.00Rate(Say)1Sqr4,518.00Rate(Say)1ft245.18Rate(Say)1m2486.1401.A.03Removing top soil to a Depth not Exceeding 6" & Depositing as Directed within SiteAnalysis for10SqrsNo.Item DescriptionItem RefUnitQuantityRateAmount1U / SK LabourerL-007Day101,000.0010,000.001.01Allow 2.5% of Items ( 1.01 ) for Tools250.00Total for10Sqrs10,250.00Rate for 1Sqrs1,025.00Rate(Say)1Sqr1,025.00Rate(Say)1ft210.25Rate(Say)1m2110.29Excavation01.B.01Excavation over site to reduce level, in any material except rock requiring blasting including depositing and levelling as directed upto a distance not exceeding 30' 0 "Analysis for1CubeNo.Item DescriptionItem RefUnitQuantityRateAmount1U / SK LabourerL-007Day1.6251,000.001,625.001.0199999809Allow 2.5% of Items ( 1.01 ) for Tools40.63Total for1Cube1,625.00Rate for 1Cube1,625.00Rate(Say)1Cube1,625.00Rate(Say)1ft316.25Rate(Say)1m3574.0001.B.02Excavation in trenches for walls/ column pits in sort/loose soil from 0' 0" to 5' 0" deep and depositing excavated material to a distance not exceeding 30' 0" (Earth work support to be paid Separately where necessary)Analysis for1CubeNoItem DescriptionItem RefUnitQuantityRateAmount1U / SK LabourerL-007Day11,000.001,000.001.0199999809Allow 2.5% of Items ( 1.01 ) for Tools25.00Total for1Cube1,000.00Rate for 1Cube1,000.00Rate(Say)1Cube1,000.00Rate(Say)1ft310.00Rate(Say)1m3353.0001.B.03Excavation in trenches for walls column pits in ordinary soil from 0' 0" to 5' 0" deep and depositing excavated material not exceeding 30' 0"Analysis for1CubeNoItem DescriptionItem RefUnitQuantityRateAmount1U / SK LabourerL-007Day2.251,000.002,250.001.0199999809Allow 2.5% of Items ( 1.01 ) for Tools56.25Total for1Cube2,306.25Rate for 1Cube2,306.25Rate(Say)1Cube2,306.25Rate(Say)1ft323.06Rate(Say)1m3815.0001.B.04Excavation in trenches for walls / column pits in hard/dense soil up to a depth of 5' 0" and depositing excavated material to distance not exceeding 30' 0"Analysis for1CubeNoItem DescriptionItem RefUnitQuantityRateAmount1U / SK LabourerL-007Day3.51,000.003,500.001.0199999809Allow 2.5% of Items ( 1.01 ) for Tools87.50Total for1Cube3,587.50Rate for 1Cube3,587.50Rate(Say)1Cube3,587.50Rate(Say)1ft335.88Rate(Say)1m31,268.0001.B.05Excavation in trenches for walls column pits in mud/wet soil upto the depth of 5' 0" and depositing excavated material not exceeding 30' 0"Analysis for1CubeNoItem DescriptionItem RefUnitQuantityRateAmount1U / SK LabourerL-007Day31,000.003,000.001.0199999809Allow 2.5% of Items ( 1.01 ) for Tools75.00Total for1Cube3,000.00Rate for 1Cube3,000.00Rate(Say)1Cube3,000.00Rate(Say)1ft330.00Rate(Say)1m31,060.0001.B.06Excavation in trenches for walls column pits in soft disintegrated rock (not requiring blasting)upto depth of 5' 0" and depositing excavated material to a distance not exceeding 30' 0"Analysis for1CubeNoItem DescriptionItem RefUnitQuantityRateAmount1U / SK LabourerL-007Day2.51,000.002,500.001.0199999809Allow 2.5% of Items ( 1.01 ) for Tools62.50Total for1Cube2,562.50Rate for 1Cube2,562.50Rate(Say)1Cube2,562.50Rate(Say)1ft325.63Rate(Say)1m3905.4801.B.07Excavation in trenches for walls column pits in Hard rock requiring Blasting upto depth of 5' 0" and depositing excavated material to a distance not exceeding 30' 0"Analysis for1CubeNoItem DescriptionItem RefUnitQuantityRateAmount1Blasting PowderM-007Lbs0.75200.00150.001.0099999905Fuse wireM-051L.ft1010.00100.001.0199999809Jumper SteelM-062Lbs165.0065.001.0299999714Allow 20% of Items ( 1, 1.01, 1.02 ) for Steel Fuel and Forge63.001.0399999619SK LabourL-003Day11,200.001,200.001.0499999523U / SK LabourerL-007Day21,000.002,000.00Total for1Cube3,578.00Rate for 1Cube3,578.00Rate(Say)1Cube3,578.00Rate(Say)1ft335.78Rate(Say)1m31,264.0001.B.08Benching rock in foundation in 3"-6" Steps (Blasting Prohibited)Analysis for10Sq.ftNoItem DescriptionItem RefUnitQuantityRateAmount1SK LabourL-003Day1.51,200.001,800.001.0099999905Allow 25% of Items ( 1 ) for Steel, fuel & forge450.001.0199999809U / SK LabourerL-007Day0.51,000.00500.00Total for10Sq.ft2,750.00Rate for 1Sq.ft275.00Rate(Say)1 Sq.ft275.00Rate(Say)1m22,959.0001.B.09Rock Requiring BlastingAnalysis for1CubeNoItem DescriptionItem RefUnitQuantityRateAmount1.0099999905Labour SkilledL-003Day31,200.003,600.001.0299999714Allow 2.5% of Items ( 1.01, 1.02 ) for Tools90.001.0399999619Fuel Forge etc.M-050Ltr0.25100.0025.001.0499999523Blasting powderM-007lbs0.68200.00136.001.0599999428Fuse wireM-051L.ft3.0510.0030.501.0700000525Steel JumperM-062lbs0.4546.0020.70Total for1Cube3,902.20Rate for 1Cube3,902.20Rate(Say)1Cube3,902.20Rate(Say)1ft339.02Rate(Say)1m31,379.00

&R&8 Page &P Of &N&L&8SDS&R&DSite PreparationExcavation

0202. Filling and Earth Work SupportA.FillingB.Earthwork SupportBackfilling02.A.01Backfilling to trenches with selected earth available at site.Analysis for1CubeNoItem DescriptionItem RefUnitQuantityRateAmount1U / SK LabourerL-007Day11,000.001,000.001.0199999809Allow 2.5% of Items ( 1 ) for Tools25.00Total for1Cube1,025.00Rate for 1Cube1,025.00Rate(Say)1Cube1,025.00Rate(Say)1 ft310.25Rate(Say)1m3362.0002.A.02Backfilling to trenches with Imported MaterialAnalysis for1CubeNoItem DescriptionItem RefUnitQuantityRateAmount1Earth Delivered at SiteM-042Cube11,500.001,500.001.0099999905Allow 15% of Items ( 1 ) for Compacting225.001.0199999809U / SK LabourerL-007Day1.251,000.001,250.00Total for1Cube2,975.00Rate for 1Cube2,975.00Rate(Say)1Cube2,975.00Rate(Say)1 ft329.75Rate(Say)1m31,051.0002.A.03Filling under floors including levelling, watering & compacting in 3" layers with available and selected earth at siteAnalysis for1CubeNoItem DescriptionItem RefUnitQuantityRateAmount1.0199999809U / SK LabourerL-007Day21,000.002,000.001.0199999809Allow 2.5% of Items ( 1 ) for Tools50.00Total for1Cube2,050.00Rate for 1Cube2,050.00Rate(Say)1Cube2,050.00Rate(Say)1 ft320.50Rate(Say)1m3724.0002.A.04Filling under floors including levelling, watering & compacting in 3" layers with imported selected earthAnalysis for1CubeNoItem DescriptionItem RefUnitQuantityRateAmount1.0199999809Earth Delivered at SiteM-042Cu11,500.001,500.001.0299999714Allow 15% of Items ( 1.02 ) for Compaction225.001.0399999619U / SK LabourerL-007Day21,000.002,000.001.0199999809Allow 2.5% of Items ( 1 ) for Tools37.50Total for1Cube3,762.50Rate for 1Cube3,762.50Rate(Say)1Cube3,762.50Rate(Say)1 ft337.63Rate(Say)1m31,329.51Rate(Say),with compaction1m31,728.3602.A.05Filling under floors including levelling, watering & compacting in 3" layers with imported gravelAnalysis for1CubeNoItem DescriptionItem RefUnitQuantityRateAmount1.0199999809Gravel Delivered at SiteM-053Cube12,000.002,000.001.0299999714Allow 15% of Items ( 1.02 ) for Compaction & wastage300.001.0399999619U / SK LabourerL-007Day21,000.002,000.001.0199999809Allow 2.5% of Items ( 1 ) for Tools50.00Total for1Cube4,350.00Rate for 1Cube4,350.00Rate(Say)1Cube4,350.00Rate(Say)1 ft343.50Rate(Say)1m31,537.10Rate(Say),with compaction1m31,998.2302.A.06Approved Soil Spread & Compacted in 150 to 225 mm Thick Layers Using Machine Rammer at Narrow Places (Loose Volume)Analysis for7Cu.mNoItem DescriptionItem RefUnitQuantityRateAmount1.0099999905Labour Unskilled (U/SK)L-007Day11,000.001,000.001.0199999809Allow 2.5% of Items ( 1.01 ) for Tools25.001.0399999619Vibrating rammer (60kg)(Less Operator)P-003Day0.51,000.00500.00Total for7Cu.m1,525.00Rate for 11Cu.m217.86Rate(Say)1m3217.86Rate(Say)Cube616.54Rate(Say)1 ft36.17Earth Work Support02.B.01Earth Work Support (Open Planking) in trenches up to a depth of 5' 0"Analysis for1.5SqrNoItem DescriptionItem RefUnitQuantityRateAmount1.0099999905Class II Timber (17.5 ft3 for 4 uses)M-140Cu.ft4.375750.003,281.251.0199999809CarpenterL-008Day11,200.001,200.001.0299999714U / SK LabourerL-007Day31,000.003,000.00Total for1.5Sqr7,481.25Rate for 1Sqr4,987.50Rate(Say)1 Sqr4,987.50Rate(Say)1m2536.6602.B.02Earth Work Support (Close Planking) in trenches up to a depth of 5' 0"Analysis for1.5SqrsNoItem DescriptionItem RefUnitQuantityRateAmount1.0099999905Class II Timber (30 ft3 for 4 uses)M-140Cu.ft7.5750.005,625.001.0199999809CarpenterL-008Day21,200.002,400.001.0299999714U / SK LabourerL-007Day61,000.006,000.00Total for1.5Sqrs14,025.00Rate for 1Sqrs9,350.00Rate(Say)1 Sqr9,350.00Rate(Say)1m21,006.0602.B.03Earth Work Support (Close Planking) in deep excavation in trenches up to 15 ft 0" depthAnalysis for4.5SqrNoItem DescriptionItem RefUnitQuantityRateAmount1.0099999905Class II Timber (100 ft3 for 4 uses)M-140Cu.ft25750.0018,750.001.0199999809CarpenterL-008Day81,200.009,600.001.0299999714U / SK LabourerL-007Day201,000.0020,000.00Total for4.5Sqr48,350.00Rate for 1Sqr10,744.44Rate(Say)1Sqr10,744.44Rate(Say)1ft2107.44Rate(Say)1m21,156.10

&R&8 Page &P Of &N&L&8SDS&R&DFillingEarthwork Support

0303. Anti termite Treatment & DPCA.Anti Termite TreatmentB.DPCAnti Termite Treatment03.A.01Anti-Termite treatment on excavated foundation and compacted soil under floors.Analysis for1SqrNoItem DescriptionItem RefUnitQuantityRateAmount1D. D. T. PowderM-038Lbs1625.00400.001.0099999905WaterM-157Gal200.306.001.0199999809U / SK LabourerL-007Day0.51,000.00500.00Total for1Sqr906.00Rate for 1Sqr906.00Rate(Say)1Sqr906.00Rate(Say)1ft29.06Rate(Say)1m297.49DPC03.B.013/4" thick DPC in cement sand 1:2 finished with 2 coats hot tar and blinded with sand.Analysis for1SqrNoItem DescriptionItem RefUnitQuantityRateAmount1.0099999905CementM-026Bag2.25850.001,912.501.0199999809SandM-113Cube0.1112,500.001,375.001.0299999714BitumenM-006Gal1.5500.00750.001.0399999619Fire WoodM-046Lbs10250.002,500.001.0499999523WaterM-157Gal100.303.001.0599999428MasonL-009Day1.251,200.001,500.001.0700000525U / SK LabourerL-007Day2.51,000.002,500.00Total for1Sqr10,540.50Rate for 1Sqr10,540.50Rate(Say)1Sqr10,541.00Rate(Say)1ft2105.41Rate(Say)1m21,134.21

