DETAILED PROJECT REPORT
IWMP-20010-11
IWMP-VI (Dhanmauli)
District Watershed Developing Unit, Tapi
Gujarat State Watershed Management Agency
Detailed Project Report, IWMP-VI (Dhanmauli)
2 | P a g e District Watershed Development Unit Tapi.
Contents
Chapter 1 - Project Background
1.1 Project Background.....................................................................................................................................................................................................13
Table no.1: Basic project information...................................................................................................................................................................16
1.2 Need of Watershed Development Programs................................................................................................................................................................
Table no.2: Weight age of the project ..................................................................................................................................................................17
Table no.3: Watershed information......................................................................................................................................................................18
1.3 Other development projects/schemes running in the Dhanmauli Project.................................................................................................................19
Table no.4: Developmental programs running in the project area.......................................................................................................................19
Table no. 5: Previous Watershed programmes in the project area......................................................................................................................19
Chapter 2 - Project Implementing Agency
2.1 Project Implementing Agency.....................................................................................................................................................................................21
2.2 About District Watershed Development Unit (DWDU), Tapi.............. ........................................................................................................................21
2.2.1 The Organization & its objectives.......................................................................................................................................................................21
2.2.2 Objectives of the Forest Dept.............................................................................................................................................................................22
2.2.3 Status of Working Plans in Gujarat state............................................................................................................................................................23
2.2.4 Programs/projects of DWDU, Tapi.....................................................................................................................................................................24
2.3 SWOT Analysis of the DWDU.......................................................................................................................................................................................24
Detailed Project Report, IWMP-VI (Dhanmauli)
3 | P a g e District Watershed Development Unit Tapi.
Table no. 6: PIA: ..................................................................................................................................................................................................27
Table no. 7: Staff at PIA level................................................................................................................................................................................28
Chapter 3 - Basic Information of the Project Area
3.1 Geography & Geo-hydrology.......................................................................................................................................................................................30
3.1.1 Land use pattern...............................................................................................................................................................................................30
Table no. 8: Land use pattern...............................................................................................................................................................................31
3.1.2 Soil & Topography..............................................................................................................................................................................................32
Table no. 9: Soil type and topography...................................................................................................................................................................32
Table no. 10: Flood and drought condition...........................................................................................................................................................33
Table no. 11.1: Soil Erosion...................................................................................................................................................................................34
Table no. 11.2: Soil Salinity/Alkalinity (Salinity ingress)........................................................................................................................................35
Table no. 12: Climatic conditions.........................................................................................................................................................................36
Table no. 13: Physiographic and relief..................................................................................................................................................................36
3.1.3 Land & Agriculture.............................................................................................................................................................................................37
Table no. 14: Land ownership details....................................................................................................................................................................38
Table no. 15: Agriculture......................................................................................................................................................................................39
Table no. 16: Irrigation..........................................................................................................................................................................................40
Table no. 17: Crop details.....................................................................................................................................................................................41
3.1.4 Livestock............................................................................................................................................................................................................44
Table no. 18: Livestock..........................................................................................................................................................................................44
Table no. 19: Drinking water.................................................................................................................................................................................45
Table no. 20: Details of Common Property Resources..........................................................................................................................................46
3.2 Socio-Economic Profile...............................................................................................................................................................................................47
Detailed Project Report, IWMP-VI (Dhanmauli)
4 | P a g e District Watershed Development Unit Tapi.
3.2.1 Demographic Status..........................................................................................................................................................................................47
Table no. 21: Demographic information..............................................................................................................................................................48
Table no. 22: Literacy rate....................................................................................................................................................................................49
3.2.2 Migration Pattern.............................................................................................................................................................................................
Table no. 23: Migration details.............................................................................................................................................................................50
Table no. 24: Poverty............................................................................................................................................................................................51
3.2.3 Infrastructure Facilities.......................................................................................................................................................................................
Table no. 25: Village infrastructure.......................................................................................................................................................................52
Table no. 26: Facilities / HH assets........................................................................................................................................................................53
3.3 Livelihood Pattern.......................................................................................................................................................................................................54
Table no. 27: Per Capita Income............................................................................................................................................................................55
3.3.1 Dependence on Forest/CPR...............................................................................................................................................................................
Table no.28: Dependence on Forest/CPR..............................................................................................................................................................56
Table no. 29: Livelihood pattern (Occupational distribution)...............................................................................................................................57
3.4 Comparative data of the crop productivity of the area: Project area Vs District Vs State Vs Country Vs World.......................................................
The Project Area..........................................................................................................................................................................................................58
Chapter 4 - Watershed Activities
4.1 Scientific Planning.......................................................................................................................................................................................................67
Table no. 30: Details of Scientific Planning and Inputs in IWMP projects.............................................................................................................70
4.2 Institution building.......................................................................................................................................................................................................
Table no. 31: Watershed Committee details........................................................................................................................................................72
4.2.2 Shelf Help Group...............................................................................................................................................................................................
Detailed Project Report, IWMP-VI (Dhanmauli)
5 | P a g e District Watershed Development Unit Tapi.
Table no. 32: SHG details......................................................................................................................................................................................91
4.2.3 User group..........................................................................................................................................................................................................
Table no. 33: User group detail............................................................................................................................................................................93
4.3 Physical Activities to be undertaken under IWMP.......................................................................................................................................................
4.3.1 Entry Point Activities (EPA)................................................................................................................................................................................96
Table no.34: Entry point activities (EPA) (All financial figures in lakh Rs.)............................................................................................................97
4.3.2 Watershed Development Works.......................................................................................................................................................................99
Table no.35: Details of activities of preparatory phase (All financial figures in lakh Rs.)...................................................................................100
Table no.36: Activities related to Surface water resources in the project areas (all financial figures in lakh Rs.).............................................107.
Table no.37: Activities related to recharging ground water resources in the project areas (all financial figures in lakh Rs.)........................110.
Table no. 38: Activities related to livelihoods by Self Help Groups (SHGs) in the project areas........................................................................111
Table no.41: Details of activities connected with vegetative cover in watershed works...................................................................................124
Table no.43: Details of activities in the CPRs in the project areas.......................................................................................................................128
4.4 Capacity Building.......................................................................................................................................................................................................129
Table no. 44: Capacity Building Institution..........................................................................................................................................................130
Table no. 45: Capacity Building plan....................................................................................................................................................................131
Table no.46: Information, education and Communication Activities..................................................................................................................131
Chapter 5 - Budgeting
Table no. 47: Budget at a glance.......................................................................................................................................................................133
Table no. 48: Village component wise budget available under IWMP..............................................................................................................134
Table no. 49: Village wise gap in funds requirements........................................................................................................................................135
Detailed Project Report, IWMP-VI (Dhanmauli)
6 | P a g e District Watershed Development Unit Tapi.
Table no. 50: Details of Convergence of IWMP with other Schemes.................................................................................................................136
Table no. 51: Public-Private Partnership in the IWMP projects..........................................................................................................................141
Chapter 6 - Expected Outcomes
6.1 Expected Outcomes:...................................................................................................................................................................................................
6.1.1 Employment:..................................................................................................................................................................................................143
Table no. 52: Employment in Project area........................................................................................................................................................144
6.1.2 Migration:.....................................................................................................................................................................................................
Table no. 53: Details of seasonal migration from Project area..........................................................................................................................145
Table no. 54: Details of average ground water table depth in the project areas (in meters)............................................................................146
6.1.3 Status of Drinking water..........................................................................................................................................................................
Table no. 55: Status of Drinking water................................................................................................................................................................147
6.1.4 Crops.................................................................................................................................................................................................................
Table no. 56: Details of Kharif crop area and yield in the project areas.............................................................................................................148
6.1.5 Horticulture.........................................................................................................................................................................................................
Table no. 57: Area under horticulture................................................................................................................................................................154
6.1.6 Vegetative cover................................................................................................................................................................................................
Table no. 58: Forest/vegetative cover................................................................................................................................................................155
6.1.7 Livestock.............................................................................................................................................................................................................
Table no. 59: Details of livestock in the project areas.........................................................................................................................156
Table no. 60: Backward-Forward linkages...........................................................................................................................................................165
Chapter 7 - Quality and Sustainability Issues
7.1 Plans for Monitoring and Evaluation.........................................................................................................................................................................168
Detailed Project Report, IWMP-VI (Dhanmauli)
7 | P a g e District Watershed Development Unit Tapi.
7.2 Plans for Project Management................................................................................................................................................................................169
7.3 Watershed Development Fund................................................................................................................................................................................169
7.4 User Charges.............................................................................................................................................................................................................169
Detailed Project Report, IWMP-VI (Dhanmauli)
8 | P a g e District Watershed Development Unit Tapi.
Chapter 8 – Mapping
1. Cadastral Map……………………………………………………………………………………………………………………………………………………………
2. Drainage Map……………………………………………………………………………………………………………………………………………………………
3. Slop Map………………………………………………………………………………………………………………………………………………………………….
4. Geomorphology Map……………………………………………………………………………………………………………………………………………………
5. Soil Map………………………………………………………………………………………………………………………………………………………………….
6. Land Use / Land Cover Map……………………………………………………………………………………………………………………………………………
7. Ground Water Map..…………………………………………………………………………………………………………………………………………………….
8. Propose Action Plan Map………………………………………………………………………………………………………………………………………………
Detailed Project Report, IWMP-VI (Dhanmauli)
9 | P a g e District Watershed Development Unit Tapi.
Tapi District
Tapi district is one of the 26 districts of Gujarat state in western India. Vyara town is the district headquarters. The area of the district is
2951.10 km². The district has a population of 719,634 (2001 census).It is Located in the southern part of Gujarat. On 27th September 2007,
the district of Surat was bifurcated into two new districts, viz. Surat district with it's headquarter at Surat and Tapi district with its headquarter
at Vyara. The newly constituted Tapi district consists of five talukas viz. Vyara, Songadh, Uchchal, Nizar and Valod. Vyara and Songadh in
Tapi district are known for dense forests with a major production of bamboos
Geographical location : 73.5° to 74.23 ° East (Longitude) 21.0 ° to 21.23 ° North (Latitude)
Temperature : 45 ° Centigrade (Maximum)
Average Rainfall : 1926 mm
Rivers : Tapi, Midoda, Purna and Ambika
Area : 3434.64 Sq Km
District headquarter : Vyara
Population : 7,19,634 (As per 2001 Census)
Population density : 210 persons per Sq Km
Sex ratio : 996 females per 1000 males
Literacy Rate : 57.05 %
Languages : Gujarati and Hindi
Seismic Zone : Zone III (Moderate damage risk zone)
(Source: http://www.vibrantgujarat.com/district-profiles/tapi-district-profile.aspx)
Detailed Project Report, IWMP-VI (Dhanmauli)
10 | P a g e District Watershed Development Unit Tapi.
Fig1. Geographical location of Dist Tapi
Detailed Project Report, IWMP-VI (Dhanmauli)
11 | P a g e District Watershed Development Unit Tapi.
Famous Places in Fort Songadh
1. Ukai Dam,
2. Rokadia Hanuman Mandir,
3. Kalyanraiji Mandir,
4. Fort of Songadh,
5. Gaumukh,
6. Dosvada Dam,
7. Hindustan Bridge,
8. The Central Pulp Mills (CPM) (now part of JK Singhania Group), The Tps & Hydro power station
9. Bhagwan Parsuramji Mandir and Agni Mandir at CPM,
10. Gayatrimata & Sai baba Mandir,
11. Suryatapeshwar Mandir,
12. Firangi Mataji - Jalaram Mandir,
13. Mari Mata Mandir,
14. Tapi Nadi,
15. V.I.P., Ukai, National Gate, Bhurival, chamri guest house, Bhimpura
16. Tharmal Station (GESEL)
Detailed Project Report, IWMP-VI (Dhanmauli)
12 | P a g e District Watershed Development Unit Tapi.
The Fort of Songadh literally means 'Son' stands for Gold & 'Gadh'
stands for fort which means that the 'Fort of Gold'. Songadh is
located at 21.17°N73.57°E[1]. It has an average elevation of
112 metres (367 feet). The town is located at the foot of a solitary
mountain which can be seen from miles round, particularly as the
surrounding area has been almost completely flattened by almost 30
local stone quarries. Due to these stone quarries, Songadh has very
good road links to the city of Surat to its west and the state
of Maharashtra to its east.
The main town of Songadh is split into two parts; Junagam (old
town) and Navagam (new town). Due to rapid expansion of the town
in recent times, Navagam has outgrown the original Junagam and is characterised by the hustle and bustle of the Main Road almost any
time of the day. This is largely due to the Bus Terminal which acts as a hub for cross country buses which are en route to the city of Surat.
This passing traffic has bought much trade into Songadh as it is the first town as you enter Gujarat from the East (or the last before you
leave from the West). To the west of Songadh is the district capital of Vyara which has a slightly smaller population but substantially more
industry. Vyara has grown faster than Songadh due to the higher work ethic of the Vyara population in comparison to the younger
population of Songadh, this is in part due to the practice of intermarrying of cousins in Songadh.
Detailed Project Report, IWMP-VI (Dhanmauli)
13 | P a g e District Watershed Development Unit Tapi.
Chapter 1
Project Background
Detailed Project Report, IWMP-VI (Dhanmauli)
14 | P a g e District Watershed Development Unit Tapi.
1.1 Project Background
Dhanmauli (IWMP-VI) project is located in Songhadh Taluka, Tapi district of Gujarat state. The project is a cluster of six micro-
watersheds with 5B2D8d1b, 5B2D8C2B, 5B2D8d1C, 5B2D8C2A, 5B2D8C2C, 5B2D8C1E, being their respective codes. The total area of
the project is 5370.7 Ha, of which 5000Ha has been proposed to be treated under Integrated Watershed Management Programme (IWMP)
starting year 20010-11.
The nearest town is Vyara which is well connected by project area. The project area lies in the edges off forest. The livelihood of
these people is primarily based on rain fed agriculture, animal husbandry, wage labour, cows and buffalos for the milk production. The
project contains three gram panchayat (Taparvada,Medha,Ghuntvel,Motatarpada). In Medha there are two project villages, Taparvada have
five villages and Ghuntvel have five village. The watershed area of the thirteen villages is taken under the area proposed to be treated for
the Dhanmauli project. The PIA (project implementation agency) for the IWMP 6-Dhanmauli project isTapi Division,
Latitude 21.1667 Longitude 73.5667 Altitude (feet) 367
Lat (DMS) 21° 10' 0N Long (DMS) 73° 34' 0E Altitude (meters) 111
District: Tapi
Detailed Project Report, IWMP-VI (Dhanmauli)
15 | P a g e District Watershed Development Unit Tapi.
IWMP-VI Dhanmauli Project
IWMP-VI Dhanmauli Project
Detailed Project Report, IWMP-VI (Dhanmauli)
16 | P a g e District Watershed Development Unit Tapi.
Table no.1: Basic project information
Sl No.
Name of the
project
Villages Gram
Panchayats Taluka
District
Area of the
project
Area proposed
to be treated
Total project
cost PIA
Name Census code
1
IWMP-VI Dhanmauli
Khadi 26006016780000 Medha
Songadh
Tapi
634.30 576.3 69.156
Forest Dept.- Vyara
2 Amathva 260060167580000 Taparvada 297.60 279.6 33.552
3 Kanti 260060167580000 Medha 439.90 399.4 47.928
4 Seljhar 260060167630000 Taparvada 289.10 264.6 31.752
5 Dhanmaulii 260060167570000 Taparvada 299.50 289.5 34.740
6 Kapadbandh 260060167670000 Ghutvel 1144.70 1038.3 124.596
7 Mota Tarpada 26006016766000 Mota
Tarpada 430.60 411.9 49.428
8 Siraspada 260060167680000 Ghutvel 214.50 205.0 24.600
9 Chikhalpada 26006016770000 Ghutvel 171.70 161.0 19.320
10 Vadi Rupgadh 260060167690000 Ghutvel 425.70 396.1 47.532
11 Khogalgam 260060167650000 Ghutvel 275.90 267.9 32.148
12 Umarda 260060167560000 Taparvada 395.60 370.7 44.484
13 Borpada 26006016740000 Taparvada 351.60 339.7 40.764
Total 5000.0 600.000
District: Tapi
Detailed Project Report, IWMP-VI (Dhanmauli)
17 | P a g e District Watershed Development Unit Tapi.
1.2 Need of watershed Development Programme
Area proposed to be treated
Table no.2: Weight age of the project
Project name Project type Village Weightage
i ii iii Iv v vi vii viii ix x xi xii xiii Total
IWMP VI-Dhanmauli Other
Khadi 5 10 5 3 2 0 5 7.5 10 5 5 0 15 72.5
Amathva 5 10 5 3 0 0 5 5 10 5 5 0 15 68
Kanti 5 10 5 3 0 0 5 5 10 5 5 0 15 68
Seljhar 5 10 5 3 0 0 5 5 10 5 5 0 15 68
Dhanmaulii 5 10 5 3 0 0 5 5 10 5 5 0 15 68
Kapadbandh 5 10 5 3 0 0 5 5 10 5 5 0 15 68
Mota Tarpada
5 10 5 3 0 0 5 5 10 5 5 0 15 68
Siraspada 5 10 5 3 2 0 5 7.5 10 5 5 0 15 72.5
Chikhalpada 5 10 5 3 0 0 5 5 10 5 5 0 15 68
Vadi Rupgadh
7.5 10 5 3 0 0 5 5 10 5 5 0 15 70.5
Khogalgam 5 10 5 3 0 0 5 5 10 5 5 0 15 70.5
Umarda 7.5 10 5 3 0 0 5 5 10 5 5 0 15 70.5
Borpada 5 10 5 3 0 0 5 5 10 5 5 0 15 68
Detailed Project Report, IWMP-VI (Dhanmauli)
18 | P a g e District Watershed Development Unit Tapi.
Project type: Hilly/desert/Other
Table no.3: Watershed information
Name of the project
No. Of watersheds to be treated
Watershed code Watershed
regime/type/order
IWMP-VI Dhanmauli
6 5B2D8d1b, 5B2D8C2B, 5B2D8d1C, 5B2D8C2A,
5B2D8C2C, 5B2D8C1E, Others
Detailed Project Report, IWMP-VI (Dhanmauli)
19 | P a g e District Watershed Development Unit Tapi.
1.3 Other Developmental projects/schemes running in the Dhanmauli project:
Table no.4: Developmental programs running in the project area:
Sl. No.
Name of the programme/scheme
Sponsoring agency
Objectives of the programme/scheme
Year of commencement
Villages covered
Estimated number of beneficiaries
1 MGNREGS
R&B Dept. and
Gram
Panchayat
Road Side Solder and
Stone Bund 2008 13 1668
2 WASMO WASMO Drinking Water Facility 2004 12 597
3 G.F.D.P. Forest Depat Plantation 2010 3 179
4 ATMA KVK Agriculture crop demo 2010 6 125
Table no. 5: Previous Watershed programmes in the project area:
Sl no
Project name
Year started
Name of
villages
No. Of micro
watershed
Watershed codes
Area under
treatment
Funding source
Nodal agency
PIA Total cost
Expenditure incurred up to start of
IWMP
% financial completion
% physical completion
No Watershed Projects running in the project area
Detailed Project Report, IWMP-VI (Dhanmauli)
20 | P a g e District Watershed Development Unit Tapi.
Chapter 2
Project Implementing Agency
Detailed Project Report, IWMP-VI (Dhanmauli)
21 | P a g e District Watershed Development Unit Tapi.
2.1 Project Implementing Agency
The Project Implementing Agencies (PIA) is selected by an appropriate mechanism by Gujarat State Watershed Management
Agency (GSWMA), the State Level Nodal Agency (SLNA) for Integrated Watershed Management Programme (IWMP) in Gujarat. The PIAs
are responsible for implementation of watershed project. These PIAs may include relevant line departments, autonomous organizations
under State / Central Governments, Government Institutes/Research bodies, Intermediate Panchayats, voluntary Organization (VOs). The
PIA for Dhanmauli watershed project is the DWDU – TAPI (VYARA)
2.2 About Gujarat Forest Department as a PIA
2.2.1 The organization and its objectives:
Gujarat state was constituted as the Union of India on May1, 1960 after the bifurcation of the State of Bombay. Gujarat Forest
department is entrusted with the prime responsibility of protection, conservation and development of the forests and wildlife of the state. The
total geographical area of the state is 196024 sq. kms out of which 18961.56 sq. kms (9.67%) is the declared forest area with 7.72% of
area as forest cover. Whereas, the unique features of the state are the climatic and geomorphologic conditions, the largest coastline in the
country, the saline deserts of Rann, grasslands, wetlands. These factors have bestowed the state with the diversity of flora and fauna. The
faunal biodiversity consists of 14% fishes, 18 % reptiles, 37% avifauna and 25% of the mammal population of the country.
Detailed Project Report, IWMP-VI (Dhanmauli)
22 | P a g e District Watershed Development Unit Tapi.
2.2.2 Objectives of the Forest Dept.:
Protection, Conservation and development of forests and wild life, the adoption of measures of soil conservation, moisture conservation
and increasing soil fertility.
1. The utilization of the forest so as to obtain the maximum yield consistent with their permanent maintenance and the supply of the
needs of the people, agriculture, industry and defence.
2. To conduct research into silviculture, utilization and other problems affecting the regeneration and development of the forests.
3. To achieve the goals of National Forest policy 1988 and to cover the maximum area under forests.
4. To create awareness among the people about the forests and environment.
5. To increase active participation of local people in protection & conservation of forest with special emphasis on tribal, poor & women.
Detailed Project Report, IWMP-VI (Dhanmauli)
23 | P a g e District Watershed Development Unit Tapi.
2.2.3 Status of Working Plans in Gujarat state
Gujarat state is situated along the western coast of the country with a total geographical area of 1,96,024 sq km having only 9.8%
designated forest lands, divided by the Tropic of Cancer. The forests of Gujarat consist of four major types, namely (1) Tropical Moist
Deciduous, (2) Tropical Dry Deciduous, (3) Littoral and Swamp and (4) Northern Tropical Thorny Forests. Most of the forest area is confined
mainly in the districts of The Dangs, Valsad, Tapi, Rajpipla, Chhotaudepur, Baria, Godhra, Sabarkantha, Banaskantha, Junagadh and
Kachchh.
