MEGA LIFT IRRIGATION PROJECT ANNUAL ACTIVITIES REPORT 2016-17 FOR CLUSTER VIII & XII EXECUTIVE ENGINEER, MEGA LIFT PROJECTS, KEONJHAR
Transcript
Page 1: MEGA LIFT IRRIGATION PROJECT ANNUAL ACTIVITIES REPORT … · mega lift irrigation project annual activities report 2016-17 ... civil works like intake well, ... mega lift irrigation

MEGA LIFT IRRIGATION PROJECT

ANNUAL ACTIVITIES REPORT 2016-17

FOR

CLUSTER – VIII & XII

EXECUTIVE ENGINEER, MEGA LIFT PROJECTS, KEONJHAR

Page 2: MEGA LIFT IRRIGATION PROJECT ANNUAL ACTIVITIES REPORT … · mega lift irrigation project annual activities report 2016-17 ... civil works like intake well, ... mega lift irrigation

Project Overview Introduction to the scheme:-

The programme has been launched by Govt. of Odisha during 2011-12 for providing irrigation to

the farmers in the upland areas by lifting water from river and Reservoir, which could not be

irrigated by normal means of flow irrigation.

It is proposed to take up 174 No mega lift schemes covering command area of 2,14,270 ha. and

grouped into 15 clusters as per the pre-feasibility study done during 2011.The first phase has been

taken up in 2012-13 and the second phase comprising schemes like Cluster-VI, VIII, XI is likely to

be completed in a period of 30 months i.e.by June- 2018.Now DPR for 8 clusters have been

prepared which contains 102 schemes. Out of which work has been started in five Clusters

i.e.Cluster VII, IX, X, XII & XIII in the district of Ganjam, Sundergarh, Keonjhar, Mayurbhanj,

Jharsuguda & Nuapada after administrative approval by Govt. of Odisha and following tendering

process.

Site selection priorities:-

Projects having irrigation command area 500-2000 ha are taken up under the scheme.

The schemes are proposed in 23 districts, which lie in the following river basins i.e. Vansadhara,

Indravati, Tel, Mahanadi, Brahmani, Baitarani, Burhabalanga, Deo, Sankh, Koel, Ib, Basundhara,

Ichha and Safei of Odisha.

Besides, some schemes have been identified in the periphery of Hirakud and Rengali reservoirs.

These schemes have been grouped into 15 clusters to facilitate tendering, execution and power

connectivity point of view.

Page 3: MEGA LIFT IRRIGATION PROJECT ANNUAL ACTIVITIES REPORT … · mega lift irrigation project annual activities report 2016-17 ... civil works like intake well, ... mega lift irrigation

Project Overview Funding arrangement:- The schemes are being funded either by the State Government or under RIDF/NABARD.

Institutional arrangement:- Head of the Project is- PD-cum-CE,PMU,Megalift Projects, Bhubaneswar. For smooth implementation of Mega Lift Project, a Project Management Unit (PMU) is created

under the Deptt. of Water Resources. The Chief Engineer, Mega Lift Projects(PMU),is heading the

unit as Project Director-cum-Chief Engineer, PMU,Megalift Projects. This office is functioning at:

Plot No-A-8/2, Bhoi Nagar, Bhubaneswar-751022.

S.E., Mega Lift Circle, Bhubaneswar is also now functioning in the above premises since its

creation in 2016-17.

Project components:- Detail survey and design.

Civil works like intake well, pump house, delivery chamber, Distribution Network, residential

building, approach roads etc.

Procurement and installation of electro-mechanical systems like pump, motor, transformer,

overhead crane and control panel etc.

Power system connectivity along with switchyard.

Rising main supplying water from the pump house to the delivery chamber.

Distribution system including distribution main, minors consisting of pipe line network.

Operation and Maintenance.