&R&08 Page &P Of &N&L&08Road Development Department - North - East ProvinceAnti Termite TreatmentDPC

0404. Random Rubble Masonry Work04.01Random Rubble Masonry in cement mortar 1:5 in foundationAnalysis for1CubeNoItem DescriptionItem RefUnitQuantityRateAmount1.016" - 9" RubbleM-111Cube1.32,500.003,250.001.02CementM-026Bag5850.004,250.001.03SandM-113Cube0.312,500.003,750.001.04WaterM-157Gal1000.3030.001.05MasonL-009Day41,200.004,800.001.06U / SK LabourerL-007Day61,000.006,000.00Total for1Cube22,080.00Rate for 1Cube22,080.00Rate(Say)1Cube22,080.00Rate(Say)1ft3220.80Rate(Say)1m37,802.1204.02Random Rubble Masonry in cement mortar 1:5 in SuperstructureAnalysis for1CubeNoItem DescriptionItem RefUnitQuantityRateAmount1.016" - 9" RubbleM-111Cu1.32,500.003,250.001.02CementM-026Bag5850.004,250.001.03SandM-113Cu0.312,500.003,750.001.04WaterM-157Gal1000.3030.001.05MasonL-009Day4.51,200.005,400.001.06U / SK LabourerL-007Day71,000.007,000.001.07Allow 3% of Items ( 1.05, 1.06 ) for Scaffolding----372.00Total for1Cube24,052.00Rate for 1Cube24,052.00Rate(Say)1Cube24,052.00Rate(Say)1ft3240.52Rate(Say)1m38,498.94