For forestry management purpose, the forests of the State are divided into 20 territorial forest divisions and 2 forest sub-divisions and
these are covered under 14 approved Working Plans. All of these Working Plans have basically been formulated for improving
conservation and development of forest resources of the state. Much higher emphasis has been given to conservation, people’s
involvement for regeneration of forests, increasing the NTFP (non timber forest products) outputs, bio-diversity conservation, and medicinal
plants. (Source: http://gujaratforest.gov.in/forests/work_plan.htm)
The PIA has experienced staff comprising Watershed Development Team of: Civil Engineer, Agriculture Expert and Community
Mobilization and other staff as Data Entry Operator, Surveyor, Accountant and Messenger. This team has a role of planning, implementing,
supervising, documenting and promoting watershed development projects and related developmental activities in the district as per The
New guidelines 2008.
Detailed Project Report, IWMP-VI (Dhanmauli)
24 | P a g e District Watershed Development Unit Tapi.
2.2.4 Programs/projects of DWDU, Tapi:
The total 8 IWMP projects have been sanctioned by Government of India in the year 2009-10 for Tapi district. The entry point
activities of all the 4 IWMP projects have been identified by the respective PIAs in the district. The DWDU, Tapi implements one project
namely; IWMP-1 Vyaval,IWMP-5 Bedchit, IWMP-6 Dhanmauli, IWMP-8 Bhintkhurd while Vyara Forest Division implements Four projects
namely; IWMP-2 Dhamandevi, IWMP-3 Dhanmauli, IWMP-4 Thuti.
2.3 SWOT Analysis of the DWDU, Tapi:
Strength:
(1) Ample forest wealth in the forms of Timber, Minor Forest Produce
(2) Possibilities for taking up horticulture and food processing due to suitable agro-climatic conditions
(3) Independent District Level Nodal Agency.
(4) Linkages with State level institutions, agricultural universities and NGOs for capacity building and technical guidance
(5) Appropriate topographic conditions for water conservation
(6) Scientific planning in watershed projects with help of GSWMA & BISAG
(7) District level monitoring, coordination & co-operation Committee
Detailed Project Report, IWMP-VI (Dhanmauli)
25 | P a g e District Watershed Development Unit Tapi.
Weakness:-
(1) The project areas are located at extreme remote places.
(2) Inadequate livelihood opportunities
(3) Heavy rainwater runoff due to hilly terrain
(4) Inadequate secondary and higher level educational infrastructure
(5) Low literacy rate and Seasonal Migration
(6) Limited employment and economic activities due to absence of major industries
(7) Poor connectivity in interior areas
(8) Irregular electric supply
(9) Lack of skilled manpower and specialized services
(10) Low production and lack of marketing infrastructure.
Detailed Project Report, IWMP-VI (Dhanmauli)
26 | P a g e District Watershed Development Unit Tapi.
Opportunities:
(1) A number of different other development schemes of the government are running; so, there can be horizontal integration and
convergence of programmes
(2) Better financial provision under IWMP
(3) Usage of new ICT tools like GIS,GPS
(4) Sustainable community forest management through Joint Forest Management Committee can be strengthen with diagnostic and
focused intervention
Threats:
(1) Rainfall being unreliable in the project area, the activities planned to be taken up may yield limited impact
(2) Irregularities in fund flow can derail the smooth functioning
(3) Lack of contribution and cooperation from local people
(4) Low literacy rate in the project area
Detailed Project Report, IWMP-VI (Dhanmauli)
27 | P a g e District Watershed Development Unit Tapi.
Table no. 6: PIA:
Sl. No. Names of project Details of PIA
1 IWMP VI, Dhanmauli
Type of organization District Level Nodal Agengy
Name of organization Vyara Forest Department
Designation & Address Deputy Conservator of Forest Office, Near-Sayajirav Statue, Vyara.
Telephone (02626)-222019
Fax (02626)-222339
E-mail [email protected]
Detailed Project Report, IWMP-VI (Dhanmauli)
28 | P a g e District Watershed Development Unit Tapi.
Table no. 7: Staff at PIA level:
Sl no
Name Age Sex Designation Qualifica
tion Experience
Job assigned
Monthly remuneration
1 Shri. B. G. Prajapati 52 Male District Forest
Officer I.F.S.
above 20 years
Project Management
Rs.50400
2 Shri. B. G. Ravlji 58 Male Nodal Officer S.S.C 38Year Team Leader
Rs. 25000
3 Chaudhari Varshaben A. 25 Female Civil D.C.E 3 Year Field Work Rs.12000
4 Chaudhari Vijaybhai S. 27 Male Agriculture B.R.S. 4 Year Field Work Rs.8000
5 Gamit Kusumben K. 27 Female Comunity Mobilizer B.R.S. 2.5 Year Field Work Rs.8000
6 Patel Alpeshbhai R. 24 Male Surveyor I.T.I. Surveyor
4 Year Field Work Rs.6000
7 Chaudhari Rajesabhai G. 40 Male Accountant M.Com 10 Year Office Work Rs.7000
8 Chaudari Jagrutiben H. 23 Female Data Entry Operator 12th COPA
- Office Work Rs.5000
Detailed Project Report, IWMP-VI (Dhanmauli)
29 | P a g e District Watershed Development Unit Tapi.
Chapter 3
Basic Information of the Project Area
Detailed Project Report, IWMP-VI (Dhanmauli)
30 | P a g e District Watershed Development Unit Tapi.
3.1. Geography & Geo-hydrology
3.1.1. Land use pattern:
The Net geographical area of Dhanmauli project is about 5370.70 ha. The total forest area is about 63.89. 33.33% land is under cultivation
in Dhanmauli Project is which is 70% rain-fed and mainly Kharif crop is taken. In Dhanmauli project, about 14.12% of the total geographical
land is classified under wasteland of which 3.80 % is cultivable land & 2.79% is no-cultivable. The land under cultivation in Dhanmauli
Project is completely rain-fed and mainly Kharif crop is taken.The traditional crops such as paddy, figer millet, Bengal gram is cultivated
under maximum area.
Detailed Project Report, IWMP-VI (Dhanmauli)
31 | P a g e District Watershed Development Unit Tapi.
Table no. 8: Land use pattern:
Sr. No.
Names of villages
Geographical Area of the village
Forest Area
Land under agricultural use
Rainfed area
Permanent pastures
Wasteland
Cultivable Non-
cultivable
1 Khadi 634.30 543.00 62.40 60.00 7.90 7.90 21.00
2 Amathva 297.60 158.10 120.80 106.50 15.60 15.60 3.20
3 Kanti 439.90 385.60 47.10 43.40 4.50 4.50 2.80
4 Seljhar 289.10 204.60 74.30 68.50 9.10 9.10 1.20
5 Dhanmaulii 299.50 80.00 183.00 173.50 28.90 28.90 7.60
6 Kapadbandh 1144.70 971.40 142.80 124.70 16.20 16.20 13.40
7 Mota Tarpada 430.60 178.70 212.20 198.70 25.20 25.20 14.50
8 Siraspada 214.50 69.40 105.40 94.80 14.20 14.20 25.40
9 Chikhalpada 171.70 110.70 48.60 39.80 4.80 4.80 7.60
10 Vadi Rupgadh 425.70 289.70 116.30 112.40 13.90 13.90 5.90
11 Khogalgam 275.90 87.90 146.30 137.30 18.40 18.40 23.20
12 Umarda 395.60 225.00 140.10 127.00 22.50 22.50 8.10
13 Borpada 351.60 127.10 185.20 164.80 23.30 23.30 16.20
Total 5370.70 3431.20 1585.50 1451.30 204.50 204.50 150.10
Detailed Project Report, IWMP-VI (Dhanmauli)
32 | P a g e District Watershed Development Unit Tapi.
3.1.2 Soil and topography:
Table no. 9: Soil type and topography:
S. No.
Name of the Agro-climatic zone covers project area
Area in ha
Names of the villages
Major soil types Topography
a) Type b) Area
1
South Gujarat
634.30 Khadi
Red, Black, Cotton, Silty
clay
634.30
Undulating, Moderate Slope
2 297.60 Amathva 297.60
3 439.90 Kanti 439.90
4 289.10 Seljhar 289.10
5 299.50 Dhanmaulii 299.50
6 1144.70 Kapadbandh 1144.70
7 430.60 Mota Tarpada 430.60
8 214.50 Siraspada 214.50
9 171.70 Chikhalpada 171.70
10 425.70 Vadi Rupgadh 425.70
11 275.90 Khogalgam 275.90
12 395.60 Umarda 395.60
Detailed Project Report, IWMP-VI (Dhanmauli)
33 | P a g e District Watershed Development Unit Tapi.
13 351.60 Borpada 351.60
Table no. 10: Flood and drought condition:
Sl no Village Flood (Incidence) Drought (Incidence)
1 Khadi
NIL NIL
2 Amathva
3 Kanti
4 Seljhar
5 Dhanmaulii
6 Kapadbandh
7 Mota Tarpada
8 Siraspada
9 Chikhalpada
10 Vadi Rupgadh
11 Khogalgam
12 Umarda
13 Borpada
Detailed Project Report, IWMP-VI (Dhanmauli)
34 | P a g e District Watershed Development Unit Tapi.
11. Edaphic Factors
Table no. 11.1: Soil Erosion
Cause Type of erosion Area affected (ha) Run off (mm/ year) Average soil loss (Tonnes/ ha/ year)
Water erosion
A Sheet 1500
B Rill 3000
C Gully 500
Sub-Total 5000
Wind erosion - NA
Total 5000
Detailed Project Report, IWMP-VI (Dhanmauli)
35 | P a g e District Watershed Development Unit Tapi.
Table no. 11.2: Soil Salinity/Alkalinity (Salinity ingress)
Name of the Village Survey Number Soil pH Type of Salinity (Inherent/Ingress)
Khadi 22 6.5 0.24
Amathva 41 6.7 0.24
Kanti 21 6.8 0.23
Seljhar 17 6.6 0.24
Dhanmaulii 86/1 6.9 0.31
Kapadbandh 32 6.8 0.28
Mota Tarpada 87 6.6 0.24
Siraspada 34 6.9 0.22
Chikhalpada 23 6.8 0.23
Vadi Rupgadh 9 7.1 0.23
Khogalgam 21 6.8 0.24
Umarda 63 6.9 0.25
Borpada 54 6.9 0.26
Detailed Project Report, IWMP-VI (Dhanmauli)
36 | P a g e District Watershed Development Unit Tapi.
Table no. 12: Climatic conditions:
Name of project Average rainfall- last 5 years Average temperature
IWMP-VI, Dhanmauli 1026 mm
Summer Winter
Max Min Max Min
38 33 30 12
Table no. 13: Physiography and relief
Project name Elevation Slope range (%) Major streams
IWMP-VI, Dhanmauli 500mt 25-30% Zakhri River, Gira River
Detailed Project Report, IWMP-VI (Dhanmauli)
37 | P a g e District Watershed Development Unit Tapi.
3.1.3 Land and Agriculture
The main reason for the insufficient base of surface water source is the steep slope & undulated plains causing maximum runoff and
appreciable seepage (lateral movement of water). Therefore, wells are seen over flooded during monsoon completely dry in summer and
major part of winter. Unavailability of irrigation source in the village forces the majority of the farmers to migrate for ensuring their livelihood.
This affects directly the demographic profile of the village. The major crops cultivated during Kharif by the farmers are Nagli, Tuwar, Adad,
Groundnut and Paddy. The land conservation measures such gully plugs, stone bunds & farm bunds in this area will help them for double
cropping and thus increase in yield.
Detailed Project Report, IWMP-VI (Dhanmauli)
38 | P a g e District Watershed Development Unit Tapi.
Table no. 14: Land ownership details
Sl no Village Total owned land
HHs giving land on lease HHs taking land on lease Gen OBC SC ST
1 Khadi 0.00 0.00 0.00 64.80 0 0
2 Amathva 0.00 30.84. 0.00 104.26 0 0
3 Kanti 0.00 0.00 0.00 50.80 0 4Ha
4 Seljhar 0.00 16.23 0.00 63.97 0 1 Ha
5 Dhanmaulii 0.00 12.82 0.00 179.78 0 4 Ha
6 Kapadbandh 0.00 0.00 0.00 162.90 0 3.5Ha
7 Mota Tarpada 0.00 0.00 0.00 225.70 0 2 Ha
8 Siraspada 0.00 0.00 0.00 116.00 0 0
9 Chikhalpada 0.00 0.00 0.00 57.40 0 0
10 Vadi Rupgadh 0.00 0.00 0.00 120.20 0 0
11 Khogalgam 0.00 0.00 0.00 155.30 0 1 Ha
12 Umarda 0.00 0.00 0.00 154.20 0 0
13 Borpada 0.00 0.00 0.00 205.60 0 1 Ha
Total 0.00 59.89 0.00 1660.91 0 15.5 Ha
Detailed Project Report, IWMP-VI (Dhanmauli)
39 | P a g e District Watershed Development Unit Tapi.
Table no. 15: Agriculture
Sl no Village Net sown area: One time Two times Three times
1 Khadi 62.40 22.50 -
2 Amathva 120.80 18.21 -
3 Kanti 47.10 21.34 -
4 Seljhar 74.30 26.17 -
5 Dhanmaulii 183.00 79.42 -
6 Kapadbandh 137.79 57.76 -
7 Mota Tarpada 207.65 98.78 -
8 Siraspada 105.40 79.01 -
9 Chikhalpada 48.60 17.59 -
10 Vadi Rupgadh 114.79 63.52 -
11 Khogalgam 146.30 56.95 -
12 Umarda 140.10 105.07 -
13 Borpada 182.89 46.78 -
Total 1571.12 693.10 -
Detailed Project Report, IWMP-VI (Dhanmauli)
40 | P a g e District Watershed Development Unit Tapi.
Table no. 16: Irrigation
Sl no
Village Source 1 : Canal Source 2 : Check dam / Pond Source 3 : Well
Availability months
Net area
Gross area
Availability months
Net area
Gross area
Availability months
Net area
Gross area
1 Khadi - - - - - 8 8
2 Amathva - - - - - 8 7
3 Kanti - - - - - 8 9
4 Seljhar - - - - - 7 11
5 Dhanmaulii - - - - - 9 24
6 Kapadbandh - - - 10 36 8 17
7 Mota
Tarpada - - - 3 1 7 12
8 Siraspada - - - - - 8 13
9 Chikhalpada - - - - - - -
10 Vadi
Rupgadh - - - - - 8 18
11 Khogalgam - - - - - 8 8
12 Umarda - - - 1 32 9 42
13 Borpada - - - - - 7 9
Detailed Project Report, IWMP-VI (Dhanmauli)
41 | P a g e District Watershed Development Unit Tapi.
Table no. 17: Crop details:
Table no. 17.1: Kharif Crop details:
Sl no
Village Kharif (Monsoon)
Crop 1 – Pigeon Pea
Crop 2 – Green Gram Crop 3 –Paddy Crop 4 - Sorghum
Crop 5 - Black Gram (Adad)
Area (Ha.)
Production (Kg.)
Productivity (Kg./Ha.)
Area (Ha.)
Production (Kg.)
Productivi
ty (Kg./Ha.)
Area (Ha.)
Production (Kg.)
Productivit
y (Kg./Ha.
) Area (Ha.)
Productio
n (Kg.)
Productivity (Kg./H
a.) Area (Ha.)
Production (Kg.)
Productiv
ity (Kg./Ha.)
1 Khadi 9.16 6109.7 667 4 2676 669 35 62615 178
9 8.2 6084.
4 742 6.04 3817.3 632
2 Amathva 18 11250 625 7.15 4611.8 645 68.4 118127 172
7 14 9856 704 13.25 8042.8 607
3 Kanti 10.05 6391.8 636 3 1977 659 22.5 39713 176
5 5.15 3780.
1 734 6 3762 627
4 Seljhar 12.1 7320.5 605 7.4 4839.6 654 39.1 67565 172
8 7.4 5372.
4 726 8.3 5071.3 611
5 Dhanmauli 39.6 26532 670 12.7 8382 660 92.4 162532 175
9 24.7 18649 755 13.6 8500 625
6 Kapadban
dh 31.3 20470 654 12.8 8422.4 658 65.4 114123 174
5 19.4 14395 742 12.9 7998 620
7 Mota
Tarpada 30.52 20418 669 19.6
8 12831 652 108.
3 187576 173
2 26.1 19288 739 27.6 17305 627
8 Siraspada 17.25 10661 618 8.22 5153.9 627 52.3 91630 175
2 14.95 10809 723 12.68 7823.6 617
9 Chikhalpad
a 9.3 5793.9 623 4.5 2835 630 22.2
5 38893 174
8 8.28 6003 725 4.27 2677.3 627
Detailed Project Report, IWMP-VI (Dhanmauli)
42 | P a g e District Watershed Development Unit Tapi.
10 Vadi
Rupgadh 19.65 12419 632 9.48 5991.4 632 59.2
2 103339 174
5 18.65 13596 729 9.3 5905.5 635
11 Khogalga
m 24.55 15761 642 12.4 7787.2 628 78.3
5 138601 176
9 16.82 12195 725 14.18 8933.4 630
12 Umarda 28.2 19148 679 9.32 5908.9 634 72.6
5 128591 177
0 19.25 14149 735 10.68 6653.6 623
13 Borpada 38.85 25563 658 11.0
5 6994.7 633 94.5 165942 175
6 28.35 20469 722 12.45 7719 620
Total 288.5
3 18783
8 8378
121.7 78411 8381
810.37
4149244
22785
211.25
154644 9501 151.25 94209 8101
Detailed Project Report, IWMP-VI (Dhanmauli)
43 | P a g e District Watershed Development Unit Tapi.
Table no. 17.2: Rabi Crop details:
Sl no
Village
Rabi (Winter)
Crop 1 Chana Crop 2 Val Crop 3 wheat Crop 4 Groundnut
Area (Ha.)
Production
(Kg.)
Productivity (Kg. /Ha.)
Area (Ha.)
Production (Kg.)
Productivity (Kg. /Ha.)
Area (Ha.)
Production (Kg.)
Productivity (Kg. /Ha.)
Area (Ha.)
Production
(Kg.)
Productivity (Kg. /Ha.)
1 Khadi 11 4971.4 469 5.1 2152 422 1.5 1346 897 4.3 6321 1470
2 Amathva 8 3492.4 436 3 1236 412 1.1 975.7 887 5.1 6971.7 1367
3 Kanti 8.6 3775.4 439 5.1 2111 414 2 1780 890 4.7 6541.2 1380
4 Seljhar 12 5517.6 456 5 2160 432 2.1 1903 906 6.6 9365.4 1419
5 Dhanmauli 29 14034 489 29.4 13171 448 3.35 3079 919 14 22007 1523
6 Kapadbandh 17 8885.3 519 19 8968 472 7.4 7193 972 12 18876 1560
7 Mota Tarpada 33 16451 497 30.3 14127 467 12.1 11499 948 18 28533 1549
8 Siraspada 27 12828 473 26.2 11436 437 5 4675 935 17 25521 1489
9 Chikhalpada 6.8 3163.7 468 6.95 3016 434 0.9 836.1 929 2.6 3753 1427
10 Vadi Rupgadh 23 10834 469 18.1 7900 436 3 2808 936 18 25737 1459
11 Khogalgam 21 10830 507 7.1 3259 459 4.82 4574 949 11 16780 1509
12 Umarda 31 17109 548 35.2 16262 462 10 9699 968 24 37694 1548
13 Borpada 18 9485 542 16.3 7482 459 3.02 2920 967 8 12376 1547
Total 245.4 121375 6312 206.75 93281 5754 56.3 53287 12103 145.3 220476 19247
Detailed Project Report, IWMP-VI (Dhanmauli)
44 | P a g e District Watershed Development Unit Tapi.
3.1.4 Livestock details
Table no. 18: Livestock
Sl no Village Buffalo Cow Total Milk
Goat Sheep Bullock Hen Rabbit, duck
No milk No Milk No Milk No No No No
1 Khadi 126 145 106 128 273 34 - - 56 339 -
2 Amathva 51 74 62 82 156 77 - - 20 275 -
3 Kanti 76 102 57 69 171 18 - - 46 268 -
4 Seljhar 34 43 38 51 94 - - - 12 128 -
5 Dhanmaulii 105 189 167 227 416 80 - - 73 477 -
6 Kapadbandh 77 123 21 60 183 22 - - 46 193 -
7 Mota Tarpada 131 184 140 192 376 87 - - 98 823 -
8 Siraspada 102 136 84 109 245 27 - - 28 489 -
9 Chikhalpada 31 48 53 74 122 28 - - 19 231 -
10 Vadi Rupgadh 146 178 135 156 334 54 - - 54 507 -
11 Khogalgam 112 133 94 127 260 - - - 52 576 -
12 Umarda 115 132 119 132 264 24 - - 61 393 -
13 Borpada 74 119 82 106 225 24 - - 62 542 -
Total 1180 1606 1158 1513 3119 475 0 0 627 5241 -
Detailed Project Report, IWMP-VI (Dhanmauli)
45 | P a g e District Watershed Development Unit Tapi.
Table no. 19: Drinking water
Sl no Village Ground water table (mt) Source of drinking water Availability in months Quality
1 Khadi 12 Well / Hand pump 8
Portable
2 Amathva 13 Well / Handpump 8
3 Kanti 11 Well / Handpump 8
4 Seljhar 11 Well / Handpump 7
5 Dhanmaulii 13 Well / Handpump 9
6 Kapadbandh 15 Well / Handpump 8
7 Mota Tarpada 14 Well / Handpump 7
8 Siraspada 12 Well / Handpump 8
9 Chikhalpada 13 Well / Handpump 8
10 Vadi Rupgadh 13 Well / Handpump 8
11 Khogalgam 12 Well / Handpump 8
12 Umarda 12 Well / Handpump 9
13 Borpada 13 Well / Handpump 7
Detailed Project Report, IWMP-VI (Dhanmauli)
46 | P a g e District Watershed Development Unit Tapi.
Table no. 20: Details of Common Property Resources
Sr. No.
Names of project
CPR Particulars
Total Area (ha) Area owned/ In possession of
Area available for treatment (ha)
Pvt. persons
Govt. (Specify deptt.)