Page 4: MEGA LIFT IRRIGATION PROJECT ANNUAL ACTIVITIES REPORT … · mega lift irrigation project annual activities report 2016-17 ... civil works like intake well, ... mega lift irrigation

MEGA LIFT IRRIGATION PROJECT

ANNUAL ACTIVITIES REPORT 2016-17

FOR

CLUSTER – VIII ( Total 13 nos. of schemes in the district of Angul, Deogarh & Sundergarh)

EXECUTIVE ENGINEER,

MEGA LIFT PROJECTS, KEONJHAR

Page 5: MEGA LIFT IRRIGATION PROJECT ANNUAL ACTIVITIES REPORT … · mega lift irrigation project annual activities report 2016-17 ... civil works like intake well, ... mega lift irrigation

Cluster VIII – Job Synopsis Execution of 13 nos. of Lift Irrigation schemes with intake points in Brahmani River having

Command Area between 500Ha. to 2000Ha. in Cluster No. VIII in the districts of Angul, Deogarh

and Sundergarh including its distribution network, up to 20 Ha Chak having total planned

Culturable Command Area of 16,200 Ha. On “EPC-Turn Key” basis including power system

connectivity and Operation & Maintenance of commissioned scheme for Five years.

• EPC Contractor : M/s. Larsen & Toubro Ltd.

• Agreement Value : ₹ 343.98 Cr

(Part-I Works : ₹ 339.43 Cr)

(Part-II O& M : ₹ 4.55 Cr)

• Date of Commencement : 21.12.2015

• Stipulated Date of Completion : 30 Months (20.06.2018)

• No. of Schemes : 13 (8 no. Reservoir and 5no. River)

• District Covered : Angul (1 Scheme)

: Deogarh (9 Schemes)

: Sundergarh (3 Schemes)

• Proof Engineering Consultant (PEC) : M/s. Aarvee Associates

• Project Management Consultant (PMC) : M/s. TÜV SÜD South Asia Pvt. Ltd.

• Third Party Inspection Agency (TPIA) : M/s. SGS India Pvt. Ltd. & M/s. CIPET

Page 6: MEGA LIFT IRRIGATION PROJECT ANNUAL ACTIVITIES REPORT … · mega lift irrigation project annual activities report 2016-17 ... civil works like intake well, ... mega lift irrigation

Location Map

CLUSTER VIII

WATER SOURCE:

River : Brahmani

Reservoir : Rengali

Sundergarh

Deogarh

Angul

Barkote

Page 7: MEGA LIFT IRRIGATION PROJECT ANNUAL ACTIVITIES REPORT … · mega lift irrigation project annual activities report 2016-17 ... civil works like intake well, ... mega lift irrigation

Cluster VIII – Scheme & District wise Details

S No Scheme CCA (Ha.) District

1 Bandhakani 1100 Ha Angul 2 Baghamari 1000 Ha Deogarh 3 Kandhal 1700 Ha Deogarh 4 Bhulkabahal 1000 Ha Deogarh 5 Daunra 1200 Ha Deogarh 6 Baliroi 1050 Ha Deogarh 7 Masinta 1650 Ha Deogarh 8 Bhatsingh 1150 Ha Deogarh 9 Kulsura 1750 Ha Deogarh

10 Khajurikhaman 1500 Ha Deogarh 11 Satakuta 600 Ha Sundergarh 12 Biritola 1500 Ha Sundergarh 13 Jangla 1000 Ha Sundergarh

Total 16200 Ha

7%

74%

19%

CCA in Ha.

Angul Deogarh Sundergarh

Page 8: MEGA LIFT IRRIGATION PROJECT ANNUAL ACTIVITIES REPORT … · mega lift irrigation project annual activities report 2016-17 ... civil works like intake well, ... mega lift irrigation

PUMP HOUSE

SUMP

SG

Pump House

Intake Well

NGL

RCC Pipe

VT Pump

Mega Lift Irrigation Project

Intake Conduit

HFL

Schematic Diagram for the functioning of Megalift System-1

Page 9: MEGA LIFT IRRIGATION PROJECT ANNUAL ACTIVITIES REPORT … · mega lift irrigation project annual activities report 2016-17 ... civil works like intake well, ... mega lift irrigation

Flow Diagram Pump House to Distribution Network

Pump

House

Delivery

Chamber

Rising

Main

Distribution

Network Schematic Diagram for the functioning of Megalift System-2

Page 10: MEGA LIFT IRRIGATION PROJECT ANNUAL ACTIVITIES REPORT … · mega lift irrigation project annual activities report 2016-17 ... civil works like intake well, ... mega lift irrigation