&R&08 Page &P Of &N

0505. Concrete WorkA.Mixing ConcreteB.ScreedC.Mass ConcreteD.ColumnE.BeamF.SlabG.LintolMixing Concrete05.A.01Mixing Concrete 1:1-1/2:3(3/4")Analysis for1CubeNo.Item DescriptionItem RefUnitQuantityRateAmount1.0099999905CementM-026Bag23850.0019,550.001.0199999809SandM-113Cube0.4212,500.005,250.001.02999997143/4 " MetalM-066Cube0.829,000.007,380.001.0399999619Hire of MixerP-001Day0.3331,500.00499.501.0499999523WaterM-157Gal1500.3045.001.0599999428SK LabourL-003Day0.3331,200.00399.601.0700000525U / SK LabourerL-007Day21,000.002,000.00Total for1Cube35,124.10Rate for 1Cube35,124.10Rate(Say)1Cube35,120.00Rate(Say)1m312,409.8905.A.02Mixing Concrete 1:3:6(1 1/2")Analysis for1CubeNoItem DescriptionItem RefUnitQuantityRateAmount1.0099999905CementM-026Bag13850.0011,050.001.0199999809SandM-113Cube0.5312,500.006,625.001.02999997141 1/2 " MetalM-065Cube0.923,500.003,220.001.0399999619Hire of MixerP-001Day0.3331,500.00499.501.0499999523WaterM-157Gal1100.3033.001.0599999428SK LabourL-003Day0.3331,200.00399.601.0700000525U / SK LabourerL-007Day21,000.002,000.00Total for1Cube23,827.10Rate for 1Cube23,827.10Rate(Say)1Cube23,830.00Rate(Say)1m38,420.4905.A.03Mixing Concrete 1:2 1/2 :5 (1")Analysis for1CubeNoItem DescriptionItem RefUnitQuantityRateAmount1.0099999905CementM-026Bag14850.0011,900.001.0199999809SandM-113Cube0.612,500.007,500.001.02999997141 " MetalM-064Cube0.98,000.007,200.001.0399999619Hire of MixerP-001Day0.3331,500.00499.501.0499999523WaterM-157Gal1000.3030.001.0599999428SK LabourL-003Day0.3331,200.00399.601.0700000525U / SK LabourerL-007Day21,000.002,000.00Total for1Cube29,529.10Rate for 1Cube29,529.10Rate(Say)1Cube29,530.00Rate(Say)1m310,434.6305.A.04Mixing Concrete 1:2:4(3/4")Analysis for1CubeNoItem DescriptionItem RefUnitQuantityRateAmount1.0099999905CementM-026Bag18850.0015,300.001.0199999809SandM-113Cube0.512,500.006,250.001.02999997143/4 " MetalM-066Cube0.889,000.007,920.001.0399999619Hire of MixerP-001Day0.3331,500.00499.501.0499999523WaterM-157Gal1200.3036.001.0599999428SK LabourL-003Day0.3331,200.00399.601.0700000525U / SK LabourerL-007Day21,000.002,000.00Total for1Cube32,405.10Rate for 1Cube32,405.10Rate(Say)1Cube32,410.00Rate(Say)1m311,452.3005.A.05Mixing Concrete 1:1:2(3/4")Analysis for1CubeNoItem DescriptionItem RefUnitQuantityRateAmount1.0099999905CementM-026Bag31850.0026,350.001.0199999809SandM-113Cube0.4412,500.005,500.001.02999997143/4 " MetalM-066Cube0.969,000.008,640.001.0399999619Hire of MixerP-001Day0.3331,500.00499.501.0499999523WaterM-157Gal2000.3060.001.0599999428SK LabourL-003Day0.3331,200.00399.601.0700000525U / SK LabourerL-007Day21,000.002,000.00Total for1Cube43,449.10Rate for 1Cube43,449.10Rate(Say)1Cube43,450.00Rate(Say)1m315,353.36Screed Concrete05.B.012" thick Cement Concrete screed 1:3:6 (1 1/2) in foundation at depth not exceed in 5' 0"Analysis for1SqrNoItem DescriptionItem RefUnitQuantityRateAmount1.0099999905Mixing Concrete 1:3:6(1 1/2")05.A.02Cube0.166723,830.003,972.461.0199999809SK LabourL-003Day0.1251,200.00150.001.0299999714U / SK LabourerL-007Day0.51,000.00500.00Total for1Sqr4,622.46Rate for 1Sqr4,622.46Rate(Say)1 Sqr4,620.00Rate(Say)1ft246.20Rate(Say)1m2497.1105.B.023" Thick cement concrete 1:3:6(1-1/2") screed in foundation at depths not exceeding 5' 0"Analysis for1SqrNoItem DescriptionItem RefUnitQuantityRateAmount1.0099999905Mixing Concrete 1:3:6(1 1/2")05.A.02Cube0.2523,830.005,957.501.0199999809SK LabourL-003Day0.1251,200.00150.001.0299999714U / SK LabourerL-007Day0.751,000.00750.00Total for1Sqr6,857.50Rate for 1Sqr6,857.50Rate(Say)1 Sqr6,860.00Rate(Say)1ft268.60Rate(Say)1m2738.14Mass Concrete05.C.016" Thick cement concrete 1:2-1/2:5(1") in floor (Mass concrete)Analysis for1SqrNoItem DescriptionItem RefUnitQuantityRateAmount1.0099999905Mixing Concrete 1:2 1/2 : 5(1")05.A.03Cube0.529,530.0014,765.001.0249999762WaterM-157Gal2000.3060.001.0299999714SK LabourL-003Day0.51,200.00600.001.0399999619U / SK LabourerL-007Day1.251,000.001,250.00Total for1Sqr16,675.00Rate for 1Sqr16,675.00Rate(Say)1 Sqr16,680.00Rate(Say)1ft2166.80Rate(Say)1m21,794.77Column Concrete05.D.01Cement concrete 1:11/2 : 3(3/4") in 13-1/2" X 13-1/2" columns in ground floor.Analysis for0.51CubeNoItem DescriptionItem RefUnitQuantityRateAmount1.0099999905Mixed Concrete 1:1 1/2 : 3 (3/4")05.A.01Cube0.5135,120.0017,911.20Allow 5% of Items ( 1.01 ) for Wastage895.561.0249999762Hire of VibratorP-002Day0.51,000.00500.001.0299999714MasonL-009Day0.51,200.00600.001.0399999619U / SK LabourerL-007Day1.51,000.001,500.001.0499999523SK Labourer (Vibrator)L-004Day0.51,200.00600.001.0599999428Jute HessianM-063Sq.ft453.50157.501.0700000525WaterM-157Gal1000.3030.001.0800000429U / SK Labourer (curing)L-007Day0.51,000.00500.00Total for0.51Cube22,694.26Rate for 1Cube44,498.5540 L.ft22,694.26Rate(Say)1Cube44,499.001 L.ft567.36Rate(Say)1m315,724.031 m1,860.93Ground floor - First Floor1m315,724.031 m1,860.93First Floor - Second Floor1m317,296.431 m2,047.02Second Floor - Third Floor1m319,026.071 m2,251.72Third Floor - Fourth Floor1m320,928.681 m2,476.9005.D.02Cement concrete 1:2:4(3/4") in 4-1/2" X 6" columns in ground floor.Analysis for240L.ftor0.45CubesNoItem DescriptionItem RefUnitQuantityRateAmount1.0099999905Mixed Concrete 1:2:4(3/4")05.A.04Cu0.4532,410.0014,584.50Allow 5% of Items ( 1.01 ) for Wastage729.231.0249999762Hire of VibratorP-002Day11,000.001,000.001.0299999714MasonL-009Day11,200.001,200.001.0399999619U / SK LabourerL-007Day31,000.003,000.001.0499999523SK Labour (Vibrator)L-004Day11,200.001,200.001.0599999428Jute HessianM-063Sq.ft103.5035.001.0700000525WaterM-157Gal1700.3051.001.0800000429U / SK Labourer (curing)L-007Day0.51,000.00500.00Total for240L.ft22,299.730.45 Cubes22,299.73Rate for 1L.ft92.921 Cube49,554.94Rate(Say)1 ft90.001Cube49,550.00Rate(Say)1 m295.201m317,508.83Ground floor - First Floor1 m295.201m317,508.83First Floor - Second Floor1 m324.721m319,259.72Second Floor - Third Floor1 m357.191m321,185.69Third Floor - Fourth Floor1 m392.911m323,304.2605.D.03Cement concrete 1:2:4(3/4") in 6" X 6" columns in ground floor.Analysis for180L.ftor0.45CubesNoItem DescriptionItem RefUnitQuantityRateAmount1.0099999905Mixed Concrete 1:2:4(3/4")05.A.04Cu0.4532,410.0014,584.50Allow 5% of Items ( 1.01 ) for Wastage729.231.0249999762Hire of VibratorP-002Day11,000.001,000.001.0299999714MasonL-009Day11,200.001,200.001.0399999619U / SK LabourerL-007Day31,000.003,000.001.0499999523SK Labourer (Vibrator)L-004Day11,200.001,200.001.0599999428Jute HessianM-063Sq.ft803.50280.001.0700000525WaterM-157Gal1400.3042.001.0800000429U / SK Labourer (curing)L-007Day0.51,000.00500.00Total for180L.ft22,535.730.45 Cubes22,535.73Rate for 1L.ft125.201 Cube50,079.39Rate(Say)1 ft130.001Cube50,080.00Rate(Say)1 m426.401m317,696.11Ground floor - First Floor1 m426.401m317,696.11First Floor - Second Floor1 m469.041m319,465.72Second Floor - Third Floor1 m515.941m321,412.30Third Floor - Fourth Floor1 m567.541m323,553.5305.D.04Cement concrete 1:2:4(3/4") in 9" X 9" columns in ground floor.Analysis for80L.ftor0.45CubesNoItem DescriptionItem RefUnitQuantityRateAmount1.0099999905Mixed Concrete 1:2:4(3/4")05.A.04Cu0.4532,410.0014,584.50Allow 5% of Items ( 1.01 ) for Wastage729.231.0249999762Hire of VibratorP-002Day11,000.001,000.001.0299999714MasonL-009Day11,200.001,200.001.0399999619U / SK LabourerL-007Day31,000.003,000.001.0499999523SK Labourer (Vibrator)L-004Day11,200.001,200.001.0599999428Jute HessianM-063Sq.ft603.50210.001.0700000525WaterM-157Gal1000.3030.001.0800000429U / SK Labourer (curing)L-007Day0.51,000.00500.00Total for80L.ft22,453.730.45 Cubes22,453.73Rate for 1L.ft280.671 Cube49,897.17Rate(Say)1 ft280.001Cube49,900.00Rate(Say)1 m918.401m317,632.51Ground floor - First Floor1 m918.401m317,632.51First Floor - Second Floor1 m1,010.241m319,395.76Second Floor - Third Floor1 m1,111.261m321,335.34Third Floor - Fourth Floor1 m1,222.391m323,468.8705.D.05Cement concrete 1:2:4(3/4") in 12" X 12" columns in ground floor.Analysis for50L.ftor0.5CubesNoItem DescriptionItem RefUnitQuantityRateAmount1.0099999905Mixing Concrete 1:2:4(3/4")05.A.04Cu0.532,410.0016,205.00Allow 5% of Items ( 1.01 ) for Wastage810.251.0249999762Hire of VibratorP-002Day11,000.001,000.001.0299999714MasonL-009Day11,200.001,200.001.0399999619U / SK LabourerL-007Day31,000.003,000.001.0499999523SK Labourer (Vibrator)L-004Day11,200.001,200.001.0599999428Jute HessianM-063Sq.ft403.50140.001.0700000525WaterM-157Gal1000.3030.001.0800000429U / SK Labourer (curing)L-007Day0.51,000.00500.00Total for50L.ft24,085.250.5 Cubes24,085.25Rate for 1L.ft481.711 Cube48,170.50Rate(Say)1 ft480.001Cube48,170.00Rate(Say)1 m1,574.401m317,021.20Ground floor - First Floor1 m1,574.401m317,021.20First Floor - Second Floor1 m1,731.841m318,723.32Second Floor - Third Floor1 m1,905.021m320,595.65Third Floor - Fourth Floor1 m2,095.531m322,655.2205.D.06Cement concrete 1:2:4(3/4") in 13-1/2" X 13-1/2" columns in ground floor.Analysis for40L.ftor0.51CubesNoItem DescriptionItem RefUnitQuantityRateAmount1.0099999905Mixing Concrete 1:2:4(3/4")05.A.04Cu0.5132,410.0016,529.10Allow 5% of Items ( 1.01 ) for Wastage826.461.0249999762Hire of VibratorP-002Day0.51,000.00500.001.0299999714MasonL-009Day0.51,200.00600.001.0399999619U / SK LabourerL-007Day1.51,000.001,500.001.0499999523SK Labourer (Vibrator)L-004Day0.51,200.00600.001.0599999428Jute HessianM-063Sq.ft453.50157.501.0700000525WaterM-157Gal1000.3030.001.0800000429U / SK Labourer (curing)L-007Day0.51,000.00500.00Total for40L.ft21,243.060.51 Cubes21,243.06Rate for 1L.ft531.081 Cube41,653.05Rate(Say)1 ft530.001Cube41,650.00Rate(Say)1 m1,738.401m314,717.31Ground floor - First Floor1 m1,738.401m314,717.31First Floor - Second Floor1 m1,912.241m316,189.05Second Floor - Third Floor1 m2,103.461m317,807.95Third Floor - Fourth Floor1 m2,313.811m319,588.75Beam Concrete05.E.01Cement concrete 1:2:4(3/4") in 6" X 6" Beams Upto 1st floor levelAnalysis for180L.ftor0.45CubesNoItem DescriptionItem RefUnitQuantityRateAmount1.0099999905Mixing Concrete 1:2:4(3/4")05.A.04Cu0.4532,410.0014,584.50Allow 5% of Items ( 1.01 ) for Wastage729.231.02Hire of VibratorP-002Day11,000.001,000.001.0299999714MasonL-009Day11,200.001,200.001.0399999619U / SK LabourerL-007Day41,000.004,000.001.0499999523SK Labourer (Vibrator)L-004Day11,200.001,200.001.0599999428Jute HessianM-063Sq.ft903.50315.001.0700000525WaterM-157Gal1800.3054.001.0800000429U / SK Labourer (curing)L-007Day0.51,000.00500.00Total for180L.ft23,582.730.45 Cubes23,582.73Rate for 1L.ft131.021 Cube52,406.06Rate(Say)1 ft130.001Cube52,410.00Rate(Say)1 m426.401m318,519.43Ground floor1 m426.401m318,519.43First Floor1 m469.041m320,371.38Second Floor1 m515.941m322,408.52Third Floor1 m567.541m324,649.3705.E.02Cement concrete 1:2:4(3/4") in 9" X 6" Beams Upto 1st floor levelAnalysis for120L.ftor0.45CubesNoItem DescriptionItem RefUnitQuantityRateAmount1.0099999905Mixing Concrete 1:2:4(3/4")05.A.04Cu0.4532,410.0014,584.50Allow 5% of Items ( 1.01 ) for Wastage729.231.0249999762Hire of VibratorP-002Day11,000.001,000.001.0299999714MasonL-009Day11,200.001,200.001.0399999619U / SK LabourerL-007Day41,000.004,000.001.0499999523SK Labourer (Vibrator)L-004Day11,200.001,200.001.0599999428Jute HessianM-063Sq.ft753.50262.501.0700000525WaterM-157Gal1500.3045.001.0800000429U / SK Labourer (curing)L-007Day0.51,000.00500.00Total for120L.ft23,521.230.45 Cubes23,521.23Rate for 1L.ft196.011 Cube52,269.39Rate(Say)1 ft200.001Cube52,270.00Rate(Say)1 m656.001m318,469.96Ground floor1 m656.001m318,469.96First Floor1 m721.601m320,316.96Second Floor1 m793.761m322,348.66Third Floor1 m873.141m324,583.5205.E.03Cement concrete 1:2:4(3/4") in 9" X 9" Beams Upto 1st floor levelAnalysis for80L.ftor0.45CubesNoItem DescriptionItem RefUnitQuantityRateAmount1.0099999905Mixing Concrete 1:2:4(3/4")05.A.04Cu0.4532,410.0014,584.50Allow 5% of Items ( 1.01 ) for Wastage729.231.0249999762Hire of VibratorP-002Day11,000.001,000.001.0299999714MasonL-009Day11,200.001,200.001.0399999619U / SK LabourerL-007Day41,000.004,000.001.0499999523SK Labourer (Vibrator)L-004Day11,200.001,200.001.0599999428Jute HessianM-063Sq.ft603.50210.001.0700000525WaterM-157Gal1200.3036.001.0800000429U / SK Labourer (curing)L-007Day0.51,000.00500.00Total for80L.ft23,459.730.45 Cubes23,459.73Rate for 1L.ft293.251 Cube52,132.72Rate(Say)1 ft290.001Cube52,130.00Rate(Say)1 m951.201m318,420.49Ground floor1 m951.201m318,420.49First Floor1 m1,046.321m320,262.54Second Floor1 m1,150.951m322,288.80Third Floor1 m1,266.051m324,517.68Slab Concrete05.F.015" Thick R.C.C 1:2:4(3/4") floor slab in 1st floorAnalysis for120Sq.ftor0.5CubesNoItem DescriptionItem RefUnitQuantityRateAmount1.0099999905Mixing Concrete 1:2:4(3/4")05.A.04Cu0.532,410.0016,205.00Allow 5% of Items ( 1.01 ) for Wastage810.251.0249999762Hire of VibratorP-002Day0.51,000.00500.001.0299999714MasonL-009Day0.51,200.00600.001.0399999619U / SK LabourerL-007Day21,000.002,000.001.0499999523SK Labourer (Vibrator)L-004Day0.51,200.00600.001.0599999428Jute HessianM-063Sq.ft303.50105.001.0700000525WaterM-157Gal900.3027.001.0800000429U / SK Labourer (curing)L-007Day0.51,000.00500.00Total for120Sq.ft21,347.250.5 Cubes21,347.25Rate for 1Sq.ft177.891 Cube42,694.50Rate(Say)1 Sq.ft177.891Cube42,690.00Rate(Say)1 Sq17,789.381m315,084.81Rate(Say)1m21,914.141m315,084.81First Floor1m21,914.141m316,593.29Second Floor1m22,105.551m318,252.61Third Floor1m22,316.111m320,077.8805.F.026" Thick R.C.C 1:2:4(3/4") floor slab in 1st floorAnalysis for1Sqor0.5CubesNoItem DescriptionItem RefUnitQuantityRateAmount1.0099999905Mixing Concrete 1:2:4(3/4")05.A.04Cu0.532,410.0016,205.00Allow 5% of Items ( 1.01 ) for Wastage810.251.0249999762Hire of VibratorP-002Day0.51,000.00500.001.0299999714MasonL-009Day0.51,200.00600.001.0399999619U / SK LabourerL-007Day21,000.002,000.001.0499999523SK Labourer (Vibrator)L-004Day0.51,200.00600.001.0599999428Jute HessianM-063Sq.ft253.5087.501.0700000525WaterM-157Gal900.3027.001.0800000429U / SK Labourer (curing)L-007Day0.51,000.00500.00Total for1Sq21,329.750.5 Cubes21,329.75Rate for 1Sq21,329.751 Cube42,659.50Rate(Say)1 Sq21,329.751Cube42,660.00Rate(Say)1 ft2213.301m315,074.20Rate(Say)1m22,295.081m315,074.20First Floor1m22,295.081m316,581.63Second Floor1m22,524.591m318,239.79Third Floor1m22,777.051m320,063.77Lintol Concrete05.G.01Cement concrete 1:2:4(3/4") in 4-1/2" X 6" lintels in ground floorAnalysis for240L.ftNoItem DescriptionItem RefUnitQuantityRateAmount1.0099999905Mixing Concrete 1:2:4(3/4")05.A.04Cu0.4532,410.0014,584.501.0249999762Hire of VibratorP-002Day11,000.001,000.001.0299999714MasonL-009Day11,200.001,200.001.0399999619U / SK LabourerL-007Day41,000.004,000.001.0499999523SK Labourer (Vibrator)L-004Day11,200.001,200.001.0599999428Jute HessianM-063Sq.ft1053.50367.501.0700000525WaterM-157Gal900.3027.001.0800000429U / SK Labourer (curing)L-007Day0.51,000.00500.00Total for240L.ft22,879.00Rate for 1L.ft95.33Rate(Say)1 ft100.00Rate(Say)1 m328.00Ground floor1 m328.00First Floor1 m360.80Second Floor1 m396.88Third Floor1 m436.5705.G.02Cement concrete 1:2:4(3/4") in 9" X 9" lintels in ground floorAnalysis for80L.ftNoItem DescriptionItem RefUnitQuantityRateAmount1.0099999905Mixing Concrete 1:2:4(3/4")05.A.04Cu0.4532,410.0014,584.501.0249999762Hire of VibratorP-002Day11,000.001,000.001.0299999714MasonL-009Day11,200.001,200.001.0399999619U / SK LabourerL-007Day41,000.004,000.001.0499999523SK Labourer (Vibrator)L-004Day11,200.001,200.001.0599999428Jute HessianM-063Sq.ft603.50210.001.0700000525WaterM-157Gal900.3027.001.0800000429U / SK Labourer (curing)L-007Day0.51,000.00500.00Total for80L.ft22,721.50Rate for 1L.ft284.02Rate(Say)1 ft280.00Rate(Say)1 m918.40Ground floor1 m918.40First Floor1 m1,010.24Second Floor1 m1,111.26Third Floor1 m1,222.3905.G.03Cement concrete 1:2:4(3/4") in 9" X 12" lintels in ground floorAnalysis for60L.ftNoItem DescriptionItem RefUnitQuantityRateAmount1.0099999905Mixing Concrete 1:2:4(3/4")05.A.04Cu0.4532,410.0014,584.501.0249999762Hire of VibratorP-002Day11,000.001,000.001.0299999714MasonL-009Day11,200.001,200.001.0399999619U / SK LabourerL-007Day41,000.004,000.001.0499999523SK Labourer (Vibrator)L-004Day11,200.001,200.001.0599999428Jute HessianM-063Sq.ft553.50192.501.0700000525WaterM-157Gal900.3027.001.0800000429U / SK Labourer (curing)L-007Day0.51,000.00500.00Total for60L.ft22,704.00Rate for 1L.ft378.40Rate(Say)1 ft380.00Rate(Say)1 m1,246.40Ground floor1 m1,246.40First Floor1 m1,371.04Second Floor1 m1,508.14Third Floor1 m1,658.9605.G.04Cement concrete 1:2:4(3/4") in 12" X 15" lintels in ground floorAnalysis for36L.ftNoItem DescriptionItem RefUnitQuantityRateAmount1.0099999905Mixing Concrete 1:2:4(3/4")05.A.04Cu0.4532,410.0014,584.501.0249999762Hire of VibratorP-002Day11,000.001,000.001.0299999714MasonL-009Day11,200.001,200.001.0399999619U / SK LabourerL-007Day41,000.004,000.001.0499999523SK Labourer (Vibrator)L-004Day11,200.001,200.001.0599999428Jute HessianM-063Sq.ft403.50140.001.0700000525WaterM-157Gal900.3027.001.0800000429U / SK Labourer (curing)L-007Day0.51,000.00500.00Total for36L.ft22,651.50Rate for 1L.ft629.21Rate(Say)1 ft630.00Rate(Say)1 m2,066.40Ground floor1 m2,066.40First Floor1 m2,273.04Second Floor1 m2,500.34Third Floor1 m2,750.38