PRI Any other
(Pl. Specify)
Pvt. persons
Govt. (specify deptt.)
PRI
Any other (Pl.
Specify)
IWMP-VI, Dhanmauli
Wasteland / degraded land
354.60
Pastures 204.50
Orchards
Village Woodlot
Forest 3431.20
Village Ponds / Tanks
Community Buildings
Weekly Markets
Permanent markets
Temples / Places of worship
Others (Pl. specify)
Total 3785.8 204.50
Detailed Project Report, IWMP-VI (Dhanmauli)
47 | P a g e District Watershed Development Unit Tapi.
3.2. Socio-Economic profile:
3.2.1. Demographic Status:
Dhammauli project has a total population of 6842 out of which 3490 are male and 3352 female. The sex ratio is 985 females to 1000
males. There are 401 BPLs HH for Dhammauli project and average family size is 4. There are total 93 HH with no land. The literacy rate is
16.37 % (of total male population) and female literacy rate is as low as 8.18 % (of total female population). The total population belongs to
ST caste & mainly involved in agriculture and animal husbandry.
Detailed Project Report, IWMP-VI (Dhanmauli)
48 | P a g e District Watershed Development Unit Tapi.
Table no. 21: Demographic information
Sl no Village Population SC ST
Total Male Female Total Male Female % Total Male Female %
1 Khadi 401 213 188 0 0 0 0 401 213 188 100
2 Amathva 197 88 109 0 0 0 0 197 88 109 100
3 Kanti 357 169 188 0 0 0 0 357 169 188 100
4 Seljhar 70 38 32 0 0 0 0 70 38 32 100
5 Dhanmauli 649 313 336 0 0 0 0 649 313 336 100
6 Kapadbandh 393 195 198 0 0 0 0 393 195 198 100
7 Mota Tarpada 1095 548 547 0 0 0 0 1095 548 547 100
8 Siraspada 548 268 280 0 0 0 0 548 268 280 100
9 Chikhalpada 297 141 156 0 0 0 0 297 141 156 100
10 Vadi Rupgadh 494 244 250 0 0 0 0 494 244 250 100
11 Khogalgam 725 358 367 0 0 0 0 725 358 367 100
12 Umarda 596 293 303 0 0 0 0 596 293 303 100
Detailed Project Report, IWMP-VI (Dhanmauli)
49 | P a g e District Watershed Development Unit Tapi.
13 Borpada 640 317 325 0 0 0 0 640 317 325 100
Total 6462 3185 3279 0 0 0 0 6462 3185 3279 1300
Detailed Project Report, IWMP-VI (Dhanmauli)
50 | P a g e District Watershed Development Unit Tapi.
Table no. 22: Literacy rate
Sl no
Village Literacy Literacy %
above age 14 Literacy %
below age 14
Total % Male % Female %
1 Khadi 96 23.94 65 67.71 31 32.29 39.78 60.22
2 Amathva 76 38.58 37 48.68 39 51.32 33.33 66.67
3 Kanti 111 31.09 63 56.76 48 43.24 20 80
4 Seljhar 1 1.43 1 100.00 0 0.00 0 100
5 Dhanmauli 108 16.64 61 56.48 47 43.52 42.86 57.14
6 Kapadbandh 116 29.52 55 47.41 61 52.59 32.95 67.05
7 Mota Tarpada 137 12.51 261 190.51 176 128.47 39.12 60.88
8 Siraspada 247 45.07 141 57.09 105 42.51 23.49 76.51
9 Chikhalpada 134 45.12 71 52.99 63 47.01 34.43 65.57
10 Vadi Rupgadh 186 37.65 103 55.38 83 44.62 45.18 54.82
11 Khogalgam 253 34.90 155 61.26 98 38.74 39.2 60.8
Detailed Project Report, IWMP-VI (Dhanmauli)
51 | P a g e District Watershed Development Unit Tapi.
12 Umarda 226 37.92 144 63.72 82 36.28 50.64 49.36
13 Borpada 306 47.81 170 55.56 136 44.44 43.3 56.7
Total 1997 402.18 1327 913.55 969 605.03 444.28 855.72
Table no. 23: Migration details
Sl no
Village Total
population
Migration Migration by months Main reason for
migration Income during
migration / month Total Male Female Up to 3 months
3-6 months
More than 6 months
1 Khadi 401 49 32 17 18 31 0
Lack of Employment
3000 to 8000
2 Amathva 197 32 25 07 9 23 0
3 Kanti 357 64 47 17 22 39 3
4 Seljhar 70 18 11 7 8 10 0
5 Dhanmaulii 649 46 33 13 14 32 0
6 Kapadbandh 393 65 39 26 20 41 4
7 Mota
Tarpada 1095 105 77 28 43 62 0
8 Siraspada 548 77 52 25 26 59 2
9 Chikhalpada 297 33 23 10 8 25 0
Detailed Project Report, IWMP-VI (Dhanmauli)
52 | P a g e District Watershed Development Unit Tapi.
10 Vadi
Rupgadh 494 78 59 19 16 62 0
11 Khogalgam 725 56 37 19 14 42 0
12 Umarda 596 41 27 14 11 30 0
13 Borpada 640 62 38 24 18 44 0
Total 6462 726 500 226 227 500 9
Table no. 24: Poverty
Sl no Village Total
Household
BPL
% of BPL HH Total Land less HH % of land less HH 0-16 17-20 Total
1 Khadi 123 6 20 26 21.13 4 3.25
2 Amathva 55 1 9 10 18.18 3 5.45
3 Kanti 80 1 15 16 20 5 6.25
4 Seljhar 32 3 16 19 59.37 4 12.5
5 Dhanmaulii 159 8 48 56 35.22 10 6.26
6 Kapadbandh 88 1 7 8 9.09 8 9.09
7 Mota Tarpada 274 8 43 51 18.61 12 4.37
8 Siraspada 163 12 32 44 26.99 8 4.9
9 Chikhalpada 77 12 17 29 37.66 3 3.89
10 Vadi Rupgadh 159 3 35 38 23.89 10 6.28
11 Khogalgam 192 4 18 22 11.45 9 4.68
Detailed Project Report, IWMP-VI (Dhanmauli)
53 | P a g e District Watershed Development Unit Tapi.
12 Umarda 131 2 22 24 18.32 9 6.87
13 Borpada 135 1 57 58 42.96 8 5.92
Total 1668 62 339 401 342.87 93 79.71
Table no. 25: Village infrastructure
Sl no
Village
Pucca road
to the village
Schools
Colleges (Number)
Post Office
(Distance) Banks
Nearest market
yard (Distance)
KM
Milk collection
centre
Milk cooperative
Other cooperatives
/ CBIs LP UP HS
1 Khadi Y Y N N N 20 1 1 0
2 Amathva Y Y N N N 24 1 1 0
3 Kanti Y Y N N N 24 1 1 0
4 Seljhar Y Y N N N 18 1 1 0
5 Dhanmaulii Y Y N N N 16 1 1 0
6 Kapadbandh Y Y N N N 18 1 1 0
7 Mota
Tarpada Y Y N N N 20 1 1 0
8 Siraspada Y Y N N N 16 1 1 0
Detailed Project Report, IWMP-VI (Dhanmauli)
54 | P a g e District Watershed Development Unit Tapi.
9 Chikhalpada Y N N N N N N 16 1 1 0
10 Vadi
Rupgadh Y Y N N N 15 1 1 0
11 Khogalgam Y Y Y N N N N 19 1 1 0
12 Umarda Y N N N N 15 1 1 0
13 Borpada Y Y Y N N N 17 1 1 0
Table no. 26: Facilities / HH assets
Sl no Village
HHs with electricity
HHs with
safety latrines
HHs with phones HHs with vehicle HHs with TV set
HHs with cooking
gas
HHs with Drinking
water
HHs with
fridge Landline Mobile 2wheeler 4wheeler
1 Khadi 88 28 4 78 37 - 28 2 52 2
2 Amathva 40 13 2 32 19 - 15 2 22 -
3 Kanti 63 11 5 48 29 1 26 1 27 1
4 Seljhar 12 2 2 18 12 - 5 - 28 -
5 Dhanmauli 117 37 8 87 32 - 36 12 32 2
6 Kapadbandh 72 23 4 46 18 - 15 6 42 3
7 Mota Tarpada 188 58 14 168 58 3 71 21 109 9
8 Siraspada 112 28 6 92 40 1 51 2 29 2
Detailed Project Report, IWMP-VI (Dhanmauli)
55 | P a g e District Watershed Development Unit Tapi.
9 Chikhalpada 58 14 3 37 22 - 27 3 23 -
10 Vadi Rupgadh 109 25 6 84 32 - 41 8 29 1
11 Khogalgam 86 27 5 97 34 - 40 4 51 2
12 Umarda 67 34 8 84 37 2 46 12 43 5
13 Borpada 85 37 7 92 41 - 44 14 52 4
Total 1097 337 74 963 411 7 445 87 539 31
3.3 Livelihood pattern:
The livelihood of the villagers depends on agriculture and animal husbandry & during lean seasons they migrate for daily wages to
other parts of the state. There are few people who are engaged in services.
Detailed Project Report, IWMP-VI (Dhanmauli)
56 | P a g e District Watershed Development Unit Tapi.
Detailed Project Report, IWMP-VI (Dhanmauli)
57 | P a g e District Watershed Development Unit Tapi.
Table no. 27: Per capita Income
Sl no
Village Agriculture Forestry Animal
husbandry Casual labour
Services Handicraft Others Total
1 Khadi 18000 2500 9000 8500 12000 4000 54000
2 Amathva 16800 2700 7800 8800 18000 5000 59100
3 Kanti 21000 3000 6120 9200 14000 0 53320
4 Seljhar 19000 3000 10000 11000 0 2500 45500
5 Dhanmaulii 28000 4000 7210 13000 18000 0 70210
6 Kapadbandh 17000 3500 12000 6418 24000 7000 69918
7 Mota Tarpada 18550 5000 6900 5200 23000 4000 62650
8 Siraspada 21900 3300 14200 7120 20200 3400 70120
9 Chikhalpada 18000 2900 10980 7000 12000 2500 53380
10 Vadi Rupgadh 22000 4050 8200 8000 9000 3100 54350
11 Khogalgam 10000 3100 7000 5000 14100 2900 42100
12 Umarda 23000 2900 12120 3900 6500 0 48420
13 Borpada 17000 3050 8000 6750 7000 2850 44650
Total 250250 43000 119530 99888 177800 37250 727718
Detailed Project Report, IWMP-VI (Dhanmauli)
58 | P a g e District Watershed Development Unit Tapi.
Table no.28: Dependence on Forest/CPR
Sl no Village
Mahuda Timru Pan Lakh & Gum
Total income
% sells Income % sells Income % sells Income
1 Khadi - 115000 - 35100 - 13600 163700
2 Amathva - 86100 - 15700 - 6150 107950
3 Kanti - 96500 - 22800 - 8800 128100
4 Seljhar - 99200 - 39000 - 5100 143300
5 Dhanmaulii - 106200 - 45600 - 12100 163900
6 Kapadbandh - 99700 - 25100 - 8000 132800
7 Mota Tarpada - 199200 - 46200 - 18000 263400
8 Siraspada - 122200 - 40700 - 15100 178000
9 Chikhalpada - 93100 - 19200 - 9000 121300
10 Vadi Rupgadh - 105200 - 39700 - 12000 156900
11 Khogalgam - 112000 - 48000 - 9000 169000
12 Umarda - 99100 - 32700 - 8100 139900
13 Borpada - 118000 - 36200 - 11100 165300
Detailed Project Report, IWMP-VI (Dhanmauli)
59 | P a g e District Watershed Development Unit Tapi.
Table no. 29: Livelihood pattern (Occupational distribution)
Sl no Village Total workforce Agriculture Animal husbandry (AH) Agriculture + AH Casual labour Services
1 Khadi 152 38 30 53 23 8
2 Amathva 232 85 14 75 51 7
3 Kanti 236 75 25 63 64 9
4 Seljhar 61 22 2 20 15 2
5 Dhanmaulii 286 112 39 56 67 12
6 Kapadbandh 322 93 75 79 56 19
7 Mota
Tarpada 222 56 44 78 33 11
8 Siraspada 271 97 38 69 58 9
9 Chikhalpada 274 97 35 62 74 6
10 Vadi
Rupgadh 212 69 24 74 41 4
11 Khogalgam 280 102 15 78 76 9
12 Umarda 270 106 22 69 67 6
13 Borpada 191 79 10 67 28 7
Total 3009 1031 373 843 653 109
Detailed Project Report, IWMP-VI (Dhanmauli)
60 | P a g e District Watershed Development Unit Tapi.
3.4 Comparative data of the crop productivity of the area:
3.4.1 The table describes the difference between the productivity of major Kharif crops grown at different locations
(Yr - 2009-10) (Kg/ha)
Sl No
Location Mung Groundnut Paddy (Rice) Oryza
sativa Black Gram (Udad) Vigna
mungo Tuwar
1 Dhanmauli
Project 644.00 2680.54 22785 623.15 8378
2 Tapi 1500.00 1200 4000 800 1000
3 Gujarat 1052.63 1367 1698.06 666.67 989
4 India 1477 1077 2178 506 678
*(Sources: for Dhanmauli project - Baseline Survey, 2009-10; for Dist. - Khetiwadi deptt., 2008-09; for State - Directorate of Agriculture,
Govt. of Gujarat; for Country - http://www.indiaagistat.com, Agriculture statistics at glance, 2008-09)
Detailed Project Report, IWMP-VI (Dhanmauli)
61 | P a g e District Watershed Development Unit Tapi.
Chart 3.4.1 showing comparative productivity of Finger Millet:
Greengram is one of the major crops grown in Tapi district with having the productivity of 1400 kg/ha approx. which is higher than the total
productivity of the state and country. Whereas, there is an appreciable productivity of the finger millet in the Dhanmauli project area i.e.
644.00 kg/ha and even it can be increased with an adequate source of irrigation.
Detailed Project Report, IWMP-VI (Dhanmauli)
62 | P a g e District Watershed Development Unit Tapi.
Chart 3.4.2 showing comparative productivity of Ground nut:
The Groundnut production has been increased last from 2 years in Tapi district, its productivity is about 1200 kg/ha. The
productivity of project area is 1480.54 kg/ha. The state and country productivity is comparatively less than tapi district.
Detailed Project Report, IWMP-VI (Dhanmauli)
63 | P a g e District Watershed Development Unit Tapi.
Chart 3.4.3 showing comparative productivity of Paddy:
Paddy is the major kharif crop which is cultivated in Tapi district. The ekdandi variety of paddy is found to be most popular
recently due to maximum production compared to other indigenous/local varieties, thus there is appreciable productivity all over the district.
The productivity in project area is about 1752.69 kg/ha, whereas, in Tapi it is 4000 kg/ha. But in the other parts of Gujarat, the productivity
is less resulting in overall less productivity i.e. 1698.06 kg/ha. The productivity of paddy in India is 2178 kg/h
Detailed Project Report, IWMP-VI (Dhanmauli)
64 | P a g e District Watershed Development Unit Tapi.
Chart 3.4.4 showing comparative productivity of Black gram:
The productivity of black gram in project area is 623.15 kg/ha, which is average compared to, state and country. The productivity
of black gram in Tapi district is 950 kg/ha.
Detailed Project Report, IWMP-VI (Dhanmauli)
65 | P a g e District Watershed Development Unit Tapi.
Chart 3.4.5 showing comparative productivity of Tuwar:
The productivity of the Tuwar in project area is 644.46 kg/ha which is much less as compared to the district & state. The Tapi has
appreciable amount of productivity. Gujarat has High productivity followed by the country.
Detailed Project Report, IWMP-VI (Dhanmauli)
66 | P a g e District Watershed Development Unit Tapi.
The Dhanmauli project area has low productivity because of the following reasons:
I. Full dependence on monsoon:
Dhanmauli village is dependent on monsoon for the cultivation. Water is being essential input in agriculture thus, shortage of water
results in lower productivity. Due to the absence of irrigation facility, 100% of the total cultivated area depends on the uncertain
monsoon. Therefore, the success or failure of the monsoon determines the success or failure of agriculture production.
II. Low use of fertilizer per unit cropped area:
Farmers do not use fertilizer due to insufficient money and poor irrigation facility which result in lower production.
III. Traditional farming methods:
The traditional methods such as monocropping, taking same crop every year results in lower productivity. The ignorance about the use
of new farming methods and technologies such as multiple cropping are not followed.
IV. Lack of adequate farm machinery:
Even today a large number of farmers use wooden ploughs and bullocks. They don't have adequate machinery like tractor for cultivation.
V. Lack of finances for farmers:
Most of the farmers are marginal and small. They do not have enough money to buy good quality seeds, machinery and other inputs.
VI. Lack of other facilities such as storage and marketing:
Detailed Project Report, IWMP-VI (Dhanmauli)
67 | P a g e District Watershed Development Unit Tapi.
5-10% of agriculture product damage after harvesting due to scarcity of proper storage and proper market for sale. So he sells to local
traders at the low prices. Farmers mainly face problems in means of transportation due to kachha roads. And other problem of farmers is
the lack of proper storage facilities.
Detailed Project Report, IWMP-VI (Dhanmauli)
68 | P a g e District Watershed Development Unit Tapi.
Chapter 4
Watershed Activities
Detailed Project Report, IWMP-VI (Dhanmauli)
69 | P a g e District Watershed Development Unit Tapi.
Watershed Activities
Watershed management as a strategy has been adopted by Government of India especially in the rain-fed regions of semi-arid
tropics. These regions are characterized by low and undependable rain, low soil fertility, poor infrastructure development, low literacy and
high incidence of migration. Several studies have identified that there is a dire need of a systematic and scientific approach to deal with
watershed development. The common guidelines generate a fresh and flexible framework for the next generation watershed development.
4.1. Scientific Planning:
i) Cluster Approach
This envisages a broader vision of Geo-hydrological unit which involves treating a cluster of micro-watershed. The Dhanmauli Project
consists of 6 micro- watersheds namely 5B2D8d1b, 5B2D8C2B, 5B2D8d1C, 5B2D8C2A, 5B2D8C2C, 5B2D8C1E, as their respective
codes.
ii) Base line Survey
To access the impact of any watershed development program a detailed baseline survey has to be conducted. This acts a
benchmark for any intervention during and post implementation of any development program. A detailed baseline survey was undertaken
which involved household census survey, Bio-physical survey, Field to field survey and Village level data collection from Talati –cum mantri.
Household census survey includes a detailed questionnaire which was been filled by visiting each and every household in the village. This
gave in the details of the demographic profile of the village, the literacy percentage, SC/ST population, number of BPL household, cattle
Detailed Project Report, IWMP-VI (Dhanmauli)
70 | P a g e District Watershed Development Unit Tapi.
population, and net consumption rate in the village, average milk production of the cattle and various schemes running and their benefits.
Bio-physical survey was undertaken to identify various natural resources available in the village. It included the soil typology, wells in the
area, crops cultivation, Cropping pattern, fertilizer application and various sources of irrigation in the field.
iii) Participatory Rural Appraisal (PRA)
The past experience of watershed has given tremendous input to focus on creating accountability of the stakeholders towards the
program. This has created an emphasis to include all the stakeholder communities and their local and indigenous Technological Knowledge
(ITK) while planning for any activity. Participatory approach provides a new path for planning, implementing, and monitoring and post-
withdrawal activities with a complete accountability of the stakeholders. Various PRA techniques like resource mapping, social mapping,
and season calendars were used to understand the physical and social orientation of the village in general and watershed in specific. These
tools put the villagers in ease than the complicated questionnaires. Various tools like Matrix ranking, Venn diagram were used to identify
various local vegetations, fodders crops and even various institutions to identify their significance in the life of the farmers.
iv) Use of GIS and remote sensing for planning
Use of various high science tools has been promoted at various stages of watershed development which include GPS, satellite maps
through BISAG.
Detailed Project Report, IWMP-VI (Dhanmauli)
71 | P a g e District Watershed Development Unit Tapi.
a) Prioritization: Geographical Information System (GIS) has been used for prioritization process. Various layer maps were created like
Geo-morphological, Soil, BPL Population, SC/ST population, Ground water Status, Drinking water situation Slope percent. These were all
given proper weight-age according to the DoLR specification. This helped in prioritization of various watershed areas.
b) Planning: A action plan matrix was formulated by State Level Nodal Agency (SLNA) taking into account various features like the
slope percent, soil Depth, Soil Texture, Soil erosion in the area for wasteland, forest land and agricultural land. Global positioning System
(GPS) was used to identify each and every water conservation structures available in the project area. This was used to create a map.
Contour Map of vertical interval of 1 meter at a scale of 1:8000 was used for identifying various locations for soil and water conservation
structures.
c) Hydrological modeling: Hydrology modeling technique was used for locating drainage, stream length, flow direction, sink, and Flow
accumulation. This model overlaid over cadastral map to calculate the catchment area of each structures like the check dam etc. This has
helped to remove the human error which generally occurs while calculating the catchment area of a check dam.
Detailed Project Report, IWMP-VI (Dhanmauli)
72 | P a g e District Watershed Development Unit Tapi.
Table no. 30: Details of Scientific Planning and Inputs in IWMP projects
Scientific criteria/ inputs used Whether scientific criteria
was used
(A) Planning
Cluster approach Yes
Whether technical back-stopping for the project has been arranged? If yes, mention the name of the Institute
Yes
Baseline survey Yes
Hydro-geological survey Yes
Contour mapping Yes
Participatory Net Planning (PNP) Yes
Remote sensing data-especially soil/ crop/ run-off cover Yes
Ridge to Valley treatment Yes
Online IT connectivity between Yes
(1) Project and DRDA cell/ZP Yes
(2) DRDA and SLNA Yes
(3) SLNA and DoLR Yes
Availability of GIS layers
1. Cadastral map
2. Village boundaries Yes
3. Drainage Yes
4. Soil (Soil nutrient status) Yes
5. Land use Yes
6. Ground water status Yes
7. Watershed boundaries Yes
8. Activity
Crop simulation models#
Integrated coupled analyzer/ near infrared visible spectroscopy/ medium spectroscopy for high speed soil nutrient analysis
Normalized difference vegetation index (NDVI)#
Weather Station Yes
(B) Inputs
1. Bio-pesticides Yes
Detailed Project Report, IWMP-VI (Dhanmauli)
73 | P a g e District Watershed Development Unit Tapi.
