    PROJECTSCHEDULING

    ATTANEJA

    ENTERPRISE

    Presented by:GROUP 10Anmol Sahni 91009

    Chinmay Jagga 91013Madhusudan 91029Neha Arya 91036Radhika Gupta 91041Shivi Aggarwal 91052

    Presented to:

    Prof Neeta Gupta

  • 8/9/2019 Scheduling 18A

    2/20

    FLOWOF T TION

    1. INT ODUCTION

    2. Process nalysis

    3. Why cheduling isrequired?4. Scheduling equirements

    5. Scheduling pproach

    6. Scheduling & Control functions

    7. Gantt Chart

    8. Performancemeasurecalculations

    9. Suggestions

  • 8/9/2019 Scheduling 18A

    3/20

    Started in 1990

    Rubber Products manufacturer

    Produces on Made-to-order basis

    Major Customers include:

    Maruti Udyog Ltd.

    Hero Honda Ltd.

    Remsons Industries

    Deepak Auto Ltd.

    Suprajit Engg Ltd.

    T NEJ ENTERPRISE

  • 8/9/2019 Scheduling 18A

    4/20

    MANUFACTURINGPROCESS

  • 8/9/2019 Scheduling 18A

    5/20

    RAW MATERIAL

    STORAGE

    KNEADING BY

    KNEADER

    MACHINE

    BINS FOR STORAGE

    ROLLED BY

    2 ROLL MIXER

    SHEETS CUT TO

    SMALLER PIECES

    LAID ON TABLE FOR

    COOLING

    MOULDING BY

    HYDRAULIC PRESS

    PRODUCT COLLECTED

    IN BINS

    INSPECTED VISUAL

    AND QUALITY CHECKED

    IS THE SAMPLE AS PER

    REQMNT ?

    STORED IN BINS

    SECOND ROUND OF

    INSPECTION

    IS THE PIECE MEETING

    REQMNTS?

    DISPOSE

    DISPOSE

    NO

    NO

    YES

    YES

    COLLECTEDPACKAGED

    PROCESSFLOWDIAGRAM

  • 8/9/2019 Scheduling 18A

    6/20

    STAGE1:PROCURINGRAWMATERIAL

    Mixing

    CHEMICALS

    RUBBER

    Carbon 550

    Magnesium Oxide

    Poly Vinyl Chloride

    Steric Carbyl Acid

    Zinc OxideSulphur

    ZDBC

    Neoprene

    Nitrile

    Synthetic rubber

    Silicon rubber

    JSR

    KSR

  • 8/9/2019 Scheduling 18A

    7/20

    STAGE2:MIXINGOFRAWMATERIAL

    A KNEADER MACHINE IS USEDTO MIX THE RAW MATERIALS

    The temperature and time of thekneader machine is set according

    to the grade of rubber to beproduced.

    For example, EPDM requires 35-65 C for 7 minutes.

    The mixture is then temporarilystored in the baskets until furtherprocessing is done.

  • 8/9/2019 Scheduling 18A

    8/20

    STAGE3: TRANSFORMATION TO

    SHEETS

    ADouble RollingMachine is used for

    this purpose. It usescold rolling to flattenthe rubber.

    These sheets are thencooled onlong table.

  • 8/9/2019 Scheduling 18A

    9/20

    STAGE4:MOULDING

    HANDMOULDING

    MACHINEMOULDING

  • 8/9/2019 Scheduling 18A

    10/20

    STAGE5:FINISHING, INSPECTIONAND

    PACKAGING

    FINISHING: 2 ROUNDS

    Once done at the factory. Then the products are sent to an

    outsourced location where second round of inspection is carried

    out.

    INSPECTION

    The various products formed are subjected to quality

    improvement tests. The standards of qualifying are set by the

    customer.

    PACKAGINGPackaging is not done at the factory. The place of

    packaging is around 3 kilometers from the factory. A considerable

    amount is paid as rent per day for this place. Packets of 400, 500

    and 1000 pieces are made.

  • 8/9/2019 Scheduling 18A

    11/20

    Scheduling Approach:Low Volume Job Shop

  • 8/9/2019 Scheduling 18A

    12/20

    Why scheduling isrequired?

    yIncreased throughputyDecreased turnaround time

    yUser deadlines met

    yUsers made responsible for providing input on

    scheduleyImproved communications with users

    yAvoidance of overloading and underuse of

    resources

    y

    Job delays more readily apparentyDocumentation of scheduling deviations and their

    causes

    yReduced confusion within the facility

    yPredictability of the effects of an increased workload

  • 8/9/2019 Scheduling 18A

    13/20

    Scheduling Requirements

    yCurrent state of the shop

    yResource and equipment status

    y

    Future ordersyDue dates

    yQuantity

    yShop Layout

    yOutside services, r aw materialavailability

    yHistorical equipment performance

  • 8/9/2019 Scheduling 18A

    14/20

    Scheduling AndControl Functions

    1.Allocate orders, equipment, and personnel to work

    centers or other specified locations.

    2.Determine the sequence of order performance (that

    is, establish job priorities).

    3.Initiate performance of the scheduled work.

    4.Shop-floor control (or production activity control):a.Review the status and control the progress of orders as

    they are being worked on.

    b.Expedite late and critical orders.

  • 8/9/2019 Scheduling 18A

    15/20

    JobSequencing

    Setting up Priority Rules to order jobs.

    Performance measures to evaluate priority

    rules:1. Meeting due dates of customers.

    2.Minimizing the flow time.

    3.Minimising work-in-process inventory.

    4.Minimising idle time of machines or

    workers.

  • 8/9/2019 Scheduling 18A

    16/20

    Gantt Chart

    Stage

    10 15 25 35 45 60 65 75 85 95 105 115 120 130 140 150 160 165

    Mixing

    RollingDrying

    Cutting

    Moulding

    Cooling

    1st finishing

    2nd finishing

    Weighing & packaging

    Time (in minutes)Stage

    10 15 25 35 45 60 65 75 85 95 105 115 120 130 140 150 160 165

    Mixing

    RollingDrying

    Cutting

    Moulding

    Cooling

    1st finishing

    2nd finishing

    Weighing & packaging

    Time (in minutes)

  • 8/9/2019 Scheduling 18A

    17/20

    Kneader machine : 10 minutesRubber stored in bins : 45 minutesRolling : 5 minutesDrying : 30 minutes

    Cutting to smaller sheets : 15 minutesMoulding : 5 minutesCooling : 30 minutes1st finshing : 25 minutes (per 200 pieces)Collection in bins for transporting : 120 minutes2nd finishing : 30 minutes (per 200 pieces)

    Stored in bins : 75 minutesWeighing and Packaging : 15 minutes

    TOTAL 405 minutes( 6 hours 45 minutes )

    THROUGHPUT TIME

  • 8/9/2019 Scheduling 18A

    18/20

    Kneader machine : 10 minutes

    Rolling : 5 minutes

    Drying : 30 minutes

    Cutting to smaller sheets : 15 minutes

    Moulding : 5 minutes

    Cooling : 30 minutes

    1st finshing : 25 minutes (per 200 pieces)

    2nd finishing : 30 minutes (per 200 pieces)

    Weighing and Packaging : 15 minutes

    TOTAL : 165 minutes

    (2 hour 45 minutes)

    VALUEADDED TIME

  • 8/9/2019 Scheduling 18A

    19/20

    SUGGESTIONS

    Modification in Layout

    Packaging Place

    Reduce Wastage

    Safety Measures