&R&08 Page &P Of &NMixing ConcreteScreedMass ConcreteColumnBeamSlabLintol

0606. FormworkA.ColumnB.BeamC.SlabColumn06.A.01Sawn timber formwork to 9" x 9" cement concrete column in ground floor.Analysis for0.15SqNoItem DescriptionItem RefUnitQuantityRateAmount1.0099999905Sawn timber formwork to 9" x 9" cement concrete column in ground floor - Making Mould06.A.021 Use1731.00731.001.0199999809Bolts 16mm 18" (12 nos 20 uses)M-010No0.675.0045.001.0299999714Mould OilM-071litre0.535.0017.501.0399999619Timber props 4" x 2"M-144L.ft3.565.00227.501.0499999523Carpenter - assemblingL-008Day0.251,200.00300.001.0599999428U / SK Labourer - assemblingL-007Day0.251,000.00250.001.0700000525Carpenter - dismantling, cleaning & repairingL-008Day0.251,200.00300.001.0800000429U / SK Labourer - dismantling, cleaning & repairingL-007Day0.251,000.00250.00Total for0.15Sq2,121.00Rate for 1Sq14,140.00Rate(Say)1Sq14,140.00Rate(Say)1ft2141.40Rate(Say)1m21,521.46Ground floor - First Floor1m21,521.46First Floor - Second Floor1m21,673.61Second Floor - Third Floor1m21,840.97Third Floor - Fourth Floor1m22,025.0706.A.02Sawn timber formwork to 9" x 9" cement concrete column in ground floor - Making MouldAnalysis for4UsesNoItem DescriptionItem RefUnitQuantityRateAmount1.00999999051" Thick Class II TimberM-141Sq.ft18.1565.001,179.751.01999998092" x 2" Class II Timber In YokesM-143L.ft17.122.00376.201.02999997142" x 1" Class II Timber Battens.M-142L.ft16.1212.00193.441.0399999619Wire NailsM-161Lbs1.550.0075.001.0499999523CarpenterL-008Day0.51,200.00600.001.0599999428U / SK LabourerL-007Day0.51,000.00500.00Total for4Uses2,924.39Rate for 1Uses731.10Rate(Say)1 Use731.00Beam06.B.01Sawn timber formwork for concrete beams in ground floorAnalysis for0.55SqNoItem DescriptionItem RefUnitQuantityRateAmount1.0099999905Sawn timber formwork for 9" x 12" concrete beams in ground floor - Making the mould06.B.021 Use12,757.002,757.001.0199999809Sawn timber formwork for concrete beams in ground floor-Assembling06.B.031 Use11,568.001,568.001.0299999714Allow 10% of Items ( 1.02 ) for Repairs----156.801.0399999619Carpenter - AssemblingL-008Day11,200.001,200.001.0499999523U / SK Labourer - AssemblingL-007Day21,000.002,000.001.0599999428Mould OilM-071litre0.535.0017.501.0700000525Wire NailsM-161Lbs0.565.0032.501.0800000429Carpenter - dismantling, cleaning & repairingL-008Day0.51,200.00600.001.0900000334U / SK Labourer - dismantling, cleaning & repairingL-007Day21,000.002,000.00Total for0.55Sq10,331.80Rate for 1Sq18,785.09Rate(Say)1Sq18,785.00Rate(Say)1ft2187.85Rate(Say)1m22,021.27Ground floor1m22,021.27First Floor1m22,223.39Second Floor1m22,445.73Third Floor1m22,690.3106.B.02Sawn timber formwork for 9" x 12" concrete beams in ground floor - Making the mouldAnalysis for4UsesNoItem DescriptionItem RefUnitQuantityRateAmount1.00999999051" Thick Class II TimberM-141Sq.ft6065.003,900.001.01999998092" x 1" Class II Timber Battens.M-142L.ft2412.00288.001.02999997142" x 2" Class II Timber In YokesM-143L.ft4522.00990.001.03999996194"X2" Timber bearersM-144L.ft3065.001,950.001.05Wire NailsM-161Lbs250.00100.001.06CarpenterL-008Day1.51,200.001,800.001.07U / SK LabourerL-007Day21,000.002,000.00Total for4Uses11,028.00Rate for 1Uses2,757.00Rate(Say)1 Use2,757.0006.B.03Sawn timber formwork for concrete beams in ground floor-Assembling - MaterialsAnalysis for6UsesNoItem DescriptionItem RefUnitQuantityRateAmount1.01Timber props 4" x 2"M-144L.ft11065.007,150.001.022" x 2" Class II Timber for bracingsM-143L.ft8022.001,760.001.031" Thick Class II Timber base plateM-141Sq.ft665.00390.001.04Timber WedgesM-151No225.00110.00Total for6Uses9,410.00Rate for 1Uses1,568.33Rate(Say)1 Use1,568.00Slab06.C.01Sawn timber formwork for underside of first floor slabAnalysis for2SqNoItem DescriptionItem RefUnitQuantityRateAmount1.01Sawn timber formwork for 20" x 10" concrete slab in ground floor - Making panels06.C.021 Use17,241.007,241.001.02Allow 20% of Items ( 1.01 ) for Repairs----1,448.201.03Sawn timber formwork for underside of first floor slab - assembling06.C.03Sq18,176.008,176.001.04Allow 20% of Items ( 1.03 ) for Wastage----1,635.201.0399999619Carpenter - AssemblingL-008Day11,200.001,200.001.0499999523U / SK Labourer - AssemblingL-007Day41,000.004,000.001.0599999428Mould OilM-071litre4.5435.00158.901.0700000525Wire NailsM-161Lbs250.00100.001.0800000429Carpenter - dismantling, cleaning & repairingL-008Day0.51,200.00600.001.0900000334U / SK Labourer - dismantling, cleaning & repairingL-007Day21,000.002,000.00Total for2Sq26,559.30Rate for 1Sq13,279.65Rate(Say)1Sq13,280.00Rate(Say)1ft2132.80Rate(Say)1m21,428.93Ground floor1m21,428.93First Floor1m21,571.82Second Floor1m21,729.00Third Floor1m21,901.9006.C.02Sawn timber formwork for 20" x 10" concrete slab in ground floor - Making panelsAnalysis for4UsesNoItem DescriptionItem RefUnitQuantityRateAmount1.00999999051" Thick Class II TimberM-141Sq.ft22065.0014,300.001.0199999809Timber props 4" x 2"M-144L.ft12165.007,865.001.0299999714Wire NailsM-161Lbs450.00200.001.0399999619CarpenterL-008Day31,200.003,600.001.0499999523U / SK LabourerL-007Day31,000.003,000.00Total for4Uses28,965.00Rate for 1Uses7,241.25Rate(Say)7,241.0006.C.03Sawn timber formwork for underside of first floor slab - AssemblingAnalysis for6UsesNoItem DescriptionItem RefUnitQuantityRateAmount1.01Timber props 4" x 2"M-144L.ft69065.0044,850.001.022" x 2" Class II Timber In YokesM-143L.ft6622.001,452.001.03Timber WedgesM-151No1225.00610.001.041" Thick Class II TimberM-141Sq.ft3365.002,145.00Total for6Uses49,057.00Rate for 1Uses8,176.17Rate(Say)8,176.00

&R&08 Page &P Of &N&LSDS&R&DColumnBeamSlab

0707. Reinforcement7.01Tor steel reinforcement to lintels, slabs, beams or columns bent to shape, laid in position and tied with G.I. Wire as directed.Analysis for1Cwt.NoItem DescriptionItem RefUnitQuantityRateAmount1.0099999905M.S./Tor Steel Rods including transport to siteM-152kg50109.005,450.001.0199999809Allow 15% of Items ( 1.01 ) for Wastage----817.501.029999971416 BWG Binding WireM-005Lbs1.5200.00300.001.0399999619Allow 1.5% of Items ( 1.01 ) for spaces or chairs----81.751.0499999523SK LabourL-003Day11,200.001,200.001.0599999428U / SK LabourerL-007Day11,000.001,000.00Total for1Cwt.8,849.25Rate for 1Cwt.8,849.25Rate(Say)1Cwt8,849.00Rate(Say)1Kg176.987.02Mild Steel reinforcement to lintels, slabs, beams or columns bent to shape, laid in position and tied with G.I. Wire as directed.Analysis for1Cwt.NoItem DescriptionItem RefUnitQuantityRateAmount1.0099999905M.S./Tor Steel Rods including transport to siteM-068kg50109.005,450.001.0199999809Allow 15% of Items ( 1.01 ) for Wastage----817.501.029999971416 BWG Binding WireM-005Lbs1.5200.00300.001.0399999619SK LabourL-003Day11,200.001,200.001.0499999523U / SK LabourerL-007Day11,000.001,000.00Total for1Cwt.8,767.50Rate for 1Cwt.8,767.50Rate(Say)1Cwt8,768.00Rate(Say)1Kg175.36

&R&08 Page &P Of &N

0808. Block Work08.018" Thick hollow block work in cement and sand mortar 1:5 in ground floor (Cavities unfilled)Analysis for1SqrNoItem DescriptionItem RefUnitQuantityRateAmount1.0099999905Hollow Cement Block (16"x 8"x 8")M-057No11230.003,360.001.0199999809Allow 5% of Items ( 1.01 ) for Wastage----168.001.0299999714CementM-026Bag0.75850.00637.501.0399999619SandM-113Cube0.0612,500.00750.001.0499999523MasonL-009Day1.51,200.001,800.001.0599999428U / SK LabourerL-007Day2.51,000.002,500.001.0700000525Allow 3% of Items ( 1.05, 1.06 ) for Scaffolding----129.00Total for1Sqr9,344.50Rate for 1Sqr9,344.50Rate(Say)1 Sq9,345.00Rate(Say)1ft293.45Rate(Say)1m21,005.52Ground floor1m21,005.52First Floor1m21,106.07Second Floor1m21,216.683rd floor1m21,338.3508.026" Thick hollow block work in cement and sand mortar 1:5 with cavities unfilled.Analysis for1SqrNoItem DescriptionItem RefUnitQuantityRateAmount1.0099999905Hollow Cement Blocks (16"x 8"x 6")M-059No11222.002,464.001.0199999809Allow 5% of Items ( 1.01 ) for Wastage----123.201.0299999714CementM-026Bag0.65850.00552.501.0399999619SandM-113Cube0.0712,500.0051.001.0499999523MasonL-009Day1.51,200.001,800.001.0599999428U / SK LabourerL-007Day21,000.002,000.001.0700000525Allow 3% of Items ( 1.05, 1.06 ) for Scaffolding----114.00Total for1Sqr7,104.70Rate for 1Sqr7,104.70Rate(Say)1 Sq7,104.70Rate(Say)1ft271.05Rate(Say)1m2764.47Ground floor1m2764.47First Floor1m2840.91Second Floor1m2925.00Third Floor1m21,017.5008.034" Thick hollow block work in cement and sand mortar 1:5 with cavities unfilled.Analysis for1SqrNoItem DescriptionItem RefUnitQuantityRateAmount1.0099999905Hollow Cement Blocks (16"x 8"x 4")M-058No11227.003,024.001.0199999809Allow 5% of Items ( 1.01 ) for Wastage----151.201.0299999714CementM-026Bag0.4850.00340.001.0399999619SandM-113Cube0.0312,500.0051.001.0499999523MasonL-009Day11,200.001,200.001.0599999428U / SK LabourerL-007Day21,000.002,000.001.0700000525Allow 5% of Items ( 1.05, 1.06 ) for Scaffolding----160.00Total for1Sqr6,926.20Rate for 1Sqr6,926.20Rate(Say)1 Sq6,926.20Rate(Say)1ft269.26Rate(Say)1m2745.26Ground floor1m2745.26First Floor1m2819.79Second Floor1m2901.76Third Floor1m2991.94