2. Organic manures Yes
3. Vermi-compost Yes
4. Bio-fertilizer Yes
5. Water saving devices Yes
6. Mechanized tools/ implements Yes
7. Bio-fencing Yes
8. Nutrient budgeting Yes
9. Automatic water level recorders & sediment samplers Yes
Any other (please specify) Yes
#NDVI - Ratio of the differences of the response of vegetation in the near infrared & red regions of the electromagnetic spectrum
Detailed Project Report, IWMP-VI (Dhanmauli)
74 | P a g e District Watershed Development Unit Tapi.
Table no.31: Details of PRA Activities conducted in the project area
Sr. No. Project
Name
Name of the PRA
Activity /
FGD
Date Number of
people
present
Lessons learnt / Understanding of the problem/situation
IWMP VI
Dhanmauli
-Transent Walk
-Chapati Diagram
-Village Mapping
-Seasonal Calender
-Boundary Mapping.
23/08/2011
To
9/09/2011 841
Major Problem is Drinking Water facility
Education Problem
Transportation Problem
People migration for income
Detailed Project Report, IWMP-VI (Dhanmauli)
75 | P a g e District Watershed Development Unit Tapi.
Detailed Project Report, IWMP-VI (Dhanmauli)
76 | P a g e District Watershed Development Unit Tapi.
Detailed Project Report, IWMP-VI (Dhanmauli)
77 | P a g e District Watershed Development Unit Tapi.
4.2. Institution building
i) Watershed Committee (WC)
Table no. 32.1: Khadi Watershed Committee details
Sl. No.
Names of
Village
Date of Registration as a Society
Name of Member
Designation
M/F
SC
ST
SF
MF
LF
Landless
UG
SHG
GP
Any other
Educational
qualification
Function/s
assigned#
1 Khadi under
process
Shri Dhanubhai V. Vasava
President M Y Y 38 B.A Pass
Watershed
Committee
Vanaraj Maganbhai Javabhai
Secretary
Forest
er 9 Pass
Shri Kishanbhai
D.Gamit Member M Y Y 40 8 Pass
Shri Shankuben
B. Gamit Member F Y Y 30 B.A.Pass
Shri Kavitaben S. Gamit
Member F Y Y 36 4 Pass
Smt. Kamaniyabhai j. Gamit
Member M Y Y Y 38 4 Pass
Smt. Lajreshbhai V. Vasava
Member M Y Y Y 30 10 Pass
Chaudhari Vijaybhai
S.
WDT Member
M Y Y 30 B.R.S
Detailed Project Report, IWMP-VI (Dhanmauli)
78 | P a g e District Watershed Development Unit Tapi.
Shri Shilaben C. Gamit
Member M Y Y Y 39 7. Pass
Shri Ramshingbhai J.Gamit
Member F Y Y Y 39 S S C
Shri Vasanjibhai T. Gamit
Member F Y Y 50 10 Pass
Detailed Project Report, IWMP-VI (Dhanmauli)
79 | P a g e District Watershed Development Unit Tapi.
Table no. 32.2: Amathva Watershed Committee details
Sl. No.
Names of
Village
Date of Registration
Name of Member
Designation M/F SC ST SF MF LF Landless UG SHG GP Any
other Educational qualification
Function/s assigned#
2 Amathva
Shri Maganbhai C.
Gamit President M Y Y 30 10 Pass
Watershed Committee
Irfanbhai M. Sindi Secretary Forester 12 Pass
Shri Pilajibhai S.Gamit
Secretary M Y Y 32 9 Pass
Shri Jasintaben
J.Gamit Member F Y Y 27 10 Pass
Shri Lilaben R. Gamit
Member F Y Y 32 10 Pass
Shri Urmilaben V.
Gamit Member F Y Y 42 7 Pass
Gitaben D. Gamit
Member F Y Y Y 29 9 Pass
Jayeshbhai R. Gamit
Member M Y Y Y 30 8 Pass
Chaudhari Vijaybhai S.
WDT Member
M Y Y 30 B.R.S.
Ragjibhai C. Gamit
Member M Y Y Y 40 5 Pass
Dineshbhai V. Gamit
Member M Y Y 50 4 Pass
Detailed Project Report, IWMP-VI (Dhanmauli)
80 | P a g e District Watershed Development Unit Tapi.
Table no. 32.3: Kanti Watershed Committee details
Sl. No.
Village Date of
Registration Name of Member
Designation M/F SC ST SF MF LF Landless UG SHG GP Any
other Educational qualification
Function/s assigned#
3 Kanti
Gamit Mirabhai
Pohalabhai President M Y Y 42 10 Pass
Watershed Committee
Vasava Maganbhai NAvabhai
Secretary
Forester 9 Pass
Arjunbhai M.Gamit Member M Y
Y 40 9 Pass
Shakuben A. Gamit Member F Y
Y 39 10 Pass
Jivlliben D. Gamit Member F Y
Y 46 7 Pass
Kapilaben A. Gamit Member F Y Y 35 7 Pass
Gamit Revajibhai R. Member M Y Y Y 32 9 Pass
Sumanbhai J. Gamit Member M Y Y Y 35 7 Pass
Vijaybhai S.Chaudhari
WDT Member
M Y Y
29 B.R.S.
Anilbhai N. Gamit Member M Y
Y Y 52 4 Pass
Detailed Project Report, IWMP-VI (Dhanmauli)
81 | P a g e District Watershed Development Unit Tapi.
Lalshingbhai G. Gamit Member M Y Y 42 10 Pass
Table no. 32.4: Seljhar Watershed Committee details
Sl. No.
Names of
WCs
Date of Registration as a Society
Name of Member
Designation M/F SC ST SF MF LF Landless UG SHG GP Any
other Educational qualification
Function/s assigned#
4 Seljhar
Gamit BIpinbhai Jentabhai
President M Y Y 39 10 Pass Watershed Committee
Detailed Project Report, IWMP-VI (Dhanmauli)
82 | P a g e District Watershed Development Unit Tapi.
Irfanbhai M. Sindi Secretary
12 pass
GAmit VInubhai Ajitbhai
Secretary M
Y Y Forester 9 Pass
Daxaben P. Gamit Member
F Y
Y 32 10 Pass
Vimalabhai S. Gamit Member
M Y
Y 45 7 Pass
Gamit Nimaben S. Member
F Y Y 28 10 Pass
Fateshingbhai C. Gamit Member M Y Y Y 46 10 Pass
GAmit Isariyabhai S. Member M Y
Y Y 35 5 Pass
Gamit Kusumben K.
WDT Member
F Y Y
30 B.R.S
Gamit Sunilbhai
Kashiyabhai Member
M Y
Y Y 42 4 Pass
GAmit JAyeshbhai C. Member M Y Y 39 4 Pass
Table no. 32.5: Dhanmauli Watershed Committee details
Sl. No.
Names of Village
Date of Registration
Name of Member
Designation M/F SC ST SF MF LF Landless UG SHG GP Any
other Educational qualification
Function/s assigned#
Detailed Project Report, IWMP-VI (Dhanmauli)
83 | P a g e District Watershed Development Unit Tapi.
5 Dhanmauli
Balubhai Vajanabhai
Gamit President M Y Y 50 8 Pass
Watershed Committee
Irfanbhai M. Sindi Secretary M Y Y Forester 12 pass
Gamit Jitubhai
Nareshbhai Member M Y
Y Y 55 Illiterate
Gamit
Laginbhai Vajanabhai
Member M Y
Y 38 10 Pass
Ajitbhai Hugaliyabhai
Gamit Member M Y
Y 33 10 Pass
Gamit Revaben Veljibhai
Member F Y Y
30 5 pass
Dineshbhai Dhhanabhai
Gamit Member M Y Y Y 30 5 Pass
Gamit Jayeshbhai Ramabhai
Member M Y Y Y 30 5 Pass
Ashvinbhai Bhilkabhai
Gamit Member M Y Y Y 39 10 Pass
Vantiben Arjunbhai
Gamit Member F Y Y
Ushaben Pilajibhai
Gamit Member F Y Y Y 35 9 Pass
Gamit Kusumben
K.
WDT Member
F Y Y 30 B.R.S
Detailed Project Report, IWMP-VI (Dhanmauli)
84 | P a g e District Watershed Development Unit Tapi.
Table no. 32.6: Kapadbandh Watershed Committee details
Sl. No.
Names of Village
Date of Registratio
n as a Society
Name of Member
Designation
M/F
SC
ST
SF
MF
LF
Landless
UG
SHG
GP
Any other
Educational qualificatio
n
Function/s
assigned#
6 Kapadband
h
Devshingbhai A. Gamit President M Y Y 39 12 Pass
Watershed Committee
Irfanbhai M. Sindi Secretary M Y Y
Forester
12 pass
Umeshbhai Vljibhai Gamit
Member M Y Y
32 10 Pass
Rameshbhai Thakorbhai
Gamit Member M Y
Y 26 10 Pass
Vigabhai Chemabhai
Gamit Member F Y Y 39 12 Pass
Samjibhai Bhikhabhai Member F Y Y Y 24 10 Pass
Kuvarjibhai Raysingbhai
Gamit Member F Y Y Y 26 Illiterate
Ramanbhai Zinabhai
Gamit Member M Y
Y 29
Raysingbhai Bablabhai
Kokani Member M Y
Y Y 39 Illiterate
Anjanaben Maganbhai
Gamit Member M Y Y 32 10 Pass
Detailed Project Report, IWMP-VI (Dhanmauli)
85 | P a g e District Watershed Development Unit Tapi.
Gemaben Shankarbhai
Gmait Member M Y Y 25 10 Pass
Arunaben Ramabhai
Gamit Membe
Chaudhari Varshaben
A.
WDT Membe
28 D.C.E
Table no. 32.7: Mota Tarpada Watershed Committee details
Sl. No.
Names of
Village
Date of Registration
Name of Member
Designation M/F SC ST SF MF LF Landless UG SHG GP Any
other Educational qualification
Function/s assigned#
7 Mota
Tarpada
Gamit HAbelbhai A. President M Y Y 36 12 Pass
Watershed Committee
Irfanbhai M. Sindi Secretary M Y Y Forester 12 pass
Daniyelbhai S. Gamit Member M Y
Y 25 12 Pass
Gamit Surendrabhai
S. Member M Y
Y 42 5 Pass
Gamit Manilal N. Member M Y Y 25 10 Pass
Lilaben Shaileshbhai
Gamit Member F Y Y Y 23 5 Pass
Varshaben Dineshbhai
Gamit Member F Y Y Y 26 7 Pass
Detailed Project Report, IWMP-VI (Dhanmauli)
86 | P a g e District Watershed Development Unit Tapi.
Gamit Gitaben G. Member F Y Y 29 B.R.S.
Chandubhai Chaganbhai
Gamit Member M Y Y Y 40 10 Pass
Vigabhai Maganbhai
Gamit Member M Y Y 38 6 Pass
Chaudhari Varshaben A. WDT
Membe 28 D.C.E
Table no. 32.8: SiraspadaWatershed Committee details
Sl. No.
Names of Village
Date of Registration
Name of Member
Designation M/F SC ST SF MF LF Landless UG SHG GP Any
other Educational qualification
Function/s assigned#
8 Siraspada
Saileshbhai J.Gamit President M Y Y 28 10 Pass
Watershed Committee
Irfanbhai M. Sindi Secretary M Forester 12 pass
Arjunbhai S. Gamit Member M Y Y Forester 9 Pass
Kalpnaben A.Gamit Member F Y Y 30 12 Pass
TInaben S. Gamit Member F Y Y 38 4 Pass
Detailed Project Report, IWMP-VI (Dhanmauli)
87 | P a g e District Watershed Development Unit Tapi.
Lataben B. Gamit Member F Y Y 51 2 Pass
Veliyabhai N. Gamit Member M Y Y Y 24 8 Pass
Limjibhai N. Gamit Member M Y Y Y 25 7 Pass
Patel AlpeshKumar
R.
WDT Member
M Y Y 27 ITI Surveyur
Sureshbhai V. Gamit Member M Y Y Y 38 10 Pass
Samjibhai S. Gamit Member M Y Y 42 4 Pass
Ashvinbhai R. Gamit Member M Y Y 45 3 Pass
Table no. 32.9: Chikhalpada Watershed Committee details
Sl. No.
Names of Village
Date of Registratio
n as a Society
Name of Member
Designation
M/F
SC
ST
SF
MF
LF
Landless
UG
SHG
GP Any other
Educational qualificatio
n
Function/s
assigned#
9 Chikhalpad
a
Balubhai G. Gamit President M Y Y 35 10 Pass
Watershed Committee Irfanbhai M.
Sindi Secretary Foreste
r 12 pass
Detailed Project Report, IWMP-VI (Dhanmauli)
88 | P a g e District Watershed Development Unit Tapi.
Kamleshbhai D. Gamit Member M Y Y 30 9 Pass
Manishaben A. Gamit Member F Y Y 35 7 Pass
Rekhaben G. Gamit Member F Y Y 40 7 Pass
Rajulaben V. Gamit Member M Y Y 32 10 Pass
Rajeshbhai B. Gamit Member M Y Y Y 28 10 Pass
Sumanbhai M. Gamit Member M Y Y Y 33 B.A.Pass
Alpeshkumar R.Patel WDT
Member M Y Y 27
I.T.I Sarveyar
Chhnabhai K. Gamit Member M Y Y Y 40 10 Pass
Ravindrabhai J. Gamit Member M Y Y 33 2 Pass
Girishbhai D. Gamit Member M Y Y 40 10 Pass
Table no. 32.10: Vadi Rupgadh Watershed Committee details
Sl. No.
Village Date of
Registration
Name of Member
Designation
M/F
SC
ST
SF
MF
LF
Landless
UG
SHG
GP
Any other
Educational qualificatio
n
Function/s
assigned#
10 Vadi
Rupgadh
Gulabbhai A.Gamit President M Y Y 37 12 Pass
Watershed Committee
Detailed Project Report, IWMP-VI (Dhanmauli)
89 | P a g e District Watershed Development Unit Tapi.
Irfanbhai M. Sindi Secretary M Y Y
Forester
12 pass
Gamabhai Thagiyabhai
Gamit Member M Y Y 42 4 Pass
Ratnabhai Agariyabhai Member M Y Y 45 Illiterate
Manilalbhai Bodaliyabhai
Gamit Member M Y Y 40 2 Pass
Bhanabhai Michrabhai
Gamit Member M Y Y Y 28 12 Pass
Shankuntlaben Sureshbhai
Gamit Member F Y Y Y 40 Illiterate
Limjibhai Indiyabhai
Gamit Member M Y Y 29
Kanabhai Laginbhai
Gamit Member M Y Y Y 35 Illiterate
Bujnaben lalubhai Gamit Member F Y Y 42 Illiterate
Somiben Maganbhai Member F Y Y 35 Illiterate
Jivanbhai Indiyabhai
Gamit Member M
Alpeshkumar R.Patel WDT
Member M Y Y 27
I.T.I Sarveyar
Detailed Project Report, IWMP-VI (Dhanmauli)
90 | P a g e District Watershed Development Unit Tapi.
Table no. 32.11: Khogalgam Watershed Committee details
Sl. No.
Names of Village
Date of Registratio
n
Name of Member
Designation
M/F
SC
ST
SF
MF
LF
Landless
UG
SHG
GP
Any other
Educational qualificatio
n
Function/s
assigned#
11 Khogalga
m
Ruvajibhai Goshdabhai Gamit
President M Y Y 45 10 Pass
Watershed Committee
Machhi Harshadbhai
m. Secretary Y Y
Forester
12 pass
Rameshhai Umariyabhai
Gamit Member M Y Y 35 10 Pass
Gamit Akariben R.
Member F Y Y 29 7 Pass
Lilaben Uttambhai
Gamit Member F Y Y 35 10 Pass
Vigniben Harjibhai
Gamit Member F Y Y Y 42 9 Pass
Gamit Chhaganbhai
Indiyabhai Member M Y Y Y 32 Illiterate
Chaudhari Varshaben A.
WDT Member
F Y Y 28 D.C.E
Gamit Ragjibhai
Thaganiyabhai
Member M Y Y Y 50 5 Pass
Detailed Project Report, IWMP-VI (Dhanmauli)
91 | P a g e District Watershed Development Unit Tapi.
Atulbhai Chemtiyabhai
Gamit Member M Y Y 52 4 Pass
Lallubhai Chhaganbhai
Gamit Member M Y Y 40 Illiterate
Table no. 32.12: Umarda Watershed Committee details
Sl. No.
Names of
Village
Date of Registratio
n as a Society
Name of Member
Designation
M/F
SC
ST
SF
MF
LF
Landless
UG
SHG
GP
Any other
Educational qualificatio
n
Function/s
assigned#
12 Umard
a
Gamit Jasvantbhai K.
President M Y Y 36 12 Pass
Watershed Committee
Irfanbhai M. Sindi
Foreste
r 12 pass
Harilalbhai B. Gamit
Secretary M Y Y 30 B.A. Pass
Minaben A.Gamit
Member F Y Y 35 Illiterate
Saradiben F. Gamit
Member F Y Y 22 6 Pass
Saruben P. Gamit
Member F Y Y Y 50 Illiterate
Gamit Kusumben K.
WDT Member
F Y Y 30 B.R.S
GAmit Gamanbhai B.
Member M Y Y Y 39 10
Jayramshingbhai N. Gamit
Member M Y Y 35 3
Gamit Nurjibhai L.
Member M Y Y 45 4
Gamit
Baliyabhai N. Member M Y Y 35 8
Gamit
BHimjibhai B. Member M Y Y 45 6
Detailed Project Report, IWMP-VI (Dhanmauli)
92 | P a g e District Watershed Development Unit Tapi.
Table no. 32.13 Borpada Watershed Committee details
Sl. No.
Names of
Village
Date of Registration as a Society
Name of Member
Designation M/F SC ST SF MF LF Landless UG SHG GP Any
other Educational qualification
Function/s assigned#
13 Borpada 131
Gamit Govindbhai Thagiyabhai
President M Y Y 38 10 Pass
Watershed Committee
Irfanbhai M. Sindi Secretary
M
Y Y Forester 12 pass
Navinbhai Maganbhai
Gamit Member
M
Y Y 45 4 Pass
Virjibhai Chemabhai
Gamit Member
M
Y Y 27 12 Pass
Ramilaben Hasmukhbhai
Kokani Member
F
Y Y 25 10 Pass
Shingabhai Bavabhai
Gamit Member M Y Y Y 30 5 Pass
Giraben Ramanbhai
Gamit Member F Y Y Y 32 7 Pass
Chaudhari Varshaben A.
WDT Member
F Y Y 28 D.C.E
Dhanabhai Duliyabhai
Gamit Member M Y Y Y 36 10 Pass
Rangabhai Kuvarjibhai Member
M
Y Y 30 4 Pass
Detailed Project Report, IWMP-VI (Dhanmauli)
93 | P a g e District Watershed Development Unit Tapi.
ii) Self Help Group
Self Help Groups are motivated, small homogenous groups organized together through credit and thrift activities. Self help group
initiative especially for women help uplift their livelihood. Generally self help groups include landless and poor women. Before formation of
the SHGs, during PRA activities, Focused Group Discussions (FGDs) were held with the women, which came up with the following
observations:
a) Lack of proper credit facilities due to low intervention of formal financial credit institution.
b) Excessive exploitation of weaker section by money lenders
Detailed Project Report, IWMP-VI (Dhanmauli)
94 | P a g e District Watershed Development Unit Tapi.
c) Lack of knowledge on credit facility and banking.
With a detailed discussion with some of the local NGOs working in the area like BAIF, it was planned to have some capacity building
training regarding SHG activities. It was also proposed to have some livelihood activities which will promote women empowerment such as
Wadi Project.
Table no. 33: SHG detail
S. No.
Village
Total no. of registered SHGs No. of members No. of ST in each
category No. of BPL in each category
With only Men
With only Women
With both
Total Categories M F Total M F Total M F Total
1 Khadi 1 2 0 3
(i) Landless 0 1 1
15 30 45 6 11 17 (ii) SF 6 12 18
(iii) MF 6 9 15
Detailed Project Report, IWMP-VI (Dhanmauli)
95 | P a g e District Watershed Development Unit Tapi.
(iv) LF 3 8 11
2 Amathva 1 0 0 1
(i) Landless 1 0 1
12 0 12 5 0 5 (ii) SF 5 0 5
(iii) MF 4 0 4
(iv) LF 2 0 2
3 Kanti 1 0 0 1
(i) Landless 1 0 1
12 0 12 5 0 5 (ii) SF 5 0 5
(iii) MF 4 0 4
(iv) LF 2 0 2
4 Seljhar 1 0 0 1
(i) Landless 0 0 0
11 0 11 8 0 8 (ii) SF 3 0 3
(iii) MF 5 0 5
(iv) LF 3 0 3
5 Dhanmauli 1 0 0 1
(i) Landless 1 0 1
11 0 11 4 0 4 (ii) SF 2 0 2
(iii) MF 3 0 3
(iv) LF 5 0 5
6 Kapadbandh 2 0 0 2
(i) Landless 0 0 0
31 0 31 8 0 8 (ii) SF 14 0 14
(iii) MF 8 0 8
(iv) LF 9 0 9
7 Mota
Tarpada 1 1 0 2
(i) Landless 1 1 2
16 18 34 6 10 16 (ii) SF 5 4 9
(iii) MF 7 9 16
(iv) LF 3 4 7
8 Sirspada 1 1 0 2
(i) Landless 0 1 1
12 16 28 5 9 14 (ii) SF 2 3 5
(iii) MF 5 8 13
(iv) LF 5 4 9
9 Chikhalpada 0 1 0 1 (i) Landless 0 0 0
0 11 11 0 2 2 (ii) SF 0 6 6
Detailed Project Report, IWMP-VI (Dhanmauli)
96 | P a g e District Watershed Development Unit Tapi.