Intake Well

MSDSS

PUMP HOUSE (PH)

DELIVERY CHAMBER (DC)

Overall Layout For Mega Lift Irrigation BCL- (Broad Conceptual Layout)

BCL(A):-Intake well, Intake conduit, PH, Rising Main, DC. BCL(B):-DISNET

BCL Part(A) BCL Part(B)

Page 11: MEGA LIFT IRRIGATION PROJECT ANNUAL ACTIVITIES REPORT … · mega lift irrigation project annual activities report 2016-17 ... civil works like intake well, ... mega lift irrigation

Delivery Chamber

Main Line

Distribution Network

Distribution Network Distribution Network

Outlet

Creation of New Ayacut ( Irrigation potential ) under Megalift

Page 12: MEGA LIFT IRRIGATION PROJECT ANNUAL ACTIVITIES REPORT … · mega lift irrigation project annual activities report 2016-17 ... civil works like intake well, ... mega lift irrigation

Pump House Location across three Districts of Cluster-VIII

Page 13: MEGA LIFT IRRIGATION PROJECT ANNUAL ACTIVITIES REPORT … · mega lift irrigation project annual activities report 2016-17 ... civil works like intake well, ... mega lift irrigation

Biritola

Baliroi

Bandhakani

Bhatsingh

Daunra

Bhulkabahal

Bhagmari

Khajurikaman

Masinta

Satkuta

Khandal

Jangala

BARKOTE

KHAMAR

BANOI

Kulsura

DEOGARGH

PALLAHARA

NH 23

RENGALI RESERVOIR

Way To TALCHER 26.592km

10km

PUMP HOUSE LOCATION

SOURCE SUB-STATION(220/33KV)

MSDSS LOCATION

ROAD

11KV LINE 138.201KM

33KV LINE

NH215

MSDSS 4

MSDSS 5

RENGALI SUBSTATION(220/33 KV)

MSDSS 2

MSDSS 1

MSDSS 3

BARKOTE SUBSTATION(220/33 KV)

MSDSS 7

BANOI SUBSTATION(220/33 KV)

MSDSS 6

MAHULIDIHA SUBSTATION(33/11 KV)

14.102km 47.351km

36.357km

13.799km UR+6- 2

UR+6- 2

UR+6- 2

UR+6- 2

HX+3 4nos

HX+3- 2

UR+6 08 Nos

HX+3 06 Nos

MSDSS LOCATION, Cluster-VIII

Transmission Line & Power Connectivity to P.H. Location from Energy Source.

MSDSS- Main Step Down Distribution Sub-station

Page 14: MEGA LIFT IRRIGATION PROJECT ANNUAL ACTIVITIES REPORT … · mega lift irrigation project annual activities report 2016-17 ... civil works like intake well, ... mega lift irrigation

S No Description of Work UoM Quantity

1 Pump House No 13

2 Intake Well No 13

3 Delivery Chamber No 13

4 MSDSS No 7

5 DSS No 13

6 Rising Main Pipe (MS) Km 39.3

7 Distribution Line (DI) Km 166.5

8 Distribution Line (HDPE) Km 230

9 Intake Pipe (RCC) Km 3.5

Major Scope of the Project, Cluster- VIII

Page 15: MEGA LIFT IRRIGATION PROJECT ANNUAL ACTIVITIES REPORT … · mega lift irrigation project annual activities report 2016-17 ... civil works like intake well, ... mega lift irrigation

S. No. Description of Work UoM Quantity

10 VT Pumps No 44

11 EOT Cranes No 13

12 Sluice Gates No 13

13 Transmission Line Km 140

14 Excavation Cum 2058656

15 Concreting Cum 29735

16 Shuttering Sqm 109289

17 Reinforcement MT 2478

18 Structural Fabrication MT 183

19 Pipe Painting Sqm 257920

Major Scope of the Project, Cluster- VIII

Page 16: MEGA LIFT IRRIGATION PROJECT ANNUAL ACTIVITIES REPORT … · mega lift irrigation project annual activities report 2016-17 ... civil works like intake well, ... mega lift irrigation

a) Cumulative Expenditure Till FY 2016-17

S No FY 2015-2016 FY 2016-2017 Total

1 24,15,54,454/- 1,63,37,45,573/- 1,87,53,00,027/-

Original works expenditure details to EPC Contractor ( M/s L&T Ltd),

Cluster- VIII

b) Consultancy Charges in FY- 2016-17 i. PEC- M/s Aarvee Associates - 1,55,84,170/- ii. PMC- M/s TUV-SUD South Asia Pvt. Ltd. - 53,13,223/- iii. TPIA- M/s SGS India Pvt. Ltd. - 54,62,607/-

