Route 47 Missouri River Bridge Bridgescape, LLC
Transcript
Page 1: Route 47 Missouri River Bridge Bridgescape, LLC. Bridge Typical Section.

Route 47 Missouri River Bridge

Bridgescape, LLC

Page 2: Route 47 Missouri River Bridge Bridgescape, LLC. Bridge Typical Section.

Bridge Typical Section

Page 3: Route 47 Missouri River Bridge Bridgescape, LLC. Bridge Typical Section.

• Distinctive appearance so that bridge remains a symbol

• Stay within budget: “German Simple”

• Recognize views to bridge from downtown/riverfront

• Maintain views to downtown from the bridge

• Keep design subtle; historic feel with minimal detailing

• Light pedestrian/ bicycle trail but not entire roadway;

• Lighting should enhance structure, not draw attention to itself.

Committee Design Goals (4/18/2013)

Page 4: Route 47 Missouri River Bridge Bridgescape, LLC. Bridge Typical Section.

Previous Committee Selections:

• Variable Depth Girders ** ** MoDOT Funded

• Pier Shape – Gothic Pier **

• One (1) Overlook Located at Pier 7 **

• Railing – 27” Concrete Wall with Vertical Railing Element

• Girder Lighting – Girder Wash Fade

• Pier Lighting

• Overhead Pier Element – Curved Truss w/ Sun Shade

• Low Level Trail Lighting

Page 5: Route 47 Missouri River Bridge Bridgescape, LLC. Bridge Typical Section.

Previous Committee Prioritization:

Enhancement Priority

Decorative Railing 1

Girder Lighting 2

Pier Lighting 3

Overhead Element 4

Trail Lighting 5

Page 6: Route 47 Missouri River Bridge Bridgescape, LLC. Bridge Typical Section.

View from Washington Riverfront Park

Page 7: Route 47 Missouri River Bridge Bridgescape, LLC. Bridge Typical Section.

View from Washington Riverfront Park

Page 8: Route 47 Missouri River Bridge Bridgescape, LLC. Bridge Typical Section.

Aerial View of Overlook

Page 9: Route 47 Missouri River Bridge Bridgescape, LLC. Bridge Typical Section.

Aerial View of Overlook

Page 10: Route 47 Missouri River Bridge Bridgescape, LLC. Bridge Typical Section.

View from Pedestrian/ Bicycle Trail

Page 11: Route 47 Missouri River Bridge Bridgescape, LLC. Bridge Typical Section.

View from Pedestrian/ Bicycle Trail

Page 12: Route 47 Missouri River Bridge Bridgescape, LLC. Bridge Typical Section.

View from Northbound Traffic Lane

Page 13: Route 47 Missouri River Bridge Bridgescape, LLC. Bridge Typical Section.

View From Northbound Traffic Lane

Page 14: Route 47 Missouri River Bridge Bridgescape, LLC. Bridge Typical Section.

View from South Approach of Existing Bridge

Page 15: Route 47 Missouri River Bridge Bridgescape, LLC. Bridge Typical Section.

View from South Approach of Existing Bridge

Page 16: Route 47 Missouri River Bridge Bridgescape, LLC. Bridge Typical Section.

View from South Approach of Existing Bridge (w/ East Face Girder Lighting )

Page 17: Route 47 Missouri River Bridge Bridgescape, LLC. Bridge Typical Section.

View from Trail Below Bridge

Page 18: Route 47 Missouri River Bridge Bridgescape, LLC. Bridge Typical Section.

View from Trail Below Bridge

Page 19: Route 47 Missouri River Bridge Bridgescape, LLC. Bridge Typical Section.

Preferred Enhancement Package Decorative Rail + Girder Lighting + Pier Lighting + Overhead Element + Trail Lighting

Prioritization Enhancement Estimated Cost (4) Estimated Cost (4A)

1 Decorative Railing (Addition to MoDOT Credit) $120,000 $120,000

2 Girder Lighting – Fade (west face only) $587,000

Girder Lighting – Fade(east and west face) $1,133,000

3 Pier Lighting $172,000 $172,000

4 Overhead Element (w/ lighting) $225,000 $225,0005 Trail Lighting (full length) $137,000 $137,000

SUBTOTAL $1,241,000 $1,787,0003% Inflation for 3 years (9.27%) $115,000 $166,000

TOTAL $1,355,000 $1,953,000

Page 20: Route 47 Missouri River Bridge Bridgescape, LLC. Bridge Typical Section.

Preferred Enhancement Package $1,355,000Decorative Rail + Girder Lighting + Pier Lighting + Overhead Element + Trail Lighting (west face only)

Page 21: Route 47 Missouri River Bridge Bridgescape, LLC. Bridge Typical Section.

Preferred Enhancement Package $1,355,000Decorative Rail + Girder Lighting + Pier Lighting (west face only)+ Overhead Element + Trail Lighting

Page 22: Route 47 Missouri River Bridge Bridgescape, LLC. Bridge Typical Section.

Preferred Enhancement Package $1,953,000Decorative Rail + Girder Lighting + Pier Lighting + Overhead Element + Trail Lighting (east & west face)

Page 23: Route 47 Missouri River Bridge Bridgescape, LLC. Bridge Typical Section.

Project Schedule

• Final Enhancement Commitment August 16, 2013

• Public Hearing (Right-of-Way) October 2013

• Final Enhancement Funds Secured August 2014

• Open Construction Bids September 2016

• New Bridge Open to Traffic Fall 2018

• Project Complete Summer 2019

Page 24: Route 47 Missouri River Bridge Bridgescape, LLC. Bridge Typical Section.