&R&08 Page &P Of &N

0909. Brick Work09.01Brick Work in cement sand 1:5 in 4-1/2" thick walls in ground floorAnalysis for1SqrNoItem DescriptionItem RefUnitQuantityRateAmount1.0099999905BricksM-019No5506.003,300.001.0199999809Allow 5% of Items ( 1.01 ) for Wastage----165.001.0299999714CementM-026Bag1.3850.001,105.001.04SandM-113Cu0.112,500.001,250.001.05WaterM-157Gal500.3015.001.06MasonL-009Day1.51,200.001,800.001.07U / SK LabourerL-007Day21,000.002,000.001.08Allow 5% of Items (1.06, 1.07 ) for Scaffolding----190.00Total for1Sqr9,825.00Rate for 1Sqr9,825.00Rate(Say)1 Sq9,825.00Rate(Say)1ft298.25Rate(Say)1m21,057.17Ground floor1m21,057.17First Floor1m21,110.03Second Floor1m21,165.53Third Floor1m21,223.8109.029" thick brick wall cement sand 1:5 in ground floorAnalysis for1SqrNoItem DescriptionItem RefUnitQuantityRateAmount1.0099999905BricksM-019No10906.006,540.001.0199999809Allow 5% of Items ( 1.01 ) for Wastage----327.001.0299999714CementM-026Bag3850.002,550.001.04SandM-113Cu0.212,500.002,500.001.05WaterM-157Gal1150.3034.501.06MasonL-009Day2.251,200.002,700.001.07U / SK LabourL-007Day3.751,000.003,750.001.08Allow 3% of Items (1.06, 1.07 ) for Scaffolding----193.50Total for1Sqr18,595.00Rate for 1Sqr18,595.00Rate(Say)1 Sq18,595.00Rate(Say)1ft2185.95Rate(Say)1m22,000.82Ground floor1m22,000.82First Floor1m22,100.86Second Floor1m22,205.91Third Floor1m22,316.2009.03Brick work in cement sand 1:5 in foundation upto D. P. CAnalysis for1CubeNoItem DescriptionItem RefUnitQuantityRateAmount1.0099999905BricksM-019No14506.008,700.001.0199999809Allow 5% of Items ( 1.01 ) for Wastage----435.001.0299999714CementM-026Bag4850.003,400.001.04SandM-113Cu0.2512,500.003,125.001.05WaterM-157Gal1500.3045.001.06MasonL-009Day31,200.003,600.001.07U / SK LabourerL-007Day41,000.004,000.00Total for1Cube23,305.00Rate for 1Cube23,305.00Rate(Say)1 Cu23,305.00Rate(Say)1ft3233.05Rate(Say)1m38,234.9809.04Brick Work in cement sand 1:8 in foundation upto D. P. CAnalysis for1CubeNoItem DescriptionItem RefUnitQuantityRateAmount1.0099999905BricksM-019No14506.008,700.001.0199999809Allow 5% of Items ( 1.01 ) for Wastage----435.001.0299999714CementM-026Bag2.333850.001,983.051.04SandM-113Cu0.37512,500.004,687.501.05WaterM-157Gal1500.3045.001.06MasonL-009Day31,200.003,600.001.07U / SK LabourerL-007Day41,000.004,000.00Total for1Cube23,450.55Rate for 1Cube23,450.55Rate(Say)1 Cu23,451.00Rate(Say)1ft3234.51Rate(Say)1m38,286.5709.05Brick Work 13 1/2" thick in cement sand 1:5 in superstructure in ground floorAnalysis for1SqrNoItem DescriptionItem RefUnitQuantityRateAmount1.0099999905BricksM-019No16306.009,780.001.0199999809Allow 5% of Items ( 1.01 ) for wastage----489.001.0299999714CementM-026Bag4.5850.003,825.001.04SandM-113Cu0.312,500.003,750.001.05WaterM-157Gal1700.3051.001.06MasonL-009Day3.51,200.004,200.001.07U / SK LabourerL-007Day5.51,000.005,500.001.08Allow 2% of Items (1.06, 1.07 ) for Scaffolding----194.00Total for1Sqr27,789.00Rate for 1Sqr27,789.00Rate(Say)1 Sq27,789.00Rate(Say)1ft2277.89Rate(Say)1m22,990.10Ground floor1m22,990.10First Floor1m23,289.11Second Floor1m23,618.02Third Floor1m23,979.8209.069" Brick Walls in cement sand 1:8 in superstructure in ground floorAnalysis for1SqrNoItem DescriptionItem RefUnitQuantityRateAmount1.0099999905BricksM-019No10906.006,540.001.0199999809Allow 5% of Items ( 1.01 ) for Wastage----327.001.0299999714CementM-026Bag1.75850.001,487.501.04SandM-113Cu0.312,500.003,750.001.05WaterM-157Gal1150.3034.501.06MasonL-009Day2.251,200.002,700.001.07U / SK LabourerL-007Day31,000.003,000.001.08Allow 3% of Items ( 1.06, 1.07 ) for Scaffolding----171.00Total for1Sqr18,010.00Rate for 1Sqr18,010.00Rate(Say)1 Sq18,010.00Rate(Say)1ft2180.10Rate(Say)1m21,937.88Ground floor1m21,937.88First Floor1m22,131.66Second Floor1m22,344.83Third Floor1m22,579.3109.074 1/2" Thick Brick Walls (wire cut) in cement sand 1:5 in superstructure in ground floor (facing to brickwork measured separately)Analysis for1SqrNoItem DescriptionItem RefUnitQuantityRateAmount1.0099999905Wire cut BricksM-164No5508.754,812.501.0199999809Allow 2% of Items ( 1.01 ) for Wastage----96.251.0299999714CementM-026Bag1.2850.001,020.001.04SandM-113Cu0.0812,500.001,000.001.05WaterM-157Gal300.309.001.06MasonL-009Day1.51,200.001,800.001.07U / SK LabourerL-007Day21,000.002,000.001.08Allow 3% of Items (1.06, 1.07 ) for Scaffolding----114.00Total for1Sqr10,851.75Rate for 1Sqr10,851.75Rate(Say)1 Sq10,852.00Rate(Say)1ft2108.52Rate(Say)1m21,167.68Ground floor1m21,167.68First Floor1m21,284.44Second Floor1m21,412.89Third Floor1m21,554.1809.089" Thick in Cement and Sand 1:5 with wire cut Bricks (Facing to brickwork measured separately)Analysis for1SqNoItem DescriptionItem RefUnitQuantityRateAmount1.0099999905Wire cut BricksM-164No10608.759,275.001.0199999809Allow 4% of Items ( 1.01 ) for Wastage----371.001.0299999714CementM-026Bag2.5850.002,125.001.04SandM-113Cu0.1812,500.002,250.001.05WaterM-157Gal1000.3030.001.06MasonL-009Day2.251,200.002,700.001.07U / SK LabourerL-007Day3.751,000.003,750.001.08Allow 3% of Items ( 1.06, 1.07 ) for Scaffolding----193.50Total for1Sq20,694.50Rate for 1Sq20,694.50Rate(Say)1 Sq20,695.00Rate(Say)1ft2206.95Rate(Say)1m22,226.78Ground floor1m22,226.78First Floor1m22,449.46Second Floor1m22,694.41Third Floor1m22,963.8509.1013 1/2" Thick Brick wall (wire cut) in cement and sand 1:5 in ground floor (Facing to brickwork measured separately)Analysis for1SqrNoItem DescriptionItem RefUnitQuantityRateAmount1.0099999905Wire cut BricksM-164No16308.7514,262.501.0199999809Allow 2% of Items ( 1.01 ) for Wastage----285.251.0299999714CementM-026Bag4.5850.003,825.001.04SandM-113Cu0.312,500.003,750.001.05WaterM-157Gal500.3015.001.06MasonL-009Day3.751,200.004,500.001.07U / SK LabourerL-007Day5.51,000.005,500.001.08Allow 2% of Items (1.06, 1.07 ) for Scaffolding----200.00Total for1Sqr32,337.75Rate for 1Sqr32,337.75Rate(Say)1 Sq32,338.00Rate(Say)1ft2323.38Rate(Say)1m23,479.57Ground floor1m23,479.57First Floor1m23,827.53Second Floor1m24,210.28Third Floor1m24,631.3109.11Extra over for facing including raised pointing 1/8" thick in cement and sand 1:1 mixture in ground floorAnalysis for1SqrNoItem DescriptionItem RefUnitQuantityRateAmount1.01CementM-026Bag0.5850.00425.001.02SandM-113Cu0.0112,500.00125.001.03AcidM-001Gal0.1254.0025.401.04WaterM-157Gal100.303.001.05MasonL-009Day51,200.006,000.001.06U / SK LabourerL-007Day3.51,000.003,500.00Total for1Sqr10,078.40Rate for 1Sqr10,078.40Rate(Say)1 Sq10,078.00Rate(Say)1ft2100.78Rate(Say)1m21,084.3909.123" Thick floor paved in lime mortar 2:5 in ground floorAnalysis for1SqrNoItem DescriptionItem RefUnitQuantityRateAmount1.01BricksM-019No3506.002,100.001.02Slaked LimeM-115Lbs1.2275.00330.001.03SandM-113Cu0.1112,500.001,375.001.04WaterM-157Gal450.3013.501.05MasonL-009Day1.251,200.001,500.001.06U / SK LabourerL-007Day2.51,000.002,500.00Total for1Sqr7,818.50Rate for 1Sqr7,818.50Rate(Say)1 Sq7,819.00Rate(Say)1ft278.19Rate(Say)1m2841.3209.13Steps 1' -1 1/2" x 0' 6" in brick in cement and sand 1:5 with 1/2" thick cement and sand 1:2 rendering including necessary excavation.Analysis for10L.ftNoItem DescriptionItem RefUnitQuantityRateAmount1.01BricksM-019No1206.00720.001.02CementM-026Bag0.5850.00425.001.03SandM-113Cu0.0512,500.00625.001.04WaterM-157Gal150.304.501.05MasonL-009Day0.51,200.00600.001.06U / SK LabourerL-007Day0.51,000.00500.00Total for10L.ft2,874.50Rate for 1L.ft287.45Rate(Say)1 ft287.45Rate(Say)1m942.8409.14Brick Drain in cement and sand 1:5 mix, 9" wide and 6"-9" average depth including cement rendering 1/2" thick 1:2 to exposed faces with 1' 6" ramp including necessary excavation.Analysis for10L.ftNoItem DescriptionItem RefUnitQuantityRateAmount1.01BricksM-019No1406.00840.001.02CementM-026Bag0.8850.00680.001.03SandM-113Cu0.0512,500.00625.001.04WaterM-157Gal200.306.001.05MasonL-009Day1.251,200.001,500.001.06U / SK LabourerL-007Day1.251,000.001,250.00Total for10L.ft4,901.00Rate for 1L.ft490.10Rate(Say)1 ft490.10Rate(Say)1m1,607.5309.15Brick Drain in cement and sand 1:5 mix, 9" wide and 6"-9" average depth including cement rendering 1/2" thick 1:2 to exposed faces without ramp including necessary excavation.Analysis for10L.ftNoItem DescriptionItem RefUnitQuantityRateAmount1.01BricksM-019No1106.00660.001.02CementM-026Bag0.7850.00595.001.03SandM-113Cu0.0412,500.00500.001.04WaterM-157Gal150.304.501.05MasonL-009Day11,200.001,200.001.06U / SK LabourerL-007Day1.251,000.001,250.00Total for10L.ft4,209.50Rate for 1L.ft420.95Rate(Say)1 ft420.95Rate(Say)1m1,380.72