Page 17: MEGA LIFT IRRIGATION PROJECT ANNUAL ACTIVITIES REPORT … · mega lift irrigation project annual activities report 2016-17 ... civil works like intake well, ... mega lift irrigation

PRESENT STATUS, Cluster- VIII Pump House Delivery Chamber Intake well MSDSS

Scope – 13 No’s Scope – 13 No’s Scope – 13 No’s Scope – 7 No’s

Present Status: 4 No’s – PH Sump Well Wall Lift in progress. 1 No’s – Raft in progress. 4 No’s – PH Excavation in progress. 4 No’s - 70% Excavation completed.

Present Status: 5 No’s Completed. 4 No’s Wall in

progress. 4 No’s Excavation

under progress.

Present Status: 4 No’s will be started

by Dec’17 & Balance 9 No’s will be started in Mar’18

Present Status: 7 MSDSS Control

Room, Foundations & Cable trenches work in progress.

MS Pipe DI Pipe HDPE Pipe

Scope – 39.3 Km Scope – 166.5 Km Scope – 230 Km

Present Status: 17.4 Km laying completed. MS Pipe Laying works stopped due to crop cultivation & monsoon.

Present Status: 85 Km laying completed. DI Pipe Laying works stopped due to crop cultivation & monsoon.

Present Status: 39 Km laying completed. HDPE Pipe Laying works stopped due to crop cultivation & monsoon.

Page 18: MEGA LIFT IRRIGATION PROJECT ANNUAL ACTIVITIES REPORT … · mega lift irrigation project annual activities report 2016-17 ... civil works like intake well, ... mega lift irrigation

SCHEME WISE PRESENT STATUS, Cluster- VIII Name of

Schemes CCA Ha.

DC Pump House MS Pipe

Ach./Scope in km

DI Pipe Ach./Scope

in km

HDPE Pipe Ach./Scope

in km MSDSS

Bandhakani 1100 Completed 70% Excavation

Completed

52% 0.66/1.3

33% 4.5/13

0% 0/14

-

Baliroi 1050 Completed 70% Excavation

Completed

64% 2/3.2

55% 5/9

11% 2/18 MSDSS-3:

80% Completed

Daunra 1200 Excavation In

Progress Excavation Completed

96% 5.5/6

79% 9.3/12

50% 7.5/15

Bhatsingh 1150 Completed 70% Excavation

Completed

0% 0/3

71% 7.8/11

50% 9/18 MSDSS-2:

33% Completed

Bhulkabahal 1000 4/16 wall lifts

completed Excavation In Progress

20% 0.5/2.5

42% 3.5/8

0% 0/15

Baghamari 1000 Excavation In

Progress PCC & Raft In Progress

68% 0.5/0.7

50% 5.8/12

0% 0/10

MSDSS-1: 64%

Completed

Page 19: MEGA LIFT IRRIGATION PROJECT ANNUAL ACTIVITIES REPORT … · mega lift irrigation project annual activities report 2016-17 ... civil works like intake well, ... mega lift irrigation

SCHEME WISE PRESENT STATUS, Cluster- VIII Name of

Schemes CCA Ha

Delivery Chamber

Pump House MS Pipe

Ach./Scope in km

DI Pipe Ach./Scope

in km

HDPE Pipe Ach./Scope

in km MSDSS

Kulsura 1750 4/8 wall lifts completed

Excavation In Progress 65% 2.5/4

64% 12.7/20

0% 0/20 MSDSS-4:

52% Completed

Khajurikhaman 1500 1/12 wall lifts In

Progress 50% Excavation Completed

0% 0/3

28% 5.2/19

0% 0/21

Satakuta 600 Completed 2/8 Sump Wall lifts

Completed

62% 0.7/1

96% 2.8/2.9

98% 10.2/10.4

-

Birtola 1500 Completed 8/8 Sump Wall lifts

Completed

84% 2.5/3

30% 3.5/12

32% 7.5/23

MSDSS-7: 71%

Completed

Kandhal 1700 7/12 wall lifts

completed 30% Excavation Completed

0% 0/5

57% 11/20

0% 0/25

MSDSS-5: 56%

Completed Masinta 1650 Excavation In

Progress 2/7 sump well wall lifts

completed

82% 2.5/3

36% 7/19

9% 2/22

Jangla 1000 1/13 wall lifts

completed

3/7 sump well wall lifts completed

0% 0/4

81% 6.6/8

7% 1/17

MSDSS-6: 28%

Completed

Page 20: MEGA LIFT IRRIGATION PROJECT ANNUAL ACTIVITIES REPORT … · mega lift irrigation project annual activities report 2016-17 ... civil works like intake well, ... mega lift irrigation

PROGRESS PHOTOGRAPHS, Cluster- VIII Pump House Works

Birtola Satakuta Masinta

Kulsura Baghamari Jangla

Page 21: MEGA LIFT IRRIGATION PROJECT ANNUAL ACTIVITIES REPORT … · mega lift irrigation project annual activities report 2016-17 ... civil works like intake well, ... mega lift irrigation

PROGRESS PHOTOGRAPHS, Cluster- VIII Pump House Works

Bhukhabahal Bhatsingh

Baliroi

Daunra

Bandhakani Khajurikhaman Kandhal

Page 22: MEGA LIFT IRRIGATION PROJECT ANNUAL ACTIVITIES REPORT … · mega lift irrigation project annual activities report 2016-17 ... civil works like intake well, ... mega lift irrigation

PROGRESS PHOTOGRAPHS, Cluster- VIII Delivery Chamber Works

BALIROI BIRTOLA SATAKUTA BANDHAKANI

Page 23: MEGA LIFT IRRIGATION PROJECT ANNUAL ACTIVITIES REPORT … · mega lift irrigation project annual activities report 2016-17 ... civil works like intake well, ... mega lift irrigation

PROGRESS PHOTOGRAPHS, Cluster- VIII Pipe Laying Works

MS PIPE DI PIPE HDPE PIPE

Page 24: MEGA LIFT IRRIGATION PROJECT ANNUAL ACTIVITIES REPORT … · mega lift irrigation project annual activities report 2016-17 ... civil works like intake well, ... mega lift irrigation

PROGRESS PHOTOGRAPHS, Cluster- VIII MSDSS Control Room Building Works

Page 25: MEGA LIFT IRRIGATION PROJECT ANNUAL ACTIVITIES REPORT … · mega lift irrigation project annual activities report 2016-17 ... civil works like intake well, ... mega lift irrigation

PROGRESS PHOTOGRAPHS , Cluster- VIII Pole Erection & Tower Foundation

Page 26: MEGA LIFT IRRIGATION PROJECT ANNUAL ACTIVITIES REPORT … · mega lift irrigation project annual activities report 2016-17 ... civil works like intake well, ... mega lift irrigation

TL & RE Visit

Sub Collector,Deogarh visit for convincing to local people for

Baghmari Scheme.

DIGNITARY PHOTOGRAPHS VISITING CLUSTER- VIII SITES

SE & EE Visit

Meeting convened for sensitizing local people regarding benefits of Baghmari

Scheme,Deogarh.

PD-cum-CE, SE, EE, PMC & PEC Visit

PD-cum-CE, SE, EE, PMC & PEC Visit

Page 27: MEGA LIFT IRRIGATION PROJECT ANNUAL ACTIVITIES REPORT … · mega lift irrigation project annual activities report 2016-17 ... civil works like intake well, ... mega lift irrigation

MEGA LIFT IRRIGATION PROJECT

ANNUAL ACTIVITIES REPORT 2016-17

FOR

CLUSTER – XII

EXECUTIVE ENGINEER, MEGA LIFT PROJECTS, KEONJHAR

( Total 16 nos. of schemes in the district of Sundergarh & Jharsuguda)

