  1. 1. 1 CURRICULUM VITAE. NAME; PIUS, SURNAME; OKUKPE, NATIONALITY; NIGERIAN, STATE OF ORIGIN; DELTA SEX; MALE DATE OF BIRTH; 1st JANUARY 1966 MARITAL STATUS; MARRIED RELIGION; CHRISTIAN OCCUPATION; PIPE FITTER GENERAL FOREMAN HOME ADDRESS; 20 OGBE STREET OFF IGBIAYE ST. MARINE QUARTER WARRI PHONE NUMBER; 08057494174 AND 08021134095 E-MAIL ADDRESS; payeh4real@gmail.com SCHOOLS ATTENDED WITH DATES Petroleum Training Institute, Effurun Higher National Diploma (HND) on Welding and Fabrication 2001 - 2004 Ordinary National Diploma (OND) on Welding and Fabrication 1990-1991 General Welding Certificate 1986-1986 Secondary School Attended. Aladja Grammar School Aladja 1978-1983 Primary School Attended Ogedegbe Primary School Warri 1970-1976
  2. 2. 2 PROFESSIONAL CERTIFICATION WITH DATES. Radiographic film Interpretation (RFI) America Society of Non Destructive Testing (ASNT) level 2. Trained by Gennaseret Resources Nigerian Limited September 2011. Ultrasonic Testing (UT) American Society of Non Destructive Testing (ASNT) level 2. Trained by Gennasaret Resources Nigerian Limited September 2011. Dye Penetrant Testing (PT) American Society of Non Destructive Testing (ASNT) level 2. Trained by Gennasaret Resources Nigerian Limited September 2011. Magnetic Particle Testing (MT) American Society of Non Destructive Testing (ASNT) level 2 September 2011. FROM AUGUST 2009 TO JULY 2012I HAVE BEEN TRAINED BY SOUTHERN GAS CONSTRUCTOR LIMITED ON THE UNDER LISTED SAFETY COURSES. Total Safety Task Instruction (TSTI) Practical. Total Safety Task Observation (TSTO) Practical. Confine Space Safety. Crane and Rigging Safety. Fall Protection Safety Scaffold Safety Fire Protection Safety Hazard Identification Basic Electrical Safety Total Safety Task Instruction (TSTI) for Supervisors1 Hand Power Tool Safety First Aid Training Excavation Safety Basic Personnel Protective Equipment (PPE)
  3. 3. 3 Lock Out Tag Out (LOTO) Grating Removal Safety Manual Material Handling Ladder Safety Incident and Injury Free Refresher Course Bench and Angle Grinder Safety. WORKING EXPERIENCE WITH DATES. I have worked as a Pipe fitter, Pipe fitter Foreman, Pipe fitter General Foreman, Pipe fitter Supervisor, QA,QC and Mechanical Supervisor. August 2009 to July 2012. Client; Chevron Nigerian Limited. Project; Escravos Gas To Liquid EGTL. Escravos Delta State Major Contractor; Southern Gas Constructor Nigerian Limited. SGC. Sub-Contractor; Daewoo Engineering and construction Local Content Contractor; Pi-Moff Resources Nigerian Limited. Department; Mechanical. Position; Pipe Fitter General Foreman (supervisor) with SGC Barge No 007874 Responsibilities. Interpretation of General Arrangement Drawing (G.A) Interpretation of Isometric drawing of spools to determine their accurate orientations and co-ordinates. Interpretation of piping and Instrument diagram (P. & I.D.) Calculation of lateral coupling of pipe nipple, marked and cut to angles with hand cutting torch to form elbows of any degree. Calculation of orientation of various degree of isometric drawing of spools.