(iii) MF 0 2 2
(iv) LF 0 3 3
10 Vadi
Rupgadh 0 2 0 2
(i) Landless 0 0 0
0 24 24 0 9 9 (ii) SF 0 6 6
(iii) MF 0 9 9
(iv) LF 0 9 9
11 Khogalgam 0 1 0 1
(i) Landless 0 1 1
0 13 13 0 7 7 (ii) SF 0 3 3
(iii) MF 0 6 6
(iv) LF 0 3 3
12 Umarda 0 1 0 1
(i) Landless 0 0 0
0 15 15 0 8 8 (ii) SF 0 4 4
(iii) MF 0 8 8
(iv) LF 0 3 3
13 Borpada 0 2 0 2
(i) Landless 0 1 1
0 25 25 0 14 14 (ii) SF 0 7 7
(iii) MF 0 7 7
(iv) LF 0 10 10
Total 9 11 0 20 120 152 272 120 152 272 47 70 117
iii) User Group:
User Groups are normally formed to manage an activity or asset created under the programme on a long term basis. The user group
collect user charges from their members, oversee the works and manage the benefits. It was decided that each group would formulate
certain internal rules and have a feeling of ownership with community spirit.
Table no. 34: UG detail
Detailed Project Report, IWMP-VI (Dhanmauli)
97 | P a g e District Watershed Development Unit Tapi.
S. No.
Name of Village
Total no. of registered UGs No. of members No. of ST in each
category No. of BPL in each
category
With only Men
With only
Women
With both
Total Categories M F Total M F Total M F Total
1 Khadi 3 0 0 3
(i) Landless 1 0 1
18 0 18 8 0 8 (ii) SF 6 0 6
(iii) MF 9 0 9
(iv) LF 2 0 2
2 Amathva 1 0 1 2
(i) Landless 1 0 1
7 2 9 4 1 5 (ii) SF 6 1 7
(iii) MF 0 1 1
(iv) LF 0 0 0
3 Kanti 2 0 1 3
(i) Landless 2 0 2
13 3 16 9 2 11 (ii) SF 3 1 4
(iii) MF 7 2 9
(iv) LF 1 0 1
4 Seljhar 1 0 1 2
(i) Landless 2 0 2
9 1 10 6 1 7 (ii) SF 2 0 2
(iii) MF 4 1 5
(iv) LF 1 0 1
5 Dhanmauli 0 0 1 1
(i) Landless 0 0 0
4 1 5 2 0 2 (ii) SF 2 1 3
(iii) MF 2 0 2
(iv) LF 0 0 0
6 Kapadbandh 3 0 2 5 (i) Landless 2 0 2 32 3 35 8 1 9
Detailed Project Report, IWMP-VI (Dhanmauli)
98 | P a g e District Watershed Development Unit Tapi.
(ii) SF 8 2 10
(iii) MF 16 1 17
(iv) LF 6 0 6
7 Mota Tarpada 1 0 0 1
(i) Landless 0 0 0
5 0 5 3 0 3 (ii) SF 2 0 2
(iii) MF 3 0 3
(iv) LF 0 0 0
8 Siraspada 2 0 0 0
(i) Landless 0 0 0
8 0 8 3 0 3 (ii) SF 1 0 1
(iii) MF 6 0 6
(iv) LF 1 0 1
9 Chikhalpada 0 1 0 1
(i) Landless 0 1 1
0 8 8 0 2 2 (ii) SF 0 3 3
(iii) MF 0 2 2
(iv) LF 0 2 2
10 Vadi Rupgadh 2 0
2
(i) Landless 0 0 0
17 0 17 5 0 5 (ii) SF 3 0 3
(iii) MF 14 0 14
(iv) LF 0 0 0
11 Khogalgam 0 0 0 0
(i) Landless 0 0 0
0 0 0 0 0 0 (ii) SF 0 0 0
(iii) MF 0 0 0
(iv) LF 0 0 0
12 Umarda 0 1 1 2
(i) Landless 0 1 1
6 10 16 2 0 2 (ii) SF 2 2 4
(iii) MF 3 5 8
Detailed Project Report, IWMP-VI (Dhanmauli)
99 | P a g e District Watershed Development Unit Tapi.
(iv) LF 1 2 2
13 Borpada 0 0 0 0
(i) Landless 0 0 0
0 0 0 0 0 0 (ii) SF 0 0 0
(iii) MF 0 0 0
(iv) LF 0 0 0
Total 15 2 1 22
119 28 146 119 28 147 50 7 57
Detailed Project Report, IWMP-VI (Dhanmauli)
100 | P a g e District Watershed Development Unit Tapi.
4.3. Physical activities to be undertaken under IWMP, Dhanmauli Project
4.3.1 Entry Point activity (EPA)
EPA activities are taken up under watershed projects to build a rapport with the village community at the beginning of the project;
generally, certain important works which are in urgent demand of the local community are taken up. A group discussion was conducted with
watershed Development Committee regarding the EPA activity, It was conveyed to the WC that an amount of Rs. 24.00 Lakh was allotted
for EPA activity, which was 4 per cent of total allocated budget. The villagers discussed various activities which they felt is important but
after a brief discussion it was conveyed to them that only those activities can be taken, which revive the common natural resources. It was
also taken into priority that there should be an instrument of convergence which will result in sustainability of activities.
Detailed Project Report, IWMP-VI (Dhanmauli)
101 | P a g e District Watershed Development Unit Tapi.
Table no.35: Entry point activities (EPA) (All financial figures in lakh Rs.)
S. No.
Names of Village
Amount earmarked for
EPA
Entry Point Activities planned
Estimated cost
GPS Expected Out
Come
N E
1 Khadi 2.77 Well Repair 2.77 21º02'431" 073º40'348" Drinking water
for Villegers
Total 2.77
2 Amathva 1.34 Under Ground Tank 1.34 21º01'943" 073º40'180"
Drinking water Feselities for
animals
Total 1.34
3 Kanti 1.92 Causeway 1.92 21º01'584" 073º40'400" Transporttation
Facilities
Total 1.92
4 Seljhar 1.27 Under Ground Tank 1.27 21º01'447" 073º39'018" Drinking water
for Villegers
Total 1.27
5 Dhanmauli 1.39
Drinking water Feselities
1.39 21º02'120" 073º38'955" Drinking water for Villegers
Total 1.39
6 Kapadbandh 4.98
Causeway Repair 4.98 20º59'511" 073º37'187" Transporttation Facilities
Under Ground Tank 20º59'621" 073º37'123" Drinking water for Villegers
Total 4.98
Detailed Project Report, IWMP-VI (Dhanmauli)
102 | P a g e District Watershed Development Unit Tapi.
7 Mota Tarpada 1.98 Check Dam Repair 1.98 21º00'011" 073º36'697" Irrigation
Facilities
Total 1.98
8 Siraspada 0.98
Rubble Piching& Outlet of Pond
0.98 20º59' 904" 073º36 '072" Irrigation for Villegers
Total 0.98
9 Chikhalda 0.77 Cattering Kit 0.77 Villegers
Total 0.77
10 Vadi Rupgadh 1.90 Pipe Culvart 1.90 20º58'973" 073º36'047" Tranceport
facility
Total 1.90
11 Khogalgam 1.29 Drinking Water Facility 1.29 21º00'528" 073º35'493" Drinking water
for Villegers
Total 1.29
12 Umarda 1.78 Check Dam Repair 1.78 21º01'922" 073º37'569" Irrigation
Facilities
Total 1.78
13 Borpada 1.63
Well Depening &Repair
1.63 21º01'454" 073º36'781"
Drinking water Fasilities & Irrigation Facilities
Total 1.63
Total 24.00 24.00
Detailed Project Report, IWMP-VI (Dhanmauli)
103 | P a g e District Watershed Development Unit Tapi.
4.3.2. Watershed Development Works:
Watershed development works are to be done during second phase of watershed project. A multi-tier ridge to valley sequence approach
should be approached towards implementation of watershed development projects. A net budget of 50 percent is allotted for this work.
Ridge Area Treatment Plans: The main purpose is to harvest the water at
ridge level first as this is where the major water resources originate. It would
allow the water to percolate underground and recharge the natural aquifers.
Other benefits would be the reduction in the velocity of the water which is
flowing with high velocity due to heavy rain and steep slope. The reduced
Kinetic energy would allow the soil particle to accumulate in the trenches and
furrows, minimizing the soil erosion as well. The Kamad watershed had been
identified as one of the most eroded part of the South Dang. Thus, SMC
treatment in that region would benefit the villagers for drinking purpose and
help them to increase the productivity. The gradual process would also help us
to retain GWT of the same region. In order to overcome above hurdles,
following structure had been proposed after interaction between the watershed committee, Range Forest Officer (RFO) and other field staff
of forest.
Detailed Project Report, IWMP-VI (Dhanmauli)
104 | P a g e District Watershed Development Unit Tapi.
Table no.36.1: Details of ridge line treatment / land based Activities in watershed works*
S. No.
Village name
Name of structures
Type of treatment Type of land Executing agency
Target
(i) Ridge area
(R)
(ii) Drainag
e line (D)
(iii) Land dev. (L)
(i) Privat
e
(ii) Communit
y
(iii) Fores
t
(i) UG (ii)SHG
(iii) Others
No. of units (No./
cu.m./ rmt)
Estimated cost (Rs. in
Lakh)
Expected month & year of
completion
(mm/yyyy) M W O T
1 Khadi
Protection Wall D C 4 nos 6.80 2013-14
Soil Bund L P 10 cmt 0.013 2013-14
Stone Bund L P 30cmt 0.04 2013-14
Field Outlet L P 12 nos 4.80 2012-13
Gabioun R F 15 cmt 0.027 2012-13
Check Wall D F 01 nos 1.50 2013-14
Check Dam D F 05 nos 25.00 2015-16
Land Leveling L P 17 Ha. 3.145 2013-14
2
Amathva
Protection Wall D C 2 nos 2.55 2015-16
Soil Bund L P 40 cmt 0.053 2013-14
Stone Bund L P 20cmt 0.026 2013-14
Field Outlet L P 7 nos 2.80 2013-14
Check Wall D F 1 nos 1.50 2012-13
Check Dam D F 2 nos 10.00 2014-15
Land Leveling L P 16 Ha. 2.96 2013-14
Detailed Project Report, IWMP-VI (Dhanmauli)
105 | P a g e District Watershed Development Unit Tapi.
3 Kanti
Protection Wall D C 4 nos 6.8 2015-16
Soil Bund L P 30 cmt 0.04 2012-13
Stone Bund L P 50 cmt 0.066 2012-13
Field Outlet L P 2 nos 0.80 2012-13
Gabioun R F 20cmt 0.036 2012-13
Check Wall D F 3 nos 3.00 2012-13
Check Dam D F 3 nos 15.00 2014-15
Land Leveling L P 15 Ha. 2.775 2014-15
4 Seljhar
SCT F 0.70Ha
. 0.019 2013-14
Stone Bund L P 40cmt 0.053 2013-14
Field Outlet L P 9 nos 3.60 2015-16
Gabioun R F 30 cmt 0.054 2012-13
Check Wall D F 6 nos 6.00 2013-14
Check Dam D F 2 nos 13.00 2014-15
Land Leveling L P 8 Ha. 1.48 2013-14
5 Dhanmauli
Protection Wall D C 2 nos 3.40 2013-14
Soil Bund L P 120 cmt
0.158 2013-14
Stone Bund L P 50 cmt 0.066 2013-14
S.C.T F 0.300H
a. 0.008 2013-14
Field Outlet L P 4 nos 1.60 2012-13
Check Wall D F 2 nos 2.00 2013-14
Detailed Project Report, IWMP-VI (Dhanmauli)
106 | P a g e District Watershed Development Unit Tapi.
Check Dam D F 2 nos 10.00 2015-16
Land Leveling L P 26 Ha. 4.81 2013-14
6 Kapadband
h
Protection Wall D C 4 nos 10.2 2013-14
Soil Bund L P 110 cmt
0.145 2012-13
Stone Bund L P 60cmt 0.079 2013-14
Field Outlet L P 19 nos 7.60 2013-14
Gabioun R F 30cmt 0.054 2012-13
Check Wall D F 5 nos 5.00 2015-16
Check Dam D F 7 nos 35.00 2014-15
Land Leveling L P 60 Ha. 11.1 2012-13
7 Mota
Tarpada
Protection Wall D C 6 nos 10.2 2014-15
Soil Bund L P 260 cmt
0.343 2013-14
Stone Bund L P 50 cmt 0.066 2013-14
Field Outlet L P 24 nos 9.60 2015-16
Check Wall D F 4 nos 4.00 2015-16
Check Dam D F 2 nos 10.00 2014-15
Land Leveling L P 42 Ha. 7.77 2013-14
8 Siraspada
Protection Wall D C 6 nos 10.2 2015-16
Soil Bund L P 70 cmt 0.092 2013-14
Stone Bund L P 30 cmt 0.040 2012-13
Detailed Project Report, IWMP-VI (Dhanmauli)
107 | P a g e District Watershed Development Unit Tapi.
Field Outlet L P 14 nos 5.60 2015-16
Check Wall D F 3 nos 3.00 2014-15
Land Leveling L P 27 Ha. 4.995 2013-14
9 Chikhalpada
Stone Bund L P 50 cmt 0.066 2013-14
Field Outlet L P 10 nos 4.00 2015-16
Check Wall D F 5 nos 5.00 2014-15
Land Leveling L P 10 Ha. 1.85 2013-14
10 Vadi
Rupgadh
Protection Wall D C 6 nos 13.6 2013-14
Soil Bund L P 70 cmt 0.092 2013-14
Stone Bund L P 30cmt 0.040 2013-14
Field Outlet L P 18 nos 7.20 2015-16
Check Wall D F 1 nos 1.50 2015-16
Check Dam D F 1 nos 5.00 2014-15
Land Leveling L P 39 Ha. 7.215 2014-15
11 Khogalgam
Protection Wall D C 4 nos 10.2 2014-15
Soil Bund L P 40 cmt 0.053 2012-13
SCT F 0.50Ha
. 0.014 2013-14
Stone Bund L P 40cmt 0.053 2013-14
Field Outlet L P 17 nos 6.80 2015-16
Detailed Project Report, IWMP-VI (Dhanmauli)
108 | P a g e District Watershed Development Unit Tapi.
Land Leveling L P 31 Ha. 5.735 2014-15
Pond L F 1 nos 1.50 2014-15
12 Umarda
Protection Wall D C 2 nos 1.7 2014-15
Soil Bund L P 100 cmt
0.132 2013-14
Stone Bund L P 50 cmt 0.066 2013-14
Field Outlet L P 10 nos 4.00 2015-16
Check Wall D F 4 nos 4.00 2015-16
Check Dam D F 4 nos 20.00 2014-15
Land Leveling L P 13 Ha. 2.4 2014-15
13 Borpada
Protection Wall D C 1 nos 2.55 2013-14
Soil Bund L P 300 cmt
0.396 2013-14
Stone Bund L P 40 cmt 0.053 2013-14
Field Outlet L P 11 nos 4.40 2015-16
Gabioun R F 15 cmt 0.027 2012-13
Check Dam D F 2 nos 10.00 2014-15
Land Leveling L P 44 Ha. 8.14 2014-15
Pond L F 2 nos 3.00 2014-15
Total Protection Wall D C 41 nos 78.2
Soil Bund L P 1150 cmt
1.518
Detailed Project Report, IWMP-VI (Dhanmauli)
109 | P a g e District Watershed Development Unit Tapi.
Stone Bund L P 540cmt 0.713
SCT F 1.50Ha
. 0.041
Field Outlet L P 157 nos
62.8
Gabioun R F 110cmt 0.198
Check Wall D F 35 nos 36.5
Check Dam D F 30 nos 153.00
Land Leveling L P 348 Ha.
64.375
Pond L F 3 nos 4.5
Table no.37: Activities related to Surface water resources in the project areas (all financial figures in lakhs Rs.)
S. No.
Village name
Type of structure
s
Proposed target
Augmentation/ repair of existing structures
Construction of new structures Total target
No.
Area to be
irrigated (ha)
Storage
capacity
Estimated cost
No.
Area to be
irrigated (ha)
Storage capacit
y m3
Estimated cost in lac
Area to be
irrigated (ha)
Storage capacit
y
Estimate
d cost
1 Khadi
CheckWall 0 0 0 0 1 1.55ha. 900 1.00 1.55ha. 900 1.00
Check dam
0 0 0 0 5 22.25ha 19000 25.00 22.25ha 19000 25.00
Detailed Project Report, IWMP-VI (Dhanmauli)
110 | P a g e District Watershed Development Unit Tapi.
2 Amathva
Checkwall 0 0 0 0 1 1.60ha. 1000 1.50 1.60ha. 1000 1.50
Check dam
0 0 0 0 2 8.9ha. 7600 10.00 8.9ha. 7600 10.00
3 Kanti
Checkwall 0 0 0 0 3 4.65ha. 2700 1.00 4.65ha. 2700 1.00
Check dam
0 0 0 0 3 13.13ha 11400 15.00 13.13ha 11400 15.00
4 Seljhar
Checkwall 0 0 0 0 6 9.3ha. 5400 6.00 9.3ha. 5400 6.00
Check dam
0 0 0 0 2 8.9ha. 7600 10.00 8.9ha. 7600 10.00
5 Dhanmauli
Check wall
0 0 0 0 2 3.1ha. 1800 2.00 3.1ha. 1800 2.00
Check dam
0 0 0 0 2 8.9ha. 7600 10.00 8.9ha. 7600 10.00
6
Kapadbandh
checkwall 0 0 0 0 5 7.75ha. 4500 5.00 7.75ha. 4500 5.00
Check dam
0 0 0 0 7 31.15ha. 26600 35.00 31.15ha. 26600 35.00
7 Mota
Tarpada
Checkwall 0 0 0 0 4 6.2ha. 3600 4.00 6.2ha. 3600 4.00
Check dam
0 0 0 0 2 8.9ha. 7600 10.00 8.9ha. 7600 10.00
8 Siraspada Check wall
0 0 0 0 3 13.93ha 2700 3.00 13.93ha 2700 3.00
9 Chikhalpada Check
wall 0 0 0 0 5 7.75ha. 4500 5.00 7.75ha. 4500
5.00
10 Vadi
Rupgadh
Check wall
0 0 0 0 1 1.55ha. 1000 1.50 1.55ha. 1000 1.50
Check dam
0 0 0 0 1 4.45ha. 3800 5.00 4.45ha. 3800 5.00
Detailed Project Report, IWMP-VI (Dhanmauli)
111 | P a g e District Watershed Development Unit Tapi.
Pond 0 0 0 0 1 2.00ha. 2000 1.50 2.00ha. 2000 1.50
12 Umarda
Check wall
0 0 0 0 4 6.2ha. 3600 4.00 6.2ha. 3600 4.00
Check dam
0 0 0 0 4 17.8ha 15200 20.00 17.8ha 15200 20.00
Check dam
0 0 0 0 2 8.9ha. 7600 10.00 8.9ha. 7600 10.00
Pond 0 0 0 0 2 4.00 4000 3.00 4.00 4000 3.00
Total
Checkwall
0 0 0 0 35 - - 36.5 - - 36.5
Check dam
0 0 0 0 30 - - 153 - - 153
Pond 0 0 0 0 3 - - 4.50 - - 4.50
Total 194
Detailed Project Report, IWMP-VI (Dhanmauli)
112 | P a g e District Watershed Development Unit Tapi.
Table no.38: Activities related to recharging ground water resources in the project areas (all financial figures in
lakh Rs.)
S. No. Name of Villages Type of
structures
Proposed target
Augmentation/ repair of existing recharging structures
Construction of new recharging structures
Total target
No. Area to be
irrigated (ha) Estimated
cost No.
Area to be irrigated (ha)
Estimated cost
Area to be irrigated (ha)
Estimated cost
1 Khadi - - - - - - - - -
2 Amathva - - - - - - - - -
- Kanti - - - - - - - - -
4 Seljhar - - - - - - - - -
5 Dhanmaulii - - - - - - - - -
6 Kapadbandh - - - - - - - - -
7 Mota Tarpada - - - - - - - - -
8 Siraspada - - - - - - - - -
9 Chikhalpada - - - - - - - - -
10 Vadi Rupgadh - - - - - - - - -
11 Khogalgam - - - - - - - - -
13 Borpada - - - - - - - - -
Total - - - - - - - - -
Detailed Project Report, IWMP-VI (Dhanmauli)
113 | P a g e District Watershed Development Unit Tapi.
Table no.39: Details of activities related to livelihood, production system and micro-enterprises
S. No.
Name of village Name of activity
Type of land Executing
agency Target
(i) Private (ii)
Community
(iii) Others (pl.
specify)
(i) UG
(ii)SHG
(iii) Others (pl. specify)
Estimated cost
(Rs. in lakh)
Expected month & year of completion
(mm/yyyy)
1 Khadi
Agriculture productivity enhancement
Creeper Vegetable(Bitter Gourd) P Individual 0.70 2013-14
Low coast Green house P Individual 1.40 2013-14
Crop Demostation(Pegeon Pea,
Turmeric) P Individual 0.380 2013-14
Horticulture Plot (Mango) P Individual 1.00 2013-14
Drip Irrigation p Individual 0.59 2015-16
Mini Lift Irrigation p UG (7) 3.55 2014-15
Honda Pump Machine & Pipe P Individual 0.84 2014-15
Agro center C SHG (15) 2.00 2013-14
Rice mill C SHG (16) 2.00 2014-15
Cattel Vacsin camp C Other 0.57 2013-14
Tea stoll C SHG(15) 1.10 2015-16
Vermi compost P Individual 0.25 2014-15
Grain Cleaning Electric Fan C UG(5) 0.30 2014-15
Distribution of HF cows P Individual 8.40 2015-16
2 Amthava Agriculture productivity enhancement
Grain Cleaning Electric Unit P UG(8) 0.33 2013-14
Detailed Project Report, IWMP-VI (Dhanmauli)
114 | P a g e District Watershed Development Unit Tapi.
Crop Demostation(Tuvar) P Individual 0.15 2013-14
Horticulture Plot (Mango) P Individual 1.00 2013-14
Water Melon Farming P Individual 0.18 2013-14
Low cost Green house P Individual 0.80 2014-15
Honda Pump Machine P UG (4) 0.32 2015-16
Drip Irrigation P Individual 0.590 2014-15
Floor Mill & Rice Mill C SHG(11) 2.00 2013-14
Cattel Vacsin camp C Other 0.77 2014-15
Vermi compost P Individual 0.25 2014-15
Distribution of HF cows P Individual 6.00 2014-15
3 Kanti Agriculture productivity enhancement
Low cost green house P Individual 1.45 2013-14
Water Melon Farming P Individual 0.18 2014-15
Creeper Vegetable(Bitter Gourd) P Individual 0.70 2014-15
Crop
Demostation(Turmeric,Groundnut) P Individual 0.37 2014-15
Horticulture Plot (Mango) P Individual 1.00 2013-14
Honda pump machine P UG (8) 0.32 2015-16
Drip Irrigation P Individual 0.77 2015-16
Community Vessels Unit P UG(5) 1.74 2014-15
Thresher C SHG (12) 1.34 2013-14
Cattel vacsin camp C Other 0.93 2015-16
Grain Cleaning Electric Fan C UG (10) 0.30 2013-14
Distribution of HF cows Individual 4.00 2014-15
Detailed Project Report, IWMP-VI (Dhanmauli)
115 | P a g e District Watershed Development Unit Tapi.
4 Selzer Agriculture productivity enhancement
Creeper Vegetable(Pointed Gourd)
P Individual 0.70 2014-15
Crop Demostation(Turmeric,) P Individual 0.22 2014-15
Horticulture Plot (Mango) P Individual 0.75 2013-14
Low cost green house P Individual 0.80 2013-14
Water Melon Farming P Individual 0.36 2014-15
Honda Pump machine C UG (5) 0.34 2015-16
Floor Mill & Rice Mill C SHG (12) 2.00 2013-14
Cattel vacsin camp C Individual 0.557 2014-15
Grain Cleaning Electric Fan C UG(6) 0.30 2015-16
Distribution of HF cows Individual 6.00 2014-15
5 Dhanmauli Agriculture productivity enhancement
Low cost green house P Individual 1.00 2013-14
Crop Demostation(LadyFingure,
Groundnut) P Individual 0.38 2014-15
Horticulture Plot (Mango) P Individual 0.75 2013-14
Agriculture Tool Kit P Individual 0.083 2014-15
Drip Irrigation P Individual 0.58 2014-15
Grain Cleaning Electric Unit C UG (5) 0.33 2015-16
Creeper Vegetable(Bitter Gourd) P Individual 0.35 2014-15
Vermi compost P Individual 0.25 2014-15
Agro center C SHG (11) 2.00 2013-14
Cattel vacsin camp C Other 0.8770 2014-15
Detailed Project Report, IWMP-VI (Dhanmauli)
116 | P a g e District Watershed Development Unit Tapi.
Distribution of HF cows Individual 6.00 2014-15
6 Kapadbandh Agriculture productivity enhancement
Crop Demostation(Turmeric,Ginger,) P Individual 0.675 2014-15-16
Horticulture Plot (Mango) P Individual 1.75 2013-14
Mini Lift irrigation p UG (9) 3.77 2014-15
Drip Irrigation P Individual 1.544 2015-16
Low cost green house P Individual 2.41 2013-14
Thresher C UG (5) 1.34 2013-14
Power Tiller C UG (10) 2.814 2014-15
Creeper Vegetable( Pointed Gourd) P Individual 2.10 2013-14
Flour Mill & Rice Mill C SHG (15) 2.00 2013-14
Agro center C SHG(16) 2.00 2013-14
Honda Pump machine P Individual 1.40 2013-14
Metrases & Chair unit P UG(5) 1.20 2015-16
Cattle Vacsin camp C Other 1.590 2014-15
Grain Cleaning Electric Fan C UG(8) 0.60 2014-15
Vermi compost P Individual 0.25 2014-15
Distribution of HF cows Individual 4.00 2014-15
7 Mota Tarpada Agriculture productivity enhancement
Low cost green house P Individual 1.20 2014-15
Horticulture Plot (Mango) P Individual 1.75 2013-14
Creeper Vegetable(Bitter Gourd) P Individual 0.70 2013-14
Agriculture Tool kit P Individual 0.062 2015-16
Detailed Project Report, IWMP-VI (Dhanmauli)
117 | P a g e District Watershed Development Unit Tapi.
Grain Cleaning Electric Fan C UG(4) 0.33 2015-16
Crop Demo( Ladyfingure) P Individual 0.90 2014-15
Agro center C SHG(16) 2.00 2013-14
Threser C SHG(18) 1.34 2014-15
Cattel Vacsin camp C Other 0.85900 2015-16
Vermi compost P Individual 0.25 2014-15
Distribution of HF cows Individual 8.00 2014-15
8 Siraspada Agriculture productivity enhancement
Low cost green house P Individual 0.80 2013-14
Crop Demostation( Ladyfingure) P Individual 0.230 2015-16
Horticulture Plot (Mango ) P Individual 0.50 2013-14
Honda pump machine P UG (6) 0.32 2014-15
Water Melon Farming P Individual 0.18 2014-15
Agriculture Tool kit P Individual 0.10 2014-15
Grain Cleaning Electric Fan C UG (6) 0.33 2014-15
Silvi pasture plot C SHG (11) 0.874 2013-14
Threser C SHG (17) 1.34 2014-15
Distribution of HF cows Individual 4.00 2014-15
9 Chikhalpada Agriculture productivity enhancement
Low cost green house P Individual 1.00 2013-14
Water Melon Farming P Individual 0.18 2015-16
Horticulture Plot (Mango) P Individual 0.50 2014-15
Detailed Project Report, IWMP-VI (Dhanmauli)
118 | P a g e District Watershed Development Unit Tapi.
Ariculture Tool Kit P Individual 0.06 2013-14
Drip Irrigation P Individual 0.19 2014-15
Threser C SHG (11) 1.34 2013-14
Grain Cleaning Electric Fan C UG(8) 0.30 2014-15
Distribution of HF cows Individual 4.00 2014-15
10 Vadi Rupgadh Agriculture productivity enhancement
Creeper Vegetable(Pointed Gourd) p Individual 0.72 2013-14
Mini Lift Irrigation p UG(12) 3.25 2014-15
Low cost green house P Individual 0.80 2013-14
Crop Demostation(Groundnut) P Individual 0.15 2013-14
Horticulture Plot (Mango) P Individual 0.75 2013-14
Grain Cleaning Electric Fan p UG(5) 0.33 2015-16
Silvey Pasture C SHG(10) 1.27 2014-15
C attle Vaccine Camp C Other 0.761 2014-15
Vermi compost P Individual 0.25 2014-15
Agro center C SHG(14) 2.00 2013-14
Distribution of HF cows Individual 8.00 2014-15
11 Khogalgam Agriculture productivity enhancement
Low cost green house P Individual 1.00 2013-14-15
Crop Demo(Groundnut,) P Individual 0.15 2014-15
Horticulture Plot (Mango) P Individual 1.00 2013-14
Drip Irrigation p Individual 0.367 2015-16
Creeper Vegetable(Bitter Gourd) P Individual 0.70 2014-15
Detailed Project Report, IWMP-VI (Dhanmauli)
119 | P a g e District Watershed Development Unit Tapi.
Flour mill & Rice Mill C SHG (13) 2.00 2013-14
C attle Vaccine Camp C Other 0.640 2014-015
Vermi compost P Individual 0.25 2014-15
Distribution of HF cows Individual 4.00 2014-15
12 Umarda Agriculture productivity enhancement
Drip Irrigation p Individual 0.904 2015-16
Crop Demo (Turmeric,,Ginger) P Individual 0.67 2013-14
Horticulture Plot (Mango) P Individual 1.00 2013-14
Creeper Vegetable(Bitter Gourd) P Individual 0.35 2013-14
Low cost green house P Individual 1.20 2013-14
Honda pump machine P UG (8) 0.670 2014-15
Flour Mill & Rice Mill C SHG(15) 2.00 2013-14
Catel Vacsin camp C Other 1.102 2014-15
Vermi compost P Individual 0.25 2014-15
Grain Cleaning Electric Fan C UG (8) 0.30 2014-15
Distribution of HF cows Individual 6.00 2014-15
13 Borpada Agriculture productivity enhancement
Low cost green house P Individual 1.20 2013-14
Drip Irrigation P Individual 0.950 2014-15
Crop Demo(,ladyfingure) P Individual 0.226 2014-15
Horticulture (Mango Plot) P Individual 1.00 2013-14
Creeper Vegetable(Bitter Gourd) P Individual 0.70 2014-15-16
Agro center C SHG (14) 2.00 2013-14
Detailed Project Report, IWMP-VI (Dhanmauli)
120 | P a g e District Watershed Development Unit Tapi.
Threser C SHG (10) 1.34 2014-15
Honda pump machine P Individual 0.32 2015-16
Distribution of HF cows Individual 8.00 2014-15
Table no. 40: Activities related to livelihoods by Self Help Groups (SHGs) in the project areas
S. No. Names of
Villages
Major activities of the SHGs
Name of activity No. of SHGs involved Average annual income from activity per SHG
1 Khadi Agrocenter 1 235000
Flour Mill & Rice Mill
1 220000
Tea Stoll
1 196000
2 Amathva Flour Mill & Rice Mill
1 220000
3 Kanti Threser 1 170000
4 Seljhar Flour Mill & Rice Mill
1 220000
5 Dhanmauli Agrocenter 1 235000
6 Kapadbandh Agrocenter 1 197000
Flour Mill & Rice Mill
1 220000
7 Mota Tarpada Threser 1 170000
Agrocenter 1 235000
Detailed Project Report, IWMP-VI (Dhanmauli)
121 | P a g e District Watershed Development Unit Tapi.
8 Siraspada Threser 1 170000
Silva Pasture Plot 1 97000
9 Chikhalpada Threser 1 170000
10 Vadi Rupgadh Agrocenter 1 235000
Silva Pasture Plot 97000
11 Khogalgam Flour Mill & Rice Mill
1 220000
12 Umarda Flour Mill & Rice Mill
1 220000
13 Borpada Agrocenter 1 235000
Threser 170000
Detailed Project Report, IWMP-VI (Dhanmauli)
122 | P a g e District Watershed Development Unit Tapi.
Table no. 41: Linkages developed at village level
Sr. No. Village Name of activity Forward/Backward
linkage Linkage with Outcome
1 Khadi Creeper Vegetable Horticulture Depart. Vyara & Songadh Market 85000
Low coast Green house K.U. Navsari Vyara & Songadh Market 26000
Crop Demostation(Pegeon Pea,
Turmeric) K.U.Navsari Vyara & Songhad Market 64000
Horticulture Plot (Mango) BAIF Trust Vyara & Songhad Market 50000
Drip Irrigation GGRC Local area -
Lift Irrigation Irrigation Dipartment Local area -
Honda Pump Machine & Pipe Vyara Local area 18000
Agro center GNFC & Agro Disti
Bitar Surat Local area 235000
Flour Mill & Rice Mill Surat Local area 220000
Cattle Vacsin camp Vetenary Dipar Vyara Local area -
Tea stoll Songadh ,Vyara Local area 196000
Vermi compost Songadh ,Vyara Local area 25000
Grain Cleaning Electric Fan Suruchi Bardoli Local area 15000
2 Amathva Grain Cleaning Electric Unit Suruchi Bardoli Local area -
Crop Demostation(Tuvar) K.U.Navsari Vyara & Songhad Market 22000
Horticulture Plot (Mango) BAIF Trust Vyara & Songhad Market 50000
Detailed Project Report, IWMP-VI (Dhanmauli)
123 | P a g e District Watershed Development Unit Tapi.
Water Melon Farming K.U.Navsari Vyara & Songhad Market 31250
Low cost Green house K.U.Navsari Vyara & Songhad Market 26000
Honda Pump Machine SURAT Local area 18000
Drip Irrigation GGRC Local area -
Floor Mill & Rice Mill Surat Local area 220000
Vermi compost Songadh ,Vyara Local area 25000
Cattle Vacsin camp Vetenary Dipar Vyara Local area -
3 Kanti Low cost green house K.U.Navsari Vyara & Songhad Local area 26000
Water Melon Farming K.U.Navsari Vyara & Songhad Market 31250
Creeper Vegetable(Bitter Gourd) Horticulture Dipartmet Vyara & Songhad Market 85000
Crop
Demostation(Turmeric,Groundnut) K.U.Navsari Vyara & Songhad Market 73000
Horticulture Plot (Mango) BAIF Trust Vyara & Songhad Market 50000
Honda pump machine SURAT Local area 18000
Drip Irrigation GGRC -
Threshar Suruchi Bardoli Local area 170000
Cattle vacsin camp Vetenary Dipar Vyara Local area -
Grain Cleaning Electric Fan Suruchi Bardoli Local area 15000
Drip Irrigation GGRC -
4 Seljhar Creeper Vegetable( Pointed Gourd) Horticulture Dipartmet Vyara & Songhad Market 85000
Crop Demostation(Turmeric,) K.U.Navsari Vyara & Songhad Market 42000
Horticulture (Mango Plot) BAIF Trust Vyara & Songhad Market 50000
Detailed Project Report, IWMP-VI (Dhanmauli)
124 | P a g e District Watershed Development Unit Tapi.
Water Melon Farming K.U.Navsari Vyara & Songhad Market 31250
Honda Pump machine Surat Local Aria 18000
Low cost green house K.U.Navsari Vyara & Songhad Market 26000
Water Melon Farming Surat Local area 31250
Floor Mill & Rice Mill Surat Local area 220000-
Grain Cleaning Electric Fan Suruchi Bardoli Local area 15000
Cattle vacsin camp Vetenary Dipar Vyara Local area -
5 Dhanmauli Crop Demostation(Lady Fingure,Ground
nut) K.U.Navsari Vyara & Songhad Market 42000
Drip Irrigation K.U.Navsari Vyara & Songhad Market 48700
Horticulture (Mango Plot) BAIF Trust Vyara & Songhad Market 50000
Agriculture Tool Kit Suruchi Bardoli Local area -
Grain Cleaning Electric Fan Suruchi Bardoli Local area 15000
Creeper Vegetable(Bittle Gourd) Horticulture Dipartmet Vyara & Songhad Market 85000
Agro center GNFC & Agro Disti
Bitar Surat Local area 235000
Cattle vacsin camp Vetenary Dipar Vyara Local area -
Vermi compost Songadh ,Vyara Local area 25000
6 Kapadbandh Crop Demostation(Turmeric,Ginger,) K.U.Navsari Vyara & Songhad Market 157000
Horticulture Plot (Mango ) BAIF Trust Vyara & Songhad Market 50000
mini Lift irrigation TSP Songhadh Vyara & Songhad Local area -
Detailed Project Report, IWMP-VI (Dhanmauli)
125 | P a g e District Watershed Development Unit Tapi.
Drip Irrigation GGRC Local area -
Low coast green house K.U.Navsari Vyara & Songhad Local area 26000
Agriculture Tool Kit Suruchi Bardoli Local area -
Threser Suruchi Bardoli Local area 170000
Power Tillir Surat Local area 215000
Creeper Vegetable(Bittle Gourd) Horticulture Dipartmet Vyara & Songhad Market 85000
Flour Mill & Rice Mill Surat Local area 220000
Agro center GNFC & Agro Disti
Bitar Surat Local area 235000
Honda Pump machine Surat Vyara & Songhad Market 18000
Cattle Vacsin camp Vetenary Dipar Vyara Local area -
Vermi compost Songadh ,Vyara Local area 25000
Grain Cleaning Electric Fan Suruchi Bardoli Local area 15000
Drip Irrigation GGRC Local area -
Metrases &chair Unit Surat Local area 175000
7 Mota Tarpada Low cost green house K.U.Navsari Vyara & Songhad Local area 26000
Horticulture Plot (Mango ) BAIF Trust Vyara & Songhad Market 50000
Creeper Vegetable(Bittle Gourd) Horticulture Dipartmet Vyara & Songhad Market 85000
Grain Cleaning Electric Fan Suruchi Bardoli Local area 15000
Crop Demo( Ladyfingure) K.U.Navsari Vyara & Songhad Local area 22300
Detailed Project Report, IWMP-VI (Dhanmauli)
126 | P a g e District Watershed Development Unit Tapi.
Agriculture Tool Kit Suruchi Bardoli Local area -
Agro center GNFC & Agro Disti
Bitar Surat Local area 235000
Threser Suruchi Bardoli Local area 170000
Vermi compost Songadh ,Vyara Local area 25000
Cattle Vacsin camp Vetenary Dipar Vyara Local area -
8 Siraspada Low cost green house K.U.Navsari Vyara & Songhad Local area 26000
Crop Demo( Ladyfingure) K.U.Navsari Vyara & Songhad Market 22300
Horticulture Plot (Mango ) BAIF Trust Vyara & Songhad Market 50000
Honda pump machine Surat Vyara & Songhad Market 18000
Water Melon Farming K.U.Navsari Vyara & Songhad Market 21250
Grain Cleaning Electric Fan Suruchi Bardoli Local area 15000
Agriculture Tool Kit Suruchi Bardoli Local area -
Silvi pasture plot Songadh Local area 97000
Threser Suruchi Bardoli Local area 170000
9 Chikhalpada Low cost green house K.U.Navsari Vyara & Songhad Local area 26000
Water Melon Farming K.U.Navsari Vyara & Songhad Local area 21250
Horticulture Plot (Mango ) BAIF Trust Vyara & Songhad Market 50000
Agriculture Tool Kit Suruchi Bardoli Local area -
Drip Irrigation GGRC Local area -
Threser Suruchi Bardoli Local area 170000
Detailed Project Report, IWMP-VI (Dhanmauli)
127 | P a g e District Watershed Development Unit Tapi.
Grain Cleaning Electric Fan Suruchi Bardoli Local area 15000
10 Vadi Rupgadh Creeper Vegetable(Bittle Gourd) Horticulture Dipartmet Vyara & Songhad Market 15000
mini Lift Irrigation TSP Songadh Vyara & Songhad Market -
Low cost green house K.U.Navsari Vyara & Songhad Local area 26000
Crop Demostation(Groundnut) K.U.Navsari Vyara & Songhad Local area 26400
Horticulture plot(Mango ) BAIF Trust Vyara & Songhad Market 50000
Grain Cleaning Electric Fan Sruchi Bardoli Local area 15000
Silvey Pasture Songadh Local area 97000
C attle Vaccine Camp Vetenary Dipar Vyara Local area -
Agro center GNFC & Agro Disti
Bitar Surat Local area 235000
Vermi compost Songadh ,Vyara Local area 25000
11 Khogalgam Low cost green house K.U.Navsari Vyara & Songhad Local area 26000
Crop Demostation(Groundnut,) K.U.Navsari Vyara & Songhad Local area 26400
Horticulture plot(Mango ) BAIF Trust Vyara & Songhad Market 50000
Drip Irrigation GGRC Local area -
Creepar Vegetale(Bittle Gourd) Horticulture Dipartment Vyara & Songhad Local area 85000
Flour mill & Rice Mill Surat Local area 220000
Vermi compost Songadh ,Vyara Local area 25000
C attle Vaccine Camp Vetenary Dipar Vyara Local area -
12 Umarda Crop Demostation (Turmeric,,Ginger) K.U.Navsari Vyara & Songhad Local area 157000
Horticulture plot (Mango ) BAIF Trust Vyara & Songhad Market 50000
Detailed Project Report, IWMP-VI (Dhanmauli)
128 | P a g e District Watershed Development Unit Tapi.
Creepar vegetale(Bittle Gourd) Horticulture Dipartment Vyara & Songhad Local area 85000
Low cost green house K.U.Navsari Vyara & Songhad Local area 26000
Honda pump machine Surat Local area 18000
Flour Mill & Rice Mill Surat Local area 220000
Cattle Vacsin camp Vetenary Dipar Vyara Local area -
Grain Cleaning Electric Fan Sruchi Bardoli Local area 15000
Drip Irrigation GGRC Local area -
Vermi compost Songadh ,Vyara Local area 25000
13 Borpada Low cost green house K.U.Navsari Vyara & Songhad Local area 26000
Drip Irrigation GGRC Local area -
Crop Demostation(,ladyfingure) K.U.Navsari Vyara & Songhad Local area 22300
Horticulture plot (Mango ) BAIF Trust Vyara & Songhad Market 50000
Creepar vegetale(Bittle Gourd) Horticulture Dipartment Vyara & Songhad Local area 85000
Agro center GNFC & Agro Disti
Bitar Surat Local area 235000
Threser Suruchi Bardoli Local area 170000
Honda pump machine Surat Local area 18000
Detailed Project Report, IWMP-VI (Dhanmauli)
129 | P a g e District Watershed Development Unit Tapi.
Table no.42: Details of activities connected with vegetative cover in watershed works
S. No.
Name of
village
Name of structure/
work
Type of treatment Type of land Executing agency
Target
(i) Ridg
e area (R)
(ii) Drainag
e line (D)
(iii) Lan
d dev. (L)
(i) Privat
e
(ii) Communit
y
(iii) Fores
t
(i) UG (ii) SHG (iii) Indi.
Area
(ha)
No. of plants
Estimated cost (Rs. in lakh)
Expected month & year of
completion (mm/ yyyy)
1 Khadi
Border Plantation(Bilipatra)
F 380 0.133 2013-14
Bamboo Plantation
R F 30hac
8000 4.114 2015-16
2 Amathv
a
Border Plantation(Bilipatra)
F 520 0.182 2013-14
Bamboo Plantation
R F 10hac
4000 1.371 2015-16
3 Kanti
Border Plantation(Bilipatra)
F 430 0.151 2013-14
Bamboo Plantation
R F 20hac
8000 2.742 2015-16
Detailed Project Report, IWMP-VI (Dhanmauli)
130 | P a g e District Watershed Development Unit Tapi.
4 Seljhar
Border Plantation(Bilipatra)
F 480 0.168 2013-14
Bamboo Plantation
R F 15hac
6000 2.057 2015-16
5 Dhanm
auli
Border Plantation(Bilipatra)
F 670 0.235 2013-14
Bamboo Plantation
R F 5ha
c 2000 0.686 2015-16
6 Kapadb
andh
Border Plantation(Bilipatra)
F 760 0.266 2013-14
Bamboo Plantation
R F 50hac
20000 6.856 2015-16
7 Mota
Tarpada
Border Plantation(Bilipatra)
F 480 0.16800 2013-14
Bamboo Plantation
R F 10 hac
4000 1.371 2015-16
8 Siraspa
da
Border Plantation(Bilipatra)
F 450 0.15800 2013-14
Bamboo Plantation
R F 5
hac 2000 0.686 2015-16
9 Chikhalpada
Border Plantation(Bilipatra)
F 400 0.140 2013-14
Bamboo Plantation
R F 10hac
4000 1.371 2015-16
10 Vadi
Rupgadh
Border Plantation(Bilipatra)
F 640 0.224 2013-14
Detailed Project Report, IWMP-VI (Dhanmauli)
131 | P a g e District Watershed Development Unit Tapi.
Bamboo Plantation
R F 20hac
8000 2.742 2015-16
11 Khogalg
am
Border Plantation(Bilipatra)
F 450 0.158 2013-14
Bamboo Plantation
R F 5ha
c 2000 0.686 2015-16
12 Umarda
Border Plantation(Bilipatra)
F 600 0.210 2013-14
Bamboo Plantation
R F 10hac
4000 1.371 2015-16
13 Borpad
a
Border Plantation(Bilipatra)
F 500 0.175 2013-14
Bamboo Plantation
R F 10hac
4000 1.371 2015-16
Total
Border Plantation(Bilipatra)
F 6760 2.366
Bamboo Plantation
R F 200hac
80000 27.424
*Horticulture figures are in unit of 40 trees and the costs are as per unit, these costs are of 4 year planning. Per unit cost there should be 5% contribution of farmer. Here cost are written after the subtraction of farmers contribution.
*Teak, Kher & Bamboo are should be planted in unit.1 unit= Teak:=1500 plant, Kher:=100 plant, Bamboo:=177 plant.
Detailed Project Report, IWMP-VI (Dhanmauli)
132 | P a g e District Watershed Development Unit Tapi.
Table no.43: Details of activities in the CPRs in the project areas
S. No.
Name(s) of the villages
CPR particulars
Activity proposed
Target
Area under the activity (ha)
Estimated expenditure (Rs. in Lakh)
Expected no. of beneficiaries
1 Sirishpada Pasture / Waste
Land Silvipasture 0.70 1.30
2 Borpada Pasture / Waste
Land Pond 0.80 3.00
3 Vadirupghadh Pasture / Waste
Land Vadirupghad 1.20 2.00
4 Khogalgam Pasture / Waste
Land Pond 0.40 1.50
Detailed Project Report, IWMP-VI (Dhanmauli)
133 | P a g e District Watershed Development Unit Tapi.
4.4 Capacity Building:
Capacity Building is the process of assisting the group or individuals to identify and address issues and gain the insights, knowledge
and experience needed to solve problems and implement change.
There is a realization in the development sector that there is a need to appraise the success of development interventions by going
beyond the conventional development targets and measures of success (e.g. in the form of commodities, goods and services) to take into
account improvements to human potential. Capacity building of stakeholders is also increasingly viewed as an important factor in
developmental projects that involve participation of stakeholders at all levels for effective implementation of projects.
Scope of capacity building at Dhanmauli Village
Alternative Land Use Plan
Scientific technique of Soil and Moisture conservation
Improved and Scientific agriculture practices
Fodder development and Management
Dairy Development and Management
Rural Craft.
Detailed Project Report, IWMP-VI (Dhanmauli)
134 | P a g e District Watershed Development Unit Tapi.
Table no. 44: Capacity Building Institution:
S. No.
Name of the
Training Institute
Full Address with contact
no., website & e-mail
Type of Institute#
Area(s) of specialization$
Accreditation details
Trainings
Reference Year
No. of trainings assigned
No. of trainees
to be trained
1 Krishi
Vigyan Kendra
Navsari Agri. University,
Vyara, Dist. Tapi. 02626-220212
Research Institute
Agriculture, Horticulture, Animal
Husbandry, Cropping Techniques, Dairy,
Nursery
GoI 2012-14
2 BISAG Gandhinagar Space
Application Remote sensing GoG 2010-15
3 BAIF Griserve, Vyara NGO Agriculture, Watershed Structures, Accounts
NGO 2010-15
#Central govt. Dept. / State govt. Dept. / Autonomous Body/ Research Institutes/ Universities/ Others (pl. specify)
$Capacity Building/ Agriculture/ Horticulture/ Animal Husbandry/ Pisciculture/ Remote Sensing/ Water conservation/ Ground water/
Forestry/ livelihoods/ entrepreneurship development/ others (pl. specify)
Detailed Project Report, IWMP-VI (Dhanmauli)
135 | P a g e District Watershed Development Unit Tapi.
Table no. 45: Capacity Building plan:
S. No.
State Project
Stakeholders Total no. of
persons No. of persons to be
trained No. of training programmes
Estimated cost
1 Gujarat
PIA 1 1 5
Under Process
WDTs 6 6 15
UGs 263 263 5
SHGs 203 203 5
WCs 130 130 5
Table no.46: Information, education and Communication Activities:
S. No.
Activity Executing agency Estimated expenditure
(Rs.) Outcome (may quantify, wherever possible)
1 Street Plays Forest Dept Vyara 0.15
Awareness for the importance of Integrated Watershed Development Programme (IWMP)
2 Video Shows Forest Dept Vyara 0.25
3 Pamphlets &
Posters Forest Dept Vyara 1.10
4 Banners & Hoardings
Forest Dept Vyara 1.50
Total 3.00
Detailed Project Report, IWMP-VI (Dhanmauli)
136 | P a g e District Watershed Development Unit Tapi.
Chapter 5
Budgeting
Detailed Project Report, IWMP-VI (Dhanmauli)
137 | P a g e District Watershed Development Unit Tapi.
Budgeting
The first step in budgeting is dividing the cost of the project into various components as detailed in the common guidelines and done
accordingly in table No.47. It helps us in further identifying activities under different components and allocate appropriate funds.
Table no. 47: Budget at a glance for the project
Sl no Budget component Cost requirement
1 Administrative costs 60
2 Monitoring 6
3 Evaluation 6
4 Entry Point activity 24
5 Institution and Capacity Building 30
6 Detailed Project Report 6
7 Watershed Development Works 336
8 Livelihood activities for asset less 54
9 Production systems and micro-enterprises 60
10 Consolidation phase 18
TOTAL 600
Detailed Project Report, IWMP-VI (Dhanmauli)
138 | P a g e District Watershed Development Unit Tapi.
Table no. 48: Village wise- component wise budget available under IWMP
Sl no
Village
Activity
EPA Institution
and CB DPR
Watershed development
Work
Livelihood for asset less
Production system and Microenterprises
Consolidation Total
1 Khadi 2.77 3.46 0.69 38.73 6.22 6.92 2.07 69.156
2 Amathva 1.34 1.68 0.34 18.79 3.02 3.36 1.01 33.552
3 Kanti 1.92 2.40 0.48 26.84 4.31 4.79 1.44 47.928
4 Seljhar 1.27 1.59 0.32 17.78 2.86 3.18 0.95 31.752
5 Dhanmaulii 1.39 1.74 0.35 19.45 3.13 3.47 1.04 34.74
6 Kapadbandh 4.98 6.23 1.25 69.77 11.21 12.46 3.74 124.596
7 Mota Tarpada 1.98 2.47 0.49 27.68 4.45 4.94 1.48 49.428
8 Siraspada 0.98 1.23 0.25 13.78 2.21 2.46 0.74 24.6
9 Chikhalpada 0.77 0.97 0.19 10.82 1.74 1.93 0.58 19.32
10 Vadi Rupgadh 1.90 2.38 0.48 26.62 4.28 4.75 1.43 47.532
11 Khogalgam 1.29 1.61 0.32 18.00 2.89 3.21 0.96 32.148
12 Umarda 1.78 2.22 0.44 24.91 4.00 4.45 1.33 44.484
13 Borpada 1.63 2.04 0.41 22.83 3.67 4.08 1.22 40.764
Total 24 30 6 336 54 60 18 600
Detailed Project Report, IWMP-VI (Dhanmauli)
139 | P a g e District Watershed Development Unit Tapi.
Table no. 49: Village wise gap in funds requirement
Sl No Village Total cost requirement Total funds available under
IWMP Gap in funds requirement
1 Khadi 80.51 69.16 11.35
2 Amathva 36.20 33.55 2.65
3 Kanti 55.63 47.93 7.70
4 Seljhar 47.64 31.75 15.88
5 Dhanmaulii 38.85 34.74 4.11
6 Kapadbandh 126.21 124.60 1.61
7 Mota Tarpada 57.67 49.43 8.24
8 Siraspada 33.30 24.60 8.70
9 Chikhalpada 20.17 19.32 0.85
10 Vadi Rupgadh 49.51 47.53 1.98
11 Khogalgam 47.68 32.15 15.54
12 Umarda 48.07 44.48 3.59
13 Borpada 48.77 40.76 8.01
Total 690.22 600.00 90.22
Detailed Project Report, IWMP-VI (Dhanmauli)
140 | P a g e District Watershed Development Unit Tapi.
Table no.50: Details of Convergence of IWMP with other Schemes
S. No. Village Phase/ Type of
work* Activity to be carried
out
Fund made available to
IWMP due to convergence (Rs.
in lakh)
Scheme with which
convergence took place
Reference no. of activity/ task/
structure in DPR
Level at which decision for
convergence was taken
1 Khadi Land
Development (Productive use)
Land Levelling 2.5715 TSP
Table no. 36 Under Process
Vegetative and
Engineering Structure
Stone Bund 0.0132 MGNREGS
Table no. 36
Soil & Moisture Conservation
Soil Bund 0.0132 MGNREGS
Table no. 36
Land
Development (Productive use)
Bamboo Plantation 4.114 FOREST DEPT. Table no. 42
Land
Development (Productive use)
Border Plantation(Bilipatra
0.133 FOREST DEPT. Table no. 42
Micro-
enterprises Lift Irrigation 1.55 TSP Table no. 39
Livlihood Activities
Distribution of HF cows
8.40 Animal Husbandry
Department Table no. 39
2 Amathva Land
Development (Productive use)
Land Levelling 1.0915 TSP Table no. 36 Under Process
Vegetative and
Engineering Structure
Stone Bund 0.026 MGNREGS Table no. 36
Detailed Project Report, IWMP-VI (Dhanmauli)
141 | P a g e District Watershed Development Unit Tapi.
Soil & Moisture Conservation
Soil Bund 0.053 MGNREGS Table no. 36
Land
Development (Productive use)
Bamboo Plantation 1.301 FOREST DEPT. Table no. 42
Land
Development (Productive use)
Border Plantation(Bilipatra
0.18200 FOREST DEPT. Table no. 42
Livlihood Activities
Distribution of HF cows
6.00 Animal Husbandry
Department Table no. 39
3 Kanti Land
Development (Productive use)
Land Levelling 2.775 TSP Table no. 36 Under Process
Vegetative and
Engineering Structure
Stone Bund 0.021 MGNREGS Table no. 36
Land
Development (Productive use)
Bamboo Plantation 1.624 FOREST DEPT. Table no. 42
Land
Development (Productive use)
Border Plantation(Bilipatra
0.151 FOREST DEPT. Table no. 42
Livlihood Activities
Distribution of HF cows
4.00 Animal Husbandry
Department Table no. 39
4 Seljhar Water
Harvesting Structure
Check Wall 2.00 MGNREGS
Table no. 37 Under Process
Vegetative and
Engineering Structure
Stone Bund 0.024 MGNREGS Table no. 36
Detailed Project Report, IWMP-VI (Dhanmauli)
142 | P a g e District Watershed Development Unit Tapi.
Vegetative and
Engineering Structure
s.c.t 0.019 MGNREGS Table no. 36
Land
Development (Productive use)
Bamboo Plantation 1.944 FOREST DEPT. Table no. 42
Land
Development (Productive use)
Border Plantation(Bilipatra
0.16800 FOREST DEPT. Table no. 42
Vegetative and
Engineering Structure
Field Outlet 3.2 MGNREGS Table no. 36
Land
Development (Productive use)
Land Levelling 1.295 TSP Table no. 36
Livlihood Activities
Distribution of HF cows
6.00 Animal Husbandry
Department Table no. 39
5 Dhanmauli Vegetative and
Engineering Structure
s.c.t 0.008 MGNREGS
Table no. 36
Vegetative and
Engineering Structure
Stone Bund 0.030 MGNREGS
Table no. 36
Land
Development (Productive use)
Land Levelling 2.8657 TSP
Table no. 36
Land
Development (Productive use)
Bamboo Plantation 0.370 FOREST DEPT.
Table no. 42
Land
Development Border
Plantation(Bilipatra 0.23500
FOREST DEPT. Table no. 42
Detailed Project Report, IWMP-VI (Dhanmauli)
143 | P a g e District Watershed Development Unit Tapi.
(Productive use)
Livlihood Activities
Distribution of HF cows
6.00 Animal Husbandry
Department Table no. 39
6 Kapadbandh Vegetative and
Engineering Structure
Stone Bund 0.079 MGNREGS
Table no. 36 Under Process
Land
Development (Productive use)
Bamboo Plantation 6.447 FOREST DEPT.
Table no. 42
Micro-
enterprises Lift Irrigation 1.77 TSP Table no. 39
Livlihood Activities
Distribution of HF cows
4.00 Animal Husbandry
Department Table no. 39
7 Mota Tarpada Vegetative and
Engineering Structure
Field Outlet 6.4 MGNREGS
Table no. 36 Under Process
Vegetative and
Engineering Structure
Land Levelling 7.77 TSP
Table no. 36
Vegetative and
Engineering Structure
Stone Bund 0.011 MGNREGS
Table no. 36
Vegetative and
Engineering Structure
Soil Bund 0.119 MGNREGS
Table no. 36
Land
Development (Productive use)
Bamboo Plantation 1.371 FOREST DEPT.
Table no. 42
Detailed Project Report, IWMP-VI (Dhanmauli)
144 | P a g e District Watershed Development Unit Tapi.
Land
Development (Productive use)
Border Plantation(Bilipatra
0.16800 FOREST DEPT.
Table no. 42
Livlihood Activities
Distribution of HF cows
8.00 Animal Husbandry
Department Table no. 39
8 Siraspada Vegetative and
Engineering Structure
Field Outlet 5.2 MGNREGS
Table no. 36 Under Process
Vegetative and
Engineering Structure
Land Levelling 4.995 TSP
Table no. 36
Land
Development (Productive use)
Bamboo Plantation 0.64200 FOREST DEPT.
Table no. 42
Land
Development (Productive use)
Border Plantation(Bilipatra
0.15800 FOREST DEPT.
Table no. 42
Livlihood Activities
Distribution of HF cows
4.00 Animal Husbandry
Department Table no. 39
9 Chikhalpada Vegetative and
Engineering Structure
Land Levelling 0.18500 TSP
Table no. 36 Under Process
Vegetative and
Engineering Structure
Stone Bund 0.066 MGNREGS
Table no. 36
Land
Development (Productive use)
Bamboo Plantation 1.216
FOREST DEPT.
Table no. 42
Land
Development (Productive use)
Border Plantation(Bilipatra
0.140 FOREST DEPT.
Table no. 42
Detailed Project Report, IWMP-VI (Dhanmauli)
145 | P a g e District Watershed Development Unit Tapi.
Livlihood Activities
Distribution of HF cows
4.00 Animal Husbandry
Department Table no. 39
10 Vadi rupgadh Vegetative and
Engineering Structure
Field Outlet 0.8
MGNREGS
Table no. 36 Under Process
Vegetative and
Engineering Structure
Land Levelling 7.215 TSP
Table no. 36
Vegetative and
Engineering Structure
Stone Bund 0.040 MGNREGS
Table no. 36
Vegetative and
Engineering Structure
Soil Bund 0.036 MGNREGS
Table no. 36
Land
Development (Productive use)
Bamboo Plantation 2.679 FOREST DEPT.
Table no. 42
Land
Development (Productive use)
Border Plantation(Bilipatra
0.224 FOREST DEPT.
Table no. 42
Micro-
enterprises Lift Irrigation 1.250 TSP Table no. 39
Livlihood Activities
Distribution of HF cows
8.00 Animal Husbandry
Department Table no. 39
11 Khogalgam Vegetative and
Engineering Structure
Land Levelling 4.784 TSP
Table no. 36 Under Process
Soil & Moisture Conservation
Pond 1.5 MGNREGS
Table no. 36
Detailed Project Report, IWMP-VI (Dhanmauli)
146 | P a g e District Watershed Development Unit Tapi.
Vegetative and
Engineering Structure
s.c.t 0.014 MGNREGS
Table no. 36
Vegetative and
Engineering Structure
Stone Bund 0.053 MGNREGS
Table no. 36
Land
Development (Productive use)
Bamboo Plantation 0.686 FOREST DEPT.
Table no. 42
Land
Development (Productive use)
Border Plantation(Bilipatra
0.15800 FOREST DEPT.
Table no. 42
Livlihood Activities
Distribution of HF cows
4.00 Animal Husbandry
Department Table no. 39
12 Umarda Vegetative and
Engineering Structure
Stone Bund 0.066 MGNREGS
Table no. 36 Under Process
Land
Development (Productive use)
Bamboo Plantation 1.155 FOREST DEPT.
Table no. 42
Land
Development (Productive use)
Border Plantation(Bilipatra
0.210 FOREST DEPT.
Table no. 42
Vegetative and
Engineering Structure
Land Levelling 2.405 TSP
Table no. 36
Vegetative and
Engineering Structure
Soil Bund 0.132 MGNREGS
Table no. 36
Vegetative and
Engineering Field Outlet 4.00
MGNREGS Table no. 36
Detailed Project Report, IWMP-VI (Dhanmauli)
147 | P a g e District Watershed Development Unit Tapi.
Structure
Water
Harvesting Structure
Check Wall 1.00 MGNREGS
Table no. 37
Livlihood Activities
Distribution of HF cows
6.00 Animal Husbandry
Department Table no. 39
13 Borpada Vegetative and
Engineering Structure
Stone Bund 0.012 MGNREGS
Table no. 36 Under Process
Land
Development (Productive use)
Bamboo Plantation 1.371 FOREST DEPT.
Table no. 42
Soil & Moisture Conservation
Pond 3.00 MGNREGS
Table no. 36
Vegetative and
Engineering Structure
Land Levelling 2.901 TSP
Table no. 36
Livlihood Activities
Distribution of HF cows
8.00 Animal Husbandry
Department Table no. 39
Total 176.6061
Detailed Project Report, IWMP-VI (Dhanmauli)
148 | P a g e District Watershed Development Unit Tapi.
Table no. 51: Public-Private Partnership in the IWMP projects
S. No.
Name of Private Sector Partner
Agency
Type of agreement signed Financial
contribution Partnership Interventions
Expected Outcomes
Comments
a)MoU b)Contract c) Any other (pl. specify)
IWMP Private sector
- - - - - - -
Detailed Project Report, IWMP-VI (Dhanmauli)
149 | P a g e District Watershed Development Unit Tapi.
Chapter 6
Expected Outcomes
Detailed Project Report, IWMP-VI (Dhanmauli)
150 | P a g e District Watershed Development Unit Tapi.
6.1 Expected Outcomes.
6.1.1 Employment
Employment has always been a problem in the village. The principal occupations of the people are dry land agriculture, animal
husbandry and casual labour work. However, rain fall being very limited and erratic, agriculture suffers, i.e. at best they can take only a
single crop, which keeps them partially engaged for about 4 months. Lack of fodder makes animal husbandry very difficult too. So, animal
husbandry does not keep tem engaged full time. Thus the People mainly depend upon casual labour, either in the village itself or outside it.
The project plans for creation of both wage employment and self employment opportunities. Wage employment would be created by
engaging people in watershed physical works like construction of earthen bunds, village pond, plantation, etc. self employment would be
created by providing the people with cash support in the form of direct livelihood like agriculture, animal husbandry and enterprise
development.
Detailed Project Report, IWMP-VI (Dhanmauli)
151 | P a g e District Watershed Development Unit Tapi.
Table no. 52: Employment in Project area:
S. NO
.
Names of Villages
Wage employment Self employment
No. of mandays No. of beneficiaries No. of beneficiaries
SC
ST Others
Women Total SC
ST Other
s Wome
n Total
SC
ST Othe
rs Wome
n Tota
l
1 Khadi 0 20000 0 9000 33700 0 200 0 90 337 0 50 0 20 70
2 Amathva 0 9500 0 5000 15900 0 95 0 50 159 0 20 0 12 32
3 Kanti 0 17000 0 9300 29300 0 170
0 93 293
0 40
0 20 60
4 Seljhar 0 4500 0 1500 7500 0 45
0 15 75
0 10
0 4 14
5 Dhanmaulii 0 32000 0 16000 52900 0 320
0 160 529
0 80
0 40 120
6 Kapadband
h 0
19500 0
9000 31000 0
195 0
90 310 0
45 0
22 76
7 Mota
Tarpada 0
54000 0
21500 84400 0
540 0
215 844 0
135 0
50 185
8 Siraspada 0 27000 0 10000 45200 0 270
0 100 452
0 65
0 25 90
9 Chikhalpad
a 0
14500 0
7000 23700 0
145 0
70 237 0
35 0
18 53
10 Vadi
Rupgadh
0 24000
0 10000 37800
0
240
0
100 378
0
60
0
25 85
11 Khogalgam 0 36000 0 16000 56700 0 360
0 160 567
0 90
0 40 130
12 Umarda 0 29000 0 12500 44400 0 290
0 125 444
0 70
0 30 100
13 Borpada 0 32000 0 14500 52900 0 320
0 145 529
0 80
0 35 115
Total 0 319000 0 141300 515400 0 3190 0 1413 5154 0 780 0 341 1130
Detailed Project Report, IWMP-VI (Dhanmauli)
152 | P a g e District Watershed Development Unit Tapi.
6.1.2. Migration
Heavy rainfall results in Dhanmauli and their is fodder availability in monsoon and winter but there is a problem for a summer. There
is a problem of water in summer. On account of agriculture and animal husbandry providing only part time employment for some part of the
year, the people migrate for a better half of the year for wage labour in sugar factory.Employment opportunities in the local area as
mentioned above will ensure lessening seasonal migration from the area.
Table no. 53: Details of seasonal migration from Project area
Pre-project Expected post project Pre-project Expected post project
1 Khadi 49 10
180 60
2 Amathva 32 7
3 Kanti 64 12
4 Seljhar 18 0
5 Dhanmaulii 46 6
6 Kapadbandh 65 12
7 Mota Tarpada 105 32
8 Siraspada 77 18
9 Chikhalpada 33 0
10 Vadi Rupgadh 78 15
11 Khogalgam 56 11
12 Umarda 41 5
13 Borpada 62 13
Total 726 141
Detailed Project Report, IWMP-VI (Dhanmauli)
153 | P a g e District Watershed Development Unit Tapi.
Table no. 54: Average ground water table depth in the project areas (in meters)
S. No. Names of Villages Sources Pre-Project level Expected Increase/decrease (Post- Project)
1 Khadi
Bore wells/well /handpump 14 8
2 Amathva
3 Kanti
4 Seljhar
5 Dhanmauli
6 Kapadbandh
7 Mota Tarpada
8 Siraspada
9 Chikhalpada
10 Vadi Rupgadh
11 Khogalgam
12 Umarda
13 Borpada
Detailed Project Report, IWMP-VI (Dhanmauli)
154 | P a g e District Watershed Development Unit Tapi.
6.1.3 Drinking water
The village has open wells and bore wells which they depend for their drinking water. Many an effort at finding sweet water at
different other places in the same village has failed. A farmer uses an open well in the farm and allows the villages to take water from the
well. There is another well in a common land too; but the water is not as good as the other well. WASMO has constructed a take to store
water brought pipeline from Bore well.As a result of the watershed activities, it is expected that the quality of drinking water would improve.
Table no. 55: Status of Drinking water
S. No.
Names of Villages
Availability of drinking water (no. of months in a year)
Quality of drinking water Comments
Pre-project Expected Post project Pre-
project Expected Post-
project
1 Khadi 8 12
Potable Potable
2 Amathva 8 12
3 Kanti 8 12
4 Seljhar 7 12
5 Dhanmauli 9 12
6 Kapadbandh 8 12
7 Mota Tarpada 7 12
8 Siraspada 8 12
9 Chikhalpada 8 12
10 Vadi Rupgadh 8 12
11 Khogalgam 8 12
12 Umarda 9 12
13 Borpada 7 12
Detailed Project Report, IWMP-VI (Dhanmauli)
155 | P a g e District Watershed Development Unit Tapi.
Table no. 56: Crop area and yield in the project area
Sr. No. Name of Village Name of crops
Pre-project Expected Post-project
Area Average Yield (Qtl) per ha.
Area Average Yield per ha (qtl)
(ha) (ha)
1 Khadi
KHARIF
Tuver 9.16 667 9.16 690
Mung 4 669 4.18 695
Paddy 35 1789 40 1890
Sorghum 8.2 742 7.2 840
Blackgram 6.04 632 7.04 738
RABI
Chana 11 495 20 495
Val 5.1 422 12 500
Wheat 1.5 897 6 1000
Ground nut 4.3 1470 12 2000
2 Amathva
KHARIF
Tuver 18 625 18 700
Mung 7.15 645 7.15 695
Paddy 68.4 1727 71.4 1890
Sorghum 14 704 12 840
Blackgram 13.25 607 12.25 745
RABI
Chana 8 436 16 495
Val 3 412 9 502
Wheat 1.1 887 6 1010
Ground nut 5.1 1367 12 2010
Detailed Project Report, IWMP-VI (Dhanmauli)
156 | P a g e District Watershed Development Unit Tapi.
3 Kanti
KHARIF
Tuver 10.05 636 10.1 700
Mung 3 659 3 700
Paddy 22.5 1765 25 1900
Sorghum 5.15 734 6 830
Blackgram 6 627 7 750
RABI
Chana 8.6 439 11.6 500
Val 5.1 414 10.1 505
Wheat 2 890 5.3 1050
Ground nut 4.7 1380 10.7 1500
4 Seljhar
KHARIF
Tuver 12.1 605 12.1 690
Mung 7.4 654 7.4 685
Paddy 39.1 1728 42.1 1830
Sorghum 7.4 726 7.9 830
Blackgram 8.3 611 8.7 750
RABI
Chana 12 456 20 550
Val 5 432 15 530
Wheat 2.1 906 10.1 1050
Ground nut 6.6 1419 15.6 1800
5 Dhanmauli
KHARIF
Tuver 39.6 670 39.6 685
Mung 12.7 660 11.7 690
Paddy 92.4 1759 100.4 1900
Sorghum 24.7 755 20.7 830
Blackgram 13.6 625 10.6 780
Detailed Project Report, IWMP-VI (Dhanmauli)
157 | P a g e District Watershed Development Unit Tapi.
RABI
Chana 29 489 31 530
Val 29.4 448 51 550
Wheat 3.35 919 15 1000
Ground nut 14 1523 22 1800
6 Kapadbandh
KHARIF
Tuver 31.3 654 31.3 710
Mung 12.8 658 12.8 715
Paddy 65.4 1745 68.4 1950
Sorghum 19.4 742 18.4 850
Blackgram 12.9 620 12.9 710
RABI
Chana 17 519 24.1 700
Val 19 472 31.7 680
Wheat 7.4 972 20 1020
Ground nut 12 1560 35 2000
7 Mota Tarpada
KHARIF
Tuver 30.53 664 30.53 700
Mung 19.68 658 19.68 720
Paddy 108.4 1745 113.4 1930
Sorghum 26.1 742 25.1 860
Blackgram 27 627 23.49 720
RABI
Chana 33 497 50 615
Val 30.6 467 45.5 620
Wheat 12.1 948 21 1100
Ground nut 18 1549 26 2000
8 Sirispada KHARIF
Detailed Project Report, IWMP-VI (Dhanmauli)
158 | P a g e District Watershed Development Unit Tapi.
Tuver 17.25 618 17.25 720
Mung 8.22 627 8.22 730
Paddy 52.3 1752 54.3 1956
Sorghum 14.95 723 13.95 845
Blackgram 12.68 617 11.68 730
RABI
Chana 27 473 30.54 680
Val 26.2 473 28.4 670
Wheat 5 935 19.3 1100
Ground nut 17 1489 22 1900
9 Chikhalpada
KHARIF
Tuver 9.3 623 9.3 725
Mung 4.5 630 4.5 710
Paddy 22.25 1748 25.28 1960
Sorghum 8.28 725 9.25 840
Blackgram 4.27 627 5.21 715
RABI
Chana 6.8 468 10 690
Val 6.95 434 9.11 685
Wheat 0.9 929 11.9 1200
Ground nut 2.6 1427 10.9 2050
10 Vadirupgadh
KHARIF
Tuver 19.65 632 19.65 800
Mung 9.48 632 9.48 790
Paddy 59.22 1745 62.22 1900
Sorghum 18.65 729 19.25 890
Blackgram 9.3 635 11 775
RABI
Detailed Project Report, IWMP-VI (Dhanmauli)
159 | P a g e District Watershed Development Unit Tapi.
Chana 23 469 27 680
Val 18.1 439 23 700
Wheat 3 936 5 1190
Ground nut 18 1459 32 1950
11 Khogalgam
KHARIF
Tuver 14.55 642 24.55 642
Mung 12.4 628 12.4 690
Paddy 78.35 1769 81.35 1910
Sorghum 16.82 725 15.82 830
Blackgram 14.18 630 12.18 780
RABI
Chana 21 507 35 710
Val 7.1 459 12 680
Wheat 4.82 968 6.5 1100
Ground nut 11 1504 16 2000
12 Umarda
KHARIF
Tuver 28.2 679 28.2 710
Mung 9.32 634 9.32 720
Paddy 72.65 1770 76.65 1960
Sorghum 19.25 735 17.25 840
Blackgram 10.68 623 8.68 715
RABI
Chana 31 548 33 700
Val 35.2 462 39 690
Wheat 10 968 17 1110
Ground nut 24 1548 31 2020
13 Borpada KHARIF
Tuver 38.85 725 38.85 658
Detailed Project Report, IWMP-VI (Dhanmauli)
160 | P a g e District Watershed Development Unit Tapi.
Mung 11.05 730 11.05 633
Paddy 97.5 1920 94.5 1756
Sorghum 26.35 830 28.35 722
Blackgram 12.45 760 12.45 620
RABI
Chana 26 700 18 542
Val 28 690 16.3 459
Wheat 4.5 1090 3.02 967
Ground nut 15 2090 8 1547
Total 2255.83 102289 2636.49 117542
6.1.5 Crop
Agriculture primarily depends upon water; but this is heavy rain fall in the Dhanmauli village. The surface water is scanty due for only
4 months and land with stone which is not preferable for recharging the ground water level. So, there is lacking of water in the summer
which is affect to the crop production. All this can change with the integrated land and water management during the watershed project. The
planned earthen bunds would prevent the saline water from the Hill to river and stop water for increasing the water level for water
underground, and preserve some moisture in the soil. This will help in additional area coming under cultivation and increasing productivity
too. The farmer can take more than one season of crops. Different varieties of crops can be taken.
Detailed Project Report, IWMP-VI (Dhanmauli)
161 | P a g e District Watershed Development Unit Tapi.
Table no. 57: Area under horticulture / other crops
S. No. Name of Village Existing area under horticulture (ha) Area under horticulture proposed to be covered
through IWMP
1 Khadi 1 3.5
2 Amathva 1 2
3 Kanti 2 2.5
4 Seljhar 1 2
5 Dhanmauli 3 2.5
6 Kapadbandh 3 3.7
7 Mota Tarpada 3 3.2
8 Siraspada 2 2.1
9 Chikhalpada 0.5 1.7
10 Vadi Rupgadh 1 1.8
11 Khogalgam 1 2.3
12 Umarda 2.5 3.7
13 Borpada 3 3.1
Detailed Project Report, IWMP-VI (Dhanmauli)
162 | P a g e District Watershed Development Unit Tapi.
Table no. 58: Forest/vegetative cover
S. No. Name of Village Existing area under tree cover (ha) Area under tree cover proposed
1 Khadi 473 12
2 Amathva 108 20
3 Kanti 295 15
4 Seljhar 160 11
5 Dhanmauli 57 19
6 Kapadbandh 831 21
7 Mota Tarpada 107 19
8 Siraspada 52 16
9 Chikhalpada 83 11
10 Vadi Rupgadh 206 21
11 Khogalgam 69 16
12 Umarda 179 21
13 Borpada 92 15
Detailed Project Report, IWMP-VI (Dhanmauli)
163 | P a g e District Watershed Development Unit Tapi.
Table no. 59: Details of livestock in the project areas (for fluids please mention in litres, for solids please mention in kgs. and income in Rs.)
S. No. Name of Village
Type of Animal Pre-Project Expected Post-project
Remarks No. Yield Income No. Yield Income
1 Khadi Milch-animals 266 273 lit/day 8190 384 405 lit/day 12150
Draught Purpose animals 56
Hen 339 847 kg 26000 489 1467 kg 36000
2 Amthva Milch-animals 190 156 lit/day 4680 305 275
lit/day 8250
Draught Purpose animals 20
Animals for other purpose 275 687 kg 18000 380 1140 kg 25000
3 Kanti Milch-animals 151 171 lit/day 5130 250 305
lit/day 9150
Draught Purpose animals 46
Animals for other purpose 268 670 kg 17000 360 1080 kg 24000
4 Seljhar Milch-animals 72 94 lit/day 2220 145 180 lit/day 5400
Draught Purpose animals 12
Animals for other purpose 128 320 kg 8000 230 690 kg 11000
5 Dhanmauli Milch-animals 352 416 lit/day 12480 480 584 lit/day 17520
Draught Purpose animals 73
Detailed Project Report, IWMP-VI (Dhanmauli)
164 | P a g e District Watershed Development Unit Tapi.
Animals for other purpose 477 1192 kg 32000 610 1830 kg 42000
6 Kapadbandh Milch-animals 120 183 lit/day 6300 170 210 lit/day 6300
Draught Purpose animals 146
Animals for other purpose 193 482 kg 10000 270 810 kg 23000
7 Mota
Tarpada Milch-animals 458 376 lit/day 11280 570 410 lit/day 12300
Draught Purpose animals 98
Animals for other purpose 823 2057 kg 51000 1021 3063 kg 64000
8 Siraspada Milch-animals 213 245 lit/day 7350 280 305 lit/day 9150
Draught Purpose animals 28
Animals for other purpose 489 1222 kg 32000- 550 1650 kg 39000
9 Chikhalpada Milch-animals 112 122 lit/day 3660 180 198 lit/day 5940
Draught Purpose animals 19
Animals for other purpose 231 577 kg 11000 277 831 kg 24000
10 Vadi
Rupgadh Milch-animals 335 334 lit/day 10000 405 447 lit/day 13400
Draught Purpose animals 54
Animals for other purpose 507 1267 kg 42000 617 1851kg 55000
11 Khogalgam Milch-animals 206 260 lit/day 7800 330 356 lit/day 10700
Detailed Project Report, IWMP-VI (Dhanmauli)
165 | P a g e District Watershed Development Unit Tapi.
Draught Purpose animals 52
Animals for other purpose 576 1440 kg 22000 680 2040 kg 32000
12 Umarda Milch-animals 360 264 lit/day 1560 100 170 5100
Draught Purpose animals 61
Animals for other purpose 393 732 kg 16000 470 1410 kg 22000
13 Borpada Milch-animals 180 225 lit/day 6750 260 305 lit/day 9150
Draught Purpose animals 62
Animals for other purpose 542 1355 kg 24000 650 1950 kg 30000
Detailed Project Report, IWMP-VI (Dhanmauli)
166 | P a g e District Watershed Development Unit Tapi.
Table no.59: Per capita Income
Sr. No. Village Source of Income Pre-project Expected post project
1 Khadi Agriculture 0.18 0.26
Forestry 0.025 0.30
Animal Husbandry 0.090 0.14
Casual Labour 0.085 0.12
Services 0.12 0.15
Handicraft 0.04 0.06
Business -
Others
Total 0.54 1.03
2 Amathva Agriculture 0.17 0.25
Forestry 0.027 0.032
Animal Husbandry 0.078 0.11
Casual Labour 0.088 0.13
Services 0.18 0.21
Handicraft 0.05 0.07
Business
Others
Total 0.59 0.80
3 Kanti Agriculture 0.21 0.32
Forestry 0.03 0.04
Animal Husbandry 0.061 0.09
Detailed Project Report, IWMP-VI (Dhanmauli)
167 | P a g e District Watershed Development Unit Tapi.
Casual Labour 0.092 0.14
Services 0.14 0.17
Handicraft
Business
Others
Total 0.53 0.76
4 Seljhar Agriculture 0.19 0.30
Forestry 0.03 0.04
Animal Husbandry 0.10 0.14
Casual Labour 0.11 0.16
Services
Handicraft 0.025 0.05
Business
Others
Total 0.46 0.69
5 Dhanmauli Agriculture 0.28 0.39
Forestry 0.04 0.06
Animal Husbandry 0.07 0.11
Casual Labour 0.13 0.17
Services 0.18 0.21
Handicraft
Business
Others
Detailed Project Report, IWMP-VI (Dhanmauli)
168 | P a g e District Watershed Development Unit Tapi.
Total 0.70 0.94
6 Kapadbandh Agriculture 0.17 0.28
Forestry 0.03 0.05
Animal Husbandry 0.12 0.18
Casual Labour 0.06 0.09
Services 0.24 0.27
Handicraft 0.07 0.10
Business
Others
Total 0.70 0.97
7 Mota Tarpada Agriculture 0.19 0.25
Forestry 0.05 0.08
Animal Husbandry 0.07 0.10
Casual Labour 0.05 0.09
Services 0.23 0.26
Handicraft 0.04 0.07
Business
Others
Total 0.63 0.85
8 Siraspada Agriculture 0.22 0.35
Forestry 0.03 0.06
Animal Husbandry 0.14 0.22
Detailed Project Report, IWMP-VI (Dhanmauli)
169 | P a g e District Watershed Development Unit Tapi.
Casual Labour 0.07 0.10
Services 0.20 0.24
Handicraft 0.03 0.06
Business
Others
Total 0.70 1.03
9 Chikhalpada Agriculture 0.18 0.29
Forestry 0.03 0.06
Animal Husbandry 0.11 0.17
Casual Labour 0.07 0.10
Services 0.12 0.15
Handicraft 0.02 0.05
Business
Others
Total 0.53 0.82
10 Vadi Rupgad Agriculture 0.22 0.36
Forestry 0.04 0.07
Animal Husbandry 0.08 0.12
Casual Labour 0.08 0.11
Services 0.09 0.12
Handicraft 0.03 0.06
Business
Others
Detailed Project Report, IWMP-VI (Dhanmauli)
170 | P a g e District Watershed Development Unit Tapi.
Total 0.54 0.84
11 Khogalgam Agriculture 0.10 0.14
Forestry 0.03 0.06
Animal Husbandry 0.07 0.11
Casual Labour 0.05 0.08
Services 0.14 0.17
Handicraft 0.03 0.06
Business
Others
Total 0.42 0.62
12 Umarda Agriculture 0.23 0.36
Forestry 0.03 0.06
Animal Husbandry 0.12 0.18
Casual Labour 0.04 0.07
Services 0.07 0.10
Handicraft
Business
Others
Total 0.48 0.77
13 Borpada Agriculture 0.17 0.28
Forestry 0.03 0.06
Animal Husbandry 0.08 0.11
Detailed Project Report, IWMP-VI (Dhanmauli)
171 | P a g e District Watershed Development Unit Tapi.
Casual Labour 0.07 0.10
Services 0.07 0.10
Handicraft 0.03 0.06
Business
Others
Total 0.45 0.71
Detailed Project Report, IWMP-VI (Dhanmauli)
172 | P a g e District Watershed Development Unit Tapi.
Table no. 60: Backward-Forward linkages
S. No. Project Type of Marketing Facility Pre-project (no.) During the project (no.) Post-project (no.)
IWMP-VI
Dhanmauli
Backward linkages
Seed certification NIL - -
Seed supply system “ Local Market Local Market
Fertilizer supply system Local Market Local Market
Pesticide supply system - -
Credit institutions - -
Water supply Village Area Village Area
Extension services - -
Nurseries Forest & local area Forest & local area
Tools/machinery suppliers - -
Price Support system - -
Labour Local Village Local Village
Any other (please specify) - -
Forward linkages
Harvesting/threshing machinery Local Local & Near Villages
Storage (including cold storage) - -
Road network - -
Transport facilities - -
Markets / Mandis Local Local
Agro and other Industries - -
Milk and other collection centres Local Local
Labour Local Local
Detailed Project Report, IWMP-VI (Dhanmauli)
173 | P a g e District Watershed Development Unit Tapi.
Any other (please specify) - -
Chapter 7
Quality and Sustainability Issues
Detailed Project Report, IWMP-VI (Dhanmauli)
174 | P a g e District Watershed Development Unit Tapi.
Detailed Project Report, IWMP-VI (Dhanmauli)
175 | P a g e District Watershed Development Unit Tapi.
7 Quality and Sustainability Issues
7.1 Plans for Monitoring and Evaluation
A Web-based GIS System is being developed for monitoring and evaluating the project in its planning & implementation phases. The
system would be available on a public domain and can be accessed by all the stakeholders of the project. The system shows the entire
state of Gujarat and all of those areas selected over the next 18 years. Filtering allows the user to zoom on to one particular project. Details
related to soil type, Land-use classification, inhabitation etc., can be obtained village-wise. Furthermore, survey-number wise details related
to ownership, irrigation source, yield etc., can also be accessed by the users of the system. This system is being used for pooling up the
details obtained from the DPR. In other words, the DPR is made available online in the form of a database which will help the stakeholders
know areas of importance viz., already treated areas/historical works in the area, proposed areas for treatment etc., for the further treatment
and planning. The system would also show the satellite imageries of various years from the project inception stage to the project closing
stages. This allows the user to evaluate the effectiveness of the treatment and thereby plan corrective measures for the project area. The
system would serve as and aiding tool to the planners and evaluators for judging the efficacy of the project.
Yet another component of the Web-based GIS system is the Mobile based Monitoring & Evaluation System, which will help the
ground staff alias WDTs (Watershed Development Team) to transmit information from the ground level to the central server. Also, any
higher-up official in charge of the project can obtain information regarding the project area on their mobile phone by means of an SMS. The
system works in the following manner. The WDT equipped with a GPS instrument marks the latitude-longitude information of various
treatment areas during the DPR. The probable sites are then transferred onto the central server. During the works phase, any progress in
Detailed Project Report, IWMP-VI (Dhanmauli)
176 | P a g e District Watershed Development Unit Tapi.
the treatment areas is reported to the server by means of an SMS by the WDT. Similarly, any nodal officer or higher-up official can view the
progress in a project by means of summarized reports generated over frequent periods of time.
7.2 Plans for Project Management:
The Project management of any Watershed programme is very important; it mainly depends upon the community organization and
the village level institutes. In Dhanmauli, watershed committee and various user groups have been formulated for post project operation and
maintenance of assets created during project period. Major emphasis will be on equity and sustainable benefit of the project even after
implementation stage. A proper link-up will be built during project period with various institutes and capacity building organization. They will
act as a major kingpin during post implementation for scaling up the successful experience during project.
7.3 Watershed Development Fund:
The major source of financial assistance after post implementation period is a Watershed Development Fund. The contribution of it
will comes mainly fund the following:
7.4 User Charges:
Various user groups will be formed in village. These user groups will collect user charges according to the designated rules formed
during the formation of user group. These funds will be transferred to the WDF funds as per these formulated rules. There secretary of
watershed committee (WC) shall maintain the records of the following.
Detailed Project Report, IWMP-VI (Dhanmauli)
177 | P a g e District Watershed Development Unit Tapi.
Chapter 8
Maps
Detailed Project Report, IWMP-VI (Dhanmauli)
178 | P a g e District Watershed Development Unit Tapi.
1. Cadastral Map
2. Drainage Map
3. Slop Map
4. Geomorphology Map
5. Soil Map
6. Land Use / Land Cover Map
7. Ground Water Map
8. Propose Action Plan Map
9. Contour maps
Detailed Project Report, IWMP-VI (Dhanmauli)