Page 28: MEGA LIFT IRRIGATION PROJECT ANNUAL ACTIVITIES REPORT … · mega lift irrigation project annual activities report 2016-17 ... civil works like intake well, ... mega lift irrigation

Cluster XII – Job Synopsis Execution of 16 nos. of Lift Irrigation Schemes with intake points in Ibb, Sapei and Basundhara river having

Command area between 500Ha. to 2000 Ha. in Cluster No.XII in the district of Sundergarh and Jharsuguda including

its distribution network, up to 4 Ha Chak having total planned Culturable Command Area of 21,300 Ha. on “EPC –

Turn Key” basis including power system connectivity and Operation & Maintenance of complete commissioned

schemes for five years.

• EPC Contractor : M/s L&T Ltd.

• Agreement Value : ₹ 594.99 Cr

(Part-I Works : ₹ 588.59 Cr)

(Part-II O& M : ₹ 6.40 Cr)

• Date of Commencement : 26.12.2016

• Stipulated Date of Completion : 30 Months (25.06.2019)

• No. of Schemes : 16 (3 River)

• District Covered : Sundergarh (15 Scheme)

: Jharsuguda (1 Schemes)

• Proof Engineering Consultant (PEC) : M/s. WAPCOS Ltd.

• Project Management Consultant (PMC) : M/s. MMIPL Ltd.

• Third Party Inspection Agency (TPIA) : M/s. SGS India Pvt. Ltd. & M/s. CIPET

Page 29: MEGA LIFT IRRIGATION PROJECT ANNUAL ACTIVITIES REPORT … · mega lift irrigation project annual activities report 2016-17 ... civil works like intake well, ... mega lift irrigation

Project Overview - Geographical Location in the state of Odisha Cluster-XII

Bhubaneswar

Cluster XII

12

CL

CL CL

CL

CL

CL

CL

Page 30: MEGA LIFT IRRIGATION PROJECT ANNUAL ACTIVITIES REPORT … · mega lift irrigation project annual activities report 2016-17 ... civil works like intake well, ... mega lift irrigation

Project Location, Cluster- XII

CLUSTER –XII No of Schemes -16

Page 31: MEGA LIFT IRRIGATION PROJECT ANNUAL ACTIVITIES REPORT … · mega lift irrigation project annual activities report 2016-17 ... civil works like intake well, ... mega lift irrigation

Cluster XII – Scheme & District wise Details

4%

96%

CCA in Ha.

Jharsuguda-800 Ha Sundergarh-20500 Ha

SL NO. SCHEME NAME DISTRICT CCA

(Ha.)

1 Chichinda Jharsuguda 800

2 Bileigarh-1 Sundergarh 2000

3 Bileigarh-2 Sundergarh 2000

4 Bharatpur Sundergarh 700

5 Semina-1 Sundergarh 2000

6 Semina-2 Sundergarh 2000

7 Bandhapali Sundergarh 1300

8 Amasaranga Sundergarh 1400

9 Badkachhar Sundergarh 1200

10 Teleimalti Sundergarh 1000

11 Bargaon Sundergarh 700

12 Phulbari Sundergarh 1200

13 Dainidihi Sundergarh 2000

14 Katingdihi Sundergarh 2000

15 Ghoghar Sundergarh 500

16 Kusumara Sundergarh 500

Total 21300

Page 32: MEGA LIFT IRRIGATION PROJECT ANNUAL ACTIVITIES REPORT … · mega lift irrigation project annual activities report 2016-17 ... civil works like intake well, ... mega lift irrigation

River

Intake

Pipe

Pump

House

Intake

Well

Rising

Main

Substation

Transmission

Lines

Outlet

Management

System

Distribution Network

till 4 Ha Chak

Branch Line

CCA varying from

500 to 2000 Ha

Minors

Typical Schematic Diagram - Cluster XII in the District of Sundergarh & Jharsuguda.

Showing Pressure Networks operated through SCADA.