&R&08 Page &P Of &N

1010. Roof Covering and CeilingA.Roof Frame & Roof CoveringB.Roof PlumbingRoof frame & Roof Covering10.A.01Timber framework for culicut pattern tile hip roof in single storey building consisting of wall plate , beam, ridge plate, rafters etc.(Preservative treatment to be measured separately)Analysis for6SqrsNoItem DescriptionItem RefUnitQuantityRateAmount1.0099999905Timber Class IM-136Cu.ft341,200.0040,800.001.0199999809Allow 10% of Items ( 1.01 ) for Wastage----4,080.001.02999997142"X1" ReepersM-149L.ft66012.007,920.001.0399999619Allow 5% of Items ( 1.03 ) for Wastage----396.001.0499999523Wire Nails 6" LongM-163Lbs825.00200.001.0599999428Wire Nails 2" LongM-162Lbs225.0050.001.0700000525CarpenterL-008Day71,200.008,400.001.0800000429U / SK LabourerL-007Day81,000.008,000.00Total for6Sqrs69,846.00Rate for 1Sqrs11,641.00Rate(Say)11,641.0010.A.02Roof Covering With calicut pattern clay tiles in single storeyed buildingAnalysis for6SqrsNoItem DescriptionItem RefUnitQuantityRateAmount1.0099999905TilesM-108No75016.0012,000.001.0199999905CarpenterL-008Day31,200.003,600.001.0299999905U / SK LabourerL-007Day31,000.003,000.00Total for6Sqrs18,600.00Rate for 1Sqrs3,100.00Rate(Say)3,100.0010.A.03Timber framework for corrugated asbestos sheet roof in single storeyed buildingAnalysis for3.6SqrsNoItem DescriptionItem RefUnitQuantityRateAmount1.0099999905Timber Class IM-136Cu.ft13.251,200.0015,900.001.0199999809Allow 10% of Items ( 1.01 ) for Wastage----1,590.001.0299999714CarpenterL-008Day2.51,200.003,000.001.0399999619U / SK LabourerL-007Day31,000.003,000.00Total for3.6Sqrs23,490.00Rate for 1Sqrs6,525.00Rate(Say)6,525.0010.A.04Roof covering with corrugated asbestos sheets (Timber frame work and ridge covering measured separately)Analysis for3.6SqrsNoItem DescriptionItem RefUnitQuantityRateAmount1.01Asbestos CorrugatedM-003Sq.ft42042.0017,640.001.02Roofing Screws and WashersM109No723.50252.001.03CarpenterL-008Day11,200.001,200.001.04U / SK LabourerL-007Day21,000.002,000.00Total for3.6Sqrs21,092.00Rate for 1Sqrs5,858.89Rate(Say)5,859.0010.A.05One layer half round clay tiles over corrugated asbestos roof coveringAnalysis for1SqrNoItem DescriptionItem RefUnitQuantityRateAmount1.0099999905Half Round Clay TilesM-056No6505.003,250.001.0199999809U / SK LabourerL-007Day21,000.002,000.00Total for1Sqr5,250.00Rate for 1Sqr5,250.00Rate(Say)1 Sqr5,250.0010.A.06Asbestos close fittings ridging fixed complete with roofing screws or bolts (hook)Analysis for13.33L.ft.NoItem DescriptionItem RefUnitQuantityRateAmount1.0099999905Ridges 3' 8" Long - AsbestosM-106Pair4245.00980.001.0199999809Roofing Screws or BoltsM-110No163.5056.001.0299999714CarpenterL-008Day0.251,200.00300.001.0399999619U / SK LabourerL-007Day0.251,000.00250.00Total for13.33L.ft.1,586.00Rate for 1L.ft.118.98Rate(Say)1 L.ft119.0010.A.07Ridging covering with calicut pattern ridge tiles bedded in cement lime mortar 1:1:4Analysis for12L.ft.NoItem DescriptionItem RefUnitQuantityRateAmount1.0099999905Ridge TilesM-105No935.00315.001.0199999809CementM-o26Bag0.333850.00283.051.0299999714SandM-113Cu0.0212,500.00250.001.0399999619Slaked LimeM-115Lbs15275.004,125.001.0499999523Colouring PowderM-036Lbs0.5175.0087.501.0599999428MasonL-009Day0.251,200.00300.001.0700000525U / SK LabourerL-007Day0.251,000.00250.00Total for12L.ft.5,610.55Rate for 1L.ft.467.55Rate(Say)468.0010.A.083/4" X 9" high valance board fixed with brass screws to ends of rafters (For tile roofing)valance boardAnalysis for100L.ft.NoItem DescriptionItem RefUnitQuantityRateAmount1.00999999051" PlanksM-147Sq.ft7565.004,875.001.0199999809Allow 5% of Items ( 1.01 ) for Wastage----243.751.0299999714Brass Screws 1 1/2"M-015No1003.75375.001.0399999619CarpenterL-008Day31,200.003,600.001.0499999523U / SK LabourerL-007Day31,000.003,000.001.0599999428Allow 5% of Items ( 1.04, 1.05 ) for Wastage----330.00Total for100L.ft.12,423.75Rate for 1L.ft.124.24Rate(Say)124.0010.A.093/4" X 9" high barge board fixed with brass screws at 2 ft. 0"centres to side of raftersbarge boardAnalysis for100L.ft.NoItem DescriptionItem RefUnitQuantityRateAmount1.00999999051" PlanksM-147Sq.ft7565.004,875.001.0199999809Allow 5% of Items ( 1.01 ) for Wastage----243.751.0299999714Brass Screws 1 1/2"M-015No503.75187.501.0399999619CarpenterL-008Day31,200.003,600.001.0499999523U / SK LabourerL-007Day31,000.003,000.001.0599999428Allow 5% of Items ( 1.04, 1.05 ) for Scaffolding----330.00Total for100L.ft.12,236.25Rate for 1L.ft.122.36Rate(Say)122.00Roof Plumbing10.B.0118 B.W.G (1.2 mm) galvanised iron sheet valley gutter 3' 0" girth over all once bent with end laps not less than 9" width including 3/4" tongued and grooved planks laid to slope and profile on timber members.Analysis for15L.ft.NoItem DescriptionItem RefUnitQuantityRateAmount1.0099999905Sheet (8'X4')M-052Sheet22,200.004,400.001.0199999809Wood PreservativeM-165Gal0.25450.00112.501.0299999714CementM-026Bag0.1850.0085.001.0399999619Slaked LimeM-115Lbs0.05275.0013.751.0499999523SandM-113Cu0.0112,500.00125.001.05999994281" Thick Class II TimberM-141Sq.ft5065.003,250.001.07000005252" NailsM-072Lbs250.00100.001.0800000429CarpenterL-008Day11,200.001,200.001.0900000334U / SK LabourerL-007Day11,000.001,000.001.10TinkerL-005Day0.51,200.00600.001.1100000143U / SK LabourerL-007Day0.51,000.00500.001.1200000048MasonL-009Day0.251,200.00300.001.1299999952U / SK LabourerL-007Day0.251,000.00250.00Total for15L.ft.11,936.25Rate for 1L.ft.795.75Rate(Say)796.0010.B.0218 B.W.G (1.2 mm) GI Flashing 1' 6" girth overall 3 thies bent with end laps not less than 6", soldered, turned and tucked up to not less than 6" into chase cut in wall and pointed in 1:2 mortar, lower end dressed over roof covering not less than 1' 0" wideAnalysis for15L.ft.NoItem DescriptionItem RefUnitQuantityRateAmount1.0099999905Sheet (8'X4')M-052Sheet12,200.002,200.001.0199999809CementM-026Bag0.05850.0042.501.0299999714SandM-113Cu0.0112,500.00125.001.0399999619Soldering LeadM-116Lbs113.7513.751.0499999523TinkerL-005Day0.51,200.00600.001.0599999428MasonL-009Day0.1251,200.00150.001.0700000525U / SK LabourerL-007Day0.751,000.00750.00Total for15L.ft.3,881.25Rate for 1L.ft.258.75Rate(Say)259.0010.B.036" half round PVC eave gutter fixed to timber valance board including gutter joiner and brackets fixed at 18" centres (other specials paid seperately)Analysis for24L.ft.NoItem DescriptionItem RefUnitQuantityRateAmount1.00999999056" eave gutter lengths (12' each)M-088No20.000.01.0199999809JoinerM-055No10.000.01.0299999714gutter bracketsM-054No170.000.01.03999996193/4" brass screwsM-017No341.2542.501.0499999523Solvent cementM-117grms201.4028.001.0599999428PlumberL-002Day0.51,200.00600.001.0700000525U / SK LabourerL-007Day0.51,000.00500.001.0800001621Allow 5% of Items ( 1.06, 1.07) for Scaffolding55.00Total for24L.ft.1,225.50Rate for 1L.ft.51.06Rate(Say)1 L.ft.51.0010.B.046" dia PVC gutter headAnalysis for1No.NoItem DescriptionItem RefUnitQuantityRateAmount1.00999999056" dia PVC gutter headM-089No10.000.01.0199999809Gutter JoinerM-055No20.000.01.0299999714gutter bracketsM-054No20.000.01.03999996193/4" brass screwsM-017No41.255.001.0499999523Solvent cementM-117grms121.4016.801.0599999428PlumberL-002Day0.1251,200.00150.001.0700000525U / SK LabourerL-007Day0.1251,000.00125.001.0800001621Allow 5% of Items ( 1.06, 1.07) for Scaffolding13.75Total for1No.310.55Rate for 1No.310.55Rate(Say)1 No.311.0010.B.056" dia PVC mitresAnalysis for1No.NoItem DescriptionItem RefUnitQuantityRateAmount1.00999999056" dia PVC mitre bendM-091No10.000.01.0199999809Gutter JoinerM-055No20.000.01.0299999714gutter bracketsM-054No20.000.01.03999996193/4" brass screwsM-017No41.255.001.0499999523Solvent cementM-117grms121.4016.801.0599999428PlumberL-002Day0.1251,200.00150.001.0700000525U / SK LabourerL-007Day0.1251,000.00125.001.0800001621Allow 5% of Items ( 1.06, 1.07) for Scaffolding13.75Total for1No.310.55Rate for 1No.310.55Rate(Say)1 No.311.0010.B.066" dia PVC end capsAnalysis for1No.NoItem DescriptionItem RefUnitQuantityRateAmount1.0099999905end capM-087No10.000.01.0499999523Solvent cementM-117grms121.4016.801.0599999428PlumberL-002Day0.06251,200.0075.001.0700000525U / SK LabourerL-007Day0.06251,000.0062.501.0800001621Allow 5% of Items ( 1.06, 1.07) for Scaffolding6.88Total for1No.161.18Rate for 1No.161.18Rate(Say)1 No.161.0010.B.073 1/2" PVC rain water down pipes fixed to brick wall with wooden plugs buried in wall (other specials paid seperately)Analysis for24L.ft.NoItem DescriptionItem RefUnitQuantityRateAmount1.00999999053 1/2" down pipe lengths (12' each)M-078No20.000.01.01999998093 1/2" JoinerM-090No10.000.01.0299999714PVC strapsM-104No40.000.01.03999996191" brass screwsM-014No82.5020.001.0499999523Solvent cementM-117grms301.4042.001.0599999428PlumberL-002Day0.331,200.00400.001.0700000525U / SK LabourerL-007Day0.331,000.00333.331.0800001621Allow 5% of Items ( 1.06, 1.07) for Scaffolding36.67Total for24L.ft.832.00Rate for 1L.ft.34.67Rate(Say)1 L.ft.35.0010.B.083 1/2" dia PVC elbowAnalysis for1No.NoItem DescriptionItem RefUnitQuantityRateAmount1.0099999905elbowM-079No10.000.01.0499999523Solvent cementM-117grms321.4044.801.0599999428PlumberL-002Day0.06251,200.0075.001.0700000525U / SK LabourerL-007Day0.06251,000.0062.501.0800001621Allow 5% of Items ( 1.06, 1.07) for Scaffolding6.88Total for1No.189.18Rate for 1No.189.18Rate(Say)1 No.189.0010.B.093 1/2" dia PVC ShoeAnalysis for1No.NoItem DescriptionItem RefUnitQuantityRateAmount1.0099999905ShoeM-099No10.000.01.0499999523Solvent cementM-117grms151.4021.001.0599999428PlumberL-002Day0.06251,200.0075.001.0700000525U / SK LabourerL-007Day0.06251,000.0062.501.0800001621Allow 5% of Items ( 1.06, 1.07) for Scaffolding6.88Total for1No.165.38Rate for 1No.165.38Rate(Say)1 No.165.00

&R&08 Page &P Of &NRoof Frame & Roof CoveringRoof Plumbing

1111. Doors & WindowsA.Doors & WindowsB.IronmongeryDoors & Windows11.A.01Door Single Hung 3' 3" X7' 0" high overall with frame having 1 1/4" thick sash and 3 1/4" X 2 1/4 ft. timber frame(glazing, ironmongery & painting measured separately)Analysis for22.75Sq.ftNoItem DescriptionItem RefUnitQuantityRateAmount1.00999999054"X3" TimberM-138Cu.ft1.51,300.001,950.001.0199999809Spur StoneM-118No215.0030.001.0299999714Fibre / Plastic PlugsM-045No61.509.001.03999996194" Long Brass ScrewsM-018No67.5045.001.04999995235/8" Mild Steel Dowels 4" Long.M-067No26.0012.001.05999994281 1/2" PlanksM-139Sq.ft14140.001,960.001.07000005251" PlanksM-139aSq.ft5110.00550.001.0800000429CarpenterL-008Day51,200.006,000.001.0900000334U / SK LabourerL-007Day1.51,000.001,500.00Total for22.75Sq.ft12,056.00Rate for 1Sq.ft529.93Rate(Say)530.0011.A.02Door glazed and paneled double hung 4' 0" x 7' 0" high overall with frame including 1 1/4" thick sash and 3 1/4 x 2 1/4" frame (Glazing, Ironmongory and painting measured separately)Analysis for28Sq.ftNoItem DescriptionItem RefUnitQuantityRateAmount1.00999999054"X3" TimberM-138Cu.ft1.661,300.002,158.001.0199999809Spur StoneM-118No215.0030.001.0299999714Fibre / Plastic PlugsM-045No61.509.001.03999996194" Long Brass ScrewsM-018No67.5045.001.04999995235/8" Mild Steel Dowels 4" Long.M-067No26.0012.001.05999994281 1/2" PlanksM-139Sq.ft16140.002,240.001.07000005251" PlanksM-139aSq.ft7110.00770.001.0800000429CarpenterL-008Day61,200.007,200.001.0900000334U / SK LabourerL-007Day21,000.002,000.00Total for28Sq.ft14,464.00Rate for 1Sq.ft516.57Rate(Say)517.0011.A.03Plywood door single hung 3' 1-1/2" x 6' 11-1/2" overall with frame having 1-1/4" thick sash and 3 1/4" x 2 1/4" frame (Glazing, Ironmongory and painting measured separately)Analysis for21.75Sq.ftNoItem DescriptionItem RefUnitQuantityRateAmount1.00999999054"X3" TimberM-138Cu.ft1.81,300.002,340.001.0199999809Spur StoneM-118No215.0030.001.0299999714Fibre / Plastic PlugsM-045No61.509.001.03999996194" Long Brass ScrewsM-018No67.5045.001.04999995236' 9" X 2' 9" Plywood SashM-074No12,000.002,000.001.0599999428CarpenterL-008Day0.751,200.00900.001.0700000525U / SK LabourerL-007Day0.3751,000.00375.001.0800000429Mason - fixing frameL-009Day0.251,200.00300.001.0900000334U / SK Labourer - fixing frameL-007Day0.251,000.00250.00Total for21.75Sq.ft6,249.00Rate for 1Sq.ft287.31Rate(Say)287.0011.A.04Door Ledged, braced and battened single hung 2' 6" x 6' 6" overall,with frame having 7/8" thick tongued & Grooved planks and 3-1/4" x 2-3/4"frame (Glazing, Ironmongory and painting measured separately)Analysis for16.25Sq.ftNoItem DescriptionItem RefUnitQuantityRateAmount1.00999999054"X3" TimberM-138Cu.ft1.71,300.002,210.001.0199999809Spur StoneM-118No215.0030.001.0299999714Fibre / Plastic PlugsM-045No61.509.001.03999996194" Long Brass ScrewsM-018No67.5045.001.04999995235/8" Mild Steel Dowels 4" Long.M-067No26.0012.001.05999994281" PlanksM-139aSq.ft21110.002,310.001.0700000525Brass Screws 1 1/2"M-015No363.75135.001.0800000429CarpenterL-008Day2.251,200.002,700.001.0900000334U / SK LabourerL-007Day11,000.001,000.001.10Mason - fixing frameL-009Day0.251,200.00300.001.1100000143U / SK Labourer - fixing frameL-007Day0.251,000.00250.00Total for16.25Sq.ft9,001.00Rate for 1Sq.ft553.91Rate(Say)554.0011.A.05window, Glazed 7'. 0" x 4' 0" High overall with frame comprising 3 No openable sashes and 3 1/4" x 2 1/4" frame and mullions (Glazing, Ironmongory and painting measured separately)Analysis for28Sq.ftNoItem DescriptionItem RefUnitQuantityRateAmount1.00999999054"X3" TimberM-138Cu.ft3.21,300.004,160.001.01999999054" Long Brass ScrewsM-018No47.5030.001.0299999905Fibre / Plastic PlugsM-045No41.506.001.03999999051 1/2" PlanksM-139Sq.ft9.25140.001,295.001.0499999905CarpenterL-008Day61,200.007,200.001.0599999905U / SK LabourerL-007Day2.51,000.002,500.001.0699999905Mason - fixing frameL-009Day0.51,200.00600.001.0799999905U / SK Labourer - fixing frameL-007Day0.51,000.00500.00Total for28Sq.ft16,291.00Rate for 1Sq.ft581.82Rate(Say)582.0011.A.061/8" clear sheet glass panes exceeding 1' 0" but not exceeding 4 squere feet cut and fixed with timber beadings to doors and windows.Analysis for9Sq.ftNoItem DescriptionItem RefUnitQuantityRateAmount1.0099999905Glass panesM-027Sq.ft925.00225.001.01999999051/2" X 1/2" BeadingM-133L.ft301.5045.001.0299999905Brass Pannel PinsM-013Doz41.004.001.0399999905GlazierL-010Day0.51,200.00600.001.0499999905U / SK LabourerL-007Day0.51,000.00500.00Total for9Sq.ft1,374.00Rate for 1Sq.ft152.67Rate(Say)153.00Ironmongery11.B.01Butt Hinges 5" X 2 1/2" BrassAnalysis for1.5PairNoItem DescriptionItem RefUnitQuantityRateAmount1.0099999905Butt Hinges (pairs 1 1/2)M-023No370.00210.001.01999998093/4" Brass ScrewsM-017No241.2530.001.0299999714CarpenterL-008Day0.251,200.00300.001.0399999619U / SK LabourerL-007Day0.251,000.00250.00Total for1.5Pair790.00Rate for 1Pair526.67Rate(Say)527.0011.B.02Tee Hinges 6" X 1/2" BrassAnalysis for1.5PairNoItem DescriptionItem RefUnitQuantityRateAmount1.0099999905Tee HingesM-128Pair1165.00165.001.01999998093/4" Iron ScrewsM-061No180.559.901.0299999714CarpenterL-008Day0.251,200.00300.001.0399999619U / SK LabourerL-007Day0.251,000.00250.00Total for1.5Pair724.90Rate for 1Pair483.27Rate(Say)483.0011.B.03Mortice LockAnalysis for1NoNoItem DescriptionItem RefUnitQuantityRateAmount1.0099999905Mortice lock with screwsM-070No1960.00960.001.0199999905CarpenterL-008Day0.51,200.00600.001.0299999905U / SK LabourerL-007Day0.51,000.00500.00Total for1No2,060.00Rate for 1No2,060.00Rate(Say)2,060.0011.B.04Casement StaysAnalysis for4NoNoItem DescriptionItem RefUnitQuantityRateAmount1.0099999905Casement StaysM-025No455.00220.001.01999998091/2 " Brass ScrewsM-016No161.3020.801.0299999714CarpenterL-008Day0.251,200.00300.001.0399999619U / SK LabourerL-007Day0.251,000.00250.00Total for4No790.80Rate for 1No197.70Rate(Say)198.0011.B.05Door Closer (Hydraulic)Analysis for1NoNoItem DescriptionItem RefUnitQuantityRateAmount1.0099999905Door CloserM-040No11,850.001,850.001.01999998093/4" Brass ScrewsM-017No81.2510.001.0299999714CarpenterL-008Day0.251,200.00300.001.0399999619U / SK LabourerL-007Day0.251,000.00250.00Total for1No2,410.00Rate for 1No2,410.00Rate(Say)2,410.0011.B.06Tower / Skeleton Brass Bolts 12"Analysis for1NoNoItem DescriptionItem RefUnitQuantityRateAmount1.0099999905Tower / Skeleton Brass BoltsM-153No1145.00145.001.01999998091/2 " Brass ScrewsM-016No101.3013.001.0299999714CarpenterL-008Day0.0631,200.0075.601.0399999619U / SK LabourerL-007Day0.0631,000.0063.00Total for1No296.60Rate for 1No296.60Rate(Say)297.0011.B.07Barrel Bolt 4"Analysis for1NoNoItem DescriptionItem RefUnitQuantityRateAmount1.0099999905Barrel BoltM-004No175.0075.001.01999998091/2 " Brass ScrewsM-016No81.3010.401.0299999714CarpenterL-008Day0.0631,200.0075.601.0399999619U / SK LabourerL-007Day0.0631,000.0063.00Total for1No224.00Rate for 1No224.00Rate(Say)224.0011.B.08Casement FastenersAnalysis for6NoNoItem DescriptionItem RefUnitQuantityRateAmount1.0099999905Casement FastenersM-024No655.00330.001.01999998091/2 " Brass ScrewsM-016No241.3031.201.0299999714CarpenterL-008Day0.51,200.00600.001.0399999619U / SK LabourerL-007Day0.51,000.00500.00Total for6No1,461.20Rate for 1No243.53Rate(Say)244.0011.B.09Check this itemAnalysis for6NoNoItem DescriptionItem RefUnitQuantityRateAmount1.0099999905Brass Fanlight ChtchesM-011No645.00270.001.01999998091/2 " Brass ScrewsM-016No241.3031.201.0299999714CarpenterL-008Day0.51,200.00600.001.0399999619U / SK LabourerL-007Day0.51,000.00500.00Total for6No1,401.20Rate for 1No233.53Rate(Say)234.0011.B.10Draw RingsAnalysis for6NoNoItem DescriptionItem RefUnitQuantityRateAmount1.0099999905Draw RingsM-041No622.50135.001.01999998091/2 " Brass ScrewsM-016No121.3015.601.0299999714CarpenterL-008Day0.1251,200.00150.001.0399999619U / SK LabourerL-007Day0.1251,000.00125.00Total for6No425.60Rate for 1No70.93Rate(Say)71.00

&R&08 Page &P Of &NDoors & WindowsIronmongery

1212. Plumbing & Drainage12.011/2 " Diameter PVC pipes fixed to walls (Specials paid separately)Analysis for10L.ftNoItem DescriptionItem RefUnitQuantityRateAmount1.00999999051/2" PVC PipesM-095L.ft137.5097.501/2 "20mm dia pipe1.01999998091 " Clips and NailsM-028No37.0021.003/4"25mm dia pipe1.0299999714Solvent CementM-117Grms21.402.801"32mm dia pipe1.0399999619PlumberL-002Day0.1251,200.00150.0011/4"40mm dia pipe1.0499999523U / SK LabourerL-007Day0.1251,000.00125.0011/2"50mm dia pipeTotal for10L.ft396.302"63mm dia pipeRate for 1L.ft39.6321/2"75mm dia pipeRate(Say)1 L.ft40.003"90mm dia pipe12.023/4 " Diameter PVC pipes fixed to walls (Specials paid separately)Analysis for10L.ftNoItem DescriptionItem RefUnitQuantityRateAmount1.00999999053/4" PVC PipesM-098L.ft1314.00182.001.01999998091 " Clips and NailsM-028No37.0021.001.0299999714Solvent CementM-117Grms31.404.201.0399999619PlumberL-002Day0.1251,200.00150.001.0499999523U / SK LabourerL-007Day0.1251,000.00125.00Total for10L.ft482.20Rate for 1L.ft48.22Rate(Say)1 L.ft48.0012.031 " Diameter PVC pipes fixed to walls (Specials paid separately)Analysis for100L.ftNoItem DescriptionItem RefUnitQuantityRateAmount1.00999999051" PVC PipesM-094L.ft10021.002,100.001.0199999809Allow 5% of Items ( 1.01 ) for Wastage----105.001.02999997141" PVC SocketsM-077No814.00112.001.0399999619Solvent CementM-117Grms321.4044.801.04999995231 " Clips and NailsM-028No357.00245.001.0599999428PlumberL-002Day0.51,200.00600.001.0700000525U / SK LabourerL-007Day0.51,000.00500.00Total for100L.ft3,706.80Rate for 1L.ft37.07Rate(Say)1 L.ft37.0012.041 1/4"Diameter PVC pipes fixed to walls (Specials paid separately)Analysis for100L.ftNoItem DescriptionItem RefUnitQuantityRateAmount1.00999999051 1/4" PVC PipesM-093L.ft10032.003,200.001.0199999809Allow 5% of Items ( 1.01 ) for Wastage----160.001.02999997141 1/4" PVC SocketsM-101No819.50156.001.0399999619Solvent CementM-117Grms481.4067.201.04999995231 1/4 " Clips and NailsM-030No358.75306.251.0599999428PlumberL-002Day0.751,200.00900.001.0700000525U / SK LabourerL-007Day0.751,000.00750.00Total for100L.ft5,539.45Rate for 1L.ft55.39Rate(Say)1 L.ft55.0012.051 1/2" Diameter PVC pipes fixed to walls (Specials paid separately)Analysis for100L.ftNoItem DescriptionItem RefUnitQuantityRateAmount1.00999999051 1/2" PVC PipesM-092L.ft10046.004,600.001.0199999809Allow 5% of Items ( 1.01 ) for Wastage----230.001.02999997141 1/2" PVC SocketsM-100No829.50236.001.0399999619Solvent CementM-117Grms641.4089.601.04999995231 1/2 " Clips and NailsM-029No3510.50367.501.0599999428PlumberL-002Day0.751,200.00900.001.0700000525U / SK LabourerL-007Day0.751,000.00750.00Total for100L.ft7,173.10Rate for 1L.ft71.73Rate(Say)1 L.ft72.0012.062" Diameter PVC pipes fixed to walls (Specials paid separately)Analysis for100L.ftNoItem DescriptionItem RefUnitQuantityRateAmount1.00999999052" PVC PipesM-096L.ft10079.007,900.001.0199999809Allow 5% of Items ( 1.01 ) for Wastage----395.001.02999997142" PVC SocketsM-102No848.00384.001.0399999619Solvent CementM-117Grms1121.40156.801.04999995232 " Clips and NailsM-031No3510.75376.251.0599999428PlumberL-002Day0.751,200.00900.001.0700000525U / SK LabourerL-007Day0.751,000.00750.00Total for100L.ft10,862.05Rate for 1L.ft108.62Rate(Say)1 L.ft109.0012.073" Diameter PVC pipes fixed to walls (Specials paid separately) Type 1000Analysis for100L.ft.NoItem DescriptionItem RefUnitQuantityRateAmount1.00999999053" PVC PipesM-097L.ft100185.0018,500.001.0199999809Allow 5% of Items ( 1.01 ) for Compaction----925.001.02999997143" PVC SocketsM-103No8192.001,536.001.0399999619Solvent CementM-117Grms2001.40280.001.04999995233 " Clips and ScrewsM-032No3534.001,190.001.0599999428PlumberL-002Day11,200.001,200.001.0700000525U / SK LabourerL-007Day11,000.001,000.00Total for100L.ft.24,631.00Rate for 1L.ft.246.31Rate(Say)1 L.ft246.0012.08Excavation for laying 1/2 " to 3" dia meter PVC pipes in ground not less than 1' 6" Deep, Backfilling & CompactingAnalysis for100L.ftNoItem DescriptionItem RefUnitQuantityRateAmount1.0099999905U / SK LabourerL-007Day2.251,000.002,250.00Total for100L.ft2,250.00Rate for 1L.ft22.50Rate(Say)1 L.ft23.0012.09Chasing brickwork for laying 1/2" to 1 1/2 " dia PVC pipes and making good average depth 2" (Pipes and specials paid separately)Analysis for100L.ftNoItem DescriptionItem RefUnitQuantityRateAmount1.0099999905CementM-026Bag0.1850.0085.001.0199999809SandM-113Cu0.0112,500.00125.001.0599999428MasonL-009Day31,200.003,600.001.0700000525U / SK LabourerL-007Day31,000.003,000.00Total for100L.ft6,810.00Rate for 1L.ft68.10Rate(Say)1 L.ft68.0012.10Chasing brickwork for laying 1 1/2" to 3 " dia PVC pipes in ground and floor and making good. average depth 3" (Pipes and specials measured paid separately)Analysis for100L.ftNoItem DescriptionItem RefUnitQuantityRateAmount1.0099999905CementM-026Bag0.2850.00170.001.0199999809SandM-113Cu0.0312,500.00375.001.0599999428MasonL-009Day3.51,200.004,200.001.0700000525U / SK LabourerL-007Day3.51,000.003,500.00Total for100L.ft8,245.00Rate for 1L.ft82.45Rate(Say)1 L.ft82.0012.111/2" dia PVC specials viz-elbow / Bends / Sockets.Analysis for10NoNoItem DescriptionItem RefUnitQuantityRateAmount1.00999999051/2" PVC Elbows / Bent / SocketM-083No1010.50105.001.0199999809Solvent CementM-117Grms201.4028.001.0599999428PlumberL-002Day0.251,200.00300.00Total for10No433.00Rate for 1No43.30Rate(Say)No43.0012.123/4" dia PVC specials viz-elbow / Bends / Sockets.Analysis for10NoNoItem DescriptionItem RefUnitQuantityRateAmount1.00999999053/4" PVC Elbows / Bent / SocketM-076No1015.00150.001.0199999809Solvent CementM-117Grms301.4042.001.0599999428PlumberL-002Day0.251,200.00300.00Total for10No492.00Rate for 1No49.20Rate(Say)No49.0012.131" dia PVC specials viz-elbo / Bends / Sockets.Analysis for10NoNoItem DescriptionItem RefUnitQuantityRateAmount1.00999999051" PVC Elbows / Bent / SocketM-082No1021.00210.001.0199999809Solvent CementM-117Grms401.4056.001.0599999428PlumberL-002Day0.251,200.00300.00Total for10No566.00Rate for 1No56.60Rate(Say)No57.0012.141 1/4" dia PVC specials viz-elbo / Bends / Sockets.Analysis for10NoNoItem DescriptionItem RefUnitQuantityRateAmount1.00999999051 1/4" PVC Elbows / Bent / SocketM-081No1042.00420.001.0199999809Solvent CementM-117Grms601.4084.001.0599999428PlumberL-002Day0.251,200.00300.00Total for10No804.00Rate for 1No80.40Rate(Say)No80.0012.151 1/2" dia PVC specials viz-elbo / Bends / Sockets.Analysis for10NoNoItem DescriptionItem RefUnitQuantityRateAmount1.00999999051 1/2" PVC Elbows / Bent / SocketM-080No1069.00690.001.0199999809Solvent CementM-117Grms801.40112.001.0599999428PlumberL-002Day0.51,200.00600.00Total for10No1,402.00Rate for 1No140.20Rate(Say)No140.0012.162" dia PVC specials viz-elbo / Bends / Sockets.Analysis for10NoNoItem DescriptionItem RefUnitQuantityRateAmount1.00999999052" PVC Elbows / Bent / SocketM-085No10110.001,100.001.0199999809Solvent CementM-117Grms1401.40196.001.0599999428PlumberL-002Day0.51,200.00600.00Total for10No1,896.00Rate for 1No189.60Rate(Say)No190.0012.172 1/2" dia PVC specials viz-elbo / Bends / Sockets.Analysis for10NoNoItem DescriptionItem RefUnitQuantityRateAmount1.00999999052 1/2" PVC Elbows / Bent / SocketM-084No10350.003,500.001.0199999809Solvent CementM-117Grms2001.40280.001.0599999428PlumberL-002Day0.51,200.00600.00Total for10No4,380.00Rate for 1No438.00Rate(Say)No438.0012.183" dia PVC specials viz-elbo / Bends / Sockets.Analysis for10NoNoItem DescriptionItem RefUnitQuantityRateAmount1.00999999053" PVC Elbows / Bent / SocketM-086No10580.005,800.001.0199999809Solvent CementM-117Grms2401.40336.001.0599999428PlumberL-002Day0.51,200.00600.00Total for10No6,736.00Rate for 1No673.60Rate(Say)No674.0012.191/2" dia PVC TeeAnalysis for10NoNoItem DescriptionItem RefUnitQuantityRateAmount1.00999999051/2 " Dia TeeM-122No1015.50155.001.0199999809Solvent CementM-117Grms301.4042.001.0599999428PlumberL-002Day0.51,200.00600.00Total for10No797.00Rate for 1No79.70Rate(Say)No80.0012.203/4 " dia PVC TeeAnalysis for10NoNoItem DescriptionItem RefUnitQuantityRateAmount1.00999999053/4 " Dia TeeM-126No1021.50215.001.0199999809Solvent CementM-117Grms451.4063.001.0599999428PlumberL-002Day0.51,200.00600.00Total for10No878.00Rate for 1No87.80Rate(Say)No88.0012.211" dia PVC TeeAnalysis for10NoNoItem DescriptionItem RefUnitQuantityRateAmount1.00999999051 " Dia TeeM-120No1031.25312.501.0199999809Solvent CementM-117Grms601.4084.001.0599999428PlumberL-002Day0.51,200.00600.00Total for10No996.50Rate for 1No99.65Rate(Say)No100.0012.221 1/4 " dia PVC TeeAnalysis for10NoNoItem DescriptionItem RefUnitQuantityRateAmount1.00999999051 1/4 " Dia TeeM-127No1063.50635.001.0199999809Solvent CementM-117Grms901.40126.001.0599999428PlumberL-002Day0.51,200.00600.00Total for10No1,361.00Rate for 1No136.10Rate(Say)No136.0012.231 1/2 " dia PVC TeeAnalysis for10NoNoItem DescriptionItem RefUnitQuantityRateAmount1.00999999051 1/2 " Dia TeeM-121No10102.001,020.001.0199999809Solvent CementM-117Grms1201.40168.001.0599999428PlumberL-002Day11,200.001,200.00Total for10No2,388.00Rate for 1No238.80Rate(Say)No239.0012.242 " dia PVC TeeAnalysis for10NoNoItem DescriptionItem RefUnitQuantityRateAmount1.00999999052 " Dia TeeM-123No10165.501,655.001.0199999809Solvent CementM-117Grms2101.40294.001.0599999428PlumberL-002Day11,200.001,200.00Total for10No3,149.00Rate for 1No314.90Rate(Say)No315.0012.252 1/2 " dia PVC TeeAnalysis for10NoNoItem DescriptionItem RefUnitQuantityRateAmount1.00999999052 1/2" Dia TeeM-124No10526.005,260.001.0199999809Solvent CementM-117Grms3001.40420.001.0599999428PlumberL-002Day1.51,200.001,800.00Total for10No7,480.00Rate for 1No748.00Rate(Say)No748.0012.263 " dia PVC TeeAnalysis for10NoNoItem DescriptionItem RefUnitQuantityRateAmount1.00999999053 " Dia TeeM-125No10875.008,750.001.0199999809Solvent CementM-117Grms3601.40504.001.0599999428PlumberL-002Day1.51,200.001,800.00Total for10No11,054.00Rate for 1No1,105.40Rate(Say)No1,105.00

&R&08 Page &P Of &N

1313. PlasteringA.Wall PlasteringB.RenderingC.Sofit PlasteringD.SkirtingWall Plastering13.A.015/8" thick plastering to wall in Cement and sand 1:3 including Cement floatingAnalysis for1SqrNoItem DescriptionItem RefUnitQuantityRateAmount1.0099999905CementM-026Bag1.4850.001,190.001.0199999809SandM-113Cu0.0612,500.00750.001.0299999714WaterM-157Gal100.303.001.0399999619MasonL-009Day11,200.001,200.001.0499999523U / SK LabourerL-007Day1.51,000.001,500.001.0599999428Allow 3% of Items ( 1.04, 1.05 ) for Scaffolding----81.00Total for1Sqr4,724.00Rate for 1Sqr4,724.00Rate(Say)1Sq4,724.00Rate(Say)1ft247.24Rate(Say)1m2508.3013.A.025/8" thick to wall in cement and sand 1:5 finished semi-rough with wooden float.Analysis for1SqrNoItem DescriptionItem RefUnitQuantityRateAmount1.0099999905CementM-026Bag0.8850.00680.000.07434944241.0299999714SandM-113Cu0.0712,500.00875.001.0399999619WaterM-157Gal100.303.001.0499999523MasonL-009Day11,200.001,200.001.0599999428U / SK LabourerL-007Day1.251,000.001,250.00Total for1Sqr4,008.00Rate for 1Sqr4,008.00Rate(Say)1Sq4,008.00Rate(Say)1ft240.08Rate(Say)1m2431.26Ground floor - First Floor1m2431.26First Floor - Second Floor1m2474.39Second Floor - Third Floor1m2521.83Third Floor - Fourth Floor1m2574.0113.A.035/8" thick to wall in lime cement and sand 1:1:5 finished semi-rough with wooden float.Analysis for1SqNoItem DescriptionItem RefUnitQuantityRateAmount1.0099999905CementM-026Bag0.8850.00680.001.0199999809Slaked LimeM-115Lbs44275.0012,100.001.0299999714SandM-113Cu0.07