ORGANICA Etyek WWTP Etyek, HUNGARY Detailed Case Study
Transcript
Page 1: Organica Water - South Pest retrofit boosting …...Reasons for Choosing Organica •The treatment plant provides a capacity that not only satisfies the continuously increasing wastewater

ORGANICA

Etyek WWTP Etyek, HUNGARY

Detailed Case Study

Page 2: Organica Water - South Pest retrofit boosting …...Reasons for Choosing Organica •The treatment plant provides a capacity that not only satisfies the continuously increasing wastewater

© 2016 Organica Water

Etyek Wastewater Treatment Plant

2

Page 3: Organica Water - South Pest retrofit boosting …...Reasons for Choosing Organica •The treatment plant provides a capacity that not only satisfies the continuously increasing wastewater

© 2016 Organica Water 3

Project Background

Project: Municipal WWTP

Population Served 8 334

ProcessBiological treatment, biological phosphorus removal plus

co-precipitation

Hydraulic capacity 1 000 m3/day

Year of Completion 2007

Duration of Construction 8 months

Duration of Commissioning 6 months

Handover of Operations to Municipality

2007

Page 4: Organica Water - South Pest retrofit boosting …...Reasons for Choosing Organica •The treatment plant provides a capacity that not only satisfies the continuously increasing wastewater

© 2016 Organica Water 4

Project Background

• Development limits were the primary factor driving theneed for a new wastewater treatment facility in themunicipality. The proposal of a major film studio in thetown could not be realized with the existing wastewatertreatment plant which in itself was aging and inefficient.

• The initial effluent limits at the original WWTP, usingA2O technology became stricter, and given hugefluctuations in influent quality and quantity from localwine production, this became an increasing challengefor the Town’s wastewater treatment process.

• As water usage slightly decreased over the years,contaminant concentration increased, further loadingthe existing WWTP.

• To make the film studio project successful, the realestate developer sought an independent technicalsolution which could preserve land value and meet theeffluent limits even with the difficult conditions

Page 5: Organica Water - South Pest retrofit boosting …...Reasons for Choosing Organica •The treatment plant provides a capacity that not only satisfies the continuously increasing wastewater

© 2016 Organica Water 5

Reasons for Choosing Organica

• The treatment plant provides a capacitythat not only satisfies the continuouslyincreasing wastewater treatmentdemands of the settlement, but alsotreats the WW from the new Korda FilmStudio

• The unique architectural design in agreenhouse fit the rural nature of thecommunity in a smaller footprint than anyother solution considered.

• The small size of the plant made itpossible to construct the new WWTPwhile the original WWTP was in operation,thus removing the requirement topurchase additional land.

Page 6: Organica Water - South Pest retrofit boosting …...Reasons for Choosing Organica •The treatment plant provides a capacity that not only satisfies the continuously increasing wastewater

© 2016 Organica Water 6

Design Parameters

Parameter Influent (mg/L) Effluent/Limit (mg/L)

COD 1 000 100

BOD 500 30

NH4-N 75 10

TN 100 35

TP 15 5

TSS 416 50

Water temperature Min. 12oC Max. 25oC

Page 7: Organica Water - South Pest retrofit boosting …...Reasons for Choosing Organica •The treatment plant provides a capacity that not only satisfies the continuously increasing wastewater

© 2016 Organica Water 7

Chemistry and Performance Data

• Water quality of both influent wastewater and treated effluent is measured regularly according to local regulations.

• This study includes monthly data values for all major water quality parameters, as certified by an independent 3rd party lab

• Spot samples are taken of raw influent, as well as finished water effluent

Page 8: Organica Water - South Pest retrofit boosting …...Reasons for Choosing Organica •The treatment plant provides a capacity that not only satisfies the continuously increasing wastewater

© 2016 Organica Water 8

Performance Summary – 2007-2015

Parameter Influent (mg/L) Effluent (mg/L) Limit (mg/L)

COD 632 42.8 100

BOD 325.6 7.2 30

NH4-N 78.8 4 10

TN 99.1 16.7 35

TP 10.2 2.8 5

TSS 282.6 10.9 50

Sample period: 2007-2015 averages from monthly spot samples, based on certified third party results (available on request)

Page 9: Organica Water - South Pest retrofit boosting …...Reasons for Choosing Organica •The treatment plant provides a capacity that not only satisfies the continuously increasing wastewater

© 2016 Organica Water 9

BOD Concentrations

In spite of exceedances of design influent limits, the WWTP is able to produce effluent quality under the required limits

0

100

200

300

400

500

600

700

Influent BOD5 Effluent BOD5

Design BOD5 Limit BOD5

Page 10: Organica Water - South Pest retrofit boosting …...Reasons for Choosing Organica •The treatment plant provides a capacity that not only satisfies the continuously increasing wastewater

© 2016 Organica Water 10

Total Nitrogen Concentrations

Regulations require the effluent limits to be met only when the influent concentrations are within the design limits. The above chart shows that in spite of significant exceedances in influent design limits, the system we able to meet the TN limit throughout the period with one lone exception, that exception being a result of TN and Ammonia exceedance along with operator error.

0

50

100

150

200

250

Influent TN Effluent TN

TN Limit Design TN

Page 11: Organica Water - South Pest retrofit boosting …...Reasons for Choosing Organica •The treatment plant provides a capacity that not only satisfies the continuously increasing wastewater

© 2016 Organica Water

Etyek Facility – Exterior I.

11

Page 12: Organica Water - South Pest retrofit boosting …...Reasons for Choosing Organica •The treatment plant provides a capacity that not only satisfies the continuously increasing wastewater

© 2016 Organica Water 12

Etyek Facility – Exterior II.

Page 13: Organica Water - South Pest retrofit boosting …...Reasons for Choosing Organica •The treatment plant provides a capacity that not only satisfies the continuously increasing wastewater

© 2016 Organica Water 13

Etyek Facility – Interior I.

Page 14: Organica Water - South Pest retrofit boosting …...Reasons for Choosing Organica •The treatment plant provides a capacity that not only satisfies the continuously increasing wastewater

© 2016 Organica Water

Etyek Facility – Interior II.

14

Page 15: Organica Water - South Pest retrofit boosting …...Reasons for Choosing Organica •The treatment plant provides a capacity that not only satisfies the continuously increasing wastewater