  4. 4. 4 Threading of small diameter galvanized pipes to fit threaded Elbows Valves, Tees to required dimension. Lateral coupling of branch and run pipes of various diameter for underground drainage piping system. Interpretations of welding symbols to fit the desired joint design specifies by drawing. Calculations of Lengths of pipe nipples and take-off for 30, 45, 60, 70, 90, degree elbows, tees, reducers, flanges and valves to fit spools dimensions during workshop and field fabrications. Salvaging of pipe fittings such as elbows, tees flanges with hand cutting torch from wrong designed spools. Erecting of newly fabricated spools in the main Process Area, in unit 30B train 1 & train 2, unit 20B, the two Boilers units, the two Slurry Hoppers, unit 50H, unit 50A and hanging of pipe Supports for the spools. Pressure testing of completed spools in accordance to specifications. January 2008 to February 2009. Client; Shell Petroleum Development Company Nigerian Limited, Project; West Africa Gas Project WAGP Oben Gas Plant. Edo State, Contractor; Lee Engineering Company Nigerian Limited, Department; Mechanical, Position; QA,QC/Mechanical Supervisor, Responsibilities. Prepare the project QA plan in connection with the project manager and the QA manager in at had office. Verify that the quality related activities are in accordance with applicable code, specification and regulations Ensuring recording updating and distribution of documents and information i.e procedures, drawing plans, reports and certificate
  5. 5. 5 Identify any deficiency, promote corrective actions and verify their implementation. Verify that contract quality requirement are specified to vendors and subcontractors. Ensuring the surveillance at subcontractor works. Ensuring that measures are taken in order to identify and prevent acceptance or defective materials Ensuring collection of documentation and certificates related to materials purchased by my company and their subcontractors. Prepare QC plans for production phase and review quality plans issued by subcontractors and vendors. Ensuring the inspection and testing in compliance with established QC. Plans Ensuring the compliance of final documentation to be issued to client. November 2006 to December 2007. Client; Delta Steel Company Limited. Project; Rehabilitation of Direct Reduction Plant, Repair of Strand Guide in Steel Rolling Shop and Removal of Storage Hurdles in Rolling Mill Shop. Contractor; Equilibrium Global Technical Services. Position; Managing Director. Responsibilities Interpretation of General Arrangement Drawing (G.A) Interpretations of welding symbols to fit the desired joint specifies by drawing. Coupling of Beams, Angle Iron, U Channels with hand cutting torch and assembling them to specifications to form platforms for the plating of the roof of the Direct Reduction Plant.
  6. 6. 6 Pre-heating of distorted welded structures and spools with pre-heating torch to accurate dimensions and shape to conform with specifications of drawing. Accurate cutting of pipes, plate and beams with hand cutting torch with oxy-acetylene gas. Cutting of pipes and plates with oxy-acetylene cutting machine (beveling and automatic cutting machine for plate). The use of Jack Hammer for the breaking of concrete to expose the base of the beam of the Storage Hurdles for cutting. Drilling of holes on the main frame of the Strand Guide for rollers that will convey the billet from the melting pot. Project Management of the entire cost of the project and being responsible for the welfare of welders and others who worked in the project. September to October 2006. Client; Acergy, Polaris Barge. Project; Installation of 1800 Tonne J Lay in Port Genty Gabon (Offshore). Contractor; Globestar Engineering Company Limited Department; Mechanical. Position; Pipe fitter. Responsibilities. Coupling of Beams, Angle Iron, U Channels with hand cutting torch and assembling them to specifications to form platform for the base of the J Lay Gouging of beam structures with hand cutting torch from the deck of the barge to create enough space for the J Lay. Accurate cutting of pipes, plate and beams with hand cutting torch with oxy-acetylene gas.
  7. 7. 7 Cutting of pipes and plates with oxy-acetylene cutting machine (beveling and automatic machine for plate). Lateral coupling of branch and run pipes of various diameters to strengthen the base of the J Lay. November 2005 to June 2006. Client; Chevron Nigeria Limited. Project; Upgrade of Olero Flowstation. Escravos Field (Offshore) Delta State. Contractor; Idmon Engineering Company Nigeria Limited. Department; Mechanical Position; Pipe fitter Supervisor. Responsibilities Interpretation of General Arrangement Drawing (G.A) Interpretation of isometric drawing of spools to determine their accurate orientations and co-ordinates. Interpretation of piping and Instrument diagram (P. & I.D.) Calculations of pipe nipples and take-off for 45, 90, degree elbows, tees, reducers, flanges and valves to fit spools dimensions during field fabrication and erection. Designing of isometric drawing and fabricating them to conform to field requirement and specifications. Interpretations of welding symbols to fit the desired joint design specifies by drawing. Salvaging of pipe fittings such as elbows, tees flanges with hand cutting torch from wrong spool designs. Pressure testing of completed spools in accordance to specifications. Internal trimming with hand cutting torch and grinding of unequal pipe thickness and fittings to avoid excessive high low
  8. 8. 8 Erecting of fabricated spools and hanging of pipe Support. Threading of small diameter galvanized pipes to fit threaded Elbows Valves, Tees to required dimension. Pressure testing of completed spools in accordance to specifications. March 2000 to September 2004. Client; Elf Project; Amenam-Kpono 1&2 Production Platform Contractor; Globstar Engineering Company Limited, Warri Yard Delta State Department; Mechanical. Position; Pipe fitter. Responsibilities. Accurate cutting of beams, U channels, Angle iron in beam shop with Oxy- acetylene hand cutting torch in preparation for beam erection to form various levels of the platform. Calculations of pipe nipples and take-off for 30, 45, 60, 70, 90, degree elbows, tees, reducers, flanges and valves to fit spools dimensions during spools fabrication in Pipe shop and field erection. Interpretations of welding symbols to fit the desired joint design specifies by drawing. Calculation of lateral coupling of pipe nipple, marked and cut to angles with hand cutting torch to form elbows of any degree. Calculation of orientation of any degree of various isometric drawing of spools. Internal trimming with hand cutting torch and grinding of unequal pipe thickness and fittings to avoid excessive high low in workshop fabrica