Page 33: MEGA LIFT IRRIGATION PROJECT ANNUAL ACTIVITIES REPORT … · mega lift irrigation project annual activities report 2016-17 ... civil works like intake well, ... mega lift irrigation

S No Description of Work UoM Quantity

1 Pump House No 16

2 Intake Well No 16

3 MSDSS No 8

4 DSS No 16

5 Distribution Main Pipe (DI) Km 223

6 Distribution Line (HDPE) Km 914

7 Intake Pipe (RCC) Km 1.5

8 VT Pumps No 56

9 EOT Cranes No 16

10 Sluice Gates No 16

11 Transmission Line Km 95

12 Excavation Cum 561168

13 Concreting Cum 27327

14 Shuttering Sqm 126703

15 Reinforcement MT 2632

16 Structural Fabrication MT 185

Major Scope of the Project , Cluster-XII

Page 34: MEGA LIFT IRRIGATION PROJECT ANNUAL ACTIVITIES REPORT … · mega lift irrigation project annual activities report 2016-17 ... civil works like intake well, ... mega lift irrigation

Cumulative Expenditure Till FY 2016-17

S No FY 2015-2016 FY 2016-2017 Total

1 - 21,78,00,000 21,78,00,000

Original works expenditure details to EPC Contractor (M/s L&T Ltd), Cluster -XII

Page 35: MEGA LIFT IRRIGATION PROJECT ANNUAL ACTIVITIES REPORT … · mega lift irrigation project annual activities report 2016-17 ... civil works like intake well, ... mega lift irrigation

PRESENT STATUS, Cluster-XII

Pump House Intake well MSDSS

Scope – 16 No’s Scope – 16 No’s Scope – 8 No’s

Present Status: Survey Work in Progress.

Present Status: Survey Work in Progress.

Present Status: Survey Work in Progress.

DI Pipe HDPE Pipe RCC Pipe

Scope – 223 Km Scope – 914 Km Scope – 1.5 Km

Present Status: 102Km pipe received at site.

Present Status: 197 Km pipe received at site.

Present Status: Procurement in progress.

Page 36: MEGA LIFT IRRIGATION PROJECT ANNUAL ACTIVITIES REPORT … · mega lift irrigation project annual activities report 2016-17 ... civil works like intake well, ... mega lift irrigation

SCHEME WISE PRESENT STATUS, Cluster-XII

SL NO. SCHEME NAME DISTRICT CCA

(Ha.) STATUS

1 Chichinda Jharsuguda 800

Survey work in progress.

2 Bileigarh-1 Sundergarh 2000

3 Bileigarh-2 Sundergarh 2000

4 Bharatpur Sundergarh 700

5 Semina-1 Sundergarh 2000

6 Semina-2 Sundergarh 2000

7 Bandhapali Sundergarh 1300

8 Amasaranga Sundergarh 1400

9 Badkachhar Sundergarh 1200

10 Teleimalti Sundergarh 1000

11 Bargaon Sundergarh 700

12 Phulbari Sundergarh 1200

13 Dainidihi Sundergarh 2000

14 Katingdihi Sundergarh 2000

15 Ghoghar Sundergarh 500

16 Kusumara Sundergarh 500

Total 21300

Page 37: MEGA LIFT IRRIGATION PROJECT ANNUAL ACTIVITIES REPORT … · mega lift irrigation project annual activities report 2016-17 ... civil works like intake well, ... mega lift irrigation

PROGRESS PHOTOGRAPHS, Cluster-XII Survey Work in Progress

Survey works by L&T Staff Rechecking of Survey works by AE & AEE

Page 38: MEGA LIFT IRRIGATION PROJECT ANNUAL ACTIVITIES REPORT … · mega lift irrigation project annual activities report 2016-17 ... civil works like intake well, ... mega lift irrigation

PROGRESS PHOTOGRAPHS, Cluster-XII Survey Work in Progress

Survey works by L&T Staff & Rechecking the Same by AE & AEE

Page 39: MEGA LIFT IRRIGATION PROJECT ANNUAL ACTIVITIES REPORT … · mega lift irrigation project annual activities report 2016-17 ... civil works like intake well, ... mega lift irrigation

Office Address :-

O/o Executive Engineer, Megalift Projects, At/Po-Kashipur,

Keonjhar - 758001

e-mail id - [email protected]

Divisional Office Setup at Keonjhar :-

Assistant Executive Engineer – 3Nos

Assistant Engineer – 1No.

Supporting Staff – Sr. Clerk, Data Entry Operator and

Peon-cum